{{#Wiki_filter:August 16, 2012   
{{#Wiki_filter:August 16, 2012  
    
   Matthew W. Sunseri, President and  Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS   
   Matthew W. Sunseri, President and  Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS   
   SUBJECT:  WOLF CREEK NUCLEAR OPERATING CORPORATION - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000482/2012005 AND REQUEST FOR INFORMATION)  Dear Mr. Sunseri:  From October 1, 2012 to October 5, 2012, inspectors from the Nuclear Regulatory  
 
   SUBJECT:  WOLF CREEK NUCLEAR OPERATING CORPORATION - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000482/2012005 AND REQUEST FOR INFORMATION)  
   Dear Mr. Sunseri:  
  From October 1, 2012 to October 5, 2012, inspectors from the Nuclear Regulatory  
Commission's (NRC) Region IV office will perform the baseline biennial requalification inspection at Wolf Creek Nuclear Operating Corporation, using NRC Inspection Procedure 71111.11B, "Licensed Operator Requalification Program."  Experience has shown that this inspection is a resource intensive inspection both for the NRC inspectors and your staff.  In order to minimize the impact to your onsite resources and to ensure a productive inspection,  
Commission's (NRC) Region IV office will perform the baseline biennial requalification inspection at Wolf Creek Nuclear Operating Corporation, using NRC Inspection Procedure 71111.11B, "Licensed Operator Requalification Program."  Experience has shown that this inspection is a resource intensive inspection both for the NRC inspectors and your staff.  In order to minimize the impact to your onsite resources and to ensure a productive inspection,  
we have enclosed a request for documents needed for this inspection.  These documents have been divided into three groups.  The first group (Section A of the enclosure) identifies information to be provided prior to the inspection to ensure that the inspectors are adequately prepared.  The second group (Section B of the enclosure) identifies the information the inspectors will need upon arrival at the site.  The third group (Section C of this enclosure)  
we have enclosed a request for documents needed for this inspection.  These documents have been divided into three groups.  The first group (Section A of the enclosure) identifies information to be provided prior to the inspection to ensure that the inspectors are adequately prepared.  The second group (Section B of the enclosure) identifies the information the inspectors will need upon arrival at the site.  The third group (Section C of this enclosure)  
identifies the items which are necessary to close out the inspection and are usually sent a few weeks after the team has left the site.  It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.  We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. J. Knapp of your operations training organization.  Our inspection dates are subject to change based on your updated schedule of examination activities.  UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511  
identifies the items which are necessary to close out the inspection and are usually sent a few weeks after the team has left the site.  It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.  
Mr. Sunseri - 2 -  If there are any questions about this inspection or the material requested, please contact the lead inspector Mr. C. Osterholtz at (817)-200-1269 (Clyde.Osterholtz@nrc.gov) or  Ms. T. Buchanan at (817)-200-1503 (Theresa.Buchanan@nrc.gov).  This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection  
  We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. J. Knapp of your operations training organization.  Our inspection dates are subject to change based on your updated schedule of examination activities.  UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511  
requirements were approved by the Office of Management and Budget, control number 3150-0018.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.  
Mr. Sunseri - 2 -  
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  Sincerely,  
  If there are any questions about this inspection or the material requested, please contact the lead inspector Mr. C. Osterholtz at (817)-200-1269 (Clyde.Osterholtz@nrc.gov) or  Ms. T. Buchanan at (817)-200-1503 (Theresa.Buchanan@nrc.gov
                                                                                       /RA/ C. Osterholtz for   
).  This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection  
  Mark S. Haire, Chief  Operations Branch  Division of Reactor Safety  Docket:  50-482  
requirements were approved by the Office of Management and Budget, control number 3150-0018.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
License:  NPF-42  50-313 License:  DPDR-51  Enclosure:  
Inservice Inspection Document Request  Electronic Distribution for Wolf Creek Nuclear Operating Corporation   
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
Mr. Sunseri - 3 -  Electronic distribution by RIV:  Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov) Acting DRS Director (Tom.Blount@nrc.gov)
   Sincerely,  
Acting DRS Deputy Director (Patrick.Louden@nrc.gov) Senior Resident Inspector (Chris.Long@nrc.gov) Resident Inspector (Charles.Peabody@nrc.gov) WC Administrative Assistant (Shirley.Allen@nrc.gov) Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)
                                                                                       /RA/ C. Osterholtz for  
Senior Project Engineer, DRP/B (Leonard.Willoughby@nrc.gov) Project Engineer, DRP/B (Nestor.Makris@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Randy.Hall@nrc.gov) Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)
    
Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource 
  Mark S. Haire, Chief  Operations Branch  Division of Reactor Safety  
   
  Docket:  50-482  
   
License:  NPF-42  50-313 License:  DPDR-51  
R:\_REACTOR\_WC\WC2012BRQ LETTER(2).doc
  Enclosure:  
ADAMS Accession No.:  ML12229A537 ADAMS:    No      # Yes # SUNSI Review Complete Reviewer Initials:    CCO  #  Publicly Available # Non-Sensitive    Non-publicly Available  Sensitive RIV/DRS/OPS  DRS/OPS/Chief C. Osterholtz  M. Haire /RA/  /RA/COsterholtz for  8/16/2012    8/16/2012 OFFICIAL RECORD COPY                                        T=Telephone          E=E-mail        F=Fax   
Inservice Inspection Document Request  
Attachment 2 BRQ Info Request Template (remove this text before use)    - 1 - Enclosure  BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST  From: C. Osterholtz Senior Operations Engineer, NRC RIV 817-200-1269  To: J. Knapp Licensed Supervising Instructor/simulator, Wolf Creek Nuclear Operating Corporation  
  Electronic Distribution for Wolf Creek Nuclear Operating Corporation   
620-364-8831  Subj: Information Request to Support October 1-5, 2012, Licensed Operator Requalification Program Inspection (IP 71111.11B)   
 
  ML12229A537 ADAMS:    No      # Yes # SUNSI Review Complete Reviewer Initials:    CCO  
  #  Publicly Available  
# Non-Sensitive  
   Non-publicly Available  Sensitive RIV/DRS/OPS  
   DRS/OPS/Chief C. Osterholtz  M. Haire /RA/  /RA/COsterholtz for  8/16/2012    8/16/2012
Attachment 2 BRQ Info Request Template (remove this text before use)  
   - 1 - Enclosure  
  BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST  
  From: C. Osterholtz Senior Operations Engineer, NRC RIV 817-200-1269  
  To: J. Knapp Licensed Supervising Instructor/simulator, Wolf Creek Nuclear Operating Corporation  
620-364-8831  
  Subj: Information Request to Support October 1-5, 2012, Licensed Operator Requalification Program Inspection (IP 71111.11B)  
   
A. The following information is requested in order to support inspection preparation activities.  These items are listed by section as they appear in the inspection module  
A. The following information is requested in order to support inspection preparation activities.  These items are listed by section as they appear in the inspection module  
(ie 2.02, 2.04, etc). Requested materials should be sent either electronically or hardcopy in order to arrive at the Region IV office no later than September 21, 2012.  * Electronically To:  e-mail address  (Clyde.Osterholtz@nrc.gov) Cc: email address (Theresa.Buchanan@nrc.gov)  * Hardcopy to: US Nuclear Regulatory Commission, Region IV 1600 E. Lamar Blvd Arlington, TX 76011  
(ie 2.02, 2.04, etc). Requested materials should be sent either electronically or hardcopy in order to arrive at the Region IV office no later than September 21, 2012.  
ATTN:  C. Osterholtz  General Requests: * List of licensed operators (SRO & RO) by crew (operating & staff) * Training and Operations Department organization charts (with qualified LOR evaluators identified) * Procedures that identify process for revising and maintaining LO continuing training program up to date * List of outstanding LOR program changes * List of plant events and industry operating experience incorporated into LOR program since last BRQ * Audits and/or self-assessment reports addressing the licensed operator requalification training program * Last two years of simulator review committee (or equivalent) meeting minutes * Last two years of CRC (or equivalent) meeting minutes  02.03:  Biennial Requalification Written Examination Quality * The current and approved biennial written examination schedule  * The current requalification cycle written examination results for both SRO & RO that have already been administered up to the week prior to the inspection team arrival onsite.   
  * Electronically To:  e-mail address  (Clyde.Osterholtz@nrc.gov) Cc: email address (Theresa.Buchanan@nrc.gov)  
Attachment 2 BRQ Info Request Template (remove this text before use)    - 2 - Enclosure * All written examinations that have been approved for administration up to and including the week before the inspection team is onsite.  This will need to have  
  * Hardcopy to: US Nuclear Regulatory Commission, Region IV 1600 E. Lamar Blvd Arlington, TX 76011  
adequate password protection if e-mailed or double envelope protection if mailed via regular mail per NUREG-1021.  * The current requalification cycle examination methodology (sample plan)  02.04:  Annual Requalification Operating Test Quality * The schedule for the operating tests (JPMs & scenarios) to be given the week of  October 1, 2012 (week team is onsite) * The operating tests (JPMs & scenarios) (password protected and provide separately via telephone at later date) to be given the week of October 1, 2012 (week team is onsite) * Current requalification cycle operating tests (SRO & RO) and results up to the week prior to the inspection team arrival onsite. * All of the previous year's NRC required annual operating tests.  * Current requalification cycle operating test methodology (sample plan) * All portions of the UFSAR that identify operator response times for time critical operator actions  02.05:  Licensee Admin of Requal Exams * All procedures used to administer the annual operating test * All procedures used to assess operator performance * All procedures that describe conduct of simulator training * All Procedures used to test, operate, and maintain the simulator  02.06:  Requalification Examination Security * Submit any tracking tools that you use as a means to prevent excessive overlap on the written examinations and also meet the intent of sampling all required topics on a periodic basis.  * Submit any tracking tools that you use as a means to prevent excessive overlap on the operating tests and also meet the intent of sampling all required malfunctions (including major events, instrument/component malfunctions, TS calls, etc) on a  
ATTN:  C. Osterholtz  
periodic basis. * All Procedures that describe examination security, including procedures used to develop the examinations that include guidelines on overlap between examinations in current exam cycle tests and prior year examinations. * List of all Condition Reports since the last biennial requal inspection related to examination security and overlap.  02.07:  Licensee Remedial Training Program * List of remedial training conducted or planned since last requal exams (includes training provided to operators to enable passing requal exams and training provided to correct generic or individual weaknesses observed during previous requal exam  
  General Requests:
* List of licensed operators (SRO & RO) by crew (operating & staff)  
* Training and Operations Department organization charts (with qualified LOR evaluators identified)  
* Procedures that identify process for revising and maintaining LO continuing training program up to date  
* List of outstanding LOR program changes  
* List of plant events and industry operating experience incorporated into LOR program since last BRQ  
* Audits and/or self-assessment reports addressing the licensed operator requalification training program  
* Last two years of simulator review committee (or equivalent) meeting minutes  
* Last two years of CRC (or equivalent) meeting minutes  
  02.03:  Biennial Requalification Written Examination Quality
* The current and approved biennial written examination schedule   
* The current requalification cycle written examination results for both SRO & RO that have already been administered up to the week prior to the inspection team arrival onsite.   
Attachment 2 BRQ Info Request Template (remove this text before use)  
   - 2 - Enclosure  
* All written examinations that have been approved for administration up to and including the week before the inspection team is onsite.  This will need to have  
adequate password protection if e-mailed or double envelope protection if mailed via regular mail per NUREG-1021.   
* The current requalification cycle examination methodology (sample plan)  
  02.04:  Annual Requalification Operating Test Quality
* The schedule for the operating tests (JPMs & scenarios) to be given the week of  October 1, 2012 (week team is onsite)  
* The operating tests (JPMs & scenarios) (password protected and provide separately via telephone at later date) to be given the week of October 1, 2012 (week team is onsite) * Current requalification cycle operating tests (SRO & RO) and results up to the week prior to the inspection team arrival onsite.  
* All of the previous year's NRC required annual operating tests.   
* Current requalification cycle operating test methodology (sample plan)  
* All portions of the UFSAR that identify operator response times for time critical operator actions  
  02.05:  Licensee Admin of Requal Exams
* All procedures used to administer the annual operating test  
* All procedures used to assess operator performance  
* All procedures that describe conduct of simulator training  
* All Procedures used to test, operate, and maintain the simulator  
  02.06:  Requalification Examination Security
* Submit any tracking tools that you use as a means to prevent excessive overlap on the written examinations and also meet the intent of sampling all required topics on a periodic basis.   
* Submit any tracking tools that you use as a means to prevent excessive overlap on the operating tests and also meet the intent of sampling all required malfunctions (including major events, instrument/component malfunctions, TS calls, etc) on a  
periodic basis.  
* All Procedures that describe examination security, including procedures used to develop the examinations that include guidelines on overlap between examinations in current exam cycle tests and prior year examinations.  
* List of all Condition Reports since the last biennial requal inspection related to examination security and overlap.  
  02.07:  Licensee Remedial Training Program
* List of remedial training conducted or planned since last requal exams (includes training provided to operators to enable passing requal exams and training provided to correct generic or individual weaknesses observed during previous requal exam  
cycle). * Remediation plans (lesson plans, reference materials, and attendance documentation)   
cycle). * Remediation plans (lesson plans, reference materials, and attendance documentation)   
Attachment 2 BRQ Info Request Template (remove this text before use)    - 3 - Enclosure  02.08:  Conformance with Operator License Conditions * All Procedures and Program documentation for maintaining active operator licenses, tracking training attendance, and ensuring medical fitness of licensed operators * All Procedures and associated documentation that supports reactivation of any SRO/RO license (operating or staff crew) since the last biennial inspection  02.09:  Simulator Performance * For the following cases, send the most recent transient test packages, which may be electronic or in paper single test packages and shall be complete with test procedures for each test, the acceptance criteria, and results.  For each transient test, the reference chart should be included or an equivalent subject matter expert review versus the simulator results with a write-up for any differences beyond the ANSI 3.5 standard requirements:  
Attachment 2 BRQ Info Request Template (remove this text before use)  
o Transient test 9, Maximum size unisolable steam line rupture o Transient test 10, Stuck open PORV o Transient test 11, Maximum design load rejection o Steady state tests for low power levels * All Simulator Management and Configuration Procedures if not already provided for section 02.05 above. * Simulator Discrepancy Report summary list for all open DR's. For closed DR's, summary list for those items closed between September 2010 and September 2012.  * Malfunction Test Package  * Primary parameters tested in order to verify core physics parameters (such as MTC, IRW). The applicable reference graphs from the Plant physics data book (electronic or other means as available) should also be included as well as the test procedures used and the acceptance criteria with results.  02.10:  Problem Identification and Resolution * A summary report of all condition reports related to operator actions/errors in the control room * Any revised requalification training that was based on licensed operator performance issues   
   - 3 - Enclosure  
   02.08:  Conformance with Operator License Conditions
* All Procedures and Program documentation for maintaining active operator licenses, tracking training attendance, and ensuring medical fitness of licensed operators  
* All Procedures and associated documentation that supports reactivation of any SRO/RO license (operating or staff crew) since the last biennial inspection  
  02.09:  Simulator Performance
* For the following cases, send the most recent transient test packages, which may be electronic or in paper single test packages and shall be complete with test procedures for each test, the acceptance criteria, and results.  For each transient test, the reference chart should be included or an equivalent subject matter expert review versus the simulator results with a write-up for any differences beyond the ANSI 3.5 standard requirements:  
 
o Transient test 9, Maximum size unisolable steam line rupture  
o Transient test 10, Stuck open PORV  
o Transient test 11, Maximum design load rejection  
o Steady state tests for low power levels  
* All Simulator Management and Configuration Procedures if not already provided for section 02.05 above.  
* Simulator Discrepancy Report summary list for all open DR's. For closed DR's, summary list for those items closed between September 2010 and September 2012.   
* Malfunction Test Package   
* Primary parameters tested in order to verify core physics parameters (such as MTC, IRW). The applicable reference graphs from the Plant physics data book (electronic or other means as available) should also be included as well as the test procedures used and the acceptance criteria with results.  
  02.10:  Problem Identification and Resolution
* A summary report of all condition reports related to operator actions/errors in the control room  
* Any revised requalification training that was based on licensed operator performance  
issues   
B. The following information is requested in order to support the onsite inspection activities.  Requested materials should be available to the inspection team, either  
B. The following information is requested in order to support the onsite inspection activities.  Requested materials should be available to the inspection team, either  
electronically or hardcopy, upon site arrival on October 1, 2012.  02.02:  Exam Results  /  02.03 and 02.04:  Written Exam and Op Test Quality * All Operating tests (JPMs & scenarios) to be given in all subsequent weeks after onsite week * All results up to the day the team leaves the site.    
electronically or hardcopy, upon site arrival on October 1, 2012.  
Attachment 2 BRQ Info Request Template (remove this text before use)    - 4 - Enclosure 02.08:  Conformance with Operator License Conditions * Access to licensed operators' records (operating and staff crews) * Access to licensed operators' training attendance records * Access to licensed operators' medical records  02.09:  Simulator Performance * Simulator discrepancies (DR's) from September 2010 to September 2012.  This should include all open DR's and DR's that have been closed, including the documentation/justification for closure.  * Acceptance test documentation, including hardware and software model revisions at the time of acceptance (as available). * Documentation that validates current models, including the thermal-hydraulics and neutronics models, to the actual plant.  * All current model deficiencies, including FSAR vs Design differences in the simulator (any documentation on this) * Summary list of modifications from September 2010 to September 2012. * Plant Modifications (both hardware and software) completed on the Simulator by due date from September 2010 to September 2012. * Simulator Differences Lesson plan used in training (current to October 1, 2012). * The complete book of all Simulator annual performance test packages (usually in a single book, but may be electronic or in single test packages), complete with all transient tests, steady state tests, and malfunction tests.  This should also include the test procedures for each test, the acceptance criteria, and results.  For each transient test, the reference chart should be included or an equivalent subject matter expert review versus the simulator results with a write-up for any differences beyond the ANSI standard requirements. * All test packages used to verify core physics parameters (such as MTC, IRW).  The applicable reference graphs from the Plant physics data book (electronic or other means as available) should also be included as well as the test procedures used and the acceptance criteria with results. * All Simulator test, configuration management, and related documents available in the room for inspectors to review.  This includes training needs analysis packages, simulator review committee meeting minutes, etc. * Current copy of ANSI 3.5 standard you are committed to for Simulator testing.  02.10:  Problem Identification and Resolution * All condition reports related to operator actions/errors in the control room  C. Wolf Creek Nuclear Operating Corporation is required to send the final results summary and any remaining exams and operating tests that have not been reviewed to the regional office lead inspector for this inspection for final review and comparison against the Significance Determination Tools in order to communicate the exit results for the inspection.
  02.02:  Exam Results  /  02.03 and 02.04:  Written Exam and Op Test Quality
 
* All Operating tests (JPMs & scenarios) to be given in all subsequent weeks after onsite week  
* All results up to the day the team leaves the site.
 
Attachment 2 BRQ Info Request Template (remove this text before use)  
   - 4 - Enclosure 02.08:  Conformance with Operator License Conditions
* Access to licensed operators' records (operating and staff crews)  
* Access to licensed operators' training attendance records  
* Access to licensed operators' medical records  
  02.09:  Simulator Performance
* Simulator discrepancies (DR's) from September 2010 to September 2012.  This should include all open DR's and DR's that have been closed, including the documentation/justification for closure.   
* Acceptance test documentation, including hardware and software model revisions at the time of acceptance (as available).  
* Documentation that validates current models, including the thermal-hydraulics and neutronics models, to the actual plant.   
* All current model deficiencies, including FSAR vs Design differences in the simulator (any documentation on this)  
* Summary list of modifications from September 2010 to September 2012.  
* Plant Modifications (both hardware and software) completed on the Simulator by due date from September 2010 to September 2012.  
* Simulator Differences Lesson plan used in training (current to October 1, 2012).  
* The complete book of all Simulator annual performance test packages (usually in a single book, but may be electronic or in single test packages), complete with all transient tests, steady state tests, and malfunction tests.  This should also include the test procedures for each test, the acceptance criteria, and results.  For each transient test, the reference chart should be included or an equivalent subject matter expert review versus the simulator results with a write-up for any differences beyond the ANSI standard requirements.  
* All test packages used to verify core physics parameters (such as MTC, IRW).  The applicable reference graphs from the Plant physics data book (electronic or other means as available) should also be included as well as the test procedures used and the acceptance criteria with results.  
* All Simulator test, configuration management, and related documents available in the room for inspectors to review.  This includes training needs analysis packages, simulator review committee meeting minutes, etc.  
* Current copy of ANSI 3.5 standard you are committed to for Simulator testing.  
  02.10:  Problem Identification and Resolution
* All condition reports related to operator actions/errors in the control room  
  C. Wolf Creek Nuclear Operating Corporation is required to send the final results summary and any remaining exams and operating tests that have not been reviewed to the regional office lead inspector for this inspection for final review and comparison against the Significance Determination Tools in order to communicate the exit results for the inspection.
}}
}}

Revision as of 08:37, 26 July 2018

Wolf Creek Nuclear Operating Corporation - Notification of Inspection (NRC Inspection Report 05000482-12-005 and Request for Information
ML12229A537
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 08/16/2012
From: Haire M S
Operations Branch IV
To: Sunseri M W
Wolf Creek
Osterholtz C C /vlm
References
IR-12-005
Download: ML12229A537 (7)


See also: IR 05000482/2012005

Text

August 16, 2012

Matthew W. Sunseri, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS

SUBJECT: WOLF CREEK NUCLEAR OPERATING CORPORATION - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000482/2012005 AND REQUEST FOR INFORMATION)

Dear Mr. Sunseri:

From October 1, 2012 to October 5, 2012, inspectors from the Nuclear Regulatory

Commission's (NRC) Region IV office will perform the baseline biennial requalification inspection at Wolf Creek Nuclear Operating Corporation, using NRC Inspection Procedure 71111.11B, "Licensed Operator Requalification Program." Experience has shown that this inspection is a resource intensive inspection both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection,

we have enclosed a request for documents needed for this inspection. These documents have been divided into three groups. The first group (Section A of the enclosure) identifies information to be provided prior to the inspection to ensure that the inspectors are adequately prepared. The second group (Section B of the enclosure) identifies the information the inspectors will need upon arrival at the site. The third group (Section C of this enclosure)

identifies the items which are necessary to close out the inspection and are usually sent a few weeks after the team has left the site. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. J. Knapp of your operations training organization. Our inspection dates are subject to change based on your updated schedule of examination activities. UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511

Mr. Sunseri - 2 -

If there are any questions about this inspection or the material requested, please contact the lead inspector Mr. C. Osterholtz at (817)-200-1269 (Clyde.Osterholtz@nrc.gov) or Ms. T. Buchanan at (817)-200-1503 (Theresa.Buchanan@nrc.gov

). This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/ C. Osterholtz for

Mark S. Haire, Chief Operations Branch Division of Reactor Safety

Docket: 50-482

License: NPF-42 50-313 License: DPDR-51

Enclosure:

Inservice Inspection Document Request

Electronic Distribution for Wolf Creek Nuclear Operating Corporation

ML12229A537 ADAMS: No # Yes # SUNSI Review Complete Reviewer Initials: CCO

  1. Publicly Available
  1. Non-Sensitive

Non-publicly Available Sensitive RIV/DRS/OPS

DRS/OPS/Chief C. Osterholtz M. Haire /RA/ /RA/COsterholtz for 8/16/2012 8/16/2012

Attachment 2 BRQ Info Request Template (remove this text before use)

- 1 - Enclosure

BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST

From: C. Osterholtz Senior Operations Engineer, NRC RIV 817-200-1269

To: J. Knapp Licensed Supervising Instructor/simulator, Wolf Creek Nuclear Operating Corporation

620-364-8831

Subj: Information Request to Support October 1-5, 2012, Licensed Operator Requalification Program Inspection (IP 71111.11B)

A. The following information is requested in order to support inspection preparation activities. These items are listed by section as they appear in the inspection module

(ie 2.02, 2.04, etc). Requested materials should be sent either electronically or hardcopy in order to arrive at the Region IV office no later than September 21, 2012.

  • Electronically To: e-mail address (Clyde.Osterholtz@nrc.gov) Cc: email address (Theresa.Buchanan@nrc.gov)
  • Hardcopy to: US Nuclear Regulatory Commission, Region IV 1600 E. Lamar Blvd Arlington, TX 76011

ATTN: C. Osterholtz

General Requests:

  • List of licensed operators (SRO & RO) by crew (operating & staff)
  • Training and Operations Department organization charts (with qualified LOR evaluators identified)
  • Procedures that identify process for revising and maintaining LO continuing training program up to date
  • List of outstanding LOR program changes
  • List of plant events and industry operating experience incorporated into LOR program since last BRQ
  • Audits and/or self-assessment reports addressing the licensed operator requalification training program
  • Last two years of simulator review committee (or equivalent) meeting minutes
  • Last two years of CRC (or equivalent) meeting minutes

02.03: Biennial Requalification Written Examination Quality

  • The current and approved biennial written examination schedule
  • The current requalification cycle written examination results for both SRO & RO that have already been administered up to the week prior to the inspection team arrival onsite.

Attachment 2 BRQ Info Request Template (remove this text before use)

- 2 - Enclosure

  • All written examinations that have been approved for administration up to and including the week before the inspection team is onsite. This will need to have

adequate password protection if e-mailed or double envelope protection if mailed via regular mail per NUREG-1021.

  • The current requalification cycle examination methodology (sample plan)

02.04: Annual Requalification Operating Test Quality

  • The schedule for the operating tests (JPMs & scenarios) to be given the week of October 1, 2012 (week team is onsite)
  • The operating tests (JPMs & scenarios) (password protected and provide separately via telephone at later date) to be given the week of October 1, 2012 (week team is onsite) * Current requalification cycle operating tests (SRO & RO) and results up to the week prior to the inspection team arrival onsite.
  • All of the previous year's NRC required annual operating tests.
  • Current requalification cycle operating test methodology (sample plan)

02.05: Licensee Admin of Requal Exams

  • All procedures used to administer the annual operating test
  • All procedures used to assess operator performance
  • All procedures that describe conduct of simulator training
  • All Procedures used to test, operate, and maintain the simulator

02.06: Requalification Examination Security

  • Submit any tracking tools that you use as a means to prevent excessive overlap on the written examinations and also meet the intent of sampling all required topics on a periodic basis.
  • Submit any tracking tools that you use as a means to prevent excessive overlap on the operating tests and also meet the intent of sampling all required malfunctions (including major events, instrument/component malfunctions, TS calls, etc) on a

periodic basis.

  • All Procedures that describe examination security, including procedures used to develop the examinations that include guidelines on overlap between examinations in current exam cycle tests and prior year examinations.
  • List of all Condition Reports since the last biennial requal inspection related to examination security and overlap.

02.07: Licensee Remedial Training Program

  • List of remedial training conducted or planned since last requal exams (includes training provided to operators to enable passing requal exams and training provided to correct generic or individual weaknesses observed during previous requal exam

cycle). * Remediation plans (lesson plans, reference materials, and attendance documentation)

Attachment 2 BRQ Info Request Template (remove this text before use)

- 3 - Enclosure

02.08: Conformance with Operator License Conditions

  • All Procedures and Program documentation for maintaining active operator licenses, tracking training attendance, and ensuring medical fitness of licensed operators
  • All Procedures and associated documentation that supports reactivation of any SRO/RO license (operating or staff crew) since the last biennial inspection

02.09: Simulator Performance

  • For the following cases, send the most recent transient test packages, which may be electronic or in paper single test packages and shall be complete with test procedures for each test, the acceptance criteria, and results. For each transient test, the reference chart should be included or an equivalent subject matter expert review versus the simulator results with a write-up for any differences beyond the ANSI 3.5 standard requirements:

o Transient test 9, Maximum size unisolable steam line rupture

o Transient test 10, Stuck open PORV

o Transient test 11, Maximum design load rejection

o Steady state tests for low power levels

  • All Simulator Management and Configuration Procedures if not already provided for section 02.05 above.
  • Simulator Discrepancy Report summary list for all open DR's. For closed DR's, summary list for those items closed between September 2010 and September 2012.
  • Malfunction Test Package
  • Primary parameters tested in order to verify core physics parameters (such as MTC, IRW). The applicable reference graphs from the Plant physics data book (electronic or other means as available) should also be included as well as the test procedures used and the acceptance criteria with results.

02.10: Problem Identification and Resolution

  • A summary report of all condition reports related to operator actions/errors in the control room
  • Any revised requalification training that was based on licensed operator performance

issues

B. The following information is requested in order to support the onsite inspection activities. Requested materials should be available to the inspection team, either

electronically or hardcopy, upon site arrival on October 1, 2012.

02.02: Exam Results / 02.03 and 02.04: Written Exam and Op Test Quality

  • All Operating tests (JPMs & scenarios) to be given in all subsequent weeks after onsite week
  • All results up to the day the team leaves the site.

Attachment 2 BRQ Info Request Template (remove this text before use)

- 4 - Enclosure 02.08: Conformance with Operator License Conditions

  • Access to licensed operators' records (operating and staff crews)
  • Access to licensed operators' training attendance records
  • Access to licensed operators' medical records

02.09: Simulator Performance

  • Simulator discrepancies (DR's) from September 2010 to September 2012. This should include all open DR's and DR's that have been closed, including the documentation/justification for closure.
  • Acceptance test documentation, including hardware and software model revisions at the time of acceptance (as available).
  • Documentation that validates current models, including the thermal-hydraulics and neutronics models, to the actual plant.
  • All current model deficiencies, including FSAR vs Design differences in the simulator (any documentation on this)
  • Summary list of modifications from September 2010 to September 2012.
  • Plant Modifications (both hardware and software) completed on the Simulator by due date from September 2010 to September 2012.
  • Simulator Differences Lesson plan used in training (current to October 1, 2012).
  • The complete book of all Simulator annual performance test packages (usually in a single book, but may be electronic or in single test packages), complete with all transient tests, steady state tests, and malfunction tests. This should also include the test procedures for each test, the acceptance criteria, and results. For each transient test, the reference chart should be included or an equivalent subject matter expert review versus the simulator results with a write-up for any differences beyond the ANSI standard requirements.
  • All test packages used to verify core physics parameters (such as MTC, IRW). The applicable reference graphs from the Plant physics data book (electronic or other means as available) should also be included as well as the test procedures used and the acceptance criteria with results.
  • All Simulator test, configuration management, and related documents available in the room for inspectors to review. This includes training needs analysis packages, simulator review committee meeting minutes, etc.
  • Current copy of ANSI 3.5 standard you are committed to for Simulator testing.

02.10: Problem Identification and Resolution

  • All condition reports related to operator actions/errors in the control room

C. Wolf Creek Nuclear Operating Corporation is required to send the final results summary and any remaining exams and operating tests that have not been reviewed to the regional office lead inspector for this inspection for final review and comparison against the Significance Determination Tools in order to communicate the exit results for the inspection.