W3P83-3318, Advises That Util Will Participate W/Inpo & C-E Owners Group in Addressing Certain Requirements of Generic Ltr 83-28, Required Actions Based on Generic Implication of Salem ATWS Events. Initial Response Expected by 840115: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 1: | Line 1: | ||
# | {{Adams | ||
| number = ML20080Q127 | |||
| issue date = 10/05/1983 | |||
| title = Advises That Util Will Participate W/Inpo & C-E Owners Group in Addressing Certain Requirements of Generic Ltr 83-28, Required Actions Based on Generic Implication of Salem ATWS Events. Initial Response Expected by 840115 | |||
| author name = Cook K | |||
| author affiliation = LOUISIANA POWER & LIGHT CO. | |||
| addressee name = Eisenhut D | |||
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | |||
| docket = 05000382 | |||
| license number = | |||
| contact person = | |||
| document report number = GL-83-28, W3P83-3318, NUDOCS 8310120226 | |||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | |||
| page count = 1 | |||
}} | |||
=Text= | |||
{{#Wiki_filter:Louisiama ! NEWORLEANS LOUSANA | |||
,.. c-e~Oe s... | |||
.m eO_ | |||
POWER & LIGHT 70174-8000 G (504) 3BO-.W5 MIDDLE SOUTH UTILmES SYSTEM October 5, 1983 W3P83-3318 Q-3-A20.02.02 3-A1.01.04 L.02 Mr. Darrell G. Eisenhut Director, Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. | |||
20555 | |||
==SUBJECT:== | |||
Waterford SES Unit 3 Docket No. 50-382 Generic Letter 83-28 Required Actions Based on Generic Implications of Salem ATWS Events | |||
==REFERENCE:== | |||
LP&L Letter W3P83-2915 The subject Generic Letter requires a response by November 8,1983 unless an extension is requested in advance. The above referenced letter indicated that our extension request would be submitted no later than October 7, 1983. | |||
LP&L is proceeding expeditiously in assessing its current compliance with the positions in the subject letter and planning actions required to improve certain areas. | |||
It is presently expected that we will participate with the Institute of Nuclear Power Operations and the Combustion Engineering Owners Group in addressing certain requirements and retain outside contractors to address others. | |||
Since these industry groups and contractors have not yet had sufficient time to formulate specific proposals and schedules it will be impossible for us to provide the information required by the Generic Letter by November 8. | |||
It is expected that this information will be available by January 15, 1984 at which time we will make the initial submittal of our plans and schedules as requested. | |||
If you have any questions please advise. | |||
Yours very truly, K.W. Cook Nuclear Support and Licensing Manager i O KWC/ MAL /ch cc: | |||
W. M. Stevenson, E. L. Blake, J. Wilson, G. L. Constable 8310120226 831005 PDR ADOCK 05000382 A | |||
pyg}} | |||
Latest revision as of 06:19, 26 May 2025
| ML20080Q127 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 10/05/1983 |
| From: | Cook K LOUISIANA POWER & LIGHT CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| GL-83-28, W3P83-3318, NUDOCS 8310120226 | |
| Download: ML20080Q127 (1) | |
Text
Louisiama ! NEWORLEANS LOUSANA
,.. c-e~Oe s...
.m eO_
POWER & LIGHT 70174-8000 G (504) 3BO-.W5 MIDDLE SOUTH UTILmES SYSTEM October 5, 1983 W3P83-3318 Q-3-A20.02.02 3-A1.01.04 L.02 Mr. Darrell G. Eisenhut Director, Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
SUBJECT:
Waterford SES Unit 3 Docket No. 50-382 Generic Letter 83-28 Required Actions Based on Generic Implications of Salem ATWS Events
REFERENCE:
LP&L Letter W3P83-2915 The subject Generic Letter requires a response by November 8,1983 unless an extension is requested in advance. The above referenced letter indicated that our extension request would be submitted no later than October 7, 1983.
LP&L is proceeding expeditiously in assessing its current compliance with the positions in the subject letter and planning actions required to improve certain areas.
It is presently expected that we will participate with the Institute of Nuclear Power Operations and the Combustion Engineering Owners Group in addressing certain requirements and retain outside contractors to address others.
Since these industry groups and contractors have not yet had sufficient time to formulate specific proposals and schedules it will be impossible for us to provide the information required by the Generic Letter by November 8.
It is expected that this information will be available by January 15, 1984 at which time we will make the initial submittal of our plans and schedules as requested.
If you have any questions please advise.
Yours very truly, K.W. Cook Nuclear Support and Licensing Manager i O KWC/ MAL /ch cc:
W. M. Stevenson, E. L. Blake, J. Wilson, G. L. Constable 8310120226 831005 PDR ADOCK 05000382 A
pyg