| {{Adams
| | #REDIRECT [[05000321/LER-1980-062-01, Investigation of Pavement Deflection Revealed Settling of Fill Matl Under Svc Water & RHR Svc Water Lines.Caused by Improper Compaction of Area in Front of Intake Structure.Backfill Replaced]] |
| | number = ML19326D776
| |
| | issue date = 06/25/1980
| |
| | title = /01T-0:on 800612,w/Unit 1 in Cold Shutdown, Investigation Was Begun to Determine Cause of Pavement Deflection Which Occurred Beneath Crane Outrigger Pad. Caused by Improper Compaction of Localized Area
| |
| | author name = Coggin C
| |
| | author affiliation = GEORGIA POWER CO.
| |
| | addressee name =
| |
| | addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| |
| | docket = 05000321
| |
| | license number =
| |
| | contact person =
| |
| | document report number = LER-80-062-01T, LER-80-62-1T, NUDOCS 8007030286
| |
| | package number = ML19326D773
| |
| | document type = LICENSEE EVENT REPORT (SEE ALSO AO RO), TEXT-SAFETY REPORT
| |
| | page count = 2
| |
| }}
| |
| {{LER
| |
| | Title = /01T-0:on 800612,w/Unit 1 in Cold Shutdown, Investigation Was Begun to Determine Cause of Pavement Deflection Which Occurred Beneath Crane Outrigger Pad. Caused by Improper Compaction of Localized Area
| |
| | Plant =
| |
| | Reporting criterion =
| |
| | Power level =
| |
| | Mode =
| |
| | Docket = 05000321
| |
| | LER year = 1980
| |
| | LER number = 62
| |
| | LER revision = 1
| |
| | Event date =
| |
| | Report date =
| |
| | ENS =
| |
| | abstract =
| |
| }}
| |
| | |
| =text=
| |
| {{#Wiki_filter:I U.S. NUCLEAR REGULATflRY COMMISSION NRC FORM 366 l(7 77)
| |
| LICENSEE EVENT REPORT coainot block:
| |
| l l
| |
| l l
| |
| l (PLFASE PRINT OR TYPE ALL REQUIRED INFORMATION)
| |
| ~
| |
| l G l A l E l I l H l 1 l@l 010 l-1010 l0 l0 !0 l-10 l0 l@l4 l1 l1 l1 l1 j@l l
| |
| l@
| |
| o i 7
| |
| 8 9 LICENSEE CODE 14 15 LICENSE NUMULH 25 26 LICEN5E TYPE Ju bl CAT td con'T 3M l L ]@l 0 l 5 l 010 j 013 l 2 l1 l@l016 l1 12 l 810 l@l0161215l810.l@
| |
| o i 74 75 HEPOHT DATE 80 7
| |
| 8 t,0 61 DOCKET NUMBEH tal 69 LVENT DATE EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h lWith Unit 1 in cold shutdown, an investigation was begun to determine
| |
| [
| |
| o 2 QL3_l Ithe cause of pavement deflection which occurred beneath a crane outrig-1 Iger pad at the intake structure.
| |
| The investigation revealed a settling i o 4 tof fill material under the service water and RHR service water lines.
| |
| I O $
| |
| lo lc i lRemedial action will be required in order to comply with FSAR compactioni 1
| |
| 0l7ll requirements.
| |
| There were no effects upon public health and safety due i
| |
| i I
| |
| lto this event. This is not a repetitive occurrence.
| |
| o a DE COCE St BC E COMPONENT CODE SUBC D'E SU DE 12 l Z 1@ Lxj@ l x i@ I zi zl zl zl zl zlO Lx_J@ LXJ @
| |
| o 9 7
| |
| 8 9
| |
| 10 11 12 13 18 19 20 SEOUENTI AL OCCURRENCE REPORT REVISIUN EVE NT YE AR REPORT NO.
| |
| CODE TYPE N O.
| |
| O s=E R/RO l 81 ol 1-1 10 16 12 1 M
| |
| 10111 lT I L _]
| |
| W L
| |
| a
| |
| _ 21 22 23 24 26 27 28 29 30 31 32 KEN ACT ON ON PL NT MET HOURS 22 SB IT FO A B.
| |
| UPPLIE MAN FACTURER lXl@lXl@
| |
| lzl@
| |
| [_zj@
| |
| 10 l0 10 l0 l lYl@
| |
| lNlg lzj@
| |
| lz l9 l9 l9 lg 3J 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h i O IThe cause has been determined as improper compaction of a localized area l li li l limmedi a tely in front of the intake structure.
| |
| A substantial depth of I
| |
| lbackfill was compacted in this area.
| |
| Difficulty in originally compact-I i 2 lTITl l i ng o f the b a ck fill appears.to have caused the problem.
| |
| Corrective I
| |
| laction will be determined after the problem's scope is determined.
| |
| l i 4 80 7
| |
| 8 9 Y
| |
| % POWE R OTHER STATUf is FY DISCOVE RY DESCRIPTION
| |
| (_Gj @ 10 l 0 1 Ol @ l NA l
| |
| lC l@l Geortechnical Investigation l
| |
| i 5 ACTIVITY CONTENT REL E ASED OF RELE ASE AMOUNT OF ACTIVITY LOCATION OF RELE ASE L.zJ @ LZJ@l NA l
| |
| l NA l
| |
| i 6 7
| |
| 8 9 10 11 44 45 80 PERSONNEL E XPOSUHES NUMBER TYPE DE SCRIPTION l 0l 0l Ol@l zl@l NA l
| |
| i 7 PEHSONNEL INJU IES NUYDEH
| |
| | |
| ==DESCRIPTION==
| |
| l0l0l0l@l NA l
| |
| i a 80 7
| |
| 8 9 11 12 TOSS OF OH DAMAGE TO FACillTY TYPE DE SCHIPTION
| |
| [_ zj@l NA l
| |
| i 9 80 7
| |
| 8 t 10 E SCnsPTION CSSSUEL 81 NA l
| |
| 1IlllllIIIllli 2 o 8 0'0 7 6'n o J_dT
| |
| 'l r I rnnnin sont p1t Fno. Sory, 917-36W-7781 a
| |
| m m..e
| |
| | |
| i LER f:
| |
| 50-321/1980-062 i
| |
| Licensee:
| |
| Georgia Power Company Facility Name:
| |
| Edwin I.
| |
| Hatch Docket #:
| |
| 50-321 L
| |
| | |
| =Narrative=
| |
| Report for LER 50-321/1980-062 On 6-12-80, with Unit 1 in cold shutdown, an investigation was begun to determine the
| |
| | |
| ==cause==
| |
| of pavement deflection which occurred beneath a
| |
| crane outrigger pad at the intake structure.
| |
| ,The investigation involved excavation of the pavement and the ground beneath until reaching the service water lines below.
| |
| There was no damage done to the Unit 1 or 2 service water (PSW) or RHRSW piping in this area.
| |
| The investigation-was continued further and revealed two 1.
| |
| the separati.on of fill from underneath the problems: _
| |
| 2.
| |
| existence of a
| |
| temporary pipe support used
| |
| : piping, and during construction which.should have been removed then.
| |
| This temporary support has been removed.
| |
| Presently, a testing plan consisting of numerous soil samples from bowings at the intake structure is underway.
| |
| The A/E is assisting 'in the investigation and in determining a proposed correction to the problem.
| |
| 'An acceptable resolution will be initiated once the results of the investigation are in and the appropriate course of action has been determined.
| |
| An update to this report will be issued.
| |