Pages that link to "PNO-IV-87-043, on 870903,fire Occurred in Auxiliary Transformer & Switchgear Room 13.8 Kv Busing.Investigation Underway to Determine Cause of Electrical Fault & Resulting Fire"
Jump to navigation
Jump to search
The following pages link to PNO-IV-87-043, on 870903,fire Occurred in Auxiliary Transformer & Switchgear Room 13.8 Kv Busing.Investigation Underway to Determine Cause of Electrical Fault & Resulting Fire:
Displayed 5 items.
- PNO-IV-86-028A, on 860829,beam Lowered Through Equipment Hatch in Containment Bldg Fell,Striking Pipefitter on Head. Cause Not Stated.Pipefitter Suffered Massive Trauma & Died After Air Evacuation to Hosp.Press Release Issued (← links)
- PNO-IV-87-009A, on 870311,steam/water Hammer Event Occurred in Component Cooling Water Lines Servicing RHR HX Trains B & C.Caused by Operational Errors.After Cooldown from Hot Functional Testing,Sys Damage Will Be Repaired (← links)
- PNO-IV-87-009, on 870311,steam/water Hammer Event Occurred in Component Cooling Water Lines Servicing RHR HX Trains B & C. Caused by Operator Overlooking Step in Procedure.All Hot Functional Testing Put on Hold Pending Evaluation (← links)
- PNO-IV-90-034, on 900929,Unit 1 Manually Tripped & Will Remain Shutdown to Allow Repairs to Bellows in Low Pressure Turbine.Unit 2 Entered First Refueling Outage (← links)
- PNO-IV-93-033, on 931029,contractor Employee Suffered Heart Attack at Site Outside Protected Area.Employee Transported to Local Hosp Where He Later Died.State of Tx Informed (← links)