05000321/LER-1981-026-01, /01T-0:on 810405,emergency Diesel Circuit Breakers Failed to Auto Close Following Loss of Sys Pressure Test Sequence.Caused by Undervoltage Relays Failure to Deactivate Upon Loss of Power.Relays Checked: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[05000321/LER-1981-026-01, Emergency Diesel Circuit Breakers Failed to Auto Close Following loss-of-offsite Power Test Sequence.Caused by Undervoltage Relays Failure to Deactuate]]
| number = ML20003F786
| issue date = 04/16/1981
| title = /01T-0:on 810405,emergency Diesel Circuit Breakers Failed to Auto Close Following Loss of Sys Pressure Test Sequence.Caused by Undervoltage Relays Failure to Deactivate Upon Loss of Power.Relays Checked
| author name = Coggin C
| author affiliation = GEORGIA POWER CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| docket = 05000321
| license number =
| contact person =
| document report number = LER-81-026-01T, LER-81-26-1T, NUDOCS 8104230586
| package number = ML20003F785
| document type = LICENSEE EVENT REPORT (SEE ALSO AO RO), TEXT-SAFETY REPORT
| page count = 2
}}
{{LER
| Title = /01T-0:on 810405,emergency Diesel Circuit Breakers Failed to Auto Close Following Loss of Sys Pressure Test Sequence.Caused by Undervoltage Relays Failure to Deactivate Upon Loss of Power.Relays Checked
| Plant =
| Reporting criterion =
| Power level =
| Mode =
| Docket = 05000321
| LER year = 1981
| LER number = 26
| LER revision = 1
| Event date =
| Report date =
| ENS =
| abstract =
}}
 
=text=
{{#Wiki_filter:mawartemanwoWT CONTROL OLOCK:
l l
l l
l lh (PLEASE PHINT OR TYPE ALL HEOulHED INFORMATION) a 6
IO lil lr l A l E l l l H Lij@l o lo l-l o lo lo lo lo l lo lo l@l411111111 1@l I
l@
7 8 9 LICEfdSEE LODE 14 lb LICEts0L NUVULH 26 26 LICENSE IYFE JG b7 UAI SS COffT IOlil
$$ tCE LLJ@l o i s l o l o lo 131211 l@lo 14 lo is i n li l@l 0 1 411161alll@
7 0
00 Gl DOCKET NUMuCH tad tf>
EVErdiOATE 74 75 HE PORT OATE 80 EVENT DESC7ilPTION AND PRODABLE CONSEQUENCES h 10171 111ni t 1 vtas shutdown for a refueling / torus modi fi ca ti on outage.
Unit ?
I 1013]Iwas o_peratina at rated nower.
While oerforming a Unit 1 nrotective relavl 10141lbreaker trip test procedure, the emergency diesel circuit breakers 1
101s1 [ failed to AUTO close following an LOSP test sequence.
The Unit 1 emer-1 IOlciIgency busses remained deenergized until normal power wa<: manually re-I lOl71lstored.
An LCo was declared ner Unit 2 Tech Specs 3/4.6.6.1.
The eventl 10181 lis nonrepetitive.
There were no effects upon public safety and health. I 7
8 9 80 C DE CODE S DC E COMPONENT CODE SUBC dE S
)E lOl91 i E l E l@ [Bj@ IB l@ l RI-El Li Al Yl XI@ I E l@ Iz l@
7 8
9 to 11 12 13 18 19 20 SE QUENTI AL OCCURRENCE REFORT REVISION LE EVENT YE AR REPORT NO.
CODE TYPE N O.
O g;R/RO i al 11 1-1 1 of 21 61 1/1 lol1I IT I l-l l o_j g
_ 21 22 23 24 26 27 28 29 30 31 32 T Kit A TIO O PLANT ET4 HOURS SB 1 D
F B.
SUPPLI MAN FAC UREH I xl@lx l@
I B l@
[A_j@
[ 01 Ol Ol 61 l Yl@
lYl@
lAl@
l W l 1 l 2 l 0 l@
3J 34 35 36 31 40 43 42 43 44 47 CAuSE DEOCRIPTION AND CORRECTIVE ACTIONS h it101(Cause was traced to undervoltage relays (monitorino the standbv offsite I 11 111 Ifeeder) f ailure to deastivate uoon loss of power.
Relays were checked andl
,li12l Ireturned to operable status.
The test was reoerformed. and the diesel I
~
lilai lbreakers. AUTO closed successfully.
The undervo1tane relav in its pres-I
,lil41 lent apolication is under investigation. An update recort will be submitted.
l l7 8 9 63 SI A S
% FOWE R OTHER STATUS ISC V FY OiSCOVERY DESCRIPTION
[!L}@ lo 10 lo l@l f1A l
[_B l@0perator Observation I
i 1 5 l'
co' TENT
'8 ACiiViTY M [Zj @ [Zj@l AMOUNT OF ACTIVtTY @ I LOCATION OF RELE ASE @
Rf LE ASED CF RU.E ACE NA l
NA l
7 8 9 to 13 44 45 80 FE RSONNt L ( XPOSUHES NDP.'H f R TWf Df SCfDPTION ll'i I 7 I l o I o I oj@LZ_J@l NA I
l
,tnSOma'.uo',',ES OtSCniPfiOse AD 13'U1241niti ii l
Num n Iofofol@l NA Uit IJ t I
l i x l7 8 9 11 12 80 107. Or Ort D AstAGE TO F ACU.lTY TYPE DE SCIIIP TION L7J@l NA I
1' l7 s 9 to 80 PUBL tCl1 Y issut o OL SC H'PT ION ~
NRC u3t ONLY
.[? I ol LEISI NA l
llllll1II!lIII P
"8'10 d 2 305WO 5
NAML Of PHEPAHER._C. L. Co@iLjyRI. El t. [00. SC[V. puoNe 912-367-7851 a,
 
LER #:
50-321/1981-026 Licensec:
Georgia Power Company Facility Name:
Edwin I. Ilatch i
Docket #:
50-321 4
1
 
=Narrative=
Report for LER 50-321/1981-026 On Sunday morning, 4-5-81, while Unit 1 was shutdown for a refueling / torus modification outage and Unit 2 was operating at rated power, maintenance procedure PROTECTIVE RELAY-BREAKER TRIP TEST,ilNP-1-6950, was in progress.
An offsite power feed trip test sequence was performed as follows:
Normal startup transformer ID wa s locked out by tripping its protective relaying.
Diesels started and standby startup transformer 1C assumed caergency bus loads.
Standby startup transformer 1C was locked out by tripping its protective relaying.
Diesel breakers did not AUTO close.
The emergency busses remained deenergized until normal startup power was restored.
The Unit 1 diesels were declared inop, and Unit 2 entered into an LCO per Tech Specs 3/4.6.6.1.
Due to a common refueling floor, Unit 2 operation requires Unit 1 secondary containment integrity which is subdefined by standby gas treatment operab-ility dependent upon diesel emergency power operability.
This event is nonrepetitive.
There were no effects upon pu.blic health and safety.
The dicsc1 breakers failed to AUTO close because the LOSP lockout switch did not operate which depends upon emergency bus and standby startup transformer 1C feeder undervoltage relay logic..
The caergency bus undervoltage logic operated propely by virture of the dicsc1 AUTO start.
The cause of LOSP lockout misoperation was traced to two standby startup transformer 1C undervoltage
: relays, Westinghouse disk induction type CV-7.
A first-hand observation revealed the disk failed to rotate upon loss of fe,eder PT voltage and break the normally energized (1 out of 2) logic which contributes to make up the LOSP lockout trip.
The relays were removed from the casings and visually inspected for damage and the presence of metal filings and dirt, then checked for proper operation and returned to an operabic status.
The test IINP-1-6950 was reperformed and the dicsc1 breakers AUTO closed successfully.
The relays were checked for disk movement upon loss of PT voltage the next day for both units and found working properly.
The relay in its present application is under investigation.
An update report will be submitted.
P00R ORIGINAL
}}
 
{{LER-Nav}}

Latest revision as of 08:07, 26 May 2025