Pages that link to "RS-22-050, Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds"
Jump to navigation
Jump to search
The following pages link to RS-22-050, Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds:
Displayed 50 items.
- RS-08-044, Additional Information Regarding Braidwood Station Relief Request I2R-48 (← links)
- RS-08-039, Third 10-Year Inservice Inspection Interval, Relief Request 13R-01, Request for Relief for Alternate Risk-Informed Selection and Examination Criteria for Examination Category B-F, B-J, C-F-1, and C-F-2 Pressure Retaining Piping Welds (← links)
- RS-08-014, Clarification to Byron Station Unit 2 Relaxation Request (← links)
- RS-06-039, Relaxation Request for First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors (← links)
- RS-18-123, Request for Alternative Follow-up Inspection for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(2) (← links)
- RS-18-074, Supplement to License Amendment Request to Utilize Accident Tolerant Fuel Lead Test Assemblies (← links)
- RS-18-041, Response to Request for Additional Information Regarding Request for Relief (I4R-07) for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened ... (← links)
- RS-18-027, License Amendment Request to Utilize Accident Tolerant Fuel Lead Test Assemblies (← links)
- RS-18-008, Correction to Inservice Inspection Program Third Interval Relief Request l3R-15 (← links)
- RS-17-054, Supplement to Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces (RS-16-049) (← links)
- RS-16-249, Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy (← links)
- RS-16-223, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- RS-16-231, Revised Response to Request for Additional Information for License Amendment Request for a One-Time Extension of the Essential Service Water (SX) Train Completion Time to Support 2A SX Pump Repair (← links)
- RS-16-222, Response to Request for Additional Information Related to License Amendment Request for a One-Time Extension of the Essential Service Water (SX) Train Completion Time to Support 2A SX Pump Repair (← links)
- RS-16-218, Response to Request for Additional Information License Amendment Request for a One-Time Extension of the Essential Service Water Train Completion Time to Support 2A SX Pump Repair (← links)
- RS-16-197, License Amendment Request for a One-Time Extension of the Essential Service Water (SX) Train Completion Time to Support 2A SX Pump Repair (← links)
- RS-16-145, Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- RS-16-088, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- RS-16-021, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- RS-16-020, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- RS-15-276, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- RS-15-267, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- RS-15-083, Request for Schedule Relief/Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- RS-15-003, Relief Request I3R-26 Associated with the Third 10-Year Lnservice Inspection Program Interval (← links)
- RS-14-242, Request for Schedule Relief/Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- RS-14-088, Relief Request 13R-23 to Extend the Reactor Vessel Inservice Inspection Interval (← links)
- RS-13-204, Response to Request for Additional Information Regarding the Steam Generator Tube Inspection Report, Braidwood, Unit 2, Refueling Outage 16 (← links)
- RS-11-065, Withdrawal of Alternative Requirements to NB-4450 on Seal Weld Repairs and Revision to Inservice Inspection Relief Request I3R-19: Alternative Requirements for the Repair of Reactor Vessel Head Penetrations (← links)
- RS-11-063, Regarding Supplement to Inservice Inspection Relief Request 13R-19: Alternative Requirements for the Repair of Reactor Vessel Head Penetrations (← links)
- RS-11-064, Revised Response to a Request for Additional Information Related to Inservice Inspection Relief Request I3R-19: Alternative Requirements for the Repair of Reactor Vessel Head Penetrations (← links)
- RS-11-051, Additional Information Regarding Inservice Inspection Relief Request I3R-19: Alternative Requirements for the Repair of Reactor Vessel Head Penetrations (← links)
- RS-11-045, Inservice Inspection Relief Request I3R-19: Alternative Requirements for the Repair of Reactor Vessel Head Penetrations (← links)
- RS-09-180, Supplement of Request for Relief from Requirements for Limited Examination of Reactor Vessel Head Penetration Welds in Accordance with 10 CFR 50.55a(a)(3)(i) (← links)
- RS-09-132, Supplement to Requests for Relief for Alternate Examination Frequency Under ASME Code Case N-729-1 and from Requirements for Limited Examination of Reactor Vessel Head Penetration Welds in Accordance with 10 CFR 50.55a(a)(3)(i) (← links)
- RS-18-129, Supplement to License Amendment Request to Utilize Tvel TVS-K Lead Test Assemblies (← links)
- RS-18-125, Proposed Alternative Requirements for the Repair and Examination of Reactor Pressure Vessel Head Penetration Nozzles for the Fourth Lnservice Inspection Interval in Accordance with 10 CFR 50.55a(z)(1) (← links)
- RS-18-124, Relief Request Alternative Requirements for the Repair and Examination of Reactor Vessel Head Penetrations for the Fourth Inservice Inspection Interval (← links)
- RS-18-102, License Amendment Request for a One-Time Extension to Technical Specification 3.8.1, AC Sources-Operating, Required Action A.2 (← links)
- RS-18-083, Response to Request for Additional Information Regarding Braidwood Station Fourth Inservice Inspection Interval Relief Request 14R-05 (← links)
- RS-18-055, Supplement to Relief Request I4R-03 Associated with the Fourth Inservice Inspection Interval (← links)
- RS-18-030, Relief Requests Associated with the Fourth Inservice Inspection Interval (← links)
- RS-17-163, Withdrawal of Relief Request RV-2 Associated with the Fourth Inservice Testing Interval (← links)
- RS-17-125, Relief Request RV-2 Associated with the Fourth Inservice Testing Interval (← links)
- RS-17-083, Inservice Inspection Program Third Interval Relief Requests 13R-12 and 13R-15 (← links)
- RS-17-036, Response to Request for Additional Information Regarding Relief Request I4R-10 (← links)
- RS-17-031, Correction to Relief Request 13R-17 to Extend the Reactor Pressure Vessel Inservice Inspection Interval (← links)
- RS-16-259, Response to Request for Additional Information for Relief Request I4R-10: Proposed Alternative Requirements for the Repair and Examination of Reactor Vessel Head Penetrations for the Fourth Inservice Inspection Interval (← links)
- RS-16-213, Response to Request for Additional Information Regarding Relief Request 13R-17 to Extend the Reactor Pressure Vessel Inservice Inspection Interval (← links)
- RS-16-224, Relief Request for Alternative Requirements for the Repair and Examination of Reactor Vessel Head Penetrations for the Fourth Inservice Inspection Interval (← links)
- RS-16-174, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review... (← links)