05000336/LER-1999-001, Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 1: Line 1:
{{Adams
#REDIRECT [[05000336/LER-1999-001]]
| number = ML20212E762
| issue date = 09/20/1999
| title = Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl
| author name = Schwarz C
| author affiliation = NORTHEAST NUCLEAR ENERGY CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000336
| license number =
| contact person =
| document report number = B17875, NUDOCS 9909270140
| package number = ML20212E765
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 5
}}
{{LER
| Title = Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl
| Plant =
| Reporting criterion = 10 CFR 50.73(a)(2)(i)
| Power level =
| Mode =
| Docket = 05000336
| LER year = 1999
| LER number = 1
| LER revision = 0
| Event date =
| Report date =
| ENS =
| abstract =
}}
 
=text=
{{#Wiki_filter:r Northeast Rose Feny Rd. (Rouw 15, Waford, CM6385 Nuclear Energy wiii. tone Nociear po.er siatio.
g Northeast Nuclear Energy Company P.O. Box 128
* ~.
,,.~
Taterford, CT 06385-0128 z
(860) 447 1791 Faz (860) 444-4277 The Northeast Utilities System SEP 2 01999 Docket No 50-336 B17875 Re: 10 CFR 50.73(a)(2)(i)
U.S. Nuclear Regulatory Commission Attn: Document Control Desk' Washington, DC 20555 Millstone Nuclear Power Station, Unit No. 2 Licensee Event Report 99-011-00 Exceedness of Thermal Reactor Power Limit This letter forwards Licensee' Event Report (LER) 99-011-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No. 2, on August 23,1999. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(i).
:- The Northeast Nuclear Energy Company's (NNECO's) commitments made within this letter are included in Attachment 1.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY l
ban CJ. Schwarz Q 4tation Director Qy '
cc: see page 2 9909270140 990920 ADOCK 0 Q POR S
05i34224 RIT. t2-05
 
U.S. Nuclear Regulatory Commission''
B17875\\Page 2 Attachments:
: 1. List of Regulatory Commitments
: 2. LER 99-011-00 cc:
H. J. Miller, Region 1 Administrator R. B. Eaton, NRC Senior Project Manager, Millstone Unit No. 2 D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 i
i l
 
Docket No. 50-336 B17875 Millstone Nuclear Power Station, Unit No. 2
 
==Commitments==
September 1999 l
l
.l
 
1 4
U.S. Nuclear Reguictory Commission B17875%ttachment 1\\Page 1 Regulatory Commitment Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.
REGULATORY COMMITMENT COMMITTED DATE OR OUTAGE B17875.01: Guidance to the licensed operators Complete for maintaining the reactor thermal power below the licensed limit has been provided.
B17875.02: Operating procedures shall be October 29,1999 revised to incorporate new guidance on maintaining reactor thermal power below allowable limits.
B17875.03: Revised alarm setpoints for the October 1, '999 calorimetric calculated values on the plant process computer shall be investigated and appropriate corrective actions shall be implemented.
B17875.04: Training shall be provided to plant November 1,1999 operators on the changes made to procedures and alarm setpoints.
 
'g i
Docket No. 50-336 B17675 i
l Millstone Nuclear Power Station, Unit No. 2 LER 99-011-00
=
i I
i l
September 1999
}}
 