{{#Wiki_filter:'ACCELERATED DISTRIBUTION DEMONSTIONSYSTEMREGULA.YINFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:9203300092 DOC.DATE:
{{#Wiki_filter:'ACCELERATED DISTRIBUTION DEMONS TION SYSTEM REGULA.Y INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9203300092 DOC.DATE: 92/03/23 NOTARIZED:
92/03/23NOTARIZED:
NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G ARITH.NAME AUTHOR AFFILIATION MECREDY,R.C.
NOFACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester GARITH.NAME AUTHORAFFILIATION MECREDY,R.C.
Rochester Gas&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)DOCKET 05000244
Rochester Gas&ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION DocumentControlBranch(Document ControlDesk)DOCKET05000244


==SUBJECT:==
==SUBJECT:==
InterimPart21reptredeficiencies w/MOVsV826B,V738B SV871A6twotwoinchVelanmanual1500ASMEClassIIvalves.Furtherinvestigation beingconducted bynoncompliance reptsprocessing group.DISTRIBUTION CODE:IE19DCOPIESRECEIVED:LTR IENCLJSIZE:TITLE:Part21Rept(50DKT)DNOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).
Interim Part 21 rept re deficiencies w/MOVs V826B,V738B S V871A 6 two two inch Velan manual 1500 ASME Class II valves.Further investigation being conducted by noncompliance repts processing group.DISTRIBUTION CODE: IE19D COPIES RECEIVED:LTR I ENCL J SIZE: TITLE: Part 21 Rept (50 DKT)D NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244/RECIPIENT IDCODE/NAME PD1-3LAJOHNSONFA INTERNAL:
05000244/RECIPIENT ID CODE/NAME PD1-3 LA JOHNSONFA INTERNAL: AEOD/DSP/ROAB NRR/DRIS/RVIB9D RES/DSIR/EIB RGN2 RGN4 SECY VANDERMEL EXTERNAL: INPO RECORD CTR NSIC SILVERFE COPIES LTTR ENCL 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD1-3 PD NR+RDOEA/OGCB 1 1 lREG'=.FILE
AEOD/DSP/ROAB NRR/DRIS/RVIB9D RES/DSIR/EIB RGN2RGN4SECYVANDERMEL EXTERNAL:
+BI F~RGNZ" RGN3 RGN5 NRC PDR COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 D D D NOTE TO ALL"RIDS" RECIPIENTS:
INPORECORDCTRNSICSILVERFECOPIESLTTRENCL10111111111111111111RECIPIENT IDCODE/NAME PD1-3PDNR+RDOEA/OGCB 11lREG'=.FILE
D D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISIRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL 17
+BIF~RGNZ"RGN3RGN5NRCPDRCOPIESLTTRENCL11221111111111DDDNOTETOALL"RIDS"RECIPIENTS:
>'s jf/BIEN)l ii~K'/ir 4iJil/IZ IIIIIIIIIIIII ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER N.Y.14649-0001 ROBERT C MECREDY Vice President Cinna Nuclear Production TELEPHONE AstErt cooE 7 re 546.2700 March 23, 1992 U.S.Nuclear Regulatory Commission Document Control Desk Washington, DC 20555'ubject:
DDPLEASEHELPUSTOREDUCEWASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMPl-37(EXT.20079)TOELIMINATE YOURNAMEFROMDISIRIBUTION LISTSFORDOCUMENTS YOUDON'TNEED!TOTALNUMBEROFCOPIESREQUIRED:
10 CFR Part 21 Interim Report R.E.Ginna Nuclear Power Plant Docket No.50-244 The revision to 10 CFR Part 21, Section 21(a)made effective on 10/29/91, requires an.interim report;of any deviation for which an evaluation to determine reportahility impact is.unable to be completed.
LTTR18ENCL17
within 60 days of discovery.
>'sjf/BIEN)lii~K'/ir4iJil/IZIIIIIIIIIIIII ROCHESTER GASANDELECTRICCORPORATION o89EASTAVENUE,ROCHESTER N.Y.14649-0001 ROBERTCMECREDYVicePresident CinnaNuclearProduction TELEPHONE AstErtcooE7re546.2700March23,1992U.S.NuclearRegulatory Commission DocumentControlDeskWashington, DC20555'ubject:
A recent RG&E audit found that.evaluations for several deviations were not timely and.that the need for interim reports had not yet been considered.
10CFRPart21InterimReportR.E.GinnaNuclearPowerPlantDocketNo.50-244Therevisionto10CFRPart21,Section21(a)madeeffective on10/29/91, requiresan.interimreport;ofanydeviation forwhichanevaluation todetermine reportahility impactis.unabletobecompleted.
It further, determined the cause of the problem to be implementation deficiencies corresponding'to'he rule change.The magnitude of the problem was 28 evaluations exceeding the 60 day duration.This total was derived from an audit sample, from the nearly 200 open Nonconformance Reports (NCR), and further investigation by.the NCR processing group.During the past four weeks a concerted effort was undertaken to complete the 28 evaluations.
within60daysofdiscovery.
The following, tabulation presents the current status:~Evaluation Completed--No Reportable Defect--25~Evaluation In Progress--Included in Interim Report--2~Evaluation Completed;
ArecentRG&Eauditfoundthat.evaluations forseveraldeviations werenottimelyand.thattheneedforinterimreportshadnotyetbeenconsidered.
--Reportable Defect--1**Notice dated February 24 sent by facsimile The two deviations requiring additional evaluation time are described in Attachment A.The actual discovery date for'ach preceded the rule change that became effective 10/29/91.For these deviations, the 10/29/91 date which augments the actual discovery'ate was used to initiate the 60 day evaluation requirement..Although these deviations were discovered prior to the rule change date, interim reports became necessary prior to 12/28/91 for evaluations continuing into 1992.9203300092 920323~d'DR ADOCK 05000244 ritirigtr'S PDR yjgS'f/
Itfurther,determined thecauseoftheproblemtobeimplementation deficiencies corresponding'to'he rulechange.Themagnitude oftheproblemwas28evaluations exceeding the60dayduration.
Thistotalwasderivedfromanauditsample,fromthenearly200openNonconformance Reports(NCR),andfurtherinvestigation by.theNCRprocessing group.Duringthepastfourweeksaconcerted effortwasundertaken tocompletethe28evaluations.
Thefollowing, tabulation presentsthecurrentstatus:~Evaluation Completed
--NoReportable Defect--25~Evaluation InProgress--IncludedinInterimReport--2~Evaluation Completed;
--Reportable Defect--1**NoticedatedFebruary24sentbyfacsimile Thetwodeviations requiring additional evaluation timearedescribed inAttachment A.Theactualdiscovery datefor'achprecededtherulechangethatbecameeffective 10/29/91.
Forthesedeviations, the10/29/91datewhichaugmentstheactualdiscovery'ate wasusedtoinitiatethe60dayevaluation requirement.
.Although thesedeviations werediscovered priortotherulechangedate,interimreportsbecamenecessary priorto12/28/91forevaluations continuing into1992.9203300092 920323~d'DRADOCK05000244ritirigtr
'SPDRyjgS'f/
C'~~  
C'~~  
(2)InadditiontothereviewofNCRs,othercorrective actionsystemswhichinvolveevaluations under.10CFRPart21havealsobeenreviewedandfoundtobefreeoftimeliness problems..
(2)In addition to the review of NCRs, other corrective action systems which involve evaluations under.10 CFR Part 21 have also been reviewed and found to be free of timeliness problems..
Thefollowing actionshavebeenundertaken toensuretimelyevaluation andinterimreporting in,thefuture.1.Assignedresponsibilities andmethods.for.processing an/statusing deviations havebeen'larified inallapplicable procedures, including GinnaStationand.QualityPerformance.
The following actions have been undertaken to ensure timely evaluation and interim reporting in, the future.1.Assigned responsibilities and methods.for.processing an/statusing deviations have been'larified in all applicable procedures, including Ginna Station and.Quality Performance.
2.Assignedresponsibilities andinstructions forperforming 10CFR21evaluations and.relatedinterimreportshavebeenclarified inexistingGinna.Station',
2.Assigned responsibilities and instructions for performing 10 CFR 21 evaluations and.related interim reports have been clarified in existing Ginna.Station', Quality Performance and Nuclear Engineering Services procedures.
QualityPerformance andNuclearEngineering Servicesprocedures.
These clarifications include.utilization of 10CFR 50.72 and, 50.73 criteria for performing evaluations of installed.
Theseclarifications include.utilization of10CFR50.72and,50.73criteriaforperforming evaluations ofinstalled.
basic components.
basiccomponents.
3.Responsibilities and requirements for 10 CFR 21, evaluations and related interim reports have been clarified.
3.Responsibilities andrequirements for10CFR21,evaluations andrelatedinterimreportshavebeenclarified.
in relevant portions of Quality Assurance Manual Sections 15 and 16.4.Target completion dates are assigned and tracked, for potential deviations to'ssure timely evaluations.
inrelevantportionsofQualityAssurance ManualSections15and16.4.Targetcompletion datesareassignedandtracked,forpotential deviations to'ssuretimelyevaluations.
5.Training has been scheduled.
5.Traininghasbeenscheduled.
for appropriate groups.In the interim, closer monitoring of the evaluation timeliness will be provided by the Quality Performance department.
forappropriate groups.Intheinterim,closermonitoring oftheevaluation timeliness willbeprovidedbytheQualityPerformance department.
In summary, corrective actions are sufficiently implemented, to assure timely evaluation of 10 CFR 21 deviations.
Insummary,corrective actionsaresufficiently implemented, toassuretimelyevaluation of10CFR21deviations.
Interim actions will remain until required.training is completed.
Interimactionswillremainuntilrequired.
Further correspondence on the 2 items described in Attachment A will not be issued unless the evaluations are not completed as scheduled or the deviations require reporting per 10 CFR Part 21.Very Truly Yours, RCMNcem%005 Robert C.Mecredy zc: Regional Administrator U.S.Nuclear Regulatory Commission Region 1 475 A'llendale Road.King of Prussia, PA Ginna USNRC Senior Resident: Inspector  
trainingiscompleted.
~'~1 I P
Furthercorrespondence onthe2itemsdescribed inAttachment Awillnotbeissuedunlesstheevaluations arenotcompleted asscheduled orthedeviations requirereporting per10CFRPart21.VeryTrulyYours,RCMNcem%005 RobertC.Mecredyzc:RegionalAdministrator U.S.NuclearRegulatory Commission Region1475A'llendale Road.KingofPrussia,PAGinnaUSNRCSeniorResident:
~~vS~'1 l Attachment A 10 CFR 21 Deviation Evaluation Extensions Deviation Discovery Date: 5/10/91 (10/29/91)
Inspector  
~'~1IP
~~vS~'1lAttachment A10CFR21Deviation Evaluation Extensions Deviation Discovery Date:5/10/91(10/29/91)


==
==
Description:==
Description:==


Severaldeficiencies withmotoroperatedvalveswerenotedasfollowswhentestdatawascomparedwithcalculations:
Several deficiencies with motor operated valves were noted as follows when test data was compared with calculations:
*V826B-Measuredthrustexceededcalculated weaklink'hrust.*V738B-Calculated dpthrustexceedsthrustmeasured.
*V826B-Measured thrust exceeded calculated weak link'hrust.*V738B-Calculated dp thrust exceeds thrust measured.by a static test.*V871A-Measured thrust in differential pressure test exceeds calculated motor stall thrust.Valves have been found to be acceptable for interim use until further testing or repair is performed.(NCR 91-362)Scheduled Evaluation Completion Date: 7/15/92 Deviation Discovery Date 8/21/91 (10/29/91)
byastatictest.*V871A-Measuredthrustindifferential pressuretestexceedscalculated motorstallthrust.Valveshavebeenfoundtobeacceptable forinterimuseuntilfurthertestingorrepairisperformed.
(NCR91-362)Scheduled Evaluation Completion Date:7/15/92Deviation Discovery Date8/21/91(10/29/91)


==
==
Description:==
Description:==


Duringreceiptinspection, twotwoinchVelanmanual15005ASNEClassIIvalveswereidentified withgouges.Valvesarenotinstalled intheplant.Depthandsignificance ofgougesarebeingevaluated.
During receipt inspection, two two inch Velan manual 1500 5 ASNE Class II valves were identified with gouges.Valves are not installed in the plant.Depth and significance of gouges are being evaluated.
,(NCR91-481)Scheduled Evaluation Completion Date:7/15/92m006 if'~iaC~~eC4,,rIC}}
,(NCR 91-481)Scheduled Evaluation Completion Date: 7/15/92 m006 i f'~i aC~~e C 4,, r I C}}

Revision as of 13:16, 7 July 2018

Interim Part 21 Rept Re Deficiencies W/Movs V826B,V738B & V871A & Two Two Inch Velan Manual 1500 ASME Class Ii Valves. Further Investigation Being Conducted by Noncompliance Repts Processing Group
ML17262A775
Person / Time
Site: Ginna 
Issue date: 03/23/1992
From: MECREDY R C
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-PT21-92 NUDOCS 9203300092
Download: ML17262A775 (7)


Text

'ACCELERATED DISTRIBUTION DEMONS TION SYSTEM REGULA.Y INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9203300092 DOC.DATE: 92/03/23 NOTARIZED:

NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G ARITH.NAME AUTHOR AFFILIATION MECREDY,R.C.

Rochester Gas&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)DOCKET 05000244

SUBJECT:

Interim Part 21 rept re deficiencies w/MOVs V826B,V738B S V871A 6 two two inch Velan manual 1500 ASME Class II valves.Further investigation being conducted by noncompliance repts processing group.DISTRIBUTION CODE: IE19D COPIES RECEIVED:LTR I ENCL J SIZE: TITLE: Part 21 Rept (50 DKT)D NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244/RECIPIENT ID CODE/NAME PD1-3 LA JOHNSONFA INTERNAL: AEOD/DSP/ROAB NRR/DRIS/RVIB9D RES/DSIR/EIB RGN2 RGN4 SECY VANDERMEL EXTERNAL: INPO RECORD CTR NSIC SILVERFE COPIES LTTR ENCL 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD1-3 PD NR+RDOEA/OGCB 1 1 lREG'=.FILE

+BI F~RGNZ" RGN3 RGN5 NRC PDR COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 D D D NOTE TO ALL"RIDS" RECIPIENTS:

D D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISIRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL 17

>'s jf/BIEN)l ii~K'/ir 4iJil/IZ IIIIIIIIIIIII ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER N.Y.14649-0001 ROBERT C MECREDY Vice President Cinna Nuclear Production TELEPHONE AstErt cooE 7 re 546.2700 March 23, 1992 U.S.Nuclear Regulatory Commission Document Control Desk Washington, DC 20555'ubject:

10 CFR Part 21 Interim Report R.E.Ginna Nuclear Power Plant Docket No.50-244 The revision to 10 CFR Part 21, Section 21(a)made effective on 10/29/91, requires an.interim report;of any deviation for which an evaluation to determine reportahility impact is.unable to be completed.

within 60 days of discovery.

A recent RG&E audit found that.evaluations for several deviations were not timely and.that the need for interim reports had not yet been considered.

It further, determined the cause of the problem to be implementation deficiencies corresponding'to'he rule change.The magnitude of the problem was 28 evaluations exceeding the 60 day duration.This total was derived from an audit sample, from the nearly 200 open Nonconformance Reports (NCR), and further investigation by.the NCR processing group.During the past four weeks a concerted effort was undertaken to complete the 28 evaluations.

The following, tabulation presents the current status:~Evaluation Completed--No Reportable Defect--25~Evaluation In Progress--Included in Interim Report--2~Evaluation Completed;

--Reportable Defect--1**Notice dated February 24 sent by facsimile The two deviations requiring additional evaluation time are described in Attachment A.The actual discovery date for'ach preceded the rule change that became effective 10/29/91.For these deviations, the 10/29/91 date which augments the actual discovery'ate was used to initiate the 60 day evaluation requirement..Although these deviations were discovered prior to the rule change date, interim reports became necessary prior to 12/28/91 for evaluations continuing into 1992.9203300092 920323~d'DR ADOCK 05000244 ritirigtr'S PDR yjgS'f/

C'~~

(2)In addition to the review of NCRs, other corrective action systems which involve evaluations under.10 CFR Part 21 have also been reviewed and found to be free of timeliness problems..

The following actions have been undertaken to ensure timely evaluation and interim reporting in, the future.1.Assigned responsibilities and methods.for.processing an/statusing deviations have been'larified in all applicable procedures, including Ginna Station and.Quality Performance.

2.Assigned responsibilities and instructions for performing 10 CFR 21 evaluations and.related interim reports have been clarified in existing Ginna.Station', Quality Performance and Nuclear Engineering Services procedures.

These clarifications include.utilization of 10CFR 50.72 and, 50.73 criteria for performing evaluations of installed.

basic components.

3.Responsibilities and requirements for 10 CFR 21, evaluations and related interim reports have been clarified.

in relevant portions of Quality Assurance Manual Sections 15 and 16.4.Target completion dates are assigned and tracked, for potential deviations to'ssure timely evaluations.

5.Training has been scheduled.

for appropriate groups.In the interim, closer monitoring of the evaluation timeliness will be provided by the Quality Performance department.

In summary, corrective actions are sufficiently implemented, to assure timely evaluation of 10 CFR 21 deviations.

Interim actions will remain until required.training is completed.

Further correspondence on the 2 items described in Attachment A will not be issued unless the evaluations are not completed as scheduled or the deviations require reporting per 10 CFR Part 21.Very Truly Yours, RCMNcem%005 Robert C.Mecredy zc: Regional Administrator U.S.Nuclear Regulatory Commission Region 1 475 A'llendale Road.King of Prussia, PA Ginna USNRC Senior Resident: Inspector

~'~1 I P

~~vS~'1 l Attachment A 10 CFR 21 Deviation Evaluation Extensions Deviation Discovery Date: 5/10/91 (10/29/91)

==

Description:==

Several deficiencies with motor operated valves were noted as follows when test data was compared with calculations:

  • V826B-Measured thrust exceeded calculated weak link'hrust.*V738B-Calculated dp thrust exceeds thrust measured.by a static test.*V871A-Measured thrust in differential pressure test exceeds calculated motor stall thrust.Valves have been found to be acceptable for interim use until further testing or repair is performed.(NCR 91-362)Scheduled Evaluation Completion Date: 7/15/92 Deviation Discovery Date 8/21/91 (10/29/91)

==

Description:==

During receipt inspection, two two inch Velan manual 1500 5 ASNE Class II valves were identified with gouges.Valves are not installed in the plant.Depth and significance of gouges are being evaluated.

,(NCR 91-481)Scheduled Evaluation Completion Date: 7/15/92 m006 i f'~i aC~~e C 4,, r I C