| Line 1: |
Line 1: |
| {{Adams
| | #REDIRECT [[05000362/LER-1983-005-01, /01T-0:on 830222,loose Snubbers & Hangers Associated W/Rcs Sampling Valves 3HV508 & 3HV517 Observed. Caused by Removal of Associated Components for Maint. Snubbers Connected & Declared Operable]] |
| | number = ML20023B852
| |
| | issue date = 03/31/1983
| |
| | title = Observed Loose Snubbers & Hangers Associated W/Two Sampling Valves (3HV508 & 3HV517) of Rcs.Caused by Removal for Maint Performed on Associated Components.Snubbers Reconnected
| |
| | author name = Ray H
| |
| | author affiliation = SOUTHERN CALIFORNIA EDISON CO.
| |
| | addressee name =
| |
| | addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
| |
| | docket = 05000362
| |
| | license number =
| |
| | contact person =
| |
| | document report number = LER-83-005-01X, LER-83-5-1X, NUDOCS 8305060450
| |
| | package number = ML20023B850
| |
| | document type = LICENSEE EVENT REPORT (SEE ALSO AO RO), TEXT-SAFETY REPORT
| |
| | page count = 3
| |
| }}
| |
| {{LER
| |
| | Title = Observed Loose Snubbers & Hangers Associated W/Two Sampling Valves (3HV508 & 3HV517) of Rcs.Caused by Removal for Maint Performed on Associated Components.Snubbers Reconnected
| |
| | Plant =
| |
| | Reporting criterion =
| |
| | Power level =
| |
| | Mode =
| |
| | Docket = 05000362
| |
| | LER year = 1983
| |
| | LER number = 5
| |
| | LER revision = 1
| |
| | Event date =
| |
| | Report date =
| |
| | ENS =
| |
| | abstract =
| |
| }}
| |
| | |
| =text=
| |
| {{#Wiki_filter:U. S NUCLE AR REGULATOR Y COMMISSION N GC FORM 366 T. m LICENSEE EVENT REPORT CONTROL BLOCK: l l
| |
| l l
| |
| l l
| |
| lh (PLEASE PRINT C2 TYPE ALL REQUtr.ED IZFORMATIcN) 1 6
| |
| l a l i l I C l A l S l 0 lS 13 l@15 010l -l 0l 01010101 -l 01 O l@264l1l1l1l l
| |
| l@
| |
| 8 9 L1CENSEE CODE le LICE *ssE Nuad8ER 25 LICENSE TYPE JO
| |
| $ 7 CA T 68 CON'T "C ll )@l 0] 5l 0l 0l 0l 31612 @l 0l 21212l 8131@l 0131311 l 813 l@
| |
| 10111 8
| |
| 80 81 DOCK ET NLMB E R S
| |
| EVENT Q ATE 74 75 REPORT DATE 80 s
| |
| EVENT DESCRIPTION AND PROB ABLE CONSEQUENCES h I o 121 10n February 22, 1983 while Unit 3 was in Mode 5, loose snubbers and hangers associated l lwith two sampling valves (3HV508 and 3HV517) of RCS were observed.
| |
| Since the componentp [o 13; 1o 141 Imay have been loosened after the last surveillance performed in October 1982, prior to l l o i si lentry into Mode 4 on January 5,1983 and since LC0 3.7.6 " Snubbers" is applicable in -
| |
| g l o !s j l Modes 1 through 4, this event was promptly reported on February 25, 1983.
| |
| Public healtp lo l 7 ) land safety were not affected as a result of this event.
| |
| I l o !a l I 80 C
| |
| C SL OOE COMPONENT CODE SUSCodE SB E
| |
| lal9l lC lJ l@ @@ W@ l S l U l P l 0 lR lT l@ J@ Q @
| |
| 8 9
| |
| 10 11 12 13 18 19 20 SE OLE NTI AL OCCLRRENCE REPORT R E VISIO N
| |
| @ s" l
| |
| l
| |
| [--l l
| |
| l l
| |
| l W
| |
| 1 0"l3 l l Xl
| |
| [ _j h
| |
| _25 22 23 24 26 27 28 29 30 31 32 gg gg hPg lZlYa El'0lg FOR 8.
| |
| 5 La uaN An A ICN PLAN?
| |
| Y 3
| |
| HOURS 22 S8 IB }ggg gg lseZ jg l7 0l 0l 0j l
| |
| l as 24 as 3
| |
| 4o ai 42 42 u
| |
| 7 CAUSE DESCRIPTION ANC CORRECTIVE ACTIONS
| |
| ;i g o, l The inoperability of these snubbers was a result of, removal for maintenance performed l
| |
| ,,;ij i on associated components. The snubbers were connected and declared operable.
| |
| i
| |
| ; Extensive investigation and plant inspection have led to the conclusion that this was gn isolated occurrence.
| |
| See attachment for additional information.
| |
| ,,IalI 1
| |
| i 4 l
| |
| 80 7
| |
| 9 g ST
| |
| %*QWER OTHER STAT.l5 RY DiSCOVE C E SCR6P TION li j s l {@ l 0 l 010l@l NA l
| |
| [A Jg Routine Observaffon l
| |
| 'ETmrv Co'ETENT auovNT or ACTmTv @ l LOCaTroN or aEtf asE h cELEisEo on aetEasE NA l
| |
| NA l
| |
| l_Z_j @ [ Z_j g l i s 80 7
| |
| 8 9 to 11 44 46 PERSONNEL ExPC$URES NLuSER TYPE
| |
| | |
| ==DESCRIPTION==
| |
| =
| |
| L1L'.] 101010 l@lI_l@l NA l
| |
| E,s a,.NENu'.',Es cEsCRs,Tm@ NA l
| |
| Nu.8E.
| |
| FG1101010 l@l i
| |
| 8 s si 32 83050604SO 830331 sa Ly,s os oa oyacg raciLirv g DR ADOCK 05000362 g
| |
| gg PDR
| |
| @ Ql NA l
| |
| 80 7
| |
| 8 9 10 g [Njg @og NA, ///[
| |
| gggg a i P T.C,N l
| |
| l 11llIllllllIli N.M 7Y4/Y92-7700 "I
| |
| No.ecr..n.R,R
| |
| ,-cNE
| |
| | |
| ATTACHMENT TO LER 83-005, Rev. 1 SAN ONOFRE NUCLEAR GENERATING STATION, UNIT 3 DOCKET NO 50-362 SUPPLEMENTAL INFORMATION FOR EVENT DESCRIPTION The specific valves involved were hot leg sample line containment isolation valves 3HV508 and 3HV517.
| |
| Corrective maintenance had been performed on the valve operators which necessitated removal of interferences such as supports and snubbers.
| |
| The Work Orders for removal and restoration of these interferences were not properly processed or tracked.
| |
| As a result, the supports and snubbers were not restored / reassembled before plant Mode changes and also no Mode restraint documentation to prevent Mode changes was in effect.
| |
| Someuof the work on these valves had been commenced before turnover of the RCS sampling system from Project to Station jurisdiction as part of the Startup Program.
| |
| The disassembled supports and snubbers were noted as exceptions in the turnover documentation at the time of turnover, but this information was not provided to Equipment Control.
| |
| CORRECTIVE ACTIONS IMMEDIATELY TAKEN Upon discovery of these unassembled supports and snubbers, immediate steps were taken to correct this condition and assure all other supports and snubbers were properly assembled and installed except where properly documented.
| |
| a)
| |
| The supports and snubbers were reassembled, adjusted and inspected on Valves 3HV508 and 3HV517.
| |
| ~
| |
| b)
| |
| A walk-through of Unit 3 was conducted by Maintenance on February 25, 1983 to examine snubbers which'were visually accessible.
| |
| This walk-through included the observation of over 700 snubbers.
| |
| In addition, i
| |
| Technical Specification surveillance of Unit ~2 snubbers was in progress.
| |
| Over 500 snubbers had been verified through this Unit 2 Surveillance which was 60% complete at that time.
| |
| No Technical Specifications required snubbers were found removed or disassembled on Unit 2 or Unit 3.
| |
| One non-safety related snubber was found to be disassembled.
| |
| This was corrected.
| |
| c)
| |
| Quality Assurance conducted a detailed examination of over 100 turnover packages and verified that all exceptions listed therin were being properly tracked.
| |
| --..e
| |
| | |
| ~
| |
| ~
| |
| * Attachment LER 83-005 Page of 2 CORRECTIVE ACTIONS TO PREVENT RECURRENCE To' assure that the Operations Equipment Control organization is fully apprised of all work affecting equipment status and that resulting Mode change restraints required by Technical Specifications are properly communicated to the Control' Room operators, the following actions are being taken:
| |
| a)
| |
| The Work Order process has been revised.
| |
| When a Work Order is written and the work' planned by the Maintenance planners, interferences such as snubbers that need to be removed are identified,.
| |
| Following this planning activity, the Work Orders are returned to Operations Equipment Control and with this additional information Equipment Control determines interference removal effects on plant system operability.
| |
| b)
| |
| " Structure Equipment and System Turnover" acceptance procedure SO123-V-4.15 has been modified to provide for exceptions.to be properly identified and the information transmitted to Operations Equipment Control N
| |
| i I
| |
| r l
| |
| 0246u l
| |
| }}
| |
| | |
| {{LER-Nav}}
| |