| number = ML25210A012
| number = ML25210A012
| issue date = 07/29/2025
| issue date = 07/29/2025
| title = Units 1 and 2 - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000352/2025403 and 05000353/2025403
| title = Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000352/2025403 and 05000353/2025403
| author name = Dentel G
| author name = Dentel G
| author affiliation = NRC/RGN-I/DORS
| author affiliation = NRC/RGN-I/DORS
Line 14: Line 14:
| page count = 1
| page count = 1
}}
}}
See also: [[see also::IR 05000352/2025403]]


=Text=
=Text=
{{#Wiki_filter:July 29, 2025 David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer (CNO)
{{#Wiki_filter:July 29, 2025  
Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555  
David P. Rhoades  
Senior Vice President  
Constellation Energy Generation, LLC  
President and Chief Nuclear Officer (CNO)  
Constellation Nuclear  
4300 Winfield Road  
Warrenville, IL 60555  
SUBJECT:
LIMERICK GENERATING STATION, UNITS 1 AND 2 - INFORMATION
REQUEST FOR THE CYBERSECURITY BASELINE INSPECTION,
NOTIFICATION TO PERFORM INSPECTION 05000352/2025403 AND
05000353/2025403
Dear David Rhoades:
On December 8, 2025, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline
inspection in accordance with Inspection Procedure (IP) 71130.10, Cyber Security, dated
December 14, 2021, at your Limerick Generating Station, Units 1 and 2. The inspection will be
performed to evaluate and verify your ability to meet the requirements of the NRCs Cyber
Security Rule, Title 10 of the Code of Federal Regulations (10 CFR) Part 73, Section 54,
Protection of Digital Computer and Communication Systems and Networks. The onsite portion
of the inspection will take place December 8-12, 2025.
Experience has shown that baseline inspections are extremely resource intensive, both for the
NRC inspectors and the licensee staff. To minimize the inspection impact on the site and to
ensure a productive inspection for both parties, we have enclosed a request for documents
needed for the inspection. These documents have been divided into four groups.
The first group specifies information necessary to assist the inspection team in choosing the
focus areas (i.e., sample set) to be inspected by IP 71130.10. This information should be
made available either on an online repository (preferred) or digital media (CD/DVD) no later
than September 5, 2025. The inspection team will review this information and, by October 3,
2025, will request the specific items that should be provided for review.
The second group of additional requested documents will assist the inspection team in the
evaluation of the critical systems and critical digital assets, defensive architecture, and the areas
of the licensees cybersecurity program selected for the cybersecurity inspection. This
information will be requested for review in the regional office prior to the inspection by 
October 31, 2025, as identified above.


==SUBJECT:==
D. Rhoades
LIMERICK GENERATING STATION, UNITS 1 AND 2 - INFORMATION REQUEST FOR THE CYBERSECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM INSPECTION 05000352/2025403 AND 05000353/2025403
2
The third group of requested documents consists of those items that the inspection team will
review, or need access to, during the inspection. Please have this information available by the
first day of the onsite inspection, December 8, 2025.
The fourth group of information is necessary to aid the inspection team in tracking issues
identified as a result of the inspection. It is requested that this information be provided to the
lead inspector as the information is generated during the inspection. It is important that all of
these documents are up to date and complete in order to minimize the number of additional
documents requested during the preparation and/or the onsite portions of the inspection.
The lead inspector for this inspection is En De Chen. We understand that our regulatory contact
for this inspection is Jordan Rajan of your organization. If there are any questions about the
inspection or the material requested, please contact the lead inspector at (610) 337-5136 or via
email at En.Chen@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150-
0011. The NRC may not conduct or sponsor, and a person is not required to respond to a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,
of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available
electronically for public inspection in the NRCs Public Document Room or from the Publicly
Available Records component of the NRC's Agencywide Documents Access and Management
System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Sincerely,  
 
Glenn T. Dentel, Chief
Engineering Branch 2
Division of Operating Reactor Safety
Docket Nos. 05000352 and 05000353  
License Nos. NPF-39 and NPF-85
Enclosure:
Cybersecurity Inspection Document Request
cc: Distribution via ListServ
GLENN
DENTEL
Digitally signed by
GLENN DENTEL
Date: 2025.07.29
07:00:24 -04'00'


==Dear David Rhoades:==
On December 8, 2025, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline inspection in accordance with Inspection Procedure (IP) 71130.10, Cyber Security, dated December 14, 2021, at your Limerick Generating Station, Units 1 and 2. The inspection will be performed to evaluate and verify your ability to meet the requirements of the NRCs Cyber Security Rule, Title 10 of the Code of Federal Regulations (10 CFR) Part 73, Section 54, Protection of Digital Computer and Communication Systems and Networks. The onsite portion of the inspection will take place December 8-12, 2025.
Experience has shown that baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. To minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into four groups.
The first group specifies information necessary to assist the inspection team in choosing the focus areas (i.e., sample set) to be inspected by IP 71130.10. This information should be made available either on an online repository (preferred) or digital media (CD/DVD) no later than September 5, 2025. The inspection team will review this information and, by October 3, 2025, will request the specific items that should be provided for review.
The second group of additional requested documents will assist the inspection team in the evaluation of the critical systems and critical digital assets, defensive architecture, and the areas of the licensees cybersecurity program selected for the cybersecurity inspection. This information will be requested for review in the regional office prior to the inspection by October 31, 2025, as identified above.


D. Rhoades 2
ML25210A012
The third group of requested documents consists of those items that the inspection team will review, or need access to, during the inspection. Please have this information available by the first day of the onsite inspection, December 8, 2025.
The fourth group of information is necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
SUNSI Review
The lead inspector for this inspection is En De Chen. We understand that our regulatory contact for this inspection is Jordan Rajan of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at (610) 337-5136 or via email at En.Chen@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
Non-Sensitive
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sensitive
Sincerely, Glenn T. Dentel, Chief Engineering Branch 2 Division of Operating Reactor Safety Docket Nos. 05000352 and 05000353 License Nos. NPF-39 and NPF-85
Publicly Available
Non-Publicly Available  
OFFICE
RI/DORS
RI/DORS
NAME
EChen
GDentel
DATE
7/28/2025
7/28/2025


==Enclosure:==
LIMERICK CYBERSECURITY INSPECTION DOCUMENT REQUEST
Cybersecurity Inspection Document Request cc: Distribution via ListServ GLENN DENTEL Digitally signed by GLENN DENTEL Date: 2025.07.29 07:00:24 -04'00'
Enclosure  
Inspection Report:
05000352/2025403 and 05000353/2025403
Inspection Dates:  
December 8 to December 12, 2025
Inspection Procedure:
Inspection Procedure (IP) 71130.10, Cyber Security, 
dated December 14, 2021 (ADAMS Accession 
Number: ML21271A106)
Reference:
Guidance Document for Development of the Request for
Information (RFI) and Notification Letter for IP 71130.10, 
Cyber Security (ML21330A088)
NRC Inspectors:  
En De Chen, Lead                            Joseph Cunningham
(610) 337-5136                                (610) 337-5390
En.Chen@nrc.gov                            Joseph.Cunningham@nrc.gov
NRC Contractors:
Timothy Hennessey
Balla Barro 
(610) 337-5135
Balla.Barro@nrc.gov 
Timothy.Hennessey@nrc.gov
I.
Information Requested for In-Office Preparation
The initial request for information (i.e., first RFI) concentrates on providing the inspection
team with the general information necessary to select appropriate components and Cyber
Security Program (CSP) elements to develop a site-specific inspection plan. The first RFI
is used to identify the list of critical systems and critical digital assets (CSs/CDAs) plus
operational and management security control portions of the CSP to be chosen as the
sample set required to be inspected by the cyber security IP. The first RFIs requested
information is specified below in Table RFI #1. The Table RFI #1 information is requested
to be provided to the regional office by September 5, 2025, or sooner, to facilitate the
selection of the specific items that will be reviewed during the onsite inspection weeks.  
The inspection team will examine the returned documentation from the first RFI and
identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more
focused follow-up request to develop the second RFI. The inspection team will submit the
specific systems and equipment list to your staff by October 3, 2025, which will identify
the specific systems and equipment that will be utilized to evaluate the CSs/CDAs,
defensive architecture, and the areas of the licensees CSP selected for the cyber
security inspection. We request that the additional information provided from the second
RFI be made available to the regional office prior to the inspection by October 31, 2025.


ML25210A012 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DORS RI/DORS NAME EChen GDentel DATE 7/28/2025 7/28/2025
LIMERICK CYBERSECURITY INSPECTION DOCUMENT REQUEST  
 
2
LIMERICK CYBERSECURITY INSPECTION DOCUMENT REQUEST Enclosure Inspection Report:
05000352/2025403 and 05000353/2025403 Inspection Dates:
The required Table RFI 1 information shall be provided on an online repository  
December 8 to December 12, 2025 Inspection Procedure:
(preferred) or digital media (CD/DVD) to the lead inspector by September 5, 2025. The  
Inspection Procedure (IP) 71130.10, Cyber Security, dated December 14, 2021 (ADAMS Accession Number: ML21271A106)
preferred file format for all lists is a searchable Excel spreadsheet file. The information  
Reference:
should be indexed and hyperlinked to facilitate ease of use. If you have any questions  
Guidance Document for Development of the Request for Information (RFI) and Notification Letter for IP 71130.10, Cyber Security (ML21330A088)
regarding this information, please call the inspection team leader as soon as possible.  
NRC Inspectors:
Table RFI #1  
En De Chen, Lead Joseph Cunningham (610) 337-5136 (610) 337-5390 En.Chen@nrc.gov Joseph.Cunningham@nrc.gov NRC Contractors:
Section 3,  
Timothy Hennessey Balla Barro (610) 337-5135 Balla.Barro@nrc.gov Timothy.Hennessey@nrc.gov I.
Paragraph Number/Title:  
Information Requested for In-Office Preparation The initial request for information (i.e., first RFI) concentrates on providing the inspection team with the general information necessary to select appropriate components and Cyber Security Program (CSP) elements to develop a site-specific inspection plan. The first RFI is used to identify the list of critical systems and critical digital assets (CSs/CDAs) plus operational and management security control portions of the CSP to be chosen as the sample set required to be inspected by the cyber security IP. The first RFIs requested information is specified below in Table RFI #1. The Table RFI #1 information is requested to be provided to the regional office by September 5, 2025, or sooner, to facilitate the selection of the specific items that will be reviewed during the onsite inspection weeks.
IP Ref  
The inspection team will examine the returned documentation from the first RFI and identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more focused follow-up request to develop the second RFI. The inspection team will submit the specific systems and equipment list to your staff by October 3, 2025, which will identify the specific systems and equipment that will be utilized to evaluate the CSs/CDAs, defensive architecture, and the areas of the licensees CSP selected for the cyber security inspection. We request that the additional information provided from the second RFI be made available to the regional office prior to the inspection by October 31, 2025.
1  
 
A list of all Identified Critical Systems and Critical Digital Assets -  
LIMERICK CYBERSECURITY INSPECTION DOCUMENT REQUEST 2
highlight/note any additions, deletions or reclassifications due to new  
The required Table RFI 1 information shall be provided on an online repository (preferred) or digital media (CD/DVD) to the lead inspector by September 5, 2025. The preferred file format for all lists is a searchable Excel spreadsheet file. The information should be indexed and hyperlinked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.
guidance from white papers, changes to NEI 10-04, 13-10, etc. since the  
Table RFI #1 Section 3, Paragraph Number/Title:
last cyber security inspection.  
IP Ref 1
Overall  
A list of all Identified Critical Systems and Critical Digital Assets -
2  
highlight/note any additions, deletions or reclassifications due to new guidance from white papers, changes to NEI 10-04, 13-10, etc. since the last cyber security inspection.
A list of emergency preparedness and Security onsite and offsite digital  
Overall 2
communication systems.
A list of emergency preparedness and Security onsite and offsite digital communication systems.
Overall  
Overall 3
3  
Network Topology Diagrams to include information and data flow for critical systems in levels 2, 3 and 4 (If available).
Network Topology Diagrams to include information and data flow for  
Overall 4
critical systems in levels 2, 3 and 4 (If available).  
Ongoing Monitoring and Assessment program documentation.
Overall  
03.01(a) 5 The most recent effectiveness analysis of the Cyber Security Program and the most recent cybersecurity Quality Assurance audit/assessment. Please include any condition reports (or similar) generated as a result of the audits/assessments.
4  
03.01(b) 6 Vulnerability screening/assessment and scan program documentation.
Ongoing Monitoring and Assessment program documentation.  
03.01(c) 7 Device Access and Key Control program documentation.
03.01(a)  
03.02(c) 8 Password/Authenticator documentation.
5  
03.02(c) 9 User Account/Credential program documentation.
The most recent effectiveness analysis of the Cyber Security Program and  
03.02(d) 10 Portable Media and Mobile Device control program documentation, including kiosk security control assessment/documentation.
the most recent cybersecurity Quality Assurance audit/assessment. Please  
03.02(e) 11 Design change/modification program documentation and a list of all design changes completed since the last two cyber security inspections, including either a summary of the design change or the 50.59 documentation for the change. Please notate/highlight which design changes affected Critical Digital Assets (added, modified, deleted, etc.)
include any condition reports (or similar) generated as a result of the  
03.03(a) 12 Supply Chain Management documentation including any security impact analysis for new acquisitions.
audits/assessments.  
03.03(a),
03.01(b)  
(b) and (c) 13 Configuration Management documentation including any security impact analysis performed due to configuration changes since the last inspection.
6 Vulnerability screening/assessment and scan program documentation.
03.03(a) and (b) 14 Cyber Security Metrics tracked (if applicable).
03.01(c)
03.06 (b) 15 Provide documentation describing any cyber security changes to the access authorization program since the last cyber security inspection.
7 Device Access and Key Control program documentation.
Overall 16 Provide a list of all procedures and policies provided to the NRC as part of this RFI with their descriptive name and associated number (if available).
03.02(c)
Overall 17 Performance testing report (if applicable).
8  
03.06 (a) 18 List of Condition Reports (or similar) associated with cybersecurity issues written since the last inspection. Please include CR #, date written, and a short description / title.
Password/Authenticator documentation.
03.02(c)  
9 User Account/Credential program documentation.
03.02(d)
10 Portable Media and Mobile Device control program documentation,  
including kiosk security control assessment/documentation.  
03.02(e)
11  
Design change/modification program documentation and a list of all design  
changes completed since the last two cyber security inspections, including  
either a summary of the design change or the 50.59 documentation for the  
change. Please notate/highlight which design changes affected Critical  
Digital Assets (added, modified, deleted, etc.)
03.03(a)  
12  
Supply Chain Management documentation including any security impact  
analysis for new acquisitions.
03.03(a),  
(b) and  
(c)
13  
Configuration Management documentation including any security impact  
analysis performed due to configuration changes since the last inspection.
03.03(a)  
and (b)  
14  
Cyber Security Metrics tracked (if applicable).  
03.06 (b)  
15  
Provide documentation describing any cyber security changes to the access  
authorization program since the last cyber security inspection.  
Overall  
16  
Provide a list of all procedures and policies provided to the NRC as part of  
this RFI with their descriptive name and associated number (if available).  
Overall  
17  
Performance testing report (if applicable).  
03.06 (a)  
18  
List of Condition Reports (or similar) associated with cybersecurity issues  
written since the last inspection. Please include CR #, date written, and a  
short description / title.  
Overall  
Overall  


LIMERICK CYBERSECURITY INSPECTION DOCUMENT REQUEST 3
LIMERICK CYBERSECURITY INSPECTION DOCUMENT REQUEST  
In addition to the above information please provide the following:
(1) Name(s) and phone numbers for the regulatory and technical contacts.
3  
(2) Current management and engineering organizational charts.
Based on this information, the inspection team will identify and select specific systems and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and submit a list of specific systems and equipment to your staff by October 3, 2025, for the second RFI (i.e., RFI #2).
In addition to the above information please provide the following:  
II.
(1) Name(s) and phone numbers for the regulatory and technical contacts.  
Additional Information Requested to be Available Prior to Inspection.
(2) Current management and engineering organizational charts.  
As stated in Section I above, the inspection team will examine the returned documentation requested from Table RFI #1 and submit the list of specific systems and equipment to your staff by October 3, 2025, for the second RFI (i.e., RFI #2). The second RFI will request additional information required to evaluate the CSs/CDAs, defensive architecture, and the areas of the licensees CSP selected for the cyber security inspection. The additional information requested for the specific systems and equipment is identified in Table RFI #2.
Based on this information, the inspection team will identify and select specific systems  
The Table RFI #2 information shall be provided to the lead inspector by October 31, 2025. The preferred file format for all lists is a searchable Excel spreadsheet. The information should be indexed and hyperlinked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.
and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and  
Table RFI #2 Section 3, Paragraph Number/Title:
submit a list of specific systems and equipment to your staff by October 3, 2025, for the  
Items For the systems and CDAs chosen for inspection provide:
second RFI (i.e., RFI #2).  
1 Ongoing Monitoring and Assessment activity performed on the system(s).
03.01(a) 2 All Security Control Assessments for the selected system(s).
03.01(a) 3 All vulnerability screenings/assessments associated with or scans performed on the selected system(s) since the last cyber security inspection.
II.  
03.01(c) 4 Documentation (including configuration files and rules sets) for Network-based Intrusion Detection/Protection Systems (NIDS/NIPS), Host-based Intrusion Detection Systems (HIDS), and Security Information and Event Management (SIEM) systems for system(s) chosen for inspection).
Additional Information Requested to be Available Prior to Inspection.  
03.02(b) 5 Documentation (including configuration files and rule sets) for intra-security level firewalls and boundary devices used to protect the selected system(s).
As stated in Section I above, the inspection team will examine the returned  
03.02(c) 6 Copies of all periodic reviews of the access authorization list for the selected systems since the last inspection.
documentation requested from Table RFI #1 and submit the list of specific systems and  
03.02(d) 7 Baseline configuration data sheets for the selected CDAs.
equipment to your staff by October 3, 2025, for the second RFI (i.e., RFI #2). The  
03.03(a) 8 Documentation on any changes, including Security Impact Analyses, performed on the selected system(s) since the last inspection.
second RFI will request additional information required to evaluate the CSs/CDAs,  
defensive architecture, and the areas of the licensees CSP selected for the cyber  
security inspection. The additional information requested for the specific systems and  
equipment is identified in Table RFI #2.  
The Table RFI #2 information shall be provided to the lead inspector by October 31,  
2025. The preferred file format for all lists is a searchable Excel spreadsheet. The  
information should be indexed and hyperlinked to facilitate ease of use. If you have any  
questions regarding this information, please call the inspection team leader as soon as  
possible.  
Table RFI #2  
Section 3,  
Paragraph Number/Title:  
Items  
For the systems and CDAs chosen for inspection provide:  
1 Ongoing Monitoring and Assessment activity performed on the system(s).  
03.01(a)  
2 All Security Control Assessments for the selected system(s).  
03.01(a)  
3  
All vulnerability screenings/assessments associated with or scans  
performed on the selected system(s) since the last cyber security  
inspection.
03.01(c)  
4  
Documentation (including configuration files and rules sets) for Network-
based Intrusion Detection/Protection Systems (NIDS/NIPS), Host-based  
Intrusion Detection Systems (HIDS), and Security Information and Event  
Management (SIEM) systems for system(s) chosen for inspection).  
03.02(b)  
5  
Documentation (including configuration files and rule sets) for intra-
security level firewalls and boundary devices used to protect the selected  
system(s).  
03.02(c)  
6 Copies of all periodic reviews of the access authorization list for the  
selected systems since the last inspection.  
03.02(d)  
7 Baseline configuration data sheets for the selected CDAs.
03.03(a)  
8 Documentation on any changes, including Security Impact Analyses,  
performed on the selected system(s) since the last inspection.  
03.03(b)  
03.03(b)  


LIMERICK CYBERSECURITY INSPECTION DOCUMENT REQUEST 4
LIMERICK CYBERSECURITY INSPECTION DOCUMENT REQUEST  
Table RFI #2 Section 3, Paragraph Number/Title:
Items 9 Copies of the purchase order documentation for any new equipment purchased for the selected systems since the last inspection.
4  
03.03(c) 10 For the selected systems, provide design change/modification packages including completed work orders since the last cyber security inspection.
03.03(a)
Table RFI #2  
III.
Section 3,  
Information Requested to be Available on First Day of Inspection Please provide the following information to the team by December 8, 2025, the first day of the inspection.
Paragraph Number/Title:  
Table 1ST Week Onsite Section 3, Paragraph Number/Title:
Items  
Items 1
9 Copies of the purchase order documentation for any new equipment  
Updated list of corrective actions that were generated since the corrective actions provided for RFI #2, to include any corrective actions generated as a result of self assessments performed prior to the inspection.
purchased for the selected systems since the last inspection.  
03.01b IV.
03.03(c)  
Information Requested to be Provided Throughout the Inspection (1) Copies of any corrective action documents generated as a result of the inspection teams questions or queries during the inspection.
10 For the selected systems, provide design change/modification packages  
(2) Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provided daily during the inspection to each inspection team member).
including completed work orders since the last cyber security inspection.  
If you have any questions regarding the information requested, please contact the inspection team leader.}}
03.03(a)  
III.  
Information Requested to be Available on First Day of Inspection  
Please provide the following information to the team by December 8, 2025, the first day  
of the inspection.  
Table 1ST Week Onsite  
Section 3,  
Paragraph Number/Title:  
Items  
1  
Updated list of corrective actions that were generated since the  
corrective actions provided for RFI #2, to include any corrective actions  
generated as a result of self assessments performed prior to the  
inspection.  
03.01b  
IV.  
Information Requested to be Provided Throughout the Inspection  
(1) Copies of any corrective action documents generated as a result of the  
inspection teams questions or queries during the inspection.  
(2) Copies of the list of questions submitted by the inspection team members and  
the status/resolution of the information requested (provided daily during the  
inspection to each inspection team member).  
If you have any questions regarding the information requested, please contact the inspection  
team leader.
}}

Latest revision as of 02:09, 21 February 2026

Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000352/2025403 and 05000353/2025403
ML25210A012
Person / Time
Site: Limerick  
Issue date: 07/29/2025
From: Glenn Dentel
Division of Operating Reactors
To: Rhoades D
Constellation Energy Generation
References
IR 2025403
Download: ML25210A012 (1)


See also: IR 05000352/2025403

Text

July 29, 2025

David P. Rhoades

Senior Vice President

Constellation Energy Generation, LLC

President and Chief Nuclear Officer (CNO)

Constellation Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT:

LIMERICK GENERATING STATION, UNITS 1 AND 2 - INFORMATION

REQUEST FOR THE CYBERSECURITY BASELINE INSPECTION,

NOTIFICATION TO PERFORM INSPECTION 05000352/2025403 AND

05000353/2025403

Dear David Rhoades:

On December 8, 2025, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline

inspection in accordance with Inspection Procedure (IP) 71130.10, Cyber Security, dated

December 14, 2021, at your Limerick Generating Station, Units 1 and 2. The inspection will be

performed to evaluate and verify your ability to meet the requirements of the NRCs Cyber

Security Rule, Title 10 of the Code of Federal Regulations (10 CFR) Part 73, Section 54,

Protection of Digital Computer and Communication Systems and Networks. The onsite portion

of the inspection will take place December 8-12, 2025.

Experience has shown that baseline inspections are extremely resource intensive, both for the

NRC inspectors and the licensee staff. To minimize the inspection impact on the site and to

ensure a productive inspection for both parties, we have enclosed a request for documents

needed for the inspection. These documents have been divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing the

focus areas (i.e., sample set) to be inspected by IP 71130.10. This information should be

made available either on an online repository (preferred) or digital media (CD/DVD) no later

than September 5, 2025. The inspection team will review this information and, by October 3,

2025, will request the specific items that should be provided for review.

The second group of additional requested documents will assist the inspection team in the

evaluation of the critical systems and critical digital assets, defensive architecture, and the areas

of the licensees cybersecurity program selected for the cybersecurity inspection. This

information will be requested for review in the regional office prior to the inspection by

October 31, 2025, as identified above.

D. Rhoades

2

The third group of requested documents consists of those items that the inspection team will

review, or need access to, during the inspection. Please have this information available by the

first day of the onsite inspection, December 8, 2025.

The fourth group of information is necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to the

lead inspector as the information is generated during the inspection. It is important that all of

these documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is En De Chen. We understand that our regulatory contact

for this inspection is Jordan Rajan of your organization. If there are any questions about the

inspection or the material requested, please contact the lead inspector at (610) 337-5136 or via

email at En.Chen@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available

electronically for public inspection in the NRCs Public Document Room or from the Publicly

Available Records component of the NRC's Agencywide Documents Access and Management

System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

Glenn T. Dentel, Chief

Engineering Branch 2

Division of Operating Reactor Safety

Docket Nos. 05000352 and 05000353

License Nos. NPF-39 and NPF-85

Enclosure:

Cybersecurity Inspection Document Request

cc: Distribution via ListServ

GLENN

DENTEL

Digitally signed by

GLENN DENTEL

Date: 2025.07.29

07:00:24 -04'00'

ML25210A012

SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

OFFICE

RI/DORS

RI/DORS

NAME

EChen

GDentel

DATE

7/28/2025

7/28/2025

LIMERICK CYBERSECURITY INSPECTION DOCUMENT REQUEST

Enclosure

Inspection Report: 05000352/2025403 and 05000353/2025403

Inspection Dates:

December 8 to December 12, 2025

Inspection Procedure:

Inspection Procedure (IP) 71130.10, Cyber Security,

dated December 14, 2021 (ADAMS Accession

Number: ML21271A106)

Reference:

Guidance Document for Development of the Request for

Information (RFI) and Notification Letter for IP 71130.10,

Cyber Security (ML21330A088)

NRC Inspectors:

En De Chen, Lead Joseph Cunningham

(610) 337-5136 (610) 337-5390

En.Chen@nrc.gov Joseph.Cunningham@nrc.gov

NRC Contractors:

Timothy Hennessey

Balla Barro

(610) 337-5135

Balla.Barro@nrc.gov

Timothy.Hennessey@nrc.gov

I.

Information Requested for In-Office Preparation

The initial request for information (i.e., first RFI) concentrates on providing the inspection

team with the general information necessary to select appropriate components and Cyber

Security Program (CSP) elements to develop a site-specific inspection plan. The first RFI

is used to identify the list of critical systems and critical digital assets (CSs/CDAs) plus

operational and management security control portions of the CSP to be chosen as the

sample set required to be inspected by the cyber security IP. The first RFIs requested

information is specified below in Table RFI #1. The Table RFI #1 information is requested

to be provided to the regional office by September 5, 2025, or sooner, to facilitate the

selection of the specific items that will be reviewed during the onsite inspection weeks.

The inspection team will examine the returned documentation from the first RFI and

identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more

focused follow-up request to develop the second RFI. The inspection team will submit the

specific systems and equipment list to your staff by October 3, 2025, which will identify

the specific systems and equipment that will be utilized to evaluate the CSs/CDAs,

defensive architecture, and the areas of the licensees CSP selected for the cyber

security inspection. We request that the additional information provided from the second

RFI be made available to the regional office prior to the inspection by October 31, 2025.

LIMERICK CYBERSECURITY INSPECTION DOCUMENT REQUEST

2

The required Table RFI 1 information shall be provided on an online repository

(preferred) or digital media (CD/DVD) to the lead inspector by September 5, 2025. The

preferred file format for all lists is a searchable Excel spreadsheet file. The information

should be indexed and hyperlinked to facilitate ease of use. If you have any questions

regarding this information, please call the inspection team leader as soon as possible.

Table RFI #1

Section 3,

Paragraph Number/Title:

IP Ref

1

A list of all Identified Critical Systems and Critical Digital Assets -

highlight/note any additions, deletions or reclassifications due to new

guidance from white papers, changes to NEI 10-04, 13-10, etc. since the

last cyber security inspection.

Overall

2

A list of emergency preparedness and Security onsite and offsite digital

communication systems.

Overall

3

Network Topology Diagrams to include information and data flow for

critical systems in levels 2, 3 and 4 (If available).

Overall

4

Ongoing Monitoring and Assessment program documentation.

03.01(a)

5

The most recent effectiveness analysis of the Cyber Security Program and

the most recent cybersecurity Quality Assurance audit/assessment. Please

include any condition reports (or similar) generated as a result of the

audits/assessments.

03.01(b)

6 Vulnerability screening/assessment and scan program documentation.

03.01(c)

7 Device Access and Key Control program documentation.

03.02(c)

8

Password/Authenticator documentation.

03.02(c)

9 User Account/Credential program documentation.

03.02(d)

10 Portable Media and Mobile Device control program documentation,

including kiosk security control assessment/documentation.

03.02(e)

11

Design change/modification program documentation and a list of all design

changes completed since the last two cyber security inspections, including

either a summary of the design change or the 50.59 documentation for the

change. Please notate/highlight which design changes affected Critical

Digital Assets (added, modified, deleted, etc.)

03.03(a)

12

Supply Chain Management documentation including any security impact

analysis for new acquisitions.

03.03(a),

(b) and

(c)

13

Configuration Management documentation including any security impact

analysis performed due to configuration changes since the last inspection.

03.03(a)

and (b)

14

Cyber Security Metrics tracked (if applicable).

03.06 (b)

15

Provide documentation describing any cyber security changes to the access

authorization program since the last cyber security inspection.

Overall

16

Provide a list of all procedures and policies provided to the NRC as part of

this RFI with their descriptive name and associated number (if available).

Overall

17

Performance testing report (if applicable).

03.06 (a)

18

List of Condition Reports (or similar) associated with cybersecurity issues

written since the last inspection. Please include CR #, date written, and a

short description / title.

Overall

LIMERICK CYBERSECURITY INSPECTION DOCUMENT REQUEST

3

In addition to the above information please provide the following:

(1) Name(s) and phone numbers for the regulatory and technical contacts.

(2) Current management and engineering organizational charts.

Based on this information, the inspection team will identify and select specific systems

and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and

submit a list of specific systems and equipment to your staff by October 3, 2025, for the

second RFI (i.e., RFI #2).

II.

Additional Information Requested to be Available Prior to Inspection.

As stated in Section I above, the inspection team will examine the returned

documentation requested from Table RFI #1 and submit the list of specific systems and

equipment to your staff by October 3, 2025, for the second RFI (i.e., RFI #2). The

second RFI will request additional information required to evaluate the CSs/CDAs,

defensive architecture, and the areas of the licensees CSP selected for the cyber

security inspection. The additional information requested for the specific systems and

equipment is identified in Table RFI #2.

The Table RFI #2 information shall be provided to the lead inspector by October 31,

2025. The preferred file format for all lists is a searchable Excel spreadsheet. The

information should be indexed and hyperlinked to facilitate ease of use. If you have any

questions regarding this information, please call the inspection team leader as soon as

possible.

Table RFI #2

Section 3,

Paragraph Number/Title:

Items

For the systems and CDAs chosen for inspection provide:

1 Ongoing Monitoring and Assessment activity performed on the system(s).

03.01(a)

2 All Security Control Assessments for the selected system(s).

03.01(a)

3

All vulnerability screenings/assessments associated with or scans

performed on the selected system(s) since the last cyber security

inspection.

03.01(c)

4

Documentation (including configuration files and rules sets) for Network-

based Intrusion Detection/Protection Systems (NIDS/NIPS), Host-based

Intrusion Detection Systems (HIDS), and Security Information and Event

Management (SIEM) systems for system(s) chosen for inspection).

03.02(b)

5

Documentation (including configuration files and rule sets) for intra-

security level firewalls and boundary devices used to protect the selected

system(s).

03.02(c)

6 Copies of all periodic reviews of the access authorization list for the

selected systems since the last inspection.

03.02(d)

7 Baseline configuration data sheets for the selected CDAs.

03.03(a)

8 Documentation on any changes, including Security Impact Analyses,

performed on the selected system(s) since the last inspection.

03.03(b)

LIMERICK CYBERSECURITY INSPECTION DOCUMENT REQUEST

4

Table RFI #2

Section 3,

Paragraph Number/Title:

Items

9 Copies of the purchase order documentation for any new equipment

purchased for the selected systems since the last inspection.

03.03(c)

10 For the selected systems, provide design change/modification packages

including completed work orders since the last cyber security inspection.

03.03(a)

III.

Information Requested to be Available on First Day of Inspection

Please provide the following information to the team by December 8, 2025, the first day

of the inspection.

Table 1ST Week Onsite

Section 3,

Paragraph Number/Title:

Items

1

Updated list of corrective actions that were generated since the

corrective actions provided for RFI #2, to include any corrective actions

generated as a result of self assessments performed prior to the

inspection.

03.01b

IV.

Information Requested to be Provided Throughout the Inspection

(1) Copies of any corrective action documents generated as a result of the

inspection teams questions or queries during the inspection.

(2) Copies of the list of questions submitted by the inspection team members and

the status/resolution of the information requested (provided daily during the

inspection to each inspection team member).

If you have any questions regarding the information requested, please contact the inspection