| {{Adams
| | #REDIRECT [[05000324/LER-1983-033, Forwards LER 83-033/03L-0]] |
| | number = ML20023D491
| |
| | issue date = 05/06/1983
| |
| | title = Supplemental LER 83-033/03L-1:on 830223,while Performing High Steam Line Radiation Channel Calibr & Functional Test, Main Steam Line Instrument Channels Found Out of Calibr. Caused by Instrument Drift.Drawers Recalibr
| |
| | author name = Poulk R
| |
| | author affiliation = CAROLINA POWER & LIGHT CO.
| |
| | addressee name =
| |
| | addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| |
| | docket = 05000324
| |
| | license number =
| |
| | contact person =
| |
| | document report number = LER-83-033-03L, LER-83-33-3L, NUDOCS 8305200543
| |
| | package number = ML20023D486
| |
| | document type = LICENSEE EVENT REPORT (SEE ALSO AO RO), TEXT-SAFETY REPORT
| |
| | page count = 3
| |
| }}
| |
| {{LER
| |
| | Title = Supplemental LER 83-033/03L-1:on 830223,while Performing High Steam Line Radiation Channel Calibr & Functional Test, Main Steam Line Instrument Channels Found Out of Calibr. Caused by Instrument Drift.Drawers Recalibr
| |
| | Plant =
| |
| | Reporting criterion =
| |
| | Power level =
| |
| | Mode =
| |
| | Docket = 05000324
| |
| | LER year = 1983
| |
| | LER number = 33
| |
| | LER revision = 0
| |
| | Event date =
| |
| | Report date =
| |
| | ENS =
| |
| | abstract =
| |
| }}
| |
| | |
| =text=
| |
| {{#Wiki_filter:<
| |
| NRC FORM 366 U.S. NUCLEAR REGULATCRY COMMISSION (7 77)
| |
| LICENSEE EVENT REPORT Previous Report Date 3/25/83 CONTROL 6 LOCK: l l
| |
| l l
| |
| l l lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6
| |
| R IN l C l B lE lP l 2 lgl50 l0 l-l0 l0 l0 l0 l0 l-l0 l0 jgl 4 l 1l ll 1l 1]@l l
| |
| lg 7
| |
| 8 9 LICENSEE CODE 14 1
| |
| LICENSE NUMBER 2b 26 LICENSE TYPE JO
| |
| $7 CAT b8 CON'T I0l1l S$RC l lgl l5l0l-l0l3l2 l4 gl0 l2 l2 l3 l8 l3 l@l0l5l0l6l8l3l@
| |
| 7 8
| |
| 60 61 DOCKET NUMBER 68 69 EVENT DATE 74 7b REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h l While performing the High Steam Line Radiation Channel Calibration and Functional l
| |
| o 2 Test PT-01.1.12PC, during normal plant operation, main steam line instrument channels l
| |
| ,g,3, g
| |
| g l A & D were found to be out of calibration. The allowable setpoints were 364 mr and l
| |
| loisl l 152 mr, respectively, and the as-found values were 369 mr and 172 mr.
| |
| This event did l
| |
| 10 l6 l l not affect the health or safety of the public.
| |
| l 101711 I
| |
| Technical Specifications 3.3.1, 3.3.2, 6.9.1.9b l
| |
| IO la I I DE CODE S BC E COMPON ENT CODE SUBC D'E SU DE lI lA lg {g l Z lg lI lN lS lT lR lU lQ lE lg ]g O 9 7
| |
| 8 9
| |
| 10 11 12 13 18 19 20 SE QUENTI AL OCCURRENCE REPORT REVISION
| |
| _EV NT Y AR EPORT N COD TYPE N O.
| |
| @,a =E N RO l
| |
| l l
| |
| l-l l
| |
| 1 1
| |
| i Ld lo i i
| |
| l 'l L-J l
| |
| I L
| |
| 3
| |
| _ 21 22 23 24 26 21 28 29 30 31 32 AKF AC ON ON PL N M
| |
| HOURS 22 SB IT FOR S B.
| |
| SU PLIER MANLFACT RER l X lgl34X lg l35Z g l36Zlg l0l0l0l l gg gg lN lg lG l0 l8 l0 lg 3J 31 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h y l The out of calibration readings were attributed to instrument drif t.
| |
| The drawers l
| |
| l were recalibrated and returned to service. Also, a review of the procedure indicated l 3 i g g that the section for drawer "D" was not the correct revision. Administrative steps j
| |
| y l are b'eing taken to ensure that the correct revision to plant procedures are used when l l required.
| |
| l 3 4 80 7
| |
| 8 9 ST S
| |
| % POWER OTHER STATUS DISCO RY DISCOVERY DESCRIPTION g { g l0l9l0lgl NA l
| |
| l A [gl Surveillance Testing l
| |
| A TiVITY CO TENT RELE ASED OF RE LE ASE AMOUNT oF ACTIVITY LOCATION OF REl,E ASE NA l
| |
| l NA l
| |
| U h Wgl 1 6 PERSONNEL EXPOS ES NUMBER TYPE
| |
| | |
| ==DESCRIPTION==
| |
| NA l
| |
| l0 l0 l0 l@lZ l@l 1 7 PERSONNE L INJURIES NUMBE R DESCRl8 TION NA l
| |
| ITTiil 101010 l@l 7
| |
| 8 9 11 12 80 8305200543 830506 LOSS OF OR DAMAGE TO FACILITY 43 f fPE DESCRIP1.0N PDR ADOCK 05000324 NA S
| |
| PDR
| |
| { @l 1 9 7
| |
| 8 9 10 ou ISSUE
| |
| | |
| ==DESCRIPTION==
| |
| lN lhl NA l
| |
| llllllllll lll,*g 2 o 38 69 80 5 7
| |
| 8 9 10 R. M. Poulk, Jr.
| |
| 919-457-9521 o
| |
| NAME OF PREPARER PHONE:
| |
| | |
| ATTACHMENT TO LER 2-83-33 (Cont'd)
| |
| To correct the problem of plant procedures not being revised as required, a task force was established to review the incident and has made its recommendations to plant management.
| |
| Based on these racommendations, appropriate controls are being incorporated in a procedure upgrade to prevent future occurrences. The plant is currently undergoing a major rewriting of its administrative instructions for procedural revisions. This upgrade will include independent second party reviews, additional control not currently in use, and temporary revision controls. Due to the magnitude of the changes being implemented and the time required to train plant reviewers on these new requirements, it is not anticipated that the procedure will be approved and in use until July 31, 1983.
| |
| Until those controls are finalized, the General Manager has directed that the Plant Nuclear Safety Committee (PNSC) not approve temporary revisions requiring a permanent revision unless the permanent revision accompanies the temporary change.
| |
| If an exception is required, it will be tracked on management's daily Immediate Attention List, until completion, to assure it receives adequate attention.
| |
| ] | |
| | |
| 1 A
| |
| \\
| |
| 4 ATTACHMENT TO LER 2-83-33 Facility:
| |
| BSEP Unit No. 2 Event Date: February 23, 1983 While performing the High Steam Line Radiation Channel Calibration and Functional Test, PT-01.1.12PC, it was determined that drawers A and D were out of calibration. The drawers were recalibrated and returned to service.
| |
| While researching several concerns expressed by tha Resident Inspector, it w s determined that the procedure used to perform weekly functional tests on the D instrument had not been revised as required on December 14, 1932, to reflect new calibration data derived from the December 14 calibration on the D drawer.
| |
| This failure to revise the functional test allowed operation of the D drawer from December 12, 1982, to February 23, 1983, without proper testing being performed. The sequence of events for this procedural error was as follows:
| |
| December 14, 1982: While performing the weekly functional test, it was determined that the D drawer needed to be recalibrated. A calibration was performed and new baseline data was established for the D drawer only.
| |
| December 16, 1982: The weekly functional test was performed on all drawers, with a temporary revision reflecting the new baseline data from the calibration on the D drawer.
| |
| Administrative controls were not adequate to assure that a permanent revision was made to the weekly functional test; therefore, subsequent tests reflected pre-December 14 baseline data.
| |
| December 23, 1982-February 16, 1983: Functional tests were performed on a weekly basis using pre-December 14 data.
| |
| A past review of these tests indicates that they were in specifications for the pre-December 14 baseline data, but exceeded the required baseline data on each performance.
| |
| February 23, 1983: The periodically required calibration was performed on all drawers and the A and D drawers were found out of calibration and were recalibrated. After this event, all required procedures were properly revised to reflect the new baseline data and have been satisfactorily performed since.
| |
| }}
| |
| | |