ML17286A826: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 24: | Line 24: | ||
This letter is to request information to support our inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment Plans beginning January 16, 2018, at your Braidwood Station, Units 1 and 2. This inspection will be performed in accordance with the U.S. Nuclear Regulatory Commission (NRC) Temporary Instruction 2515/191. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents requested for the inspection. Please provide this information prior to January 2, 2018. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection. Insofar as possible, this information should be provided electronically to the lead inspector. The lead inspector for this inspection is Dr. Stuart Sheldon. We understand that our primary contact for this inspection is Mr. Richard Schliessmann of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at 630-829-9727 or via e-mail at Stuart.Sheldon@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Offi ce of Management and Budget, Control Number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. | This letter is to request information to support our inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment Plans beginning January 16, 2018, at your Braidwood Station, Units 1 and 2. This inspection will be performed in accordance with the U.S. Nuclear Regulatory Commission (NRC) Temporary Instruction 2515/191. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents requested for the inspection. Please provide this information prior to January 2, 2018. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection. Insofar as possible, this information should be provided electronically to the lead inspector. The lead inspector for this inspection is Dr. Stuart Sheldon. We understand that our primary contact for this inspection is Mr. Richard Schliessmann of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at 630-829-9727 or via e-mail at Stuart.Sheldon@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Offi ce of Management and Budget, Control Number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. | ||
This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding." | This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding." | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Ann Marie Stone, Team Lead Technical Support Staff Division of Reactor Projects Docket Nos. 50-456 and 50-457 License Nos. NPF-72 and NPF-77 | Ann Marie Stone, Team Lead Technical Support Staff Division of Reactor Projects Docket Nos. 50-456 and 50-457 License Nos. NPF-72 and NPF-77 | ||
Line 51: | Line 50: | ||
DRPIII DRSIII ROPreports.Resource@nrc.gov JLD_Regional.Resource@nrc.gov | DRPIII DRSIII ROPreports.Resource@nrc.gov JLD_Regional.Resource@nrc.gov | ||
ADAMS Accession Number: ML17286A826 OFFICE RIII RIII NAME SSheldon:lg AMStone DATE 10/10/2017 10/13/2017 OFFICIAL RECORD COPY | ADAMS Accession Number: ML17286A826 OFFICE RIII RIII NAME SSheldon:lg AMStone DATE 10/10/2017 10/13/2017 OFFICIAL RECORD COPY | ||
Enclosure REQUESTED INFORMATION TO SUPPORT TEMPORARY INSTRUCTION 2515/191 INSPECTION | Enclosure REQUESTED INFORMATION TO SUPPORT TEMPORARY INSTRUCTION 2515/191 INSPECTION |
Revision as of 18:47, 6 July 2018
ML17286A826 | |
Person / Time | |
---|---|
Site: | Braidwood |
Issue date: | 10/13/2017 |
From: | Stone A M NRC/RGN-III/DRP/TSS |
To: | Bryan Hanson Exelon Generation Co, Exelon Nuclear |
References | |
Download: ML17286A826 (5) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 October 13, 2017 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
INFORMATION REQUEST TO SUPPORT UPCOMING TEMPORARY INSTRUCTION 2515/191 INSPECTION AT BRAIDWOOD STATION, UNITS 1 AND 2
Dear Mr. Hanson:
This letter is to request information to support our inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment Plans beginning January 16, 2018, at your Braidwood Station, Units 1 and 2. This inspection will be performed in accordance with the U.S. Nuclear Regulatory Commission (NRC) Temporary Instruction 2515/191. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents requested for the inspection. Please provide this information prior to January 2, 2018. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection. Insofar as possible, this information should be provided electronically to the lead inspector. The lead inspector for this inspection is Dr. Stuart Sheldon. We understand that our primary contact for this inspection is Mr. Richard Schliessmann of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at 630-829-9727 or via e-mail at Stuart.Sheldon@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Offi ce of Management and Budget, Control Number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
Sincerely,
/RA/
Ann Marie Stone, Team Lead Technical Support Staff Division of Reactor Projects Docket Nos. 50-456 and 50-457 License Nos. NPF-72 and NPF-77
Enclosure:
Requested Information to Support Temporary Instruction 2515/191 Inspection cc: Distribution via LISTSERV
Letter to Bryan C. Hanson from Ann Marie Stone dated October 13, 2017
SUBJECT:
INFORMATION REQUEST TO SUPPORT UPCOMING TEMPORARY INSTRUCTION 2515/191 INSPECTION AT BRAIDWOOD STATION, UNITS 1 AND 2
DISTRIBUTION:
RidsNrrDorlLpl3 RidsNrrPMBraidwood Resource RidsNrrDirsIrib Resource Cynthia Pederson
Richard Skokowski Allan Barker Carole Ariano
DRPIII DRSIII ROPreports.Resource@nrc.gov JLD_Regional.Resource@nrc.gov
ADAMS Accession Number: ML17286A826 OFFICE RIII RIII NAME SSheldon:lg AMStone DATE 10/10/2017 10/13/2017 OFFICIAL RECORD COPY
Enclosure REQUESTED INFORMATION TO SUPPORT TEMPORARY INSTRUCTION 2515/191 INSPECTION
Please provide the following information on a compac t disc or another form of electronic media, if possible. For requested lists please provide the information, if possible, in a "sortable" Excel spreadsheet format. For the purposes of this document request, FLEX will mean any item, procedure, calculation, document or structure, system, and component that was part of the implementation of Mitigating Strategies, or Spent Fuel Pool Instrumentation (SFPLI) orders and emergency preparedness (EP) communications/staffing and multi-unit dose assessment.
- 1. A current copy of the Final Integrated Plan (FIP) and any documentation to or from the NRC related to the FIP. Please include any changes to the FIP since submittal to the NRC.
- 2. A listing of any changes to the FIP since issuance of the NRC Safety Evaluation Report. 3. A copy of your communications and staffing assessments for responding to a beyond design basis external event.
- 4. A listing of Corrective Action Program (CAP) items related to implementation of FLEX, maintenance of the FLEX program and equipment, modifications related to FLEX, and training related to FLEX.
- 5. A current copy of the SAFER response plan.
- 6. A copy of any audits related to your preparation for this inspection as well as any related to the implementation or maintenance of FLEX.
- 7. A current copy of administrative procedure(s) for the CAP, modification program, maintenance of FLEX equipment program, operations procedure writing and implementing, and top-level documents for the work control programs, and work scheduling programs. If FLEX related procedures such as Flex Support Guidelines (FSGs) or the FIP are maintained under a different process please include copies of those procedures. Include procedures for configuration control of FLEX documents.
- 8. A current copy of the Emergency Operating Procedures, Abnormal Operating Procedures, Off-Normal Procedures and FSGs. Please have the annunciator response procedures available during the inspection. Also include Station Blackout related procedures if they are separate from the above.
- 9. A current copy of your outage planning procedures including forced outage planning procedures related to FLEX implementation. For example, procedures for implementation of FLEX in shutdown modes.
- 10. FLEX related training documents, aids, and records, including presentations and videos. Include training on SFPLI maintenance and operations. (Ref. NEI 12-06 Section 11.6)
- 11. A listing of plant modifications related to FLEX along with a copies of the spent fuel pool instrumentation modification, and EP communications modifications.
2 12. A listing of calculations, evaluations, and 50.59 reviews related to FLEX.
- 14. A copy of the FLEX strategies time validation study.
- 15. A copy of the haul path liquefaction analysis. (Ref. NEI 12-06 Section 5.3.2.1)
- 17. A listing of Preventive Maintenance (PM) tasks for FLEX equipment, SFPLI, and EP communications equipment installed for FLEX response. Include a copy of the most recent PMs (work orders) for this equipment. (Ref. NEI 12-06 Section 11.5.2)
- 18. Current copies of SFPLI maintenance procedures.
- 19. Documents and procedures related to y our multi-unit dose assessment capability. Please include a copy of your multi-unit dose assessment submittal.
- 20. A copy of the Updated Final Safety A nalysis Report, Technical Specifications and bases documents.
OTHER: On the first day of the inspection, please provi de the inspection team a briefing of your FIP and overall strategy.
On the first day of the inspection, please provi de a copy of any procedures revised after your response to this request for information.
In addition, the inspectors will require computer access to the CAP database while on site.