Pages that link to "05000278/LER-2011-001"
Jump to navigation
Jump to search
The following pages link to 05000278/LER-2011-001:
Displayed 8 items.
- 05000278/LER-1998-004, Forwards LER 98-004-00 Re ESF Actuation of Rwcs Due to High Flow Signal During Sys Restoration on 980820 (← links)
- 05000278/LER-1999-001, Forwards LER 99-001-00 Re 990312 ESF Actuation of Rcics Due to High Steam Flow Signal During Sys Restoration.Rept Submitted Per 10CFR50.73(a)(2)(iv) (← links)
- 05000278/LER-1998-002, Forwards LER 98-002-00,reporting Failure to Meet TS Requirements for Unit 3 RCIC During Period When Overspeed Trip Function Could Have Resulted in Inadvertent Trip During RCIC Operation (← links)
- 05000278/LER-1998-001, Forwards LER 98-001-00,re Failure of 3A Core Spray Pump to Meet TS 3.5.1 as Result of Foreign Matl Intrusion Into Pump Impeller Area (← links)
- 05000278/LER-1999-004, Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv) (← links)
- 05000278/LER-1999-002, Forwards LER 99-002-01 to Correct Title Contained in Box (4) of LER Coversheet Form.Rev Does Not Change Reportability Requirements or Any Other Info Contained in Original Submittal of LER (← links)
- 05000278/LER-2023-002, Main Steam Isolation Valves Stroke Times Exceed Technical Specification Limit (← links)
- 05000278/LER-2023-001, Standby Liquid Control Pump Inoperable for Greater than LCO Window Due to Gas Intrusion (← links)