Pages that link to "ML20069M318"
Jump to navigation
Jump to search
The following pages link to ML20069M318:
Displayed 23 items.
- BECO-84-088, Application for Amend to License DPR-35,consisting of Proposed Change 84-04,revising Tech Specs to Require Two Licensed Senior Reactor Operators When Plant Operating & Addressing NRC Change Request (← links)
- BECO-92-012, Application for Amend to License DPR-35.changing TS to Extend Reactor Protection Sys Instrumentation Surveillance Test Intervals from 1 Month to 3 Months to Provide for 12 & 6 H Allowable out-of-svc Times for Repairs & Tests (← links)
- BECO-92-039, Application for Amend to License DPR-35,changing TS Section 4.7 Re Primary Containment Integrity to Remove Words Each Operating Cycle for MSIV & Personnel Airlock Door Testing (← links)
- BECO-84-047, Application for Amend to License DPR-35,consisting of Proposed Change 84-03,revising Tech Specs Re Fire Protection (← links)
- BECO-84-044, Application to Amend License DPR-35,consisting of Proposed Change 84-01,changing Tech Specs to Remove Details of Section XI Inservice Insp Program (← links)
- BECO-84-045, Application for Amend to License DPR-35,consisting of Proposed Tech Spec Change 84-02 Allowing Increased Core Flow (← links)
- BECO-95-074, Application for Amend to License DPR-35,reflecting Use of Advanced GE-11 Fuel Design in Cycle 11 (← links)
- BECO-91-136, Application for Amend to License DPR-35,changing Tech Spec 3.5.D.2, RCIC Sys,Under Exigent Circumstances to Provide Limited Extension of 7-day LCO (← links)
- BECO-91-127, Application for Amend to License DPR-35,revising TS Section 3/4.12, Fire Protection, Per Generic Ltr 88-12.Amend Will Relocate Most of Existing Fire Protection TSs Into Fire Protection Program Ref in FSAR (← links)
- BECO-83-301, Application for Proposed Tech Spec Change 83-15 to License DPR-35,correcting Error in GE Oct 1983 Reload Licensing Submittal for Restart from Refueling Outage 6 (← links)
- BECO-83-300, Application for Amend to License DPR-35,consisting of Proposed Change 83-14 to Tech Specs Re Fire Protection. Change Represents Final Component of Changes Committed to in (← links)
- BECO-83-282, Application for Amend to License DPR-35,changing Tech Specs Re Fire Protection.Areas Include Fire Suppression Water Sys,Spray &/Or Sprinkler Sys & Fire Hose Stations.Upcoming Complete Submittal Should Be Considered as Application (← links)
- BECO-91-076, Application for Amend to License DPR-35,revising Thermal & Pressurization Limit Curves of Tech Specs Figures 3.6.1 & 3.6.2 & Adding New Curve to Figure 3.6.3 to Cover Operation Between 10 & 32 Effective Full Power Years (← links)
- BECO-94-127, Application for Amend to License DPR-35,revising Mode Conditions Under Scram Discharge Instrument vol-scram Trip Bypass in Table 3.2.C.1,required to Be Operable & Changes Associated Functional Test Frequency from Quarterly (← links)
- BECO-83-237, Application for Amend to License DPR-35,consisting of Proposed Change 83-9 to Revise Tech Spec 3/4.12 Re Fire Protection (← links)
- BECO-94-126, Application for Amend to License DPR-35,increasing Current EDG Allowed out-of-svc Time in Specification 3.5.F from 72 H to 7 Days (← links)
- BECO-94-128, Application for Amend to License DPR-35,revising Suppression Chamber Water Level Operating Range,Increasing & Revises Water Level Recorder Range in Response to Commitment from Insp 50-293/91-201 (← links)
- BECO-91-052, Revised Application for Amend to License DPR-35,changing Tech Spec Re Reactor Coolant Leakage Detection Sys at Plant (← links)
- BECO-94-098, Application for Amend to License DPR-35,requesting Change to Reflect Standard TSs Re Maintenance of Filled Discharge Pipe (← links)
- BECO-85-147, Application for Amend (Proposed Change 85-10) to License DPR-35,revising Tech Spec Table 3.1.1, Reactor Protection Sys (Scram) Instrumentation Requirement. Fee Paid (← links)
- BECO-91-013, Application for Amend to License DPR-35,changing Tech Specs to Establish Revised Basis for Safety Analyses Based on Results of GE Safer/Gestr LOCA Analysis Methodology (← links)
- BECO-90-136, Application for Amend to License DPR-35,revising Tech Specs to Upgrade Safety Limit Min Critical Power Ratio & Revise Operating Limit Min Critical Power Ratio.Revs Will Maximize Fuel Utilization During Fuel Cycle (← links)
- BECO-LTR-97-107, Application for Emergency Amend to License DPR-35,changing TS 3.7.A.5 as Pertains to Periodic Surveillance Testing of Check Valve 30-CK-432.Exemption from LCO Footnote Provides Would Expire When Testing Is Performed (← links)