Pages that link to "05000267/LER-2023-001"
Jump to navigation
Jump to search
The following pages link to 05000267/LER-2023-001:
Displayed 21 items.
- 05000267/LER-1983-014, Forwards LER 83-014/03L-0.Detailed Event Analysis Encl (← links)
- 05000267/LER-1983-010, Forwards LER 83-010/03L-0.Detailed Event Analysis Encl (← links)
- 05000267/LER-1984-002, Final LER 84-002-01:on 840123,one of Three Bearing Water Pressure Differential Switches Found Inoperable.Caused by Dirt & Oil Accumulation on High Alarm Micro Switch.Switch Replaced (← links)
- 05000267/LER-1982-048, Final LER 82-048/03X-1:on 821207,primary Coolant to Purification Cooling Water Sys Leak Present in Purification Train B Helium Purification Cooler.Caused by Corrosion. Cooler Replaced (← links)
- 05000267/LER-1984-008, Forwards Addl Info Re Three CRDs & Orifice Assemblies That Failed to Scram During in-core back-EMF Testing,Per 850122 Telcon.Suppl to LER 84-008 Will Be Provided (← links)
- 05000267/LER-1976-024, Update 1 to LER 76-024:on 760726,circulator 1C Tripped on Buffer Upset Following Discharge Valve Opening During Helium Recirculator Return to Svc.Caused by Buffer Differential Pressure Exceeding Trip Point (← links)
- 05000267/LER-1983-009, Forwards LER 83-009/01T-0.Detailed Event Analysis Encl (← links)
- 05000267/LER-1983-005, Forwards LER 83-005/03L-0.Detailed Event Analysis Encl (← links)
- 05000267/LER-1982-045, Forwards LER 82-045/03L-0 (← links)
- 05000267/LER-1982-044, Forwards LER 82-044/03L-0.Detailed Event Analysis Encl (← links)
- 05000267/LER-1982-034, Forwards LER 82-034/03L-0.Detailed Event Analysis Encl (← links)
- 05000267/LER-1983-004, Forwards LER 83-004/03L-0.Detailed Event Analysis Encl (← links)
- 05000267/LER-1978-030, Forwards LER 78-030/03L-0 (← links)
- 05000267/LER-1988-008, Forwards LER 88-008-00 & Redistributes LER 87-004-02 W/Cover Ltrs P-88174 & P-88223 to Ensure Recipients Receipt (← links)
- 05000267/LER-1985-029, Forwards Info Prepared to Assist in Closing Out Open Items Resulting from Insp Rept 50-267/87-12 & Info Re Corrective Actions Discussed in LER 85-029.Cold Checkout Tests, Functional Tests & Specific Surveillance Tests Encl (← links)
- 05000267/LER-1950-267, Advises That Status Rept Re Corrective Actions Resulting from LER 50-267/86-017 Delayed Due to Further Investigation of Transient Effects on Helium Purification Sys.Commmitment Extended to 861219 (← links)
- 05000267/LER-1987-019, Forwards LER 87-019-00 & 870911 Preliminary Rept of Helium Circulator S/N C-2101 Damage Including Licensing Assessment (← links)
- 05000267/LER-1987-018, Summarizes Util Commitments to Support Continued Operation of Plant,Per 870911 Meeting W/Nrc Re Damage in Helium Circulator C-2101 (Ref LER 87-018) (← links)
- 05000267/LER-1986-029, Requests Interpretation of Applicability of 10CFR50.72 & 50.73 to Partial Spurious Reactor Protection Sys Scram Actuations,Per LER 86-029 Re Partial Actuation Caused by Radio Interference When Contactors Deenergized (← links)
- 05000267/LER-1986-017, Summarizes Status Rept on Corrective Actions Resulting from LER 86-017 Re Loop Shutdown Actuations & Manual Scram Due to Severe Snowstorm (← links)
- 05000267/LER-1982-025, Forwards LER 82-025/03L-1.Detailed Event Analysis Encl (← links)