Pages that link to "ML20206J712"
Jump to navigation
Jump to search
The following pages link to ML20206J712:
Displayed 49 items.
- ML20247J806 (← links)
- ML20247G879 (← links)
- ML20247C456 (← links)
- ML20245F682 (← links)
- ML20236H422 (← links)
- ML20234D747 (← links)
- ML20217P396 (← links)
- ML20217G646 (← links)
- ML20217C449 (← links)
- ML20214S562 (← links)
- FVY-87-117, Application for Amend to License DPR-28,consisting of Proposed Change 143,revising Tech Spec Pages 39,53,61,65 & 67 to Address Addition of Equipment to Automatic Depressurization Sys.Fee Paid (← links)
- FVY-87-112, Application for Amend to License DPR-28,consisting of Suppl 1 to Proposed Change 85,changing Tech Specs Re Surveillance Testing of ECCS & Standby Liquid Control Equipment.Fee Paid (← links)
- ML20210R468 (← links)
- ML20210D324 (← links)
- ML20210D243 (← links)
- ML20210B541 (← links)
- ML20209G163 (← links)
- FVY-85-117, Suppl 1 to 841214 Application for Amend to License DPR-28, Consisting of Proposed Change 124,responding to NRC Concerns Re Containment Hydrogen/Oxygen Monitor & Control Room Toxic Gas Monitor (← links)
- FVY-85-104, Revised Application to Amend License DPR-28,revising Tech Specs to Delete Sections Associated W/Requirement That Valves in Equalizer Piping Between Recirculation Loops Be Closed During Reactor Operation (← links)
- BVY-97-106, Application for Amend to License DPR-28,amending App a to Modify TS to More Clearly Describe Separation of Switchgear Room Into Two Fire Areas & Incorporate Specifications for New Low Pressure CO2 Suppression Sys (← links)
- BVY-97-107, Application for Amend to License DPR-28,modifying TS to Update Section 6 in Order to Add & Revise Ref to NRC Approved Methodologies Which Will Be Used to Generate cycle- Specific Thermal Operating Limits in COLR (← links)
- BVY-99-134, TS Proposed Change 228 for License DPR-28,correcting Two Textual Errors & Changing Designation of Ref Figure (← links)
- BVY-99-132, TS Proposed Change 227 to License DPR-28,revising Activated Charcoal Testing Methodology IAW Guidance Provided in GL 99-02 (← links)
- BVY-97-130, Application for Amend to License DPR-28,revising & Clarifying Requirements of Offsite Power Sources (← links)
- BVY-99-119, TS Proposed Change 198 to License DPR-28,increasing Required Vol of Stored Fuel in Diesel Fuel Oil Storage Tank (← links)
- BVY-99-105, Supplemental Application for Amend to License DPR-28, Correcting Typographical Error & Clarifying Certain Changes to Requirements for High Pressure Core Cooling Sys Contained in TS (← links)
- BVY-99-104, TS Proposed Change 223 to License DPR-28,revising Reactor Core Spiral Reloading Pattern to Begin Around Srm.Submittal Entirely Supersedes Proposed Change 211 to TS (← links)
- BVY-99-106, TS Proposed Change 225 to License DPR-28,revising Definition of Surveillance Frequency to Incorporate Provisions That Apply Upon Discovery of Missed TS Surveillance (← links)
- BVY-97-165, Application for Amend to License DPR-28,revising Current Value for SLMCPR for Cycle 20,next Operating Cycle. Proprietary Summary of Plant SLMCPR Evaluation for Cycle 20, Encl.Proprietary Info Withheld,Per Encl GE Affidavit (← links)
- BVY-97-155, Application for Amend to License DPR-28,proposing Mod to Revise Requirements for Main Station Batteries (← links)
- BVY-98-165, TS Proposed Change 210 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation.Change 209,withdrawn (← links)
- BVY-98-119, LAR 206 to License DPR-58,correcting Error in TS 4.9.2 Re Calibr of Augmented Offgas Sys Hydrogen Monitors (← links)
- BVY-98-162, TS Proposed Change 209 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation (← links)
- BVY-98-118, Application for Amend to License DPR-28,consisting of TS Proposed Change 180,incorporating Number of Minor Corrections or Clarifications Which Enhance Clarity of TSs Without Materially Changing Meaning or Application (← links)
- BVY-98-130, TS Proposed Change 207 to License DPR-28,increasing Spent Fuel Storage Capacity of Util Spent Fuel Pool from 2,870 to 3,355 Fuel assemblies.Non-proprietary & Proprietary Rept Encl.Proprietary Rept Withheld (Ref 10CFR2.790(a)(4)) (← links)
- BVY-96-155, Application for Amend to License DPR-28,requesting Rev to TS to Relocate Fire Protection Requirements (← links)
- BVY-96-104, Application for Amend to License DPR-28,modifying Sections 2.2.B & 3.6.D.1 of Util TS & Accompanying Bases Section to Permit Operation W/Increased SRV & SV Setpoint Tolerance & to Permit Operation Up to 100% of Rated Power (← links)
- BVY-96-120, Application for Amend to License DPR-28,revising Existing Requirements Re Amount of Foam Concentrate Required to Support Operability of Recirculation Motor Generator Set Foam Sys in TS 3.13.G.1 & 3.13.G.2 (← links)
- FVY-84-129, Application for Proposed Change 122 to License DPR-28, Incorporating Required Setpoints & Tolerances,Limiting Conditions for Operation & Surveillance Requirements for Degraded Grid Protection Sys.Fee Paid (← links)
- FVY-84-130, Application for Amend to License DPR-28,revising Tech Specs to Update Primary Containment Bases to Incorporate Results of plant-unique Analysis Rept for Mark I Containment long-term Program.Fee Paid (← links)
- FVY-84-124, Application for Amend to License DPR-28,changing Tech Specs Re safety-related Shock Suppressors (← links)
- FVY-84-146, Application to Amend License DPR-28,changing Tech Specs to Incorporate Addition of post-accident Instrumentation & Associated Limiting Conditions for Operation & Surveillance Requirements,Per NUREG-0737.Fee Paid (← links)
- BVY-91-125, Application for Amend to License DPR-28,consisting of Proposed Change 164 to TS Deleting Specific Supervisory Titles from Section 6.2 Re Composition of Plant Operations Review Committee (← links)
- BVY-94-123, Application for Amend to License DPR-28 to Change Instrument Identification for ECCS Actuation Instrumentation (← links)
- BVY-94-105, Proposed Change 177 to License DPR-28,replacing TS 3.7.B, Pages 152,153 & 154 Re Standby Gas Treatment Power Supply Requirements During Refueling Operations (← links)
- BVY-94-103, Application for Amend to License DPR-28,consisting of Proposed Change 174,removing Neutron Flux Instrumentation from Post Accident Monitoring TS (← links)
- BVY-94-109, Application for Amend to License DPR-28,consisting of Proposed Change 178,updating TS Requirements for Procurement & Testing of Diesel Fuel Oil by Using 1993 Version of Std D975 (← links)
- FVY-82-129, Application to Amend License DPR-28,revising App a Tech Specs to Reflect Administrative Changes.Class II Fee Encl (← links)
- BVY-93-134, Application for Amend to License DPR-28,proposing Changes to TS by Removing Requirement to Perform Jet Pump Integrity & Operability Surveillances in Idle Loop During Operation W/One Recirculation Pump (← links)