Pages that link to "RA-21-0259, Response to Request for Additional Information for Request to Use Provisions of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI for Repair/ Replacement Activities in Accordance with 10 CFR 50.55a(g)(4"
Jump to navigation
Jump to search
The following pages link to RA-21-0259, Response to Request for Additional Information for Request to Use Provisions of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI for Repair/ Replacement Activities in Accordance with 10 CFR 50.55a(g)(4:
Displayed 8 items.
- RA-22-0133, Cycle 29, Revision 0, Core Operating Limits Report (COLR) (← links)
- RA-22-0102, Response to Request for Additional Information (RAI) Regarding Revision 1 of DPC-NE-1007-P, Conditional Exemption of the EOC Mtc Measurement Methodology (← links)
- RA-21-0304, Emergency Plan Revision 21-2 and 21-3 (← links)
- RA-22-0238, Relief Requested in Accordance with 10 CFR 50.55a(z)(2) for Pressurizer Power Operated Relief Valve (PORV) Block Valve 2NC-31 B Inservice Testing (← links)
- RA-23-0024, Response to Request for Additional Information (RAI) for Relief Request for RPV Reactor Coolant System Welds (← links)
- RA-23-0025, End of Cycle 28 (M1R28) Steam Generator Tube Inspection Report Response to Request for Additional Information (RAI) (← links)
- RA-23-0079, Cycle 29, Revision 0, Core Operating Limits Report (COLR) (← links)
- RA-23-0076, Supplement to Response to Request for Additional Information (RAI) Regarding McGuire Nuclear Station Unit 1 Spring, 2022 Outage Steam Generator Tube Inspection Report (← links)