June 25, 2007Mr. Gary Van MiddlesworthVice-President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785
SUBJECT:
DUANE ARNOLD NUCLEAR POWER STATION, INFORMATION REQUESTFOR AN NRC BIENNIAL PERMANENT MODIFICATIONS AND 10 CFR 50.59 (MOD/50.59) BASELINE INSPECTION
Dear Mr. Van Middlesworth:
On September 24, 2007, the NRC will begin a Modifications and 10 CFR 50.59 (MOD/50.59)baseline inspection at the Duane Arnold Nuclear Power Station. This inspection will be performed in accordance with the NRC baseline Inspection Procedures IP 71111.02 and IP 71111.17. The on-site portion of the inspection will take place on September 24 through September 28, 2007 and October 15 through October 19, 2007.Experience has shown that these baseline inspections are extremely resource intensive, bothfor the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into three groups.
The first group is necessary to ensure that the inspection team is adequately prepared for the inspection. This information should be available to the Regional Office no later than July 26, 2007. The inspection team will review this information and, by August 7, 2007, will request specific items that should be available for review by September 10, 2007. The second group of requested documents contains additional items that the team will review, or need access to, during the inspecti on. Certain documents in Group II. (1) will be requested forreview in the Regional Office the week prior to the inspection. The remaining documents should be available by the first day of the on-site inspection, September 24, 2007. The third group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.The lead inspector for this inspection is Mr. Robert Daley. We understand that our regulatorycontact for this inspection is Bob Murrell (319) 851-7900 of your organization. If there are anyquestions about the inspection or the material requested, please contact the lead inspector at (630) 829-9749 or via e-mail at RCD@nrc.gov.
G. Van Middlesworth-2-In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter andits enclosure will be available electronically for public inspection in the NRC PublicDocument Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).Sincerely,/RA/David E. Hills, ChiefEngineering Branch 1 Division of Reactor Safety Docket No. 50-331; 72-032License No. DPR-49
Enclosure:
Modification and 50.59 Inspection Document Request (Information for Preparation Week and Information Available On-site During Inspection)cc w/encl:J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer R. Helfrich, Senior Attorney M. Ross, Managing Attorney W. Webster, Vice President, Nuclear Operations M. Warner, Vice President, Nuclear Operations Support R. Kundalkar, Vice President, Nuclear Engineering J. Bjorseth, Site Director D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs Chief Radiological Emergency Preparedness Section, Dept. Of Homeland Security D. McGhee, State Liaison Officer G. Van Middlesworth-2-In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter andits enclosure will be available electronically for public inspection in the NRC PublicDocument Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).Sincerely,David E. Hills, ChiefEngineering Branch 1 Division of Reactor Safety Docket No. 50-331; 72-032License No. DPR-49
Enclosure:
Modification and 50.59 Inspection Document Request (Information for Preparation Week and Information Available On-site During Inspection)cc w/encl:J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer R. Helfrich, Senior Attorney M. Ross, Managing Attorney W. Webster, Vice President, Nuclear Operations M. Warner, Vice President, Nuclear Operations Support R. Kundalkar, Vice President, Nuclear Engineering J. Bjorseth, Site Director D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs Chief Radiological Emergency Preparedness Section, Dept. Of Homeland Security D. McGhee, State Liaison OfficerDOCUMENT NAME: C:\FileNet\ML071770211.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIIRIIINAMERDaley: lsDHillsDATE06/25/0706/25/07OFFICIAL RECORD COPY G. Middlesworth-3-DISTRIBUTION
- TEB DWS RidsNrrDirsIrib GEG KGO SRI Duane Arnold
CAA1 DRPIII DRSIII PLB1 TXN INITIAL DOCUMENT REQUESTEnclosure 1MODIFICATIONS AND 50.59 INSPECTION DOCUMENT REQUESTInspection Report
- 05000331/2007007(DRS)Inspection Dates
- September 24 through October 19, 2007Inspection Procedures
- IP 71111- 02, "Changes, Tests, or Experiments"IP 71111- 17, "Permanent Plant Modifications"Lead Inspector
- R. Daley, Reactor Inspector(630) 829-9749I.Information Requested for In-Office Preparation WeekThe following information is requested by July 26, 2007, or sooner, to facilitate the selectionof specific items that will be reviewed during the on-site inspection week. The team will select specific items from the information requested below and submit a list to your staff by August 7, 2007. We will request that certain items be made available to the regional office during the week prior to the inspection (by September 10, 2007). We request that the remaining items selected from the lists be available and ready for review on the first day of inspection. All requested information should cover the time frame from the receipt of information for the last Permanent Modification inspection (October 18, 2005) to the present.
If you have any questions regarding this information, please call the team leader as soon as
possible.(1)List of "permanent plant modifications" to risk significant systems, structures orcomponents that are field work complete. (For the purpose of this inspection, permanent plant modifications include permanent: plant changes, design changes, set point changes, equivalency evaluations, suitability analyses, and commercial gradededications.)The list should contain the number of each document, the title, the revision (ordate), and the affected system. In addition to the list, please provide a description of each modification and a list of associated calculations and affected procedures. (2)List of all 10 CFR 50.59 completed evaluations involving: (a) calculations; (b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of analyses. This list shouldonly include 50.59 evaluations for the following:i)UFSAR changes that have been updated in accordance with 10 CFR50.71(e)(4) since September 6, 2005; INITIAL DOCUMENT REQUESTEnclosure 2ii)Modifications that are field work complete; andiii)Changes to calculations (or initiation of new calculations) that have beenissued. The list should contain the number and title of each document, a brief descriptionof the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). The list should NOT include any evaluations in which prior NRC approval was sought and obtained.(3)List of all 10 CFR 50.59 changes that have been screened out as not requiring a fullevaluation involving: (a) calculations; (b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of analyses. The list should contain the number and title of each document, a brief descriptionof the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies).(4)List of any modifications, procedure revisions, or UFSAR changes where it wasdetermined that 10 CFR 50.59 did not apply.(5)List of calculation changes that have been issued for use.
(6)List of corrective action documents (open and closed) that address plant permanentmodification or 10 CFR 50.59 issues, concerns, or processes. These documents should also include corrective action documents associated with modification and 50.59 change implementation.The list should contain the number, title and revision (or date) of each document,the affected system and corresponding documentation (if applicable), and should be sorted in order of significance.(7)Copies of procedures addressing the following: modifications, design changes, set pointchanges, equivalency evaluations or suitability analyses, commercial grade dedications,post-modification testing, 10 CFR 50.59 evaluation and screenings, and UFSAR updates.(8)UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide copies ofthe complete submittal.(9)Copy of the UFSAR change log (or a synopsis of changes). This should include all ofthe changes made to the UFSAR that were incorporated in the last 10 CFR 50.71(e)(4) submittal.(10)Name(s) and phone numbers for the regulatory and technical contacts.
INITIAL DOCUMENT REQUESTEnclosure 3(11)Current management and engineering organizational chart.II.Information Requested to be Available the Week Prior to Inspection (Request willbe made by August 7, 2007) or on First Day of Inspection (September 24, 2007)(1)Copies of all selected items from Section I. This includes copies of associateddocuments such as calculations, post-modification test packages, 10 CFR 50.59 evaluations or screenings, and any corrective action documents.(2)Copies of these documents do not need to be solely available to the team as long as theinspectors have easy and unrestrained access to them.a.Updated Final Safety Analysis Report;b.Original FSAR Volumes; c.Original SER and Supplements (for Original FSAR);
d.FSAR Question and Answers; e.Quality Assurance Plan; f.Technical Specifications; g.Latest IPE/PRA Report; h.Vendor Manuals; and i.The Latest 10 CFR 50.59 FSAR Update Submittal.(3)Please ensure that other supporting documents for the selected items have beenlocated and are readily retrievable as the team will likely be requesting these documents during the inspections. Examples of supporting documents are:a.Drawings supporting the modifications;b.Procedures affected by the modifications; and c.UFSAR change papers generated due to a 10 CFR 50.59evaluation.(4)Current management and engineering organizational chart.III.Information Requested to be provided th roughout the inspection(1)Copies of any corrective action documents generated as a result of the team's questionsor queries during this inspection.(2)Copies of the list of questions submitted by the team members and the status/resolutionof the information requested (provide daily during the inspection to each team member).If you have questions regarding the information requested, please contact the team leader.