ENS 57929: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:
| title = Manual Reactor Trip
| title = Manual Reactor Trip
| event text = The following information was provided by the licensee via phone and email:
| event text = The following information was provided by the licensee via phone and email:
At 2020 CDT [on 9/14/2025], [Comanche Peak] Unit 2 reactor was manually tripped due to a malfunction of the electro-hydraulic control (EHC) system on the main turbine. All auxiliary feedwater pumps started due to steam generator `Lo-Lo' levels post trip. This event is being reported in accordance with 10 CFR 50.72(b)(2)(iv)(B) for a reactor trip and 10 CFR 50.72(b)(3)(iv)(A) for an actuation of auxiliary feedwater. Unit 2 is being maintained in hot standby (mode 3) in accordance with integrated plant operating procedures. Decay heat is being rejected to the main condenser via the steam dump valves."  
At 2020 CDT [on 9/14/2025], [Comanche Peak] Unit 2 reactor was manually tripped due to a malfunction of the electro-hydraulic control (EHC) system on the main turbine. All auxiliary feedwater pumps started due to steam generator `Lo-Lo' levels post trip. This event is being reported in accordance with 10 CFR 50.72(b)(2)(iv)(B) for a reactor trip and 10 CFR 50.72(b)(3)(iv)(A) for an actuation of auxiliary feedwater. Unit 2 is being maintained in hot standby (mode 3) in accordance with integrated plant operating procedures. Decay heat is being rejected to the main condenser via the steam dump valves."  
The NRC Resident Inspector was notified.
The NRC Resident Inspector was notified.
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:

Latest revision as of 22:24, 23 September 2025

ENS 57929 +/-
Where
Comanche Peak Luminant icon.png
Texas (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation
Time - Person (Reporting Time:+-1.07 h-0.0446 days <br />-0.00637 weeks <br />-0.00147 months <br />)
Opened: Victor Alanis
00:16 Sep 15, 2025
NRC Officer: Ernest West
Last Updated: Sep 15, 2025
57929 - NRC Website
Loading map...