Pages that link to "NL-16-1328, License Amendment Request Concerning Safety Limit Minimum Critical Power Ratio"
Jump to navigation
Jump to search
The following pages link to NL-16-1328, License Amendment Request Concerning Safety Limit Minimum Critical Power Ratio:
Displayed 31 items.
- NL-04-0563, Technical Specification Revision Request Integrated Leakage Rate Testing Interval Extension (← links)
- NL-03-2517, Application for Technical Specification Improvement to Revise TS 3.1.8, Scram Discharge Volume (SDV) Vent and Drain Valves, Using the Consolidated Line Item Improvement Process (← links)
- NL-03-2407, Technical Specifications Revision to a Unit Staff Position Title (← links)
- NL-03-2353, Proposed Technical Specification Revision to Primary Containment Leakage Rate Testing Program (← links)
- NL-03-1842, Technical Specifications Revision to Include Monitoring of Linear Heat Generation Rate (← links)
- NL-03-1563, TS Revision to Allow Fuel Movement with Refueling Interlock Inoperable (← links)
- ML031050264 (← links)
- ML031050221 (← links)
- ML031050209 (← links)
- ML023470521 (← links)
- ML023450276 (← links)
- ML022000324 (← links)
- ML021500525 (← links)
- ML020570320 (← links)
- ML020090172 (← links)
- NL-20-0785, Southern Nuclear Operating Co - Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements (← links)
- NL-21-0413, Supplement to Emergency License Amendment Request for Technical Specification 3.5.1 Re One-Time Extension of Completion Time for 2D RHR Pump (← links)
- NL-21-0411, Emergency License Amendment Request for Technical Specification 3.5.1 Regarding One-Time Extension of Completion Time for 2D RHR Pump (← links)
- NL-20-0843, License Amendment Request to Revise the Required Actions of Technical Specifications 3.8.1, AC Sources - Operating, for One-Time Extension of Completion Time for Unit 1 and Swing Emergency Diesel Generators (← links)
- NL-21-0852, Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable (← links)
- NL-21-0576, Units 1 and 2 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (← links)
- NL-21-0784, License Amendment Request: Revise Technical Specifications to Adopt TSTF-227, Revision to EOC-RPT Pump Actions and TSTF-297, Enhancements to Required Actions for Feedwater and Main Turbine High Water Level Trip (← links)
- NL-21-0722, Units 1 and 2, License Amendment Request: Revise Technical Specifications to Adopt TSTF-207-A, Completion Time for Restoration of Various Excessive Leakage Rates (← links)
- NL-21-1037, License Amendment Request to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling (← links)
- NL-21-0918, License Amendment Request to Revise the NFPA 805 Fire Protection Program. with Attachments 3 to 5 (← links)
- NL-22-0010, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 and Administrative. (← links)
- NL-22-0316, Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable (← links)
- NL-22-0335, Supplement to Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 And. (← links)
- NL-22-0406, Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (← links)
- NL-22-0757, Units 1 & 2, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (← links)
- NL-22-0832, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF . (← links)