{{#Wiki_filter:ACCELERATED DISTjUBUTION DEMONSHRATION SYSTEMREGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:9004130169 DOC.DATE:
{{#Wiki_filter:ACCELERATED DISTjUBUTION DEMONSHRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9004130169 DOC.DATE: 90/03/28 NOTARIZED:
90/03/28NOTARIZED:
NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.
NOFACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester GAUTH.NAMEAUTHORAFFILIATION MECREDY,R.C.
Rochester Gas 6 Electric Corp.RECIP.NAME RECIPIENT AFFILIATXON JOHNSON,A.R.
Rochester Gas6ElectricCorp.RECIP.NAME RECIPIENT AFFILIATXON JOHNSON,A.R.
.Project Directorate I-3  
.ProjectDirectorate I-3


==SUBJECT:==
==SUBJECT:==
ForwardsannualreptofECCSmodelrevsasapplicable tofacility,per 10CFR50.46.
Forwards annual rept of ECCS model revs as applicable to facility,per 10CFR50.46.
DISTRXBUTION CODE:A001DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:ORSubmittal:
DISTRXBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal:
GeneralDistribution NOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).
General Distribution NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
DOCKET0500024405000244.SRECIPIENT IDCODE/NAME PDl-3LAJOHNSON,A INTERNAL:
DOCKET 05000244 05000244.S RECIPIENT ID CODE/NAME PDl-3 LA JOHNSON,A INTERNAL: NRR/DET/ECMB 9H NRR/DST 8E2 NRR/DST/SXCB 7E NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 5 5 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD1-3 PD NRR/DOEA/OTS B11 NRR/DST/SELB 8 D NRR/DST/SRXB 8E EMB REG LE 01 NRC PDR COPIES LTTR ENCL 1"1 1 1 1 1 1 1 1 0 1 1 1 1 A N D D Ps9~<rmo7 R A NOTE TO ALL"RIDS" RECIPIENTS:
NRR/DET/ECMB 9HNRR/DST8E2NRR/DST/SXCB 7ENUDOCS-ABSTRACT OGC/HDS2RES/DSIR/EIB EXTERNAL:
PLEASE HELP US TO REDUCE WASTElCONTACT THE.DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM'DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 21, ENCL 19 S A~fg 4 ,h g'l>>~)VI Al e~I PJ k C c f 1~)~<, iJ i/(*-P'(I Jl fl 0 i)l/IIIIIIIIIIIIII lillllllE/I i/ANO/j jIIIII/jjjjjIIII SZZZuI l(liltiiZikll IIIIIII/ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N Y.14649.0001 March 28, 1990 TELEP NON E AREA COOK 7ld 546-2700 U.S.Nuclear Regulatory Commission Document Control Desk Attn: Mr.Allen R.Johnson PWR Project Directorate I-3 Washington, D.C.20555  
LPDRNSICCOPIESLTTRENCL11551111111110111111RECIPIENT IDCODE/NAME PD1-3PDNRR/DOEA/OTS B11NRR/DST/SELB 8DNRR/DST/SRXB 8EEMBREGLE01NRCPDRCOPIESLTTRENCL1"1111111101111ANDDPs9~<rmo7 RANOTETOALL"RIDS"RECIPIENTS:
PLEASEHELPUSTOREDUCEWASTElCONTACTTHE.DOCUMENTCONTROLDESK,ROOMPl-37(EXT.20079)TOELIMINATE YOURNAMEFROM'DISTRIBUTION LISISFORDOCUMENTS YOUDON'TNEEDITOTALNUMBEROFCOPIESREQUIRED:
LTTR21,ENCL19S A~fg4,hg'l>>~)VIAle~IPJkCcf1~)~<,iJi/(*-P'(IJlfl 0i)l/IIIIIIIIIIIIII lillllllE/I i/ANO/jjIIIII/jjjjjIIII SZZZuIl(liltiiZikll IIIIIII/ROCHESTER GASANDELECTRICCORPORATION o89EASTAVENUE,ROCHESTER, NY.14649.0001 March28,1990TELEPNONEAREACOOK7ld546-2700U.S.NuclearRegulatory Commission DocumentControlDeskAttn:Mr.AllenR.JohnsonPWRProjectDirectorate I-3Washington, D.C.20555


==Subject:==
==Subject:==
10CFR50.46 AnnualReportECCSEvaluation ModelRevisions R.E.GinnaNuclearPowerPlantDocketNo.50-244
10CFR50.46 Annual Report ECCS Evaluation Model Revisions R.E.Ginna Nuclear Power Plant Docket No.50-244  


==Reference:==
==Reference:==


1)NS-NRC-89-3463, "10CFR50.46 AnnualNotification for1989ofModifications intheWestinghouse ECCSEvaluation Models",LetterfromW.J.Johnson(Westinghouse) toT.E.Murley(NRC),Dated.October5,1989.2)NS-NRC-89-3464, "Correction ofErrorsandModifications totheNOTRUMPCodeintheWestinghouse SmallBreakLOCAECCSEvaluation ModelWhichArePotentially Significant",
1)NS-NRC-89-3463,"10CFR50.46 Annual Notification for 1989 of Modifications in the Westinghouse ECCS Evaluation Models", Letter from W.J.Johnson (Westinghouse) to T.E.Murley (NRC), Dated.October 5, 1989.2)NS-NRC-89-3464,"Correction of Errors and Modifications to the NOTRUMP Code in the Westinghouse Small Break LOCA ECCS Evaluation Model Which Are Potentially Significant", Letter from W.J.Johnson (Westinghouse) to T.E.Murley (NRC), Dated October 5, 1989.
LetterfromW.J.Johnson(Westinghouse) toT.E.Murley(NRC),DatedOctober5,1989.


==DearMr.Johnson:==
==Dear Mr.Johnson:==
ThisletterprovidestheannualreportofEmergency CoreCoolingSystem(ECCS)modelrevisions astheyapplytoR.E.Ginna.ZnReferences 1)and2),Westinghouse ElectricCorporation providedinformation regarding modifications totheirECCSevaluation modelstoNRCStaff.References 1)and2)describethegenericeffectsofthemodelrevisions forbothlargeandsmallbreakLossOfCoolantAccidents (LOCA).Theattachment tothisletterprovidesinformation regarding theeffectsoftheECCSevaluation modelmodifications ontheGinnaUFSARChapter15.6.4LOCAanalysis.
This letter provides the annual report of Emergency Core Cooling System (ECCS)model revisions as they apply to R.E.Ginna.Zn References 1)and 2), Westinghouse Electric Corporation provided information regarding modifications to their ECCS evaluation models to NRC Staff.References 1)and 2)describe the generic effects of the model revisions for both large and small break Loss Of Coolant Accidents (LOCA).The attachment to this letter provides information regarding the effects of the ECCS evaluation model modifications on the Ginna UFSAR Chapter 15.6.4 LOCA analysis.Modifications to the model cause the large break LOCA Peak Clad Temperature (PCT)to increase by 2 F to 1889 F.9004i30i69 90032S PDR ADOCK 05000244 R PDC i p'gget5/44'/
Modifications tothemodelcausethelargebreakLOCAPeakCladTemperature (PCT)toincreaseby2Fto1889F.9004i30i69 90032SPDRADOCK05000244RPDCip'gget5/44'/
Modifications to the model for small break LOCA do not affect calculated.
Modifications tothemodelforsmallbreakLOCAdonotaffectcalculated.
peak clad temperature.
peakcladtemperature.
Very truly yours, Robert C.Mecredy Division Manager Nuclear Pr'oduction RWEi088 Enclosures xc: Mr.Allen R.Johnson (Mail Stop 14D1)Project Directorate I-3 Washington, D.C.20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector ATT'O 10CFR50.46 ANNUAL PORT Effect of Westinghouse ECCS Evaluation Model Modifications on the LOCA Analysis Results Found in Chapter 15.6.4 of the R.E.Ginna (RG&E)Nuclear Power Plant Updated, Final Safety Analysis Report and.WCAP-11609 Containing the Steam Generator Tube Plu in Re ort for Ginna Nuclear Power Station The October 17, 1988 revision to 10CFR50.46 required applicants and holders of operating licenses or construction permits to notify the Nuclear Regulatory'ommission (NRC)of errors and changes in the ECCS Evaluation Models on an annual basis, when the errors and changes are not.significant.
Verytrulyyours,RobertC.MecredyDivisionManagerNuclearPr'oduction RWEi088Enclosures xc:Mr.AllenR.Johnson(MailStop14D1)ProjectDirectorate I-3Washington, D.C.20555U.S.NuclearRegulatory Commission RegionI475Allendale RoadKingofPrussia,PA19406GinnaSeniorResidentInspector ATT'O10CFR50.46ANNUALPORTEffectofWestinghouse ECCSEvaluation ModelModifications ontheLOCAAnalysisResultsFoundinChapter15.6.4oftheR.E.Ginna(RG&E)NuclearPowerPlantUpdated,FinalSafetyAnalysisReportand.WCAP-11609 Containing theSteamGenerator TubePluinReortforGinnaNuclearPowerStationTheOctober17,1988revisionto10CFR50.46 requiredapplicants andholdersofoperating licensesorconstruction permitstonotifytheNuclearRegulatory'ommission (NRC)oferrorsandchangesintheECCSEvaluation Modelsonanannualbasis,whentheerrorsandchangesarenot.significant.
Reference 1 defines a significant error or change as one which results in a calculated peak fuel cladding temperature dif f erent by more than 50'F from the temperature calculated for the limiting transient using the last acceptable model, or is a cumulation of changes and errors such that the sum of the absolute magnitudes of the respective temperature changes is greater than 50'F.In References 2 and 3, information regarding modifications to the Westinghouse large break and small break LOCA ECCS Evaluation Models was submitted to the NRC.The following presents an assessment of the effect of the modifications to the Westinghouse ECCS Evaluation Models on the Loss-Of-Coolant Accident (LOCA)analyses results found in WCAP-11609,"Steam Generator Tube Plugging (SGTP)Report for Ginna Nuclear Power Station", October 1987 and Chapter 15.6.4 of the R.E.Ginna (RG&E)Nuclear Power Plant Updated Final Safety Analysis Report.LARGE BREAK LOCA-EVALUATION MODEL CHANGES The large break LOCA analysis for R.E.Ginna (RG&E)was examined to assess the effect of the applicable modifications to the Westinghouse large break LOCA ECCS Evaluation Model on Peak Cladding Temperature (PCT)results reported.in WCAP-11609.
Reference 1definesasignificant errororchangeasonewhichresultsinacalculated peakfuelcladdingtemperature differentbymorethan50'Ffromthetemperature calculated forthelimitingtransient usingthelastacceptable model,orisacumulation ofchangesanderrorssuchthatthesumoftheabsolutemagnitudes oftherespective temperature changesisgreaterthan50'F.InReferences 2and3,information regarding modifications totheWestinghouse largebreakandsmallbreakLOCAECCSEvaluation Modelswassubmitted totheNRC.Thefollowing presentsanassessment oftheeffectofthemodifications totheWestinghouse ECCSEvaluation ModelsontheLoss-Of-Coolant Accident(LOCA)analysesresultsfoundinWCAP-11609, "SteamGenerator TubePlugging(SGTP)ReportforGinnaNuclearPowerStation",
The LOCA safety analyses reported in the UFSAR were performed for Ginna with a uniform Steam Generator Tube Plugging (SGTP)level of 12'-o.The large break analysis was subsequently reanalyzed and licensed for 15%tube plugging and.the results were documented in WCAP-11609,"Steam Generator Tube Plugging (SGTP)Report for Ginna Nuclear Power Station", October 1987.The large break LOCA analysis results were calculated.
October1987andChapter15.6.4oftheR.E.Ginna(RG&E)NuclearPowerPlantUpdatedFinalSafetyAnalysisReport.LARGEBREAKLOCA-EVALUATION MODELCHANGESThelargebreakLOCAanalysisforR.E.Ginna(RG&E)wasexaminedtoassesstheeffectoftheapplicable modifications totheWestinghouse largebreakLOCAECCSEvaluation ModelonPeakCladdingTemperature (PCT)resultsreported.
using the 1981 version of the Westinghouse large break LOCA ECCS Evaluation Model which is documented in WCAP-9220-P-A (Reference 4).The current licensing basis analysis assumed.the following information important to the large break LOCA analysis NSSS power level-102-o of 1520 MWt Fuel Type-,14 X14 OFA Pellet Edge Configuration
inWCAP-11609.
-Chamfer Uniform Steam Generator Tube Plugging Level-15%i Nuclear Peaking Factors of 2.32 for the Total Peaking Factor and 1.66 for the Enthalpy Rise Peaking Factor.  
TheLOCAsafetyanalysesreportedintheUFSARwereperformed forGinnawithauniformSteamGenerator TubePlugging(SGTP)levelof12'-o.Thelargebreakanalysiswassubsequently reanalyzed andlicensedfor15%tubepluggingand.theresultsweredocumented inWCAP-11609,"SteamGenerator TubePlugging(SGTP)ReportforGinnaNuclearPowerStation",
October1987.ThelargebreakLOCAanalysisresultswerecalculated.
usingthe1981versionoftheWestinghouse largebreakLOCAECCSEvaluation Modelwhichisdocumented inWCAP-9220-P-A (Reference 4).Thecurrentlicensing basisanalysisassumed.thefollowing information important tothelargebreakLOCAanalysisNSSSpowerlevel-102-oof1520MWtFuelType-,14X14OFAPelletEdgeConfiguration
-ChamferUniformSteamGenerator TubePluggingLevel-15%iNuclearPeakingFactorsof2.32fortheTotalPeakingFactorand1.66fortheEnthalpyRisePeakingFactor.  
~~
~~
r~~orR.E.Ginna(R),thelimitingbreakreslkedfromthedoubleended.guillotine ruptureofthecoldlegpipingwithadischarge coefficient ofCD=0.4.Thecalculated peakcladdingtemperature was1887'Fincluding theapplicable penalties.
r~~or R.E.Ginna (R), the limiting break reslked from the double ended.guillotine rupture of the cold leg piping with a discharge coefficient of CD=0.4.The calculated peak cladding temperature was 1887'F including the applicable penalties.
ThePCTvalueof1887'Fincludesa6'enaltytoaccountforanupperplenuminjection and.acorecrossflow penalty'of 10'F.Thefollowing modifications totheWestinghouse ECCSEvaluation Modelwereevaluated todetermine iftheywouldaffectthecurrentlicensing basis-largebreakLOCAanalysisresultsforR.E.Ginnafor15%SGTPfound.'nWCAP-11609.
The PCT value of 1887'F includes a 6'enalty to account for an upper plenum injection and.a core crossflow penalty'of 10'F.The following modifications to the Westinghouse ECCS Evaluation Model were evaluated to determine if they would affect the current licensing basis-large break LOCA analysis results for R.E.Ginna for 15%SGTP found.'n WCAP-11609.
1981ECCSEvaluation Model:(NotMax-SILimited,)
1981 ECCS Evaluation Model: (Not Max-SI Limited,)In the 1981 version of the Westinghouse ECCS Evaluation Model, a modification was made to delay downcomer overfilling.
Inthe1981versionoftheWestinghouse ECCSEvaluation Model,amodification wasmadetodelaydowncomer overfilling.
The delay corresponds to backfilling of the intact cold legs.Data from tests simulating cold leg injection during the post-large break LOCA reflood phase which have adequate safety injection flow to condense all of the-available steam flow show a significant amount of subcooled.
Thedelaycorresponds tobackfilling oftheintactcoldlegs.Datafromtestssimulating coldleginjection duringthepost-large breakLOCArefloodphasewhichhaveadequatesafetyinjection flowtocondenseallofthe-available steamflowshowasignificant amountofsubcooled.
liquid to be present in the cold leg pipe test section.This situation corresponds to the so-called maximum safety injection scenario of ECCS Evaluation Model analyses.The R.E.Ginna (RGGE)LOCA analysis performed with the Westinghouse 1981 large break LOCA ECCS Evaluation Model is not affected.by the WREFLOOD code modifications since the maximum safeguards safety injection flow assumption is not limiting.1981 ECCS Evaluation Model.: (Two-Loop Plants)In the 1981'version of the Westinghouse ECCS Evaluation Model, the pressurizer is modeled as being attached to the broken (faulted)loop in the SATAN-VI code for calculating large break blowdown behavior.Sensitivity studies were performed to determine if this pressurizer location in the noding scheme was the most limiting position.The results indicated that two-loop Westinghouse PWRs are sensitive'to the pressurizer nodal location and that in some cases modeling the pressurizer in the intact (non-faulted) loop resulted.in a slight increase in the calculated Peak Cladding Temperature (PCT).For a two loop plant, core cooling is provided by negative core flow and.the negative core flow period.lasts through most of the remaining blowdown period;The concern regarding pressurizer location relates to the negative core flow period which is crucial for core cooling in a two-loop plant.With the pressurizer on the broken loop, pressurizer flow is a large contributor to break flow (pump side), lessening the contribution from the upper plenum and leaving a large upper plenum inventory for negative core flow later in blowdown.For Ginna, a penalty of 2'F due to modeling the pressurizer in the intact (non-faulted) loop was assessed to be used in tracking margin to the 10CFR50.46 limit on the current licensing basis analysis for 15-o SGTP contained.
liquidtobepresentinthecoldlegpipetestsection.Thissituation corresponds totheso-called maximumsafetyinjection scenarioofECCSEvaluation Modelanalyses.
in WCAP-11609.
TheR.E.Ginna(RGGE)LOCAanalysisperformed withtheWestinghouse 1981largebreakLOCAECCSEvaluation Modelisnotaffected.
The PCT for the limiting C=0.4 break is 1887'F with applicable penalties, and thus adding the 2'F increase brings the PCT, to 1889'F which is well below the 10CFR50.46 limit.
bytheWREFLOODcodemodifications sincethemaximumsafeguards safetyinjection flowassumption isnotlimiting.
ks discussed abov modifications to the Nestgghouse large break LOCA ECCS Evaluation Model could affect the result by altering the~PCT.A.Analysis Calculated Result B.Modifications to Westinghouse ECCS Evaluation Model C.ECCS Evaluation Model Modifications Resultant PCT 1887'F 2oF 1889 F SMALL BREAK LOCA-EVALUATION MODEL CHANGES The small break.LOCA analysis for R.E.Ginna (RG&E)was also examined to assess the effect of the applicable modifications to the Westinghouse ECCS Evaluation Models on Peak Cladding Temperature (PCT)results reported in Chapter 15.6.4.1 of the UFSAR.The LOCA safety analyses reported in the UFSAR were performed for Ginna with a uniform Steam Generator Tube Plugging (SGTP)level of 12%.The small break LOCA analysis was subsequently evaluated and licensed for a SGTP level increase from 12: to 15%.The small break LOCA event was not reanalyzed because the results are not sensitive to a SGTP level increase from 12%to 15:.The evaluation was documented, and transmitted in WCAP-11609,"Steam Generator Tube Plugging (SGTP)Report for Ginna Nuclear Power Station", October 1987.The small break LOCA analysis results were calculated using the Westinghouse small break LOCA ECCS Evaluation Model documented in WCAP-8970 (Reference 12)which utilized the WFLASH computer code.For R.E.Ginna (RG&E), the limiting size small break resulted from a 6 inch equivalent diameter break in the cold leg.The calculated peak cladding temperature was 1092 F.The analysis assumed the following information important to the small break analyses: NSSS power level-102%of 1520 MWt Fuel Type-14 Z14 OFA Pellet Edge Configuration
1981ECCSEvaluation Model.:(Two-Loop Plants)Inthe1981'version oftheWestinghouse ECCSEvaluation Model,thepressurizer ismodeledasbeingattachedtothebroken(faulted) loopintheSATAN-VIcodeforcalculating largebreakblowdownbehavior.
-Chamfer Uniform Steam Generator Tube Plugging Level-12-o Nuclear Peaking Factors of 2e32 for the Total Peaking Factor and 1.66 for the Enthalpy Rise Peaking Factor.600 GPM Total Auziliary Feedwater Flow.The following modification to the Westinghouse ECCS Evaluation Model were evaluated to determine if they would affect the current licensing basis small break LOCA analysis results for R.E.Ginna.WFLASH ECCS Evaluation Model Following the accident at Three Mile Island Unit 2, additional attention was focused on the small break LOCA and.Westinghouse submitted a report, WCAP-9600 (Reference 5), to the Nuclear Regulatory Commission (NRC)detailing the performance of the Westinghouse small break LOCA Evaluation Model which utilized the WFLASH computer code.In NUREG-0611 (Reference 6), the NRC staff questioned the validity of certain models in the WFLASH, computer  
Sensitivity studieswereperformed todetermine ifthispressurizer locationinthenodingschemewasthemostlimitingposition.
~t1'V code and required censees to justify contin acceptance of the model.Section II.K.3.30 of NUREG-0737 (Reference 7), which clarified the NRC Post-TMI requirements regarding small break LOCA modeling, required that the licensees revise the small break LOCA ECCS models along the guidelines specified in NUREG-0611.
Theresultsindicated thattwo-loopWestinghouse PWRsaresensitive'to thepressurizer nodallocationandthatinsomecasesmodelingthepressurizer intheintact(non-faulted) loopresulted.
Following the issuance of NUREG-0737, Westinghouse and the Westinghouse Owners Group decided to develop the NOTRUMP (Reference 9)computer code for use in a new small break LOCA ECCS Evaluation Model (Reference 10).The NRC approved the use of NOTRUMP for small break LOCA ECCS analyses in May 1985.Since approval of the NOTRUMP small break LOCA ECCS Evaluation Model in 1985, the WFLASH computer code has not been maintained as.part of the Westinghouse ECCS Evaluation Model computer codes.In section II.K.3.31 of NUREG-0737, the NRC required that each licensee submit a new small break LOCA analysis using an NRC approved small break LOCA Evaluation Model.which satisfied the requirements of NUREG-0737 section II.K.3.30.
inaslightincreaseinthecalculated PeakCladdingTemperature (PCT).Foratwoloopplant,corecoolingisprovidedbynegativecoreflowand.thenegativecoreflowperiod.laststhroughmostoftheremaining blowdownperiod;Theconcernregarding pressurizer locationrelatestothenegativecoreflowperiodwhichiscrucialforcorecoolinginatwo-loopplant.Withthepressurizer onthebrokenloop,pressurizer flowisalargecontributor tobreakflow(pumpside),lessening thecontribution fromtheupperplenumandleavingalargeupperplenuminventory fornegativecoreflowlaterinblowdown.
NRC Generic Letter 83-35 (Reference 8)relaxed the requirements of Item II.K.3.31 by allowing a more generic response and providing a basis for retention of the existing small, break LOCA analyses.Provided that the previously existing model results were demonstrated to be conservative with respect to the new small break LOCA model approved under the requirements of NUREG-0737 II.K.3.30 (NOTRUMP), plant specific analyses using the new small break LOCA Evaluation Model would not be required.In WCAP-11145 (Reference 11), Westinghouse and the Westinghouse Owners Group demonstrated that the result's obtained from calculations with WFLASH were conservative relative to those obtained.with NOTRUMP.Compliance with Item II.K.3.31 of NUREG-0737 could be completed by referencing WCAP-11145 and supplying some plant specific information.
ForGinna,apenaltyof2'Fduetomodelingthepressurizer intheintact(non-faulted) loopwasassessedtobeusedintrackingmargintothe10CFR50.46 limitonthecurrentlicensing basisanalysisfor15-oSGTPcontained.
Westinghouse, therefore, has not been modifying, investigating, or evaluating proposed changes to the WFLASH.small break LOCA ECCS Evaluation Model.As discussed above, none of the modifications to the Westinghouse small break LOCA ECCS Evaluation Model would affect the small break LOCA analysis results by altering the PCT.A.Analysis Calculated Result B.Modifications to Westinghouse ECCS Evaluation Model C.ECCS Evaluation Model Modifications Resultant PCT 1092'F+0oF 1092'F CONCLUSION An evaluation of the effect of modifications to the Westinghouse ECCS Evaluation Model as reported in References 2 and 3 was performed for both the large break LOCA and small break LOCA analyses results found in WCAP-11609 and Chapter 15.6.4 of the R.E.Ginna Nuclear Power Plant Updated Final Safety Analysis Report.The LOCA safety analyses reported in the UFSAR were performed for Ginna with a uniform Steam Generator Tube Plugging (SGTP)level of 12-o.The large break LOCA analysis was subsequently reanalyzed and licensed for an increase to 15: tube plugging.The small break LOCA analysis was evaluated and was not impacted by the increase in SGTP level to.The results of the ana es and evaluations for the increase in.SGTP level to 15-o were documented in WCAP-11609,"Steam Generator Tube Plugging (SGTP)Report for Ginna.Nuclear Power Station".When the effects of the ECCS model changes were combined with the current plant analysis results, it was determined that compliance with the requirements of 10CFR50.46 would be maintained.
inWCAP-11609.
REFERENCES 2.3.4.5.6.7.8.9.10.12."Emergency Core Cooling Systems;Revisions to Acceptance Criteria", Federal Register, Vol.53, No.180, pp.35996-36005, dated September, 16, 1988.NS-NRC-89-3463,"10CFR50.46 Annual Notification for 1989 of Modifications in the Westinghouse ECCS Evaluation Models," Letter from W.J.Johnson (Westinghouse) to T.E.Murley (NRC), dated.October 5, 1989.NS-NRC-89-3464,"Correction of Errors.and Modifications to the NOTRUMP Code in the Westinghouse Small Break LOCA ECCS Evaluation Model Which Are Potentially Significant", Letter from W.J.Johnson (Westinghouse) to T.E.Murley (NRC), dated October 5, 1989.WCAP-9220-P-A, Revision 1 (Proprietary), WCAP-9221-A, Revision 1 (Non-Proprietary),"Westinghouse ECCS Evaluation Model 1981 Version", 1981, Eicheldinger, C.WCAP-10924-P-A (Proprietary), WCAP-12130-A (Non-Proprietary),"Westinghouse Large Break LOCA Best Estimate Methodology", Hochreiter, L.E., et.al., January 1987.Report on Small Break Accidents for Westinghouse Nuclear Steam Supply System", WCAP-9601 (Non-Proprietary), June 1979, WCAP-9600 (Proprietary), June 1979."Generic Evaluation of Feedwater Transients and Small Break Loss-of-Coolant Accidents in Westinghouse Designed Operating Plants", NUREG-0611, January 1980."Clarification of TMI Action Plan Requirements", NUREG-0737, November 1980."Clarification of TMI Plan Item II.K.3.31,"NRC Generic Letter 83-85 from D.G.Eisenhut, November 2, 1983."NOTRUMP-A Nodal Transient Small Break and General Network Code", WCAP-10079-P-A (Proprietary), WCAP-10081-A (Non-'Proprietary), Lee, N., et.al., August 1985."Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code", WCAP-10054-P-A (Proprietary), WCAP-10081-A (Non-Proprietary), Lee, N., et.al., August 1985.WCAP-8970 (Proprietary) and WCAP-8971 (Non-Proprietary),"Westinghouse Emergency Core Cooling System Small Break October 1975 Model", April 1977.}}
ThePCTforthelimitingC=0.4breakis1887'Fwithapplicable penalties, andthusaddingthe2'FincreasebringsthePCT,to1889'Fwhichiswellbelowthe10CFR50.46 limit.
ksdiscussed abovmodifications totheNestgghouse largebreakLOCAECCSEvaluation Modelcouldaffecttheresultbyalteringthe~PCT.A.AnalysisCalculated ResultB.Modifications toWestinghouse ECCSEvaluation ModelC.ECCSEvaluation ModelModifications Resultant PCT1887'F2oF1889FSMALLBREAKLOCA-EVALUATION MODELCHANGESThesmallbreak.LOCAanalysisforR.E.Ginna(RG&E)wasalsoexaminedtoassesstheeffectoftheapplicable modifications totheWestinghouse ECCSEvaluation ModelsonPeakCladdingTemperature (PCT)resultsreportedinChapter15.6.4.1oftheUFSAR.TheLOCAsafetyanalysesreportedintheUFSARwereperformed forGinnawithauniformSteamGenerator TubePlugging(SGTP)levelof12%.ThesmallbreakLOCAanalysiswassubsequently evaluated andlicensedforaSGTPlevelincreasefrom12:to15%.ThesmallbreakLOCAeventwasnotreanalyzed becausetheresultsarenotsensitive toaSGTPlevelincreasefrom12%to15:.Theevaluation wasdocumented, andtransmitted inWCAP-11609, "SteamGenerator TubePlugging(SGTP)ReportforGinnaNuclearPowerStation",
October1987.ThesmallbreakLOCAanalysisresultswerecalculated usingtheWestinghouse smallbreakLOCAECCSEvaluation Modeldocumented inWCAP-8970 (Reference 12)whichutilizedtheWFLASHcomputercode.ForR.E.Ginna(RG&E),thelimitingsizesmallbreakresultedfroma6inchequivalent diameterbreakinthecoldleg.Thecalculated peakcladdingtemperature was1092F.Theanalysisassumedthefollowing information important tothesmallbreakanalyses:
NSSSpowerlevel-102%of1520MWtFuelType-14Z14OFAPelletEdgeConfiguration
-ChamferUniformSteamGenerator TubePluggingLevel-12-oNuclearPeakingFactorsof2e32fortheTotalPeakingFactorand1.66fortheEnthalpyRisePeakingFactor.600GPMTotalAuziliary Feedwater Flow.Thefollowing modification totheWestinghouse ECCSEvaluation Modelwereevaluated todetermine iftheywouldaffectthecurrentlicensing basissmallbreakLOCAanalysisresultsforR.E.Ginna.WFLASHECCSEvaluation ModelFollowing theaccidentatThreeMileIslandUnit2,additional attention wasfocusedonthesmallbreakLOCAand.Westinghouse submitted areport,WCAP-9600 (Reference 5),totheNuclearRegulatory Commission (NRC)detailing theperformance oftheWestinghouse smallbreakLOCAEvaluation ModelwhichutilizedtheWFLASHcomputercode.InNUREG-0611 (Reference 6),theNRCstaffquestioned thevalidityofcertainmodelsintheWFLASH,computer  
~t1'Vcodeandrequiredcenseestojustifycontinacceptance ofthemodel.SectionII.K.3.30 ofNUREG-0737 (Reference 7),whichclarified theNRCPost-TMIrequirements regarding smallbreakLOCAmodeling, requiredthatthelicensees revisethesmallbreakLOCAECCSmodelsalongtheguidelines specified inNUREG-0611.
Following theissuanceofNUREG-0737, Westinghouse andtheWestinghouse OwnersGroupdecidedtodeveloptheNOTRUMP(Reference 9)computercodeforuseinanewsmallbreakLOCAECCSEvaluation Model(Reference 10).TheNRCapprovedtheuseofNOTRUMPforsmallbreakLOCAECCSanalysesinMay1985.SinceapprovaloftheNOTRUMPsmallbreakLOCAECCSEvaluation Modelin1985,theWFLASHcomputercodehasnotbeenmaintained as.partoftheWestinghouse ECCSEvaluation Modelcomputercodes.InsectionII.K.3.31 ofNUREG-0737, theNRCrequiredthateachlicenseesubmitanewsmallbreakLOCAanalysisusinganNRCapprovedsmallbreakLOCAEvaluation Model.whichsatisfied therequirements ofNUREG-0737 sectionII.K.3.30.
NRCGenericLetter83-35(Reference 8)relaxedtherequirements ofItemII.K.3.31 byallowingamoregenericresponseandproviding abasisforretention oftheexistingsmall,breakLOCAanalyses.
Providedthatthepreviously existingmodelresultsweredemonstrated tobeconservative withrespecttothenewsmallbreakLOCAmodelapprovedundertherequirements ofNUREG-0737 II.K.3.30 (NOTRUMP),
plantspecificanalysesusingthenewsmallbreakLOCAEvaluation Modelwouldnotberequired.
InWCAP-11145 (Reference 11),Westinghouse andtheWestinghouse OwnersGroupdemonstrated thattheresult'sobtainedfromcalculations withWFLASHwereconservative relativetothoseobtained.
withNOTRUMP.Compliance withItemII.K.3.31 ofNUREG-0737 couldbecompleted byreferencing WCAP-11145 andsupplying someplantspecificinformation.
Westinghouse, therefore, hasnotbeenmodifying, investigating, orevaluating proposedchangestotheWFLASH.smallbreakLOCAECCSEvaluation Model.Asdiscussed above,noneofthemodifications totheWestinghouse smallbreakLOCAECCSEvaluation ModelwouldaffectthesmallbreakLOCAanalysisresultsbyalteringthePCT.A.AnalysisCalculated ResultB.Modifications toWestinghouse ECCSEvaluation ModelC.ECCSEvaluation ModelModifications Resultant PCT1092'F+0oF1092'FCONCLUSION Anevaluation oftheeffectofmodifications totheWestinghouse ECCSEvaluation ModelasreportedinReferences 2and3wasperformed forboththelargebreakLOCAandsmallbreakLOCAanalysesresultsfoundinWCAP-11609 andChapter15.6.4oftheR.E.GinnaNuclearPowerPlantUpdatedFinalSafetyAnalysisReport.TheLOCAsafetyanalysesreportedintheUFSARwereperformed forGinnawithauniformSteamGenerator TubePlugging(SGTP)levelof12-o.ThelargebreakLOCAanalysiswassubsequently reanalyzed andlicensedforanincreaseto15:tubeplugging.
ThesmallbreakLOCAanalysiswasevaluated andwasnotimpactedbytheincrease inSGTPlevelto.Theresultsoftheanaesandevaluations fortheincreasein.SGTPlevelto15-oweredocumented inWCAP-11609,"SteamGenerator TubePlugging(SGTP)ReportforGinna.NuclearPowerStation".
WhentheeffectsoftheECCSmodelchangeswerecombinedwiththecurrentplantanalysisresults,itwasdetermined thatcompliance withtherequirements of10CFR50.46 wouldbemaintained.
REFERENCES 2.3.4.5.6.7.8.9.10.12."Emergency CoreCoolingSystems;Revisions toAcceptance Criteria",
FederalRegister, Vol.53,No.180,pp.35996-36005,datedSeptember, 16,1988.NS-NRC-89-3463, "10CFR50.46 AnnualNotification for1989ofModifications intheWestinghouse ECCSEvaluation Models,"LetterfromW.J.Johnson(Westinghouse) toT.E.Murley(NRC),dated.October5,1989.NS-NRC-89-3464, "Correction ofErrors.and Modifications totheNOTRUMPCodeintheWestinghouse SmallBreakLOCAECCSEvaluation ModelWhichArePotentially Significant",
LetterfromW.J.Johnson(Westinghouse) toT.E.Murley(NRC),datedOctober5,1989.WCAP-9220-P-A, Revision1(Proprietary),
WCAP-9221-A, Revision1(Non-Proprietary),
"Westinghouse ECCSEvaluation Model1981Version",
1981,Eicheldinger, C.WCAP-10924-P-A (Proprietary),
WCAP-12130-A (Non-Proprietary),
"Westinghouse LargeBreakLOCABestEstimateMethodology",
Hochreiter, L.E.,et.al.,January1987.ReportonSmallBreakAccidents forWestinghouse NuclearSteamSupplySystem",WCAP-9601 (Non-Proprietary),
June1979,WCAP-9600(Proprietary),
June1979."GenericEvaluation ofFeedwater Transients andSmallBreakLoss-of-Coolant Accidents inWestinghouse DesignedOperating Plants",NUREG-0611, January1980."Clarification ofTMIActionPlanRequirements",
NUREG-0737, November1980."Clarification ofTMIPlanItemII.K.3.31, "NRCGenericLetter83-85fromD.G.Eisenhut, November2,1983."NOTRUMP-ANodalTransient SmallBreakandGeneralNetworkCode",WCAP-10079-P-A (Proprietary),
WCAP-10081-A (Non-'Proprietary),
Lee,N.,et.al.,August1985."Westinghouse SmallBreakECCSEvaluation ModelUsingtheNOTRUMPCode",WCAP-10054-P-A (Proprietary),
WCAP-10081-A (Non-Proprietary),
Lee,N.,et.al.,August1985.WCAP-8970 (Proprietary) andWCAP-8971 (Non-Proprietary),
"Westinghouse Emergency CoreCoolingSystemSmallBreakOctober1975Model",April1977.}}

Revision as of 14:26, 7 July 2018

Forwards Annual Rept of ECCS Model Revs as Applicable to Facility,Per 10CFR50.46.Mods to Model for Small Break LOCA Do Not Affect Calculated Peak Clad Temp
ML17261B032
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/28/1990
From: MECREDY R C
ROCHESTER GAS & ELECTRIC CORP.
To: JOHNSON A R
Office of Nuclear Reactor Regulation
References
NUDOCS 9004130169
Download: ML17261B032 (11)


Text

ACCELERATED DISTjUBUTION DEMONSHRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9004130169 DOC.DATE: 90/03/28 NOTARIZED:

NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.

Rochester Gas 6 Electric Corp.RECIP.NAME RECIPIENT AFFILIATXON JOHNSON,A.R.

.Project Directorate I-3

SUBJECT:

Forwards annual rept of ECCS model revs as applicable to facility,per 10CFR50.46.

DISTRXBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal:

General Distribution NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

DOCKET 05000244 05000244.S RECIPIENT ID CODE/NAME PDl-3 LA JOHNSON,A INTERNAL: NRR/DET/ECMB 9H NRR/DST 8E2 NRR/DST/SXCB 7E NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 5 5 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD1-3 PD NRR/DOEA/OTS B11 NRR/DST/SELB 8 D NRR/DST/SRXB 8E EMB REG LE 01 NRC PDR COPIES LTTR ENCL 1"1 1 1 1 1 1 1 1 0 1 1 1 1 A N D D Ps9~<rmo7 R A NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTElCONTACT THE.DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM'DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 21, ENCL 19 S A~fg 4 ,h g'l>>~)VI Al e~I PJ k C c f 1~)~<, iJ i/(*-P'(I Jl fl 0 i)l/IIIIIIIIIIIIII lillllllE/I i/ANO/j jIIIII/jjjjjIIII SZZZuI l(liltiiZikll IIIIIII/ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N Y.14649.0001 March 28, 1990 TELEP NON E AREA COOK 7ld 546-2700 U.S.Nuclear Regulatory Commission Document Control Desk Attn: Mr.Allen R.Johnson PWR Project Directorate I-3 Washington, D.C.20555

Subject:

10CFR50.46 Annual Report ECCS Evaluation Model Revisions R.E.Ginna Nuclear Power Plant Docket No.50-244

Reference:

1)NS-NRC-89-3463,"10CFR50.46 Annual Notification for 1989 of Modifications in the Westinghouse ECCS Evaluation Models", Letter from W.J.Johnson (Westinghouse) to T.E.Murley (NRC), Dated.October 5, 1989.2)NS-NRC-89-3464,"Correction of Errors and Modifications to the NOTRUMP Code in the Westinghouse Small Break LOCA ECCS Evaluation Model Which Are Potentially Significant", Letter from W.J.Johnson (Westinghouse) to T.E.Murley (NRC), Dated October 5, 1989.

Dear Mr.Johnson:

This letter provides the annual report of Emergency Core Cooling System (ECCS)model revisions as they apply to R.E.Ginna.Zn References 1)and 2), Westinghouse Electric Corporation provided information regarding modifications to their ECCS evaluation models to NRC Staff.References 1)and 2)describe the generic effects of the model revisions for both large and small break Loss Of Coolant Accidents (LOCA).The attachment to this letter provides information regarding the effects of the ECCS evaluation model modifications on the Ginna UFSAR Chapter 15.6.4 LOCA analysis.Modifications to the model cause the large break LOCA Peak Clad Temperature (PCT)to increase by 2 F to 1889 F.9004i30i69 90032S PDR ADOCK 05000244 R PDC i p'gget5/44'/

Modifications to the model for small break LOCA do not affect calculated.

peak clad temperature.

Very truly yours, Robert C.Mecredy Division Manager Nuclear Pr'oduction RWEi088 Enclosures xc: Mr.Allen R.Johnson (Mail Stop 14D1)Project Directorate I-3 Washington, D.C.20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector ATT'O 10CFR50.46 ANNUAL PORT Effect of Westinghouse ECCS Evaluation Model Modifications on the LOCA Analysis Results Found in Chapter 15.6.4 of the R.E.Ginna (RG&E)Nuclear Power Plant Updated, Final Safety Analysis Report and.WCAP-11609 Containing the Steam Generator Tube Plu in Re ort for Ginna Nuclear Power Station The October 17, 1988 revision to 10CFR50.46 required applicants and holders of operating licenses or construction permits to notify the Nuclear Regulatory'ommission (NRC)of errors and changes in the ECCS Evaluation Models on an annual basis, when the errors and changes are not.significant.

Reference 1 defines a significant error or change as one which results in a calculated peak fuel cladding temperature dif f erent by more than 50'F from the temperature calculated for the limiting transient using the last acceptable model, or is a cumulation of changes and errors such that the sum of the absolute magnitudes of the respective temperature changes is greater than 50'F.In References 2 and 3, information regarding modifications to the Westinghouse large break and small break LOCA ECCS Evaluation Models was submitted to the NRC.The following presents an assessment of the effect of the modifications to the Westinghouse ECCS Evaluation Models on the Loss-Of-Coolant Accident (LOCA)analyses results found in WCAP-11609,"Steam Generator Tube Plugging (SGTP)Report for Ginna Nuclear Power Station", October 1987 and Chapter 15.6.4 of the R.E.Ginna (RG&E)Nuclear Power Plant Updated Final Safety Analysis Report.LARGE BREAK LOCA-EVALUATION MODEL CHANGES The large break LOCA analysis for R.E.Ginna (RG&E)was examined to assess the effect of the applicable modifications to the Westinghouse large break LOCA ECCS Evaluation Model on Peak Cladding Temperature (PCT)results reported.in WCAP-11609.

The LOCA safety analyses reported in the UFSAR were performed for Ginna with a uniform Steam Generator Tube Plugging (SGTP)level of 12'-o.The large break analysis was subsequently reanalyzed and licensed for 15%tube plugging and.the results were documented in WCAP-11609,"Steam Generator Tube Plugging (SGTP)Report for Ginna Nuclear Power Station", October 1987.The large break LOCA analysis results were calculated.

using the 1981 version of the Westinghouse large break LOCA ECCS Evaluation Model which is documented in WCAP-9220-P-A (Reference 4).The current licensing basis analysis assumed.the following information important to the large break LOCA analysis NSSS power level-102-o of 1520 MWt Fuel Type-,14 X14 OFA Pellet Edge Configuration

-Chamfer Uniform Steam Generator Tube Plugging Level-15%i Nuclear Peaking Factors of 2.32 for the Total Peaking Factor and 1.66 for the Enthalpy Rise Peaking Factor.

~~

r~~or R.E.Ginna (R), the limiting break reslked from the double ended.guillotine rupture of the cold leg piping with a discharge coefficient of CD=0.4.The calculated peak cladding temperature was 1887'F including the applicable penalties.

The PCT value of 1887'F includes a 6'enalty to account for an upper plenum injection and.a core crossflow penalty'of 10'F.The following modifications to the Westinghouse ECCS Evaluation Model were evaluated to determine if they would affect the current licensing basis-large break LOCA analysis results for R.E.Ginna for 15%SGTP found.'n WCAP-11609.

1981 ECCS Evaluation Model: (Not Max-SI Limited,)In the 1981 version of the Westinghouse ECCS Evaluation Model, a modification was made to delay downcomer overfilling.

The delay corresponds to backfilling of the intact cold legs.Data from tests simulating cold leg injection during the post-large break LOCA reflood phase which have adequate safety injection flow to condense all of the-available steam flow show a significant amount of subcooled.

liquid to be present in the cold leg pipe test section.This situation corresponds to the so-called maximum safety injection scenario of ECCS Evaluation Model analyses.The R.E.Ginna (RGGE)LOCA analysis performed with the Westinghouse 1981 large break LOCA ECCS Evaluation Model is not affected.by the WREFLOOD code modifications since the maximum safeguards safety injection flow assumption is not limiting.1981 ECCS Evaluation Model.: (Two-Loop Plants)In the 1981'version of the Westinghouse ECCS Evaluation Model, the pressurizer is modeled as being attached to the broken (faulted)loop in the SATAN-VI code for calculating large break blowdown behavior.Sensitivity studies were performed to determine if this pressurizer location in the noding scheme was the most limiting position.The results indicated that two-loop Westinghouse PWRs are sensitive'to the pressurizer nodal location and that in some cases modeling the pressurizer in the intact (non-faulted) loop resulted.in a slight increase in the calculated Peak Cladding Temperature (PCT).For a two loop plant, core cooling is provided by negative core flow and.the negative core flow period.lasts through most of the remaining blowdown period;The concern regarding pressurizer location relates to the negative core flow period which is crucial for core cooling in a two-loop plant.With the pressurizer on the broken loop, pressurizer flow is a large contributor to break flow (pump side), lessening the contribution from the upper plenum and leaving a large upper plenum inventory for negative core flow later in blowdown.For Ginna, a penalty of 2'F due to modeling the pressurizer in the intact (non-faulted) loop was assessed to be used in tracking margin to the 10CFR50.46 limit on the current licensing basis analysis for 15-o SGTP contained.

in WCAP-11609.

The PCT for the limiting C=0.4 break is 1887'F with applicable penalties, and thus adding the 2'F increase brings the PCT, to 1889'F which is well below the 10CFR50.46 limit.

ks discussed abov modifications to the Nestgghouse large break LOCA ECCS Evaluation Model could affect the result by altering the~PCT.A.Analysis Calculated Result B.Modifications to Westinghouse ECCS Evaluation Model C.ECCS Evaluation Model Modifications Resultant PCT 1887'F 2oF 1889 F SMALL BREAK LOCA-EVALUATION MODEL CHANGES The small break.LOCA analysis for R.E.Ginna (RG&E)was also examined to assess the effect of the applicable modifications to the Westinghouse ECCS Evaluation Models on Peak Cladding Temperature (PCT)results reported in Chapter 15.6.4.1 of the UFSAR.The LOCA safety analyses reported in the UFSAR were performed for Ginna with a uniform Steam Generator Tube Plugging (SGTP)level of 12%.The small break LOCA analysis was subsequently evaluated and licensed for a SGTP level increase from 12: to 15%.The small break LOCA event was not reanalyzed because the results are not sensitive to a SGTP level increase from 12%to 15:.The evaluation was documented, and transmitted in WCAP-11609,"Steam Generator Tube Plugging (SGTP)Report for Ginna Nuclear Power Station", October 1987.The small break LOCA analysis results were calculated using the Westinghouse small break LOCA ECCS Evaluation Model documented in WCAP-8970 (Reference 12)which utilized the WFLASH computer code.For R.E.Ginna (RG&E), the limiting size small break resulted from a 6 inch equivalent diameter break in the cold leg.The calculated peak cladding temperature was 1092 F.The analysis assumed the following information important to the small break analyses: NSSS power level-102%of 1520 MWt Fuel Type-14 Z14 OFA Pellet Edge Configuration

-Chamfer Uniform Steam Generator Tube Plugging Level-12-o Nuclear Peaking Factors of 2e32 for the Total Peaking Factor and 1.66 for the Enthalpy Rise Peaking Factor.600 GPM Total Auziliary Feedwater Flow.The following modification to the Westinghouse ECCS Evaluation Model were evaluated to determine if they would affect the current licensing basis small break LOCA analysis results for R.E.Ginna.WFLASH ECCS Evaluation Model Following the accident at Three Mile Island Unit 2, additional attention was focused on the small break LOCA and.Westinghouse submitted a report, WCAP-9600 (Reference 5), to the Nuclear Regulatory Commission (NRC)detailing the performance of the Westinghouse small break LOCA Evaluation Model which utilized the WFLASH computer code.In NUREG-0611 (Reference 6), the NRC staff questioned the validity of certain models in the WFLASH, computer

~t1'V code and required censees to justify contin acceptance of the model.Section II.K.3.30 of NUREG-0737 (Reference 7), which clarified the NRC Post-TMI requirements regarding small break LOCA modeling, required that the licensees revise the small break LOCA ECCS models along the guidelines specified in NUREG-0611.

Following the issuance of NUREG-0737, Westinghouse and the Westinghouse Owners Group decided to develop the NOTRUMP (Reference 9)computer code for use in a new small break LOCA ECCS Evaluation Model (Reference 10).The NRC approved the use of NOTRUMP for small break LOCA ECCS analyses in May 1985.Since approval of the NOTRUMP small break LOCA ECCS Evaluation Model in 1985, the WFLASH computer code has not been maintained as.part of the Westinghouse ECCS Evaluation Model computer codes.In section II.K.3.31 of NUREG-0737, the NRC required that each licensee submit a new small break LOCA analysis using an NRC approved small break LOCA Evaluation Model.which satisfied the requirements of NUREG-0737 section II.K.3.30.

NRC Generic Letter 83-35 (Reference 8)relaxed the requirements of Item II.K.3.31 by allowing a more generic response and providing a basis for retention of the existing small, break LOCA analyses.Provided that the previously existing model results were demonstrated to be conservative with respect to the new small break LOCA model approved under the requirements of NUREG-0737 II.K.3.30 (NOTRUMP), plant specific analyses using the new small break LOCA Evaluation Model would not be required.In WCAP-11145 (Reference 11), Westinghouse and the Westinghouse Owners Group demonstrated that the result's obtained from calculations with WFLASH were conservative relative to those obtained.with NOTRUMP.Compliance with Item II.K.3.31 of NUREG-0737 could be completed by referencing WCAP-11145 and supplying some plant specific information.

Westinghouse, therefore, has not been modifying, investigating, or evaluating proposed changes to the WFLASH.small break LOCA ECCS Evaluation Model.As discussed above, none of the modifications to the Westinghouse small break LOCA ECCS Evaluation Model would affect the small break LOCA analysis results by altering the PCT.A.Analysis Calculated Result B.Modifications to Westinghouse ECCS Evaluation Model C.ECCS Evaluation Model Modifications Resultant PCT 1092'F+0oF 1092'F CONCLUSION An evaluation of the effect of modifications to the Westinghouse ECCS Evaluation Model as reported in References 2 and 3 was performed for both the large break LOCA and small break LOCA analyses results found in WCAP-11609 and Chapter 15.6.4 of the R.E.Ginna Nuclear Power Plant Updated Final Safety Analysis Report.The LOCA safety analyses reported in the UFSAR were performed for Ginna with a uniform Steam Generator Tube Plugging (SGTP)level of 12-o.The large break LOCA analysis was subsequently reanalyzed and licensed for an increase to 15: tube plugging.The small break LOCA analysis was evaluated and was not impacted by the increase in SGTP level to.The results of the ana es and evaluations for the increase in.SGTP level to 15-o were documented in WCAP-11609,"Steam Generator Tube Plugging (SGTP)Report for Ginna.Nuclear Power Station".When the effects of the ECCS model changes were combined with the current plant analysis results, it was determined that compliance with the requirements of 10CFR50.46 would be maintained.

REFERENCES 2.3.4.5.6.7.8.9.10.12."Emergency Core Cooling Systems;Revisions to Acceptance Criteria", Federal Register, Vol.53, No.180, pp.35996-36005, dated September, 16, 1988.NS-NRC-89-3463,"10CFR50.46 Annual Notification for 1989 of Modifications in the Westinghouse ECCS Evaluation Models," Letter from W.J.Johnson (Westinghouse) to T.E.Murley (NRC), dated.October 5, 1989.NS-NRC-89-3464,"Correction of Errors.and Modifications to the NOTRUMP Code in the Westinghouse Small Break LOCA ECCS Evaluation Model Which Are Potentially Significant", Letter from W.J.Johnson (Westinghouse) to T.E.Murley (NRC), dated October 5, 1989.WCAP-9220-P-A, Revision 1 (Proprietary), WCAP-9221-A, Revision 1 (Non-Proprietary),"Westinghouse ECCS Evaluation Model 1981 Version", 1981, Eicheldinger, C.WCAP-10924-P-A (Proprietary), WCAP-12130-A (Non-Proprietary),"Westinghouse Large Break LOCA Best Estimate Methodology", Hochreiter, L.E., et.al., January 1987.Report on Small Break Accidents for Westinghouse Nuclear Steam Supply System", WCAP-9601 (Non-Proprietary), June 1979, WCAP-9600 (Proprietary), June 1979."Generic Evaluation of Feedwater Transients and Small Break Loss-of-Coolant Accidents in Westinghouse Designed Operating Plants", NUREG-0611, January 1980."Clarification of TMI Action Plan Requirements", NUREG-0737, November 1980."Clarification of TMI Plan Item II.K.3.31,"NRC Generic Letter 83-85 from D.G.Eisenhut, November 2, 1983."NOTRUMP-A Nodal Transient Small Break and General Network Code", WCAP-10079-P-A (Proprietary), WCAP-10081-A (Non-'Proprietary), Lee, N., et.al., August 1985."Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code", WCAP-10054-P-A (Proprietary), WCAP-10081-A (Non-Proprietary), Lee, N., et.al., August 1985.WCAP-8970 (Proprietary) and WCAP-8971 (Non-Proprietary),"Westinghouse Emergency Core Cooling System Small Break October 1975 Model", April 1977.