ML17265A265: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORYREGULATRYINFORMATION DISTRIBUTIO SYSTEM(RIDS)ACl"ESSION NBR:9805140326 DOC.DATE:
{{#Wiki_filter:CATEGORY REGULAT RY INFORMATION DISTRIBUTIO SYSTEM (RIDS)ACl"ESSION NBR:9805140326 DOC.DATE: 98/04/30 NOTARIZED:
98/04/30NOTARIZED:
NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G AUTH.NAME AUTHOR AFFILIATION WALDEN,J.V.
NOFACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester GAUTH.NAMEAUTHORAFFILIATION WALDEN,J.V.
Rochester Gas S Electric Corp.WIDAY,J.A.
Rochester GasSElectricCorp.WIDAY,J.A.
Rochester Gas&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000244 VISSING, G.S.
Rochester Gas&ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION DOCKET05000244VISSING,G.S.


==SUBJECT:==
==SUBJECT:==
Monthlyoperating reptforApr1998forREGinnaNuclearPowerPlant.W/980506 ltr.DISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).
Monthly operating rept for Apr 1998 for RE Ginna Nuclear Power Plant.W/980506 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
CA,'5000244 E.GRECIPIENT IDCODE/NAME PDl-1PDINTERNAL:
C A,'5000244 E.G RECIPIENT ID CODE/NAME PDl-1 PD INTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1-ILE CENTER 0 1 1 RGN1 1 1 1 1 NOAC COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1 1 VISSING,G.
AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL:
COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D E N NOTE TO ALL"RIDS" RECIPIENTS:
LITCOBRYCE,JHNRCPDR11-ILECENTER011RGN11111NOACCOPIESRECIPIENT LTTRENCLIDCODE/NAME 11VISSING,G.
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9 l J II' AND ROCHESTER GAS AND ELECTRIC CORPORATION
COPIESLTTRENCL11111111DENNOTETOALL"RIDS"RECIPIENTS:
~89 EASTAVfNLIE, ROCHESTER, N.Y 14649-000I AREA CODE7I6 546-2700 May 6, 1998 US Nuclear Regulatory Commission Document Control Desk Attn: Guy S.Vissing Project Directorate 1-1 Washington, DC 20555
PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:
LTTR9ENCL9 lJII' ANDROCHESTER GASANDELECTRICCORPORATION
~89EASTAVfNLIE, ROCHESTER, N.Y14649-000I AREACODE7I6546-2700May6,1998USNuclearRegulatory Commission DocumentControlDeskAttn:GuyS.VissingProjectDirectorate 1-1Washington, DC20555


==Subject:==
==Subject:==
MonthlyReportforApril,1998Operating StatusInformation R.E.GinnaNuclearPowerPlantDocketNo.50-244
Monthly Report for April, 1998 Operating Status Information R.E.Ginna Nuclear Power Plant Docket No.50-244  


==DearMr.Vissing:==
==Dear Mr.Vissing:==
PursuanttoGinnaImprovedTechnical Specifications Section5.6.4,attachedisthemonthlyoperating statusreportforGinnaStationforthemonthofApril,1998.~Verytrulyyours,u.dJshA.WidaylantManagerxc:U.S.NuclearRegulatory Commission Mr.GuyS.Vissing(MailStop14B2)ProjectDirectorate I-1Washington, D.C.20555U.S.NuclearRegulatory Commission RegionI475Allendale RoadKingofPrussia,PA19406U.S.NRCGinnaSeniorResidentInspector Attachments 9805140326
Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of April, 1998.~Very truly yours, u.d J s h A.Widay lant Manager xc: U.S.Nuclear Regulatory Commission Mr.Guy S.Vissing (Mail Stop 14B2)Project Directorate I-1 Washington, D.C.20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S.NRC Ginna Senior Resident Inspector Attachments 9805140326
'F80430POR,AOQCK05000244R."PDR=47)3gg okl OPERATING DATAREPORT50-244May6,1998COMPLETED BY:JohnV.WaldenTELEPHONE (716)771-3588OPERATING STATUS4801.UnitName:R.E.GINNANUCLEARPOWERPLANT2.Reporting Period:An'I,'I9983.DesignElectricRating(NetMWe):4704.MaximumDependable Capacity(NetMWe):Notes:ThisMonthYr.-to-Date Cumulative**
'F80430 POR, AOQCK 05000244 R." PDR=47)3g g o kl OPERATING DATA REPORT 50-244 May 6, 1998 COMPLETED BY: John V.Walden TELEPHONE (716)771-3588 OPERATING STATUS 480 1.Unit Name: R.E.GINNA NUCLEAR POWER PLANT 2.Reporting Period: A n'I,'I998 3.Design Electric Rating (Net MWe): 470 4.Maximum Dependable Capacity (Net MWe): Notes: This Month Yr.-to-Date Cumulative**
5.NumberofhoursReactorWasCritical6.HoursGenerator On-line7.UnitReserveShutdownHours8.NetElectrical EnergyGenerated (MWH)719.0719.00.0357410.02879.02879.00.01429793.0 200838.2197817.78.5*88971309.4
5.Number of hours Reactor Was Critical 6.Hours Generator On-line 7.Unit Reserve Shutdown Hours 8.Net Electrical Energy Generated (MWH)719.0 719.0 0.0 357410.0 2879.0 2879.0 0.0 1429793.0 200838.2 197817.7 8.5*88971309.4
**CUMULATIVE TOTALCOMMENCING NOVEMBER8,1969 1~aS11 l4DOCKETNO:50-244UNITNAME:R.E.GINNANUCLEARPOWERPLANTCOMPLETED BY:JohnV.WaldenUNITSHUTDOWNREPORTING PERIOD:Aril1998(Month/Year)
**CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969 1~a S 11 l 4 DOCKET NO: 50-244 UNIT NAME: R.E.GINNA NUCLEAR POWER PLANT COMPLETED BY: John V.Walden UNIT SHUTDOWN REPORTING PERIOD: A ril 1998 (Month/Year)
NO.DATETYPEF:FORCEDS:SCHEDULED DURATION(HOURS)REASON"'ETHOD OFSHUTTINGDOWN~2'AUSE/CORRECTIVE ACTIONSCOMMENTSSUMMARY:TheunitoperatedatfullpowerfortheentiremonthofApril.(1)Reason(2)MethodA-Equipment Failure(Explain)
NO.DATE TYPE F: FORCED S: SCHEDULED DURATION (HOURS)REASON"'ETHOD OF SHUTTING DOWN~2'AUSE/CORRECTIVE ACTIONS COMMENTS
B-Maintenance orTestC-Refueling D-Regulatory Restriction E-OperatorTraining/License Examination F-Administrative G-Operational Error(Explain)
 
H-Other(Explain) 1-Manual2-ManualTrip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other(Explain) e.0t~pl9}}
==SUMMARY==
: The unit operated at full power for the entire month of April.(1)Reason (2)Method A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other (Explain) e.0 t~pl 9}}

Revision as of 12:39, 7 July 2018

Monthly Operating Rept for Apr 1998 for Re Ginna Nuclear Power Plant.W/980506 Ltr
ML17265A265
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/30/1998
From: WALDEN J V, WIDAY J A
ROCHESTER GAS & ELECTRIC CORP.
To: VISSING G S
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9805140326
Download: ML17265A265 (8)


Text

CATEGORY REGULAT RY INFORMATION DISTRIBUTIO SYSTEM (RIDS)ACl"ESSION NBR:9805140326 DOC.DATE: 98/04/30 NOTARIZED:

NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G AUTH.NAME AUTHOR AFFILIATION WALDEN,J.V.

Rochester Gas S Electric Corp.WIDAY,J.A.

Rochester Gas&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000244 VISSING, G.S.

SUBJECT:

Monthly operating rept for Apr 1998 for RE Ginna Nuclear Power Plant.W/980506 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

C A,'5000244 E.G RECIPIENT ID CODE/NAME PDl-1 PD INTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1-ILE CENTER 0 1 1 RGN1 1 1 1 1 NOAC COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1 1 VISSING,G.

COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D E N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9 l J II' AND ROCHESTER GAS AND ELECTRIC CORPORATION

~89 EASTAVfNLIE, ROCHESTER, N.Y 14649-000I AREA CODE7I6 546-2700 May 6, 1998 US Nuclear Regulatory Commission Document Control Desk Attn: Guy S.Vissing Project Directorate 1-1 Washington, DC 20555

Subject:

Monthly Report for April, 1998 Operating Status Information R.E.Ginna Nuclear Power Plant Docket No.50-244

Dear Mr.Vissing:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of April, 1998.~Very truly yours, u.d J s h A.Widay lant Manager xc: U.S.Nuclear Regulatory Commission Mr.Guy S.Vissing (Mail Stop 14B2)Project Directorate I-1 Washington, D.C.20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S.NRC Ginna Senior Resident Inspector Attachments 9805140326

'F80430 POR, AOQCK 05000244 R." PDR=47)3g g o kl OPERATING DATA REPORT 50-244 May 6, 1998 COMPLETED BY: John V.Walden TELEPHONE (716)771-3588 OPERATING STATUS 480 1.Unit Name: R.E.GINNA NUCLEAR POWER PLANT 2.Reporting Period: A n'I,'I998 3.Design Electric Rating (Net MWe): 470 4.Maximum Dependable Capacity (Net MWe): Notes: This Month Yr.-to-Date Cumulative**

5.Number of hours Reactor Was Critical 6.Hours Generator On-line 7.Unit Reserve Shutdown Hours 8.Net Electrical Energy Generated (MWH)719.0 719.0 0.0 357410.0 2879.0 2879.0 0.0 1429793.0 200838.2 197817.7 8.5*88971309.4

    • CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969 1~a S 11 l 4 DOCKET NO: 50-244 UNIT NAME: R.E.GINNA NUCLEAR POWER PLANT COMPLETED BY: John V.Walden UNIT SHUTDOWN REPORTING PERIOD: A ril 1998 (Month/Year)

NO.DATE TYPE F: FORCED S: SCHEDULED DURATION (HOURS)REASON"'ETHOD OF SHUTTING DOWN~2'AUSE/CORRECTIVE ACTIONS COMMENTS

SUMMARY

The unit operated at full power for the entire month of April.(1)Reason (2)Method A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other (Explain) e.0 t~pl 9