Pages that link to "WCAP-14036-P-A"
Jump to navigation
Jump to search
The following pages link to WCAP-14036-P-A:
Displayed 50 items.
- RC-11-0062, V. C. Summer, License Amendment Request - LAR 04-02961, License Amendment Request for Slave Relay Surveillance Testing (← links)
- ML103160469 (← links)
- ML103050177 (← links)
- ML102940288 (← links)
- ML102700197 (← links)
- ML101610312 (← links)
- ML101370383 (← links)
- ML101170367 (← links)
- ML101170148 (← links)
- ML100920160 (← links)
- ML100900167 (← links)
- ML100890320 (← links)
- ML100550501 (← links)
- ML100191500 (← links)
- ML092940593 (← links)
- ML092820156 (← links)
- ML091940191 (← links)
- ML091280276 (← links)
- RS-08-161, Braidwood, Units 1 and 2 - Technical Specification Bases (← links)
- ML090270474 (← links)
- ML083090047 (← links)
- ML082330474 (← links)
- ML082321278 (← links)
- ML081820247 (← links)
- ML081270228 (← links)
- ML16288A141 (← links)
- CP-201300130, Comanche Peak, Units 1 & 2, Technical Specification Bases, Revision 67 (← links)
- CP-201101065, Comanche Peak Units 1 & 2 Final Safety Analysis Report (Fsar), Amendment 104, Technical Specifications Bases (← links)
- CP-201000212, Technical Specifications Bases for Comanche Peak Steam Electric Station, Units 1 and 2 (← links)
- CP-200801015, Technical Specification Bases for Comanche Peak Steam Electric Station Units 1 & 2 (← links)
- ML073480445 (← links)
- ML073410682 (← links)
- ML063000026 (← links)
- ML18276A287 (← links)
- ML18275A340 (← links)
- TSTF-18-02, Technical Specifications Task Force - Transmittal of TSTF-569, Revision 0, Revise Response Time Testing Definition. (← links)
- TSTF-10-02, Transmittal of TSTF-521, Revision 0, Exclusion of Time Constants from Channel Operation Tests in Specifications 3.3.1 and 3.3.2 (← links)
- TSTF-18-06, TSTF Response to NRC Questions on TSTF-569, Revise Response Time Testing Definition (← links)
- RC-15-0171, License Amendment Request - LAR-15-01424, Implementation of WCAP-15376-P-A, Revision 1 - Risk-Informed Assessment of the RTS and ESFAS Surveillance Test Intervals and Reactor Trip Breaker Test and Completion Times. (← links)
- DCL-18-070, Technical Specification Bases, Revision 11 (← links)
- DCL-16-126, Revision 10 to Technical Specification Bases (← links)
- CNS-16-031, Technical Specification Bases Changes (← links)
- CNS-16-015, Technical Specification Bases Changes (← links)
- DCL-15-059, Technical Specification Bases, Revision 9 (← links)
- DCL-15-047, License Amendment Request 15-02 Revision of Updated Final Safety Analysis Report for Beacon Power Distribution Monitoring System Methodology and Technical Specification 5.6.5. Core Operating Limits Report (Colr), For... (← links)
- NL-14-1531, License Amendment Request for Adoption of TSTF-432-A, Rev. 1, Change in Technical Specifications End States (WCAP-16294), Using the Consolidated Line Item Improvement Process (← links)
- L-13-319, License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b (← links)
- DCL-13-092, Technical Specification Bases, Revision 8 (← links)
- DCL-13-043, Supplement to License Amendment Request 11-07. Process Protection System Replacement. (← links)
- DCL-12-050, Attachment 2 to DCL-12-050, Final Safety Analysis Report Changes for Process Protection System Replacement (← links)