ML13029A511: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 14: | Line 14: | ||
| page count = 1 | | page count = 1 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:Draft Simulator Scenarios (containing ES | |||
-D-1 and ES-D-2) There were no Draft Simulator Scenarios for the North Anna 2012 | |||
-302 Exam (the Simulator portion of the Operating Test was waived).}} | |||
Revision as of 07:53, 19 July 2018
| ML13029A511 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 01/24/2013 |
| From: | NRC/RGN-II |
| To: | Virginia Electric & Power Co (VEPCO) |
| References | |
| 50-338/12-302, 50-339/12-302 | |
| Download: ML13029A511 (1) | |
Text
Draft Simulator Scenarios (containing ES
-D-1 and ES-D-2) There were no Draft Simulator Scenarios for the North Anna 2012
-302 Exam (the Simulator portion of the Operating Test was waived).