Pages that link to "05000499/LER-2013-001"
Jump to navigation
Jump to search
The following pages link to 05000499/LER-2013-001:
Displayed 11 items.
- 05000499/LER-1997-003, Forwards LER 97-003-01,failure to Meet Requirements of TS 4.5.2.c Re Surveillance Insp of Containment for Loose Debris (← links)
- 05000499/LER-1992-007, Forwards LER 92-007-01 Re Unplanned ESF Actuation of Isolation Valve for above-seat Drain Line.Rev Addresses Results of Troubleshooting in Effort to Replicate Conditions Reported to Determine Cause of Event (← links)
- 05000499/LER-1998-002, Forwards LER 98-002-00,re Automatic Reactor Trip Due to low-low Level in SG 2A.Commitments Made by Util Are in Corrective Actions Section (← links)
- 05000499/LER-1999-003, Forwards LER 99-003-00 Re Esfa & Entry Into TS 3.0.3 Following Partial Loss of Offsite Power Due to Fault in Switchyard Circuit Breaker.Licensee Commitments Are Listed in Corrective Actions Section of LER (← links)
- 05000499/LER-1997-007, Forwards LER 97-007-00,for Stp,Unit 2 Re Manual Reactor Trip Due to Loss of Inventory in SG 2D.Commitments Listed (← links)
- 05000499/LER-1998-001, Forwards LER 98-001-00 Re Failure to Meet TS Requirements for Inoperable Sdg 21.LER Meets Special Rept Requirements of STP TS 4.8.1.1.3 & 6.9.2 Re Valid Failure of Sdg 21 on 971228 (← links)
- 05000499/LER-1998-004, Forwards LER 98-004-00,re Completion of Plant SD Required by TS 3.3.2.Commitments Made by Util Are Found in Corrective Action Section of Attachment (← links)
- 05000499/LER-1999-002, Forwards LER 99-002-00 Re Unit 2 Automatic Reactor Trip,Due to Loss of Power to Turbine Control Sys.Event Did Not Have Adverse Effect on Health & Safety of Public.Commitments Are Contained in Corrective Action Section of Encl (← links)
- 05000499/LER-1999-004, Forwards LER 99-004-00 Re non-compliance with TS 3.9.4 in That It Was Not Possible to Close Min of One of Personnel Air Lock Doors within 30 Minutes.Licensee Commitments Listed in Corrective Action Section of Attachment (← links)
- 05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER (← links)
- 05000499/LER-1999-006, Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment (← links)