ML17263A355: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
Created page by program invented by StriderTol
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ACCEIERATDOCVMENTDISTRIBVTION SYSTEMREGULAYINFORMATION DISTRIBUTICSYSTEM (RIDE)ACCESSION NBR:9308130032 DOC.DATE:
{{#Wiki_filter:ACCEI ERAT DOCVMENT DISTRIBVTION SYSTEM REGULA Y INFORMATION DISTRIBUTICSYSTEM (RIDE)ACCESSION NBR:9308130032 DOC.DATE: 93/08/06 NOTARIZED:
93/08/06NOTARIZED:
NO DOCKET t FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUlPH'.0/bfE AUTHOR AFFILIATION MECREDC,R.C.
NODOCKETtFACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester G05000244AUlPH'.0/bfEAUTHORAFFILIATION MECREDC,R.C.
Rochester Gas&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.
Rochester Gas&ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.
NRC-No Detailed Affiliation Given  
NRC-NoDetailedAffiliation Given


==SUBJECT:==
==SUBJECT:==
Respondstotelconon930707repreviousadministrative changesperapplication foramendtoLicenseDPR-18onrequirements forsnubbervisualinspintervals
Responds to telcon on 930707 re previous administrative changes per application for amend to License DPR-18 on requirements for snubber visual insp intervals&Generic Ltr 90-09.DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR J ENCL Q SIZE:,+'ITLE: OR Submittal:
&GenericLtr90-09.DISTRIBUTION CODE:AOOIDCOPIESRECEIVED:LTR JENCLQSIZE:,+'ITLE:ORSubmittal:
General Distribution D NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
GeneralDistribution DNOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).
05000244 RECIPIENT ID CODE/NAME PDl-3 LA JOHNSON,A INTERNAL: NRR/DE/EELB NRR/DRPW/OTSB NRR/DSSA/SRXB OC/LFDCB 01 EXTERNAL: NRC PDR COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 0 1 1 1 1 RECIPIENT ID CODE/NAME PD1-3 PD NRR/DRCH/HICB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS1 NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 0 1 1 D D D D NOTE TO ALL"RIDS" RECIPIENTS:
05000244RECIPIENT IDCODE/NAME PDl-3LAJOHNSON,A INTERNAL:
PLEASE HELP US TO REDUCE WASTE(CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.504-2065)TO ELIMINATE YOUR NAME FROM DISTRII3UTION LISTS FOR DOCUMENTS YOU DON'T NEED!D TOTAL NUMBER OF COPIES REQUIRED: LTTR 15 ENCL 13 IIIIZif IIIIIII rI eric'r'rrrrr ROCHESTER GAS AND ELECTRIC CORPORATION
NRR/DE/EELB NRR/DRPW/OTSB NRR/DSSA/SRXB OC/LFDCB01EXTERNAL:
>>>>~0>>I>>>>4 89 EAST AVENUE, ROCHESTER N.Y.14649.0001 ROBERT C MECREDY Vice Prerldent Clnna Nuclear Production August 6, 1993 TELEPHONE AREA CODE 71B 546 2700 U.S.Nuclear Regulatory Commission Document Control Desk Attn: Allen R.Johnson Project Directorate I-3 Washington, D.C.20555  
NRCPDRCOPIESLTTRENCL1122111111101111RECIPIENT IDCODE/NAME PD1-3PDNRR/DRCH/HICB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS1NSICCOPIESLTTRENCL111111111011DDDDNOTETOALL"RIDS"RECIPIENTS:
PLEASEHELPUSTOREDUCEWASTE(CONTACTTHEDOCUMENTCONTROLDESK,ROOMPl-37(EXT.504-2065)
TOELIMINATE YOURNAMEFROMDISTRII3UTION LISTSFORDOCUMENTS YOUDON'TNEED!DTOTALNUMBEROFCOPIESREQUIRED:
LTTR15ENCL13 IIIIZifIIIIIIIrIeric'r'rrrrr ROCHESTER GASANDELECTRICCORPORATION
>>>>~0>>I>>>>489EASTAVENUE,ROCHESTER N.Y.14649.0001 ROBERTCMECREDYVicePrerldent ClnnaNuclearProduction August6,1993TELEPHONE AREACODE71B5462700U.S.NuclearRegulatory Commission DocumentControlDeskAttn:AllenR.JohnsonProjectDirectorate I-3Washington, D.C.20555


==Subject:==
==Subject:==
Administrative ChangestoaPreviously Submitted Application toAmendtheTechnical Specifications R.E.GinnaNuclearPowerPlantDocket'No.
Administrative Changes to a Previously Submitted Application to Amend the Technical Specifications R.E.Ginna Nuclear Power Plant Docket'No.
50-244Ref.(a):LetterfromR.C.Mecredy(RG6E)toA.R.Johnson(NRC),"Application forAmendment toOperating License,"
50-244 Ref.(a): Letter from R.C.Mecredy (RG6E)to A.R.Johnson (NRC),"Application for Amendment to Operating License," dated April 23, 1992  
datedApril23,1992


==DearMr.Johnson:==
==Dear Mr.Johnson:==
Thissubmittal isinresponsetoateleconbetweenyouandmembersofRGGE'sstaffonJuly7,1993.Submitted herewitharetheproposedpagesfromapreviously submitted application (Reference a)toamendtheGinnaTechnical Specifications regarding alternative requirements forsnubbervisualinspection intervals, madepursuanttoGenericLetter90-09,containing severaladministrative changesandminorcorrections.
This submittal is in response to a telecon between you and members of RGGE's staff on July 7, 1993.Submitted herewith are the proposed pages from a previously submitted application (Reference a)to amend the Ginna Technical Specifications regarding alternative requirements for snubber visual inspection intervals, made pursuant to Generic Letter 90-09, containing several administrative changes and minor corrections.
Asagreedinourteleconthefollowing changeshavebeenmadeandareconsidered administrative innature.1.Onproposedpage4.14-2(line11)theword"or"hasbeenchangedto"and",consistent withGenericLetter90-09,Enclosure B,para.4.7.9c.2.Onproposedpage4.14-2(line15)theword"in-operable" hasbeencorrected to"inoperable."
As agreed in our telecon the following changes have been made and are considered administrative in nature.1.On proposed page 4.14-2 (line 11)the word"or" has been changed to"and", consistent with Generic Letter 90-09, Enclosure B, para.4.7.9c.2.On proposed page 4.14-2 (line 15)the word"in-operable" has been corrected to"inoperable." 3.On proposed page 4.14-2 a change bar has been added in the right hand margin, which was inadvertently left off in the Reference (a)submittal.
3.Onproposedpage4.14-2achangebarhasbeenaddedintherighthandmargin,whichwasinadvertently leftoffintheReference (a)submittal.
4.On proposed page 4.14-4 (Table 4.14-1), the word"acceptable" has been corrected to"unacceptable", in Note 4 consistent with Generic Letter 90-09, Enclosure B, Table 4.7-2, Note 4.c 9308130032'30806 PDR ADQCK 05000244'" P PDR, 0el In order to keep all proposed pages together, a complete ATTACHMENT A of our Reference (a)submittal is hereby, submitted to replace the previous ATTACHMENT A in its entirety.Very truly yours, Robert C.Mec edy GAH4295 Attachment xc: Mr.Allen R.Johnson (Mail Stop 14D1)Project Directorate I-3 Washington, D.C.20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector}}
4.Onproposedpage4.14-4(Table4.14-1),theword"acceptable" hasbeencorrected to"unacceptable",
inNote4consistent withGenericLetter90-09,Enclosure B,Table4.7-2,Note4.c9308130032'30806 PDRADQCK05000244'"PPDR,0el Inordertokeepallproposedpagestogether, acompleteATTACHMENT AofourReference (a)submittal ishereby,submitted toreplacethepreviousATTACHMENT Ainitsentirety.
Verytrulyyours,RobertC.MecedyGAH4295Attachment xc:Mr.AllenR.Johnson(MailStop14D1)ProjectDirectorate I-3Washington, D.C.20555U.S.NuclearRegulatory Commission RegionI475Allendale RoadKingofPrussia,PA19406GinnaSeniorResidentInspector}}

Revision as of 13:07, 7 July 2018

Responds to Telcon on 930707 Re Previous Administrative Changes Per Application for Amend to License DPR-18 on Requirements for Snubber Visual Insp Intervals & Generic Ltr 90-09
ML17263A355
Person / Time
Site: Ginna 
Issue date: 08/06/1993
From: MECREDY R C
ROCHESTER GAS & ELECTRIC CORP.
To: JOHNSON A R
NRC, NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17263A356 List:
References
GL-90-09, GL-90-9, NUDOCS 9308130032
Download: ML17263A355 (3)


Text

ACCEI ERAT DOCVMENT DISTRIBVTION SYSTEM REGULA Y INFORMATION DISTRIBUTICSYSTEM (RIDE)ACCESSION NBR:9308130032 DOC.DATE: 93/08/06 NOTARIZED:

NO DOCKET t FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUlPH'.0/bfE AUTHOR AFFILIATION MECREDC,R.C.

Rochester Gas&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.

NRC-No Detailed Affiliation Given

SUBJECT:

Responds to telcon on 930707 re previous administrative changes per application for amend to License DPR-18 on requirements for snubber visual insp intervals&Generic Ltr 90-09.DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR J ENCL Q SIZE:,+'ITLE: OR Submittal:

General Distribution D NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 RECIPIENT ID CODE/NAME PDl-3 LA JOHNSON,A INTERNAL: NRR/DE/EELB NRR/DRPW/OTSB NRR/DSSA/SRXB OC/LFDCB 01 EXTERNAL: NRC PDR COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 0 1 1 1 1 RECIPIENT ID CODE/NAME PD1-3 PD NRR/DRCH/HICB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS1 NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 0 1 1 D D D D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE(CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.504-2065)TO ELIMINATE YOUR NAME FROM DISTRII3UTION LISTS FOR DOCUMENTS YOU DON'T NEED!D TOTAL NUMBER OF COPIES REQUIRED: LTTR 15 ENCL 13 IIIIZif IIIIIII rI eric'r'rrrrr ROCHESTER GAS AND ELECTRIC CORPORATION

>>>>~0>>I>>>>4 89 EAST AVENUE, ROCHESTER N.Y.14649.0001 ROBERT C MECREDY Vice Prerldent Clnna Nuclear Production August 6, 1993 TELEPHONE AREA CODE 71B 546 2700 U.S.Nuclear Regulatory Commission Document Control Desk Attn: Allen R.Johnson Project Directorate I-3 Washington, D.C.20555

Subject:

Administrative Changes to a Previously Submitted Application to Amend the Technical Specifications R.E.Ginna Nuclear Power Plant Docket'No.

50-244 Ref.(a): Letter from R.C.Mecredy (RG6E)to A.R.Johnson (NRC),"Application for Amendment to Operating License," dated April 23, 1992

Dear Mr.Johnson:

This submittal is in response to a telecon between you and members of RGGE's staff on July 7, 1993.Submitted herewith are the proposed pages from a previously submitted application (Reference a)to amend the Ginna Technical Specifications regarding alternative requirements for snubber visual inspection intervals, made pursuant to Generic Letter 90-09, containing several administrative changes and minor corrections.

As agreed in our telecon the following changes have been made and are considered administrative in nature.1.On proposed page 4.14-2 (line 11)the word"or" has been changed to"and", consistent with Generic Letter 90-09, Enclosure B, para.4.7.9c.2.On proposed page 4.14-2 (line 15)the word"in-operable" has been corrected to"inoperable." 3.On proposed page 4.14-2 a change bar has been added in the right hand margin, which was inadvertently left off in the Reference (a)submittal.

4.On proposed page 4.14-4 (Table 4.14-1), the word"acceptable" has been corrected to"unacceptable", in Note 4 consistent with Generic Letter 90-09, Enclosure B, Table 4.7-2, Note 4.c 9308130032'30806 PDR ADQCK 05000244'" P PDR, 0el In order to keep all proposed pages together, a complete ATTACHMENT A of our Reference (a)submittal is hereby, submitted to replace the previous ATTACHMENT A in its entirety.Very truly yours, Robert C.Mec edy GAH4295 Attachment xc: Mr.Allen R.Johnson (Mail Stop 14D1)Project Directorate I-3 Washington, D.C.20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector