05000260/LER-1981-010-03, During Normal Operation, Output Signal Calibr SI 4.1.B-2 Was Not Performed as Scheduled.Caused by Personnel Error.Personnel Cautioned: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[05000260/LER-1981-010-03, /03L-0:on 810306,during Normal Operation,Special Instruction 4.1.B.2 Was Not Performed.Caused by Personnel Error.Personnel Cautioned to Perform Instructions as Scheduled]]
| number = ML20009C153
| issue date = 04/09/1981
| title = During Normal Operation, Output Signal Calibr SI 4.1.B-2 Was Not Performed as Scheduled.Caused by Personnel Error.Personnel Cautioned
| author name =
| author affiliation = TENNESSEE VALLEY AUTHORITY
| addressee name =
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| docket = 05000260
| license number =
| contact person =
| document report number = LER-81-010-03L, LER-81-10-3L, NUDOCS 8107200328
| package number = ML20009C152
| document type = LICENSEE EVENT REPORT (SEE ALSO AO RO), TEXT-SAFETY REPORT
| page count = 2
}}
{{LER
| Title = During Normal Operation, Output Signal Calibr SI 4.1.B-2 Was Not Performed as Scheduled.Caused by Personnel Error.Personnel Cautioned
| Plant =
| Reporting criterion =
| Power level =
| Mode =
| Docket = 05000260
| LER year = 1981
| LER number = 10
| LER revision = 3
| Event date =
| Report date =
| ENS =
| abstract =
}}
 
=text=
{{#Wiki_filter:;7'[7[ " " " 7.
UPLATE REPORT - PREVIOUS REPORT DATE 3/25/81 LICENSEE EVENT REPORT
\\
..w CONTROL BLOCK: l l
l l
l l
lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)
I e
10 lil l Al Ll B l R l F] 2 l@l 0 l 0 l - l 0 l 0 l 0 l 0 l 0 l-l 0 l 0 l@l 4 l 1 l 1 l 1 l 1 l@l l
l@
I 8 9 LICENSEE col)E 14 IS LICENSE NUMBEH Jb 26 LICENSE TYPE JO 67 CAT 68 l CON'T lOl,j g l ?-l@l 0 l 5 l 0 l 0 l 0 l 2 l 6 l 0 @l 0 l 3 l 0 l 6 l 8 l 1 l@l 014 l0 19 18 11 l@
1 8
60 61 DOCKET NUMBER 68 60 EVENT DATE 74 75 REPORT DATE 80
, EVENT DESCRIPTION AND PROB ABLE CONSEQUENCES Oio 10 l 2 I i During normal operation, SI 4.1.B-2 (APRM output signal calibration) was not l
,n,3, l performed as scheduled. The SI should have been performed between 2/4/81 and l
;gl 2/6/81. It was performed on 1/29/81, 2/2/81, and 2/11/81. Redundant systems are l
;io,,i i not applicable. There was no effect on the health or safety of the public.
l IO is l l There have been no previ6us occurrences.
l I O l 71 l l
I Lo l"I I 80 7
8 9 DE CODE S SCO E COMPONENT CODE SUSCOD'E SU E
10191 l ZI Zl@ W@ W@ l ZI ZI ZI ZI ZI ZI@ l Zi@ W @
7 8
9 to 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LE H EVENT YEAR REPOR T NO.
CODE TYPE NO.
@,aj,g/ROI al 1l L-j i 01 11 Ol y
I 01 31 LL_]
l-l Lil 21 22 23 24 26 27 28 29 30 31 32 TAK r AC O O LANT ME
' HOURS 22 S8 I E F R B.
SU PLIE MANUF CTURER l Hl@ y @
W@
l Zl@
l0 l0 l0 l0 l ]@
l Nl@
l Zl@
l Zl 9l 9l 9l@
JJ 34 35 36 31 40 el 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h iiiOi l The problem was caused by personnel error. The personnel were cautioned to perform l gij l ST's as scheduled. No further recurrence control action is plar.ned.
l I
' li i il l I i l 31 l l
l i 141 l l
80 1
8 9 A S
% POWER OTHER STATUS 015 0 RY DISCOVEHY DESCRIPTION NA l
l Algl During the review cycle l
l8 l 5 l l, E l@ l 0l 9l 8l@l I
M 6
80 AST". i i v CONTENT nELEASe AMOUNT OF ACTivlTY LOCATION OF RELEASE g l Z l @o ok '4ELEASEl Z l@l NA l
l NA l
7 8 9 10 11 44 45 80 PEniONNEL f XPOGURES NUP/RE H FYPE
 
==DESCRIPTION==
l l i l l 0 l 0 l 0 l@l Z ]@l NA l
Pr.. ON~d',~ lo'i,Es insCn pnO~@ NA Nn..m n l
ji l,ll0l0l0l@l 1
M 9 11 12 Sf' L0% r)s QH DAMA( E TO F ACILi TV fvPE DE SCitiP flON Li[2] l Zlgl NA l
<t 9
to 60 oeSCnipTiON @
NRC USE ONLY l
NA l
lllllllllllllk
,eNfhl
[.Zj o,j 4 9 10 68 69 80 3 2
8107200328 810409 gggyg.
PDR ADOCK 05000260 S
PDR
~
 
c O
Form DF-17
'Tr:lnessee 'falley Authority BF 15.2
~ Browns Ferry Nuclear Plant 1/10/79 LER SUPPLEMENTAL INFORMATION 41B BFR(:-50 260 f 8110 Technical Specification involved 6.7.2.b(2)
Itepccted Under Technical Specification 2
E Unit Date of Occurrence 3/6/81 Time of Occurrence Ident.ification and Description of Occurrence:
SI 4.1.B.2 (APRM Output Signal Calibration) was not performed as. scheduled.
Con:'itions Prior to Occurrence:
T!TTt i at 99A power.
Unit 2 at 98% power.
Unit 3 at 95% power.
Act',n specified in the Technical Specification Surveillance Requirements met dtig to inoperable equipment.
Describe.
None App, rent Cause of Occurrence:
Personnel error.
Analysis of Occurrence:
There was no danger to the health or safety of the public, no release of activity, no damage to plant or equipment and no resulting significant chain of events.
 
==Corrective Action==
Personnel cautioned.'
Faibire Data:
None
*R eten tion :
Period - Lifetime', Responsibility - Administrative Supervisor y/0 CHevision:
o 1
}}
 
{{LER-Nav}}

Latest revision as of 02:15, 18 September 2025