ML15231A836: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 20: | Line 20: | ||
__ Examination Level SRO Operating Test Number DB NRC 2015 Administrative Topic (See Note) | __ Examination Level SRO Operating Test Number DB NRC 2015 Administrative Topic (See Note) | ||
Type Code* Describe activity to be performed Conduct of Operations (SRO A1.1) | Type Code* Describe activity to be performed Conduct of Operations (SRO A1.1) | ||
N, R 2.1.20 (4.6) Ability to interpret and execute procedure steps JPM New Senior Reactor Operator review of manual RCS Leakage Calculation Conduct of | N, R 2.1.20 (4.6) Ability to interpret and execute procedure steps JPM New Senior Reactor Operator review of manual RCS Leakage Calculation Conduct of Operatio ns (SRO A1.2) | ||
N, R 2.1. 4 (3.8) Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, "no | N, R 2.1. 4 (3.8) Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, "no | ||
-solo" operation, maintenance of active license status, 10CFR55, etc JPM New Senior Reactor Operator license maintenance Equipment Control (SRO A2) N, R 2.2.17 (3.8) Knowledge of the process for managing maintenance activities during power operations, such as risk assessments, work prioritization, and coordination with the transmission system operator. JPM New Perform Risk Assessment Radiation Control (SRO A3) N, R 2.3.4 (3.7) Knowledge of radiation exposure limits under normal and emergency conditions. | -solo" operation, maintenance of active license status, 10CFR55, etc JPM New Senior Reactor Operator license maintenance Equipment Control (SRO A2) N, R 2.2.17 (3.8) Knowledge of the process for managing maintenance activities during power operations, such as risk assessments, work prioritization, and coordination with the transmission system operator. JPM New Perform Risk Assessment Radiation Control (SRO A3) N, R 2.3.4 (3.7) Knowledge of radiation exposure limits under normal and emergency conditions. | ||
JPM New Emergency Dose Authorization Emergency Procedures/Plan (SRO A4) N, S 2.4.43 (3.8) Knowledge of emergency communications systems and techniques JPM 253 Emergency Response Organization Notification NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics (which would require all 5 items). *Type Codes & Criteria (C)ontrol Room, (S)imulator, or Class(R)oom (D)irect from bank ( | JPM New Emergency Dose Authorization Emergency Procedures/Plan (SRO A4) N , S 2.4.43 (3.8) Knowledge of emergency communications systems and techniques JPM 253 Emergency Response Organization Notification NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics (which would require all 5 items). *Type Codes & Criteria (C)ontrol Room, (S)imulator, or Class(R)oom (D)irect from bank (< 3 for ROs; | ||
< 3 for ROs; | |||
< 4 for SROs & RO retakes) | < 4 for SROs & RO retakes) | ||
(N)ew or (M)odified from bank ( | (N)ew or (M)odified from bank (> 1) (P)revious 2 exams (< 1; randomly selected)}} | ||
> 1) (P)revious 2 exams ( | |||
< 1; randomly selected)}} | |||
Revision as of 23:34, 8 July 2018
| ML15231A836 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 03/06/2015 |
| From: | NRC/RGN-III |
| To: | FirstEnergy Nuclear Operating Co |
| Reeser D W | |
| Shared Package | |
| ML15217A099 | List: |
| References | |
| Download: ML15231A836 (1) | |
Text
NUREG-1021, R9 Supplement 1 FENOC Facsimile Rev. 1 ES-301 Administrative Topics Outline Form ES-301-1 Facility: Davis Besse Date of Examination:
__6/15/15 thru 6/26/15
__ Examination Level SRO Operating Test Number DB NRC 2015 Administrative Topic (See Note)
Type Code* Describe activity to be performed Conduct of Operations (SRO A1.1)
N, R 2.1.20 (4.6) Ability to interpret and execute procedure steps JPM New Senior Reactor Operator review of manual RCS Leakage Calculation Conduct of Operatio ns (SRO A1.2)
N, R 2.1. 4 (3.8) Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, "no
-solo" operation, maintenance of active license status, 10CFR55, etc JPM New Senior Reactor Operator license maintenance Equipment Control (SRO A2) N, R 2.2.17 (3.8) Knowledge of the process for managing maintenance activities during power operations, such as risk assessments, work prioritization, and coordination with the transmission system operator. JPM New Perform Risk Assessment Radiation Control (SRO A3) N, R 2.3.4 (3.7) Knowledge of radiation exposure limits under normal and emergency conditions.
JPM New Emergency Dose Authorization Emergency Procedures/Plan (SRO A4) N , S 2.4.43 (3.8) Knowledge of emergency communications systems and techniques JPM 253 Emergency Response Organization Notification NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics (which would require all 5 items). *Type Codes & Criteria (C)ontrol Room, (S)imulator, or Class(R)oom (D)irect from bank (< 3 for ROs;
(N)ew or (M)odified from bank (> 1) (P)revious 2 exams (< 1; randomly selected)