ML16130A564: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:'*' Dominion | {{#Wiki_filter:'*' Dominion Resources | ||
Resources | Services, Inc. Innsbrook | ||
Services, | |||
Inc. Innsbrook | |||
Technical | Technical | ||
Center 5000 Dominion | Center 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 May 2, 2016 U. S. Nuclear Regulatory | ||
Boulevard, | |||
2SE, Glen Allen, VA 23060 May 2, 2016 U. S. Nuclear Regulatory | |||
Commission | Commission | ||
Attention: | Attention: | ||
Document | Document Control Desk One White Flint North 11555 Rockville | ||
Control Desk One White Flint North 11555 Rockville | Pike Rockville, MD 20852-2738 | ||
Pike Rockville, | |||
MD 20852-2738 | |||
Serial No.: NLOS/MLW: | Serial No.: NLOS/MLW: | ||
Docket Nos.: License Nos.: DOMINION | Docket Nos.: License Nos.: DOMINION NUCLEAR CONNECTICUT, INC. (DNC) VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION) | ||
NUCLEAR CONNECTICUT, | |||
INC. (DNC) VIRGINIA | |||
ELECTRIC | |||
AND POWER COMPANY (DOMINION) | |||
MILLSTONE | MILLSTONE | ||
POWER STATION UNITS 2 AND 3 NORTH ANNA POWER STATION UNITS 1AND2 SURRY POWER STATION UNITS 1 AND 2 NRC REGULATORY | POWER STATION UNITS 2 AND 3 NORTH ANNA POWER STATION UNITS 1AND2 SURRY POWER STATION UNITS 1 AND 2 NRC REGULATORY | ||
| Line 45: | Line 35: | ||
50-280/281 | 50-280/281 | ||
DPR-65 NPF-49 NPF-4/7 DPR-32/37 | DPR-65 NPF-49 NPF-4/7 DPR-32/37 | ||
In response | In response to Nuclear Regulatory | ||
to Nuclear Regulatory | Commission (NRC) Regulatory | ||
Commission | Issue Summary 2015-16, Revision 1, "Planned Licensing | ||
(NRC) Regulatory | |||
Issue Summary 2015-16, | |||
Revision | |||
1, "Planned | |||
Licensing | |||
Actions Submittals | Actions Submittals | ||
for All Power Reactor Licensees," | for All Power Reactor Licensees," Attachments | ||
Attachments | |||
1 through 3 provide the requested | 1 through 3 provide the requested | ||
information | information | ||
on proposed | on proposed planned licensing | ||
planned licensing | |||
action submittals | action submittals | ||
for the next three calendar | for the next three calendar years for Millstone (MPS), North Anna (NAPS) and Surry (SPS) Power Stations. | ||
years for Millstone | Neither DNC nor Dominion currently | ||
(MPS), North Anna (NAPS) and Surry (SPS) Power Stations. | have power uprates planned in the nextfive years. The information | ||
Neither DNC nor Dominion | |||
currently | |||
have power uprates planned in the nextfive | |||
years. The information | |||
in the attachments | in the attachments | ||
is being voluntarily | is being voluntarily | ||
provided | provided to assist the NRC in planning for the necessary | ||
to assist the NRC in planning | |||
for the necessary | |||
resources | resources | ||
during the budget process. | during the budget process. Alterations | ||
Alterations | |||
to the planned licensing | to the planned licensing | ||
actions in Attachments | actions in Attachments | ||
1 through 3 will be communicated | 1 through 3 will be communicated | ||
to the appropriate | to the appropriate | ||
NRC Project Managers | NRC Project Managers as they occur. If you have any questions | ||
as they occur. If you have any questions | |||
concerning | concerning | ||
this information, | this information, please contact Michael Whitlock at (804) 273-3123. | ||
please contact Michael Whitlock | Sincerely, Mark D. Sartain Vice President | ||
at (804) 273-3123. | |||
Sincerely, | |||
Mark D. Sartain Vice President | |||
-Nuclear Engineering | -Nuclear Engineering | ||
Dominion | Dominion Nuclear Connecticut, Inc. Virginia Electric and Power Company Attachment | ||
Nuclear Connecticut, | |||
Inc. Virginia | |||
Electric | |||
and Power Company Attachment | |||
1: Table of Estimated | 1: Table of Estimated | ||
Licensing | Licensing | ||
| Line 113: | Line 81: | ||
Commission | Commission | ||
Region II Marquis One Tower 245 Peachtree | Region II Marquis One Tower 245 Peachtree | ||
Center Ave., NE, Suite 1200 Atlanta, | Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 | ||
Georgia 30303-1257 | |||
R. V. Guzman U.S. Nuclear Regulatory | R. V. Guzman U.S. Nuclear Regulatory | ||
Commission | Commission | ||
One White Flint North Mail Stop 08 C-2 11555 Rockville | One White Flint North Mail Stop 08 C-2 11555 Rockville | ||
Pike Rockville, | Pike Rockville, MD 20852-2738 | ||
MD 20852-2738 | |||
K. R. Cotton-Gross | K. R. Cotton-Gross | ||
U.S. Nuclear Regulatory | U.S. Nuclear Regulatory | ||
Commission | Commission | ||
One White Flint North Mail Stop 08 G-9A 11555 Rockville | One White Flint North Mail Stop 08 G-9A 11555 Rockville | ||
Pike Rockville, | Pike Rockville, MD 20852-2738 | ||
MD 20852-2738 | |||
Dr. V. Sreenivas | Dr. V. Sreenivas | ||
U. S. Nuclear Regulatory | U. S. Nuclear Regulatory | ||
Commission | Commission | ||
One White Flint North Mail Stop 08 G-9A 11555 Rockville | One White Flint North Mail Stop 08 G-9A 11555 Rockville | ||
Pike Rockville, | Pike Rockville, MD 20852-2738 | ||
MD 20852-2738 | NRC Senior Resident Inspector | ||
NRC Senior Resident | |||
Inspector | |||
Millstone | Millstone | ||
Power Station NRC Senior Resident | Power Station NRC Senior Resident Inspector | ||
Inspector | North Anna Power Station NRC Senior Resident Inspector | ||
North Anna Power Station NRC Senior Resident | |||
Inspector | |||
Surry Power Station Serial No. 16-023 Docket Nos.: 50-336/423 | Surry Power Station Serial No. 16-023 Docket Nos.: 50-336/423 | ||
50-338/339 | 50-338/339 | ||
| Line 149: | Line 110: | ||
Actions for Millstone | Actions for Millstone | ||
Power Station MILLSTONE | Power Station MILLSTONE | ||
POWER STATION -UNITS 2 & 3 DOMINION | POWER STATION -UNITS 2 & 3 DOMINION NUCLEA.R CONNECTICUT, INC. | ||
NUCLEA.R | |||
CONNECTICUT, | |||
INC. | |||
Table of Estimated | Table of Estimated | ||
Licensing | Licensing | ||
Actions Millstone | Actions Millstone | ||
Power Station Units 2 and 3 Docket Nos: 50-336/50-423 | Power Station Units 2 and 3 Docket Nos: 50-336/50-423 | ||
TSTF Number, If Projected | TSTF Number , If Projected | ||
Submittal | Submittal | ||
Outage Outage Related Can the NRC staff Proprietary | Outage Outage Related Can the NRC staff Proprietary | ||
| Line 165: | Line 123: | ||
Action Description/Title | Action Description/Title | ||
make the lnfonnallon | make the lnfonnallon | ||
C-ta any Date Related? | C-ta any Date Related? Date public? lnfonnatlon | ||
Date public? lnfonnatlon | |||
Millstone | Millstone | ||
Power Station Unit 2 and 3 Relief Request Relief Requests | Power Station Unit 2 and 3 Relief Request Relief Requests RR-04-23 and IR-03-28 to use UT in lieu of RT. 04/2016 Yes 102017 Yes No Millstone | ||
RR-04-23 | |||
and IR-03-28 | |||
to use UT in lieu of RT. 04/2016 Yes 102017 Yes No Millstone | |||
Power Station Unit 2 License Amendment | Power Station Unit 2 License Amendment | ||
LAR for Large Break LOCA Reanalysis | LAR for Large Break LOCA Reanalysis | ||
| Line 177: | Line 131: | ||
Power Station Unit 3 Exemptions | Power Station Unit 3 Exemptions | ||
Exemption | Exemption | ||
for AXIOM Lead Test Assembly | for AXIOM Lead Test Assembly 07/2016 Yes 402017 Yes No Millstone | ||
07/2016 Yes 402017 Yes No | |||
Power Station Unit 2 License Amendment | Power Station Unit 2 License Amendment | ||
LAR to Revise MPS2 TS 3.8.1.1 to add a required ACTION that 09/2016 Yes 402017 Yes No would reduce shutdown risk at MPS3. (RSST) Mill s tone Power Station Unit 3 Licen se Amendment | |||
LAR to Add New TS 3/4.7.15 for Main Feedwater | |||
Isolation , 12/2016 No Yes No Regulating, and Bypas s Valves Millstone | |||
Power Sta tion Un it 2 License Amendment | |||
Extension | Extension | ||
of Type A ILRT Interval | of Type A ILRT Interval to 15 Years. Rev ise TS for 10/2017 Yes 402018 Yes No Containment | ||
to 15 Years. | Leakage Rate Testi ng Requirements | ||
Leakage Rate | |||
Millstone | Millstone | ||
Power Station Units 2 and 3 License Amendment | Power Station Units 2 and 3 License Amendment | ||
| Line 198: | Line 145: | ||
Cross-Tie Connection | Cross-Tie Connection | ||
2017 No Yes No Millstone | 2017 No Yes No Millstone | ||
Power Station | Power Station Un it 3 License Amendment | ||
TSTF-556 | TSTF-556 LAR for Resolution | ||
LAR for Resolution | |||
of Open Phase Condition | of Open Phase Condition | ||
Bulletin | Bulletin 2012-01 -2017 No Yes No Design Vulnerability | ||
2012-01 -2017 No Yes No Design Vulnerability | in electric power system Millstone | ||
in electric | Power Station Un it 2 License Amendment | ||
power system Millstone | LAR to Revise SR 4.6.2.1.2.b to Increase RBCCW Minimum 2017 No Yes No Flow Rate to CAR Coolers from >500 gpm to >1700 gpm Millstone | ||
Power Station | |||
LAR to Revise SR 4.6.2.1.2.b to Increase | |||
RBCCW Minimum 2017 No Yes No Flow Rate to CAR Coolers from >500 gpm to >1700 gpm Millstone | |||
Power Station Unit 3 License Amendment | Power Station Unit 3 License Amendment | ||
TSTF- | TSTF-3 74 Modify TS requirements | ||
for EDG fuel oil testing 2017 No Yes No Millstone | for EDG fuel oil testing 2017 No Yes No Millstone | ||
Power Station Units 2 and 3 | Power Station Units 2 and 3 Licen se Amendment | ||
TSTF-552 Diesel Generator | TSTF-552 Diesel Generator | ||
Frequency | Frequency | ||
and Voltage Surveillance | and Voltage Surveillance | ||
2018 No Yes No Requirements | 2018 No Yes No Requirements. WCAP-17308-NP. Measurement | ||
. WCAP-17308-NP. Measurement | |||
Uncertainty | Uncertainty | ||
Recapture | Recapture (MUR) -Recovery of a Millston e Power Station Unit 2 License Amendment | ||
(MUR) -Recovery | |||
of a | |||
portion of the 2% measurements | portion of the 2% measurements | ||
Uncertainty | Uncertainty | ||
Required | Required by 2018 No Yes No Rono | ||
by 2018 No Yes No Rono | |||
Millstone | Millstone | ||
Power Station | Power Station Un it 2 License Amendment | ||
Delete Item 8 ( | Delete Item 8 (Cont ainment Water Level Narrow Range) from 2018 No Yes No Table 3.3-11 of TS 3.3.3.8 Mill sto ne Power Station Unit 3 License Amendment | ||
Extens ion of Type A ILRT I nterval to 15 Years. Revise TS for 1 0/2019 Yes 402020 Yes No Containment | |||
Leakage Rate Testing Requirements | Leakage Rate Testing Requirements | ||
Page 1of1 | Page 1of1 | ||
| Line 237: | Line 176: | ||
Licensing | Licensing | ||
Actions for North Anna Power Station NORTH ANNA POWER STATION-UNITS | Actions for North Anna Power Station NORTH ANNA POWER STATION-UNITS | ||
1 & 2 VIRGINIA | 1 & 2 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION) | ||
ELECTRIC | |||
AND POWER COMPANY (DOMINION) | |||
Table of Estimated | Table of Estimated | ||
Licensing | Licensing | ||
Actions North Anna Power Station Unit 1 and Unit 2 Docket Nos: 50-338/339 | Actions North Anna Power Station Unit 1 and Unit 2 Docket Nos: 50-338/339 | ||
Plant Name and Unit Number(s) | Plant Name and Unit Number(s) | ||
North Anna | North Anna Powe r Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 North Anna Power Station , Unit 1 North Anna Power Station , Un i ts 1 and 2 North A nna Power Station , Unit 1 North Anna Power Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 Licensing | ||
Action Type License Amendment | Action Type License Amendment | ||
License Amendment | License Amendment | ||
| Line 251: | Line 188: | ||
License Amendment | License Amendment | ||
License Amendment | License Amendment | ||
Li cense Amendment | |||
Lice n se Amendment | |||
Re l ief Request Relief Request Relief Request License Amendment | |||
License Amendment | License Amendment | ||
TSTF Number, If any TSTF-522 Licensing | |||
TSTF Number, If any TSTF-522 | |||
Licensing | |||
Action Description/Title | Action Description/Title | ||
EAL Revision | EAL Revision -Fuel clad degradation | ||
-Fuel clad degradation | and fue l clad barrier l oss ISFSI License Renewal (f or Pad 1 TN-32) Fuel Independent | ||
and | SBLOCA Analysis (TS Reference | ||
SBLOCA Analysis | Change/COLR Mod) Revision to Spent Fuel Criticality | ||
(TS Reference | Analysis -updated fuel design w/ 5% fuel enrichment | ||
Change/COLR Mod) Revision | LAR for PAD 5.0 and FSLOCA [Large Brea k] Adds Open Phase Condition (O P C) Isolat ion System operab i lity and surveillance | ||
to Spent Fuel Criticality | requireme nts for mitigation | ||
Analysis | |||
-updated fuel design w/ 5% fuel enrichment | |||
LAR for PAD 5.0 and FSLOCA [Large | |||
( | |||
requireme | |||
nts for mitigation | |||
of an OPC Revise the Environmental | of an OPC Revise the Environmental | ||
Protection | Protection | ||
Plan to Correct CFR References | Plan to Correct CFR References | ||
Revise the surveillance | Revise the surveillance | ||
requ i rements for TS 3.7.10 and 3.7.12 for the PREACS and MCR/ESGR Filters to operate them for greater than or equal to 15 minutes. Revise TS 5.5.10 to inco rporate the requirements | |||
Filters to operate them for greater than or equal to 15 minutes. Revise TS 5.5.10 to | |||
of Regulatory | of Regulatory | ||
Guide 1.52, revision | Guide 1.52 , revision 3 , which requires In-Place Filter Testing/Laboratory | ||
3, which requires | Testing to be extended to 24 months. Second Period Limited E xa mination Relief Request -N1-14-LMT-002 | ||
In-Place | Request to extend the reactor vesse l weld examinations | ||
Filter Testing/Laboratory | by ten years. The PWR Owner's Group analysis by Westinghouse | ||
Testing to be extended | has already been started. N1-14-NDE-008 | ||
to 24 months. Second Period Limited | |||
Relief Request -N1-14-LMT-002 | |||
Request to extend the reactor | |||
by ten years. The PWR Owner's Group analysis | |||
by Westinghouse | |||
has already been started | |||
. N1-14-NDE-008 | |||
I N2-14-NDE-003 | I N2-14-NDE-003 | ||
North Anna Unit 1 Fifth Interval | North Anna Unit 1 Fifth Interval ISi Program Relief Requests LAR to rely on off-site EMT's rather than on-site EMT's LAR to move the Local Emergency | ||
ISi Program Relief Requests | |||
LAR to rely on off-site | |||
EMT's rather than on-site EMT's LAR to move the Local Emergency | |||
Operations | Operations | ||
Facility | Facility (LEOF) to an EOF located at Innsbrook | ||
(LEOF) to an EOF located at Innsbrook | |||
Page 1of1 Projected | Page 1of1 Projected | ||
Submittal | Submittal | ||
Outage Outage Can the NRC staff Proprietary | Outage Outage Can the NRC staff Proprietary | ||
make the lnfonnatlon | make the lnfonnatlon | ||
Comments | Comments Date Related? Related Data public? Yes or No Information | ||
Date Related? Related Data public? Yes or No Information | 07/2 016 No Yes No 05/2016 No Yes No 08/2 016 No Yes Supports comp lia nce Yes with 10CFR50.46(c) 09/2016 No Ye s Yes 2018 No Yes Supports compliance | ||
07/ | |||
compliance | |||
Yes with 10CFR50.46(c) | Yes with 10CFR50.46(c) | ||
2nd Otr 2018 01/2017 Yes (NAPS1) Yes No 4th Otr 2020 (NAPS2) 2017 No Yes No 09/2016 No | 2nd Otr 2018 01/2017 Yes (NAPS1) Yes No 4th Otr 2020 (NAPS2) 2017 No Yes No 09/2016 No Ye s No 2017 No Yes No 07/2016 Yes 102018 Yes No 2018 Yes 302019 Yes No 2017 No Yes No 2017 No Yes No | ||
ATTACHMENT | ATTACHMENT | ||
3 Serial No. 16-023 Docket Nos.: 50-280/281 | 3 Serial No. 16-023 Docket Nos.: 50-280/281 | ||
Table of Estimated | Table of Estimated | ||
Licensing | Licensing | ||
Actions for Surry Power Station SURRY POWER STATION-UNITS 1 & 2 VIRGINIA | Actions for Surry Power Station SURRY POWER STATION-UNITS 1 & 2 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION) | ||
ELECTRIC | |||
AND POWER COMPANY (DOMINION) | |||
Table of Estimated | Table of Estimated | ||
Licensing | Licensing | ||
Actions Surry Power Station Unit 1 and Unit 2 Docket Nos: 50-280/281 | Actions Surry Power Station Unit 1 and Unit 2 Docket Nos: 50-280/281 | ||
Plant Name and Unit Number(*) | Plant Name and Unit Number(*) | ||
Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station | Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Un it s 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Un its 1 and 2 Surry Power Station Units 1 and 2 S urry Power Station Units 1 and 2 Surry Power Stat io n Units 1 and 2 Surry Power Station Un i ts 1 and 2 Surry Power Station Un i ts 1 and 2 Surry Power Stat i on Un i ts 1 and 2 Surry Power Stat io n Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Un its 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Un its 1 and 2 Surry Power Station Units 1 and 2 Licensing | ||
Action Type License Amendment | Action Type License Amendment | ||
License | License Amendme n t License Amendment | ||
License | License A m endment License Amendment | ||
License Amendment | License Amendment | ||
License Amendment | License Amendment | ||
License Amendment | License Amendment | ||
License Amendment | License Amendment | ||
Rel i ef Request License Amendment | |||
License Amendment | License Amendment | ||
License | License Ame ndm ent License Amendment | ||
License | License Ame ndm ent License Amendment | ||
License Amendment | License Amendment | ||
License Amendment | License Amendment | ||
| Line 343: | Line 256: | ||
Date Alternate | Date Alternate | ||
monitoring | monitoring | ||
of rod position | of rod position with one 05/2016 in operable rod position indicator | ||
with one 05/2016 | Revises Residual Heat Removal (RHR) and Com p onent Cooling (CC) Systems' TS 05/2016 Requirements | ||
rod position | |||
indicator | |||
Revises Residual | |||
Heat Removal (RHR) and | |||
TS 05/2016 Requirements | |||
and adds an RHR Surveillance | and adds an RHR Surveillance | ||
Re vises the Fue l Cladd i ng Barrier Degradation | |||
and 06/2016 Loss Emergency | and 06/2016 Loss Emergency | ||
Action | Action Le vel Thresholds | ||
Extends the Charging | Extends the Charging Pump Service Wa t er and MCR/ESGR AC Subsystems | ||
Pump Service | Flowpath Allowed 05/2016 Outage T i me from 24 to 72 hrs E xpands the Primary Grade (PG) Water Lo ckout TS 05/2016 Requirements | ||
AC Subsystems | |||
Flowpath | |||
Allowed 05/2016 Outage | |||
Extends the Emergency | Extends the Emergency | ||
Service Water Pump 06/2016 Allowed Outage Time from 7 to 14 days Adds Open Phase Condition | Service Water Pump 06/2016 Allowed Outage Time from 7 to 14 days Adds Open Phase Condition | ||
| Line 364: | Line 269: | ||
System operability | System operability | ||
and surveillance | and surveillance | ||
requ ireme nts 01/2017 for m i t i gat ion of an OPC Revises RCS Activity Limits and Dose 06/2016 Consequences | |||
Limits and Dose 06/2016 Consequences | for FHA , SGTR, MSLB and L RA TS change to extend ACT to permit replacement | ||
for FHA, SGTR, MSLB and | of the Reserve St at io n Service Transformer | ||
of the Reserve | C and and 03/2017 cable/bu s replacement | ||
C and and 03/2017 cable/ | |||
ISi Alternative | ISi Alternative | ||
Req uest to perm it use of CFRP application | |||
i n buried safety re l ated SW Pip i ng as 07/2016 pressure boundary Administrati | |||
boundary | ve change de l etes temporary/one-time TS AOTs/Requirements | ||
Administrati | |||
ve change | |||
/one-time | |||
TS AOTs/Requirements | |||
for previously | for previously | ||
completed | completed | ||
08/ | 08/2 016 chilled water pipe replacement | ||
project, and other | project , and other Rev ise d UFSAR Dose Analyses 09/2016 Fuel I ndependen t S BLOC A A na lysis 09/2016 Topical Report DOM-NAF-2 Appendix E (A GORA 12/2016 CHF Correlation) RLBL OCA for Vend or Qualification | ||
09/2016 Fuel | |||
t | |||
E ( | |||
) | |||
Program 04/2017 AGORA Vendor Qualificat | Program 04/2017 AGORA Vendor Qualificat | ||
i on Program Submitta l 04/201 7 Spent Fuel Poot Criticality | |||
An alys i s 2018 Full Spectrum LOCA An a lysis 2018 R elocation | |||
LOCA | of L eak Tes ting of Misce llan eous 2018 Rad ioactive Matera il s to TRM LAR to rely on off-s i te EMrs rather than on-site 2017 EM rs LAR to m ove the Local Emergen cy O pera tions 2017 Facili ty (LEOF) to an EOF located at Innsbrook | ||
of | |||
Page 1of1 Outage Outage Related Can the NRC staff Proprietary | Page 1of1 Outage Outage Related Can the NRC staff Proprietary | ||
make the Information | make the Information | ||
Comments | Comments Related? Date public? Yea or No Information | ||
Related? | No Yes No No Yes No No Yes No No Yes No No Yes No No Yes No Yes 2nd Qtr 2018 (SPS1) Yes No 4th Qtr 2018 (S PS2) No Yes No Yes Yes No 3rd Qtr 2018 Yes Yes No 2nd Qtr 2017 No Yes No No Yes No No Yes Yes No Yes TBD No Yes TBD No Yes TBD No Yes Y es No Yes Yes No Yes No No Yes No No Yes No | ||
Date public? Yea or No Information | |||
No Yes No No Yes No No Yes No No Yes No No Yes No No Yes No Yes 2nd Qtr 2018 (SPS1) Yes No 4th Qtr 2018 ( | |||
}} | }} | ||
Revision as of 10:40, 8 July 2018
| ML16130A564 | |
| Person / Time | |
|---|---|
| Site: | Millstone, Surry, North Anna |
| Issue date: | 05/02/2016 |
| From: | Sartain M D Dominion Nuclear Connecticut, Virginia Electric & Power Co (VEPCO) |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| RIS-15-016, SN 16-023 | |
| Download: ML16130A564 (8) | |
See also: RIS 2015-16
Text
'*' Dominion Resources
Services, Inc. Innsbrook
Technical
Center 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 May 2, 2016 U. S. Nuclear Regulatory
Commission
Attention:
Document Control Desk One White Flint North 11555 Rockville
Pike Rockville, MD 20852-2738
Serial No.: NLOS/MLW:
Docket Nos.: License Nos.: DOMINION NUCLEAR CONNECTICUT, INC. (DNC) VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
MILLSTONE
POWER STATION UNITS 2 AND 3 NORTH ANNA POWER STATION UNITS 1AND2 SURRY POWER STATION UNITS 1 AND 2 NRC REGULATORY
ISSUE SUMMARY 2015-16 PLANNED LICENSING
ACTION SUBMITTALS16-023 R4 50-336/423
50-338/339
50-280/281
DPR-65 NPF-49 NPF-4/7 DPR-32/37
In response to Nuclear Regulatory
Commission (NRC) Regulatory
Issue Summary 2015-16, Revision 1, "Planned Licensing
Actions Submittals
for All Power Reactor Licensees," Attachments
1 through 3 provide the requested
information
on proposed planned licensing
action submittals
for the next three calendar years for Millstone (MPS), North Anna (NAPS) and Surry (SPS) Power Stations.
Neither DNC nor Dominion currently
have power uprates planned in the nextfive years. The information
in the attachments
is being voluntarily
provided to assist the NRC in planning for the necessary
resources
during the budget process. Alterations
to the planned licensing
actions in Attachments
1 through 3 will be communicated
to the appropriate
NRC Project Managers as they occur. If you have any questions
concerning
this information, please contact Michael Whitlock at (804) 273-3123.
Sincerely, Mark D. Sartain Vice President
-Nuclear Engineering
Dominion Nuclear Connecticut, Inc. Virginia Electric and Power Company Attachment
1: Table of Estimated
Licensing
Actions for Millstone
Power Station Attachment
2: Table of Estimated
Licensing
Actions for North Anna Power Station Attachment
3: Table of Estimated
Licensing
Actions for Surry Power Station Commitments
made in this letter: None
cc: U. S. Nuclear Regulatory
Commission
Region I 2100 Renaissance
Blvd. Suite 100 King of Prussia,
19406-2713
U. S. Nuclear Regulatory
Commission
Region II Marquis One Tower 245 Peachtree
Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257
R. V. Guzman U.S. Nuclear Regulatory
Commission
One White Flint North Mail Stop 08 C-2 11555 Rockville
Pike Rockville, MD 20852-2738
K. R. Cotton-Gross
U.S. Nuclear Regulatory
Commission
One White Flint North Mail Stop 08 G-9A 11555 Rockville
Pike Rockville, MD 20852-2738
Dr. V. Sreenivas
U. S. Nuclear Regulatory
Commission
One White Flint North Mail Stop 08 G-9A 11555 Rockville
Pike Rockville, MD 20852-2738
NRC Senior Resident Inspector
Millstone
Power Station NRC Senior Resident Inspector
North Anna Power Station NRC Senior Resident Inspector
Surry Power Station Serial No.16-023 Docket Nos.: 50-336/423
50-338/339
50-280/281
Page 2 of 2
- ./ ATTACHMENT
1 Serial No.16-023 Docket Nos.: 50-336/423
Table of Estimated
Licensing
Actions for Millstone
Power Station MILLSTONE
POWER STATION -UNITS 2 & 3 DOMINION NUCLEA.R CONNECTICUT, INC.
Table of Estimated
Licensing
Actions Millstone
Power Station Units 2 and 3 Docket Nos: 50-336/50-423
TSTF Number , If Projected
Submittal
Outage Outage Related Can the NRC staff Proprietary
Plant Name and Unit Number(*)
Licensing
Action Type Licensing
Action Description/Title
make the lnfonnallon
C-ta any Date Related? Date public? lnfonnatlon
Millstone
Power Station Unit 2 and 3 Relief Request Relief Requests RR-04-23 and IR-03-28 to use UT in lieu of RT. 04/2016 Yes 102017 Yes No Millstone
Power Station Unit 2 License Amendment
LAR for Large Break LOCA Reanalysis
05/2016 Yes 402016 Yes Yes Millstone
Power Station Unit 3 Exemptions
Exemption
for AXIOM Lead Test Assembly 07/2016 Yes 402017 Yes No Millstone
Power Station Unit 2 License Amendment
LAR to Revise MPS2 TS 3.8.1.1 to add a required ACTION that 09/2016 Yes 402017 Yes No would reduce shutdown risk at MPS3. (RSST) Mill s tone Power Station Unit 3 Licen se Amendment
LAR to Add New TS 3/4.7.15 for Main Feedwater
Isolation , 12/2016 No Yes No Regulating, and Bypas s Valves Millstone
Power Sta tion Un it 2 License Amendment
Extension
of Type A ILRT Interval to 15 Years. Rev ise TS for 10/2017 Yes 402018 Yes No Containment
Leakage Rate Testi ng Requirements
Millstone
Power Station Units 2 and 3 License Amendment
LAR for Electrical
Cross-Tie Connection
2017 No Yes No Millstone
Power Station Un it 3 License Amendment
Bulletin 2012-01 -2017 No Yes No Design Vulnerability
in electric power system Millstone
Power Station Un it 2 License Amendment
LAR to Revise SR 4.6.2.1.2.b to Increase RBCCW Minimum 2017 No Yes No Flow Rate to CAR Coolers from >500 gpm to >1700 gpm Millstone
Power Station Unit 3 License Amendment
TSTF-3 74 Modify TS requirements
for EDG fuel oil testing 2017 No Yes No Millstone
Power Station Units 2 and 3 Licen se Amendment
TSTF-552 Diesel Generator
Frequency
and Voltage Surveillance
2018 No Yes No Requirements. WCAP-17308-NP. Measurement
Uncertainty
Recapture (MUR) -Recovery of a Millston e Power Station Unit 2 License Amendment
portion of the 2% measurements
Uncertainty
Required by 2018 No Yes No Rono
Millstone
Power Station Un it 2 License Amendment
Delete Item 8 (Cont ainment Water Level Narrow Range) from 2018 No Yes No Table 3.3-11 of TS 3.3.3.8 Mill sto ne Power Station Unit 3 License Amendment
Extens ion of Type A ILRT I nterval to 15 Years. Revise TS for 1 0/2019 Yes 402020 Yes No Containment
Leakage Rate Testing Requirements
Page 1of1
ATTACHMENT
2 Serial No.16-023 Docket Nos.: 50-338/339
Table of Estimated
Licensing
Actions for North Anna Power Station NORTH ANNA POWER STATION-UNITS
1 & 2 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
Table of Estimated
Licensing
Actions North Anna Power Station Unit 1 and Unit 2 Docket Nos: 50-338/339
Plant Name and Unit Number(s)
North Anna Powe r Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 North Anna Power Station , Unit 1 North Anna Power Station , Un i ts 1 and 2 North A nna Power Station , Unit 1 North Anna Power Station , Units 1 and 2 North Anna Power Station , Units 1 and 2 Licensing
Action Type License Amendment
License Amendment
License Amendment
License Amendment
License Amendment
License Amendment
Li cense Amendment
Lice n se Amendment
Re l ief Request Relief Request Relief Request License Amendment
License Amendment
TSTF Number, If any TSTF-522 Licensing
Action Description/Title
EAL Revision -Fuel clad degradation
and fue l clad barrier l oss ISFSI License Renewal (f or Pad 1 TN-32) Fuel Independent
SBLOCA Analysis (TS Reference
Change/COLR Mod) Revision to Spent Fuel Criticality
Analysis -updated fuel design w/ 5% fuel enrichment
LAR for PAD 5.0 and FSLOCA [Large Brea k] Adds Open Phase Condition (O P C) Isolat ion System operab i lity and surveillance
requireme nts for mitigation
of an OPC Revise the Environmental
Protection
Plan to Correct CFR References
Revise the surveillance
requ i rements for TS 3.7.10 and 3.7.12 for the PREACS and MCR/ESGR Filters to operate them for greater than or equal to 15 minutes. Revise TS 5.5.10 to inco rporate the requirements
of Regulatory
Guide 1.52 , revision 3 , which requires In-Place Filter Testing/Laboratory
Testing to be extended to 24 months. Second Period Limited E xa mination Relief Request -N1-14-LMT-002
Request to extend the reactor vesse l weld examinations
by ten years. The PWR Owner's Group analysis by Westinghouse
has already been started. N1-14-NDE-008
I N2-14-NDE-003
North Anna Unit 1 Fifth Interval ISi Program Relief Requests LAR to rely on off-site EMT's rather than on-site EMT's LAR to move the Local Emergency
Operations
Facility (LEOF) to an EOF located at Innsbrook
Page 1of1 Projected
Submittal
Outage Outage Can the NRC staff Proprietary
make the lnfonnatlon
Comments Date Related? Related Data public? Yes or No Information
07/2 016 No Yes No 05/2016 No Yes No 08/2 016 No Yes Supports comp lia nce Yes with 10CFR50.46(c) 09/2016 No Ye s Yes 2018 No Yes Supports compliance
Yes with 10CFR50.46(c)
2nd Otr 2018 01/2017 Yes (NAPS1) Yes No 4th Otr 2020 (NAPS2) 2017 No Yes No 09/2016 No Ye s No 2017 No Yes No 07/2016 Yes 102018 Yes No 2018 Yes 302019 Yes No 2017 No Yes No 2017 No Yes No
ATTACHMENT
3 Serial No.16-023 Docket Nos.: 50-280/281
Table of Estimated
Licensing
Actions for Surry Power Station SURRY POWER STATION-UNITS 1 & 2 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
Table of Estimated
Licensing
Actions Surry Power Station Unit 1 and Unit 2 Docket Nos: 50-280/281
Plant Name and Unit Number(*)
Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Un it s 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Un its 1 and 2 Surry Power Station Units 1 and 2 S urry Power Station Units 1 and 2 Surry Power Stat io n Units 1 and 2 Surry Power Station Un i ts 1 and 2 Surry Power Station Un i ts 1 and 2 Surry Power Stat i on Un i ts 1 and 2 Surry Power Stat io n Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Un its 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Un its 1 and 2 Surry Power Station Units 1 and 2 Licensing
Action Type License Amendment
License Amendme n t License Amendment
License A m endment License Amendment
License Amendment
License Amendment
License Amendment
License Amendment
Rel i ef Request License Amendment
License Amendment
License Ame ndm ent License Amendment
License Ame ndm ent License Amendment
License Amendment
License Amendment
License Amendment
License Amendment
License Amendment
TSTF Number, If any TSTF-547 Projected
Submittal
Licensing
Action Description/Title
Date Alternate
monitoring
of rod position with one 05/2016 in operable rod position indicator
Revises Residual Heat Removal (RHR) and Com p onent Cooling (CC) Systems' TS 05/2016 Requirements
and adds an RHR Surveillance
Re vises the Fue l Cladd i ng Barrier Degradation
and 06/2016 Loss Emergency
Action Le vel Thresholds
Extends the Charging Pump Service Wa t er and MCR/ESGR AC Subsystems
Flowpath Allowed 05/2016 Outage T i me from 24 to 72 hrs E xpands the Primary Grade (PG) Water Lo ckout TS 05/2016 Requirements
Extends the Emergency
Service Water Pump 06/2016 Allowed Outage Time from 7 to 14 days Adds Open Phase Condition
(OPC) Isolation
System operability
and surveillance
requ ireme nts 01/2017 for m i t i gat ion of an OPC Revises RCS Activity Limits and Dose 06/2016 Consequences
for FHA , SGTR, MSLB and L RA TS change to extend ACT to permit replacement
of the Reserve St at io n Service Transformer
C and and 03/2017 cable/bu s replacement
ISi Alternative
Req uest to perm it use of CFRP application
i n buried safety re l ated SW Pip i ng as 07/2016 pressure boundary Administrati
ve change de l etes temporary/one-time TS AOTs/Requirements
for previously
completed
08/2 016 chilled water pipe replacement
project , and other Rev ise d UFSAR Dose Analyses 09/2016 Fuel I ndependen t S BLOC A A na lysis 09/2016 Topical Report DOM-NAF-2 Appendix E (A GORA 12/2016 CHF Correlation) RLBL OCA for Vend or Qualification
Program 04/2017 AGORA Vendor Qualificat
i on Program Submitta l 04/201 7 Spent Fuel Poot Criticality
An alys i s 2018 Full Spectrum LOCA An a lysis 2018 R elocation
of L eak Tes ting of Misce llan eous 2018 Rad ioactive Matera il s to TRM LAR to rely on off-s i te EMrs rather than on-site 2017 EM rs LAR to m ove the Local Emergen cy O pera tions 2017 Facili ty (LEOF) to an EOF located at Innsbrook
Page 1of1 Outage Outage Related Can the NRC staff Proprietary
make the Information
Comments Related? Date public? Yea or No Information
No Yes No No Yes No No Yes No No Yes No No Yes No No Yes No Yes 2nd Qtr 2018 (SPS1) Yes No 4th Qtr 2018 (S PS2) No Yes No Yes Yes No 3rd Qtr 2018 Yes Yes No 2nd Qtr 2017 No Yes No No Yes No No Yes Yes No Yes TBD No Yes TBD No Yes TBD No Yes Y es No Yes Yes No Yes No No Yes No No Yes No