NUREG-0762, Ack Receipt of Revised Pages Dtd Mar 1985 & June 1986 for Radiological Contingency Plan,As Submitted in 850308 & s.Revs Acceptable,Although One Change Questionable.Annual Review Schedule Should Be Reinstated: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 1: Line 1:
#REDIRECT [[NUREG-0762, Informs That Integrated site-wide Emergency Preparedness Plan Must Be Submitted by 820906 Due to Amend of Regulations for Test & Research Reactors]]
{{Adams
| number = ML20211P579
| issue date = 07/16/1986
| title = Ack Receipt of Revised Pages Dtd Mar 1985 & June 1986 for Radiological Contingency Plan,As Submitted in 850308 & s.Revs Acceptable,Although One Change Questionable.Annual Review Schedule Should Be Reinstated
| author name = Rouse L
| author affiliation = NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
| addressee name = Cunningham G
| addressee affiliation = GENERAL ELECTRIC CO.
| docket = 07000754
| license number =
| contact person =
| case reference number = RTR-NUREG-0762, RTR-NUREG-762
| document report number = NUDOCS 8607230294
| document type = CORRESPONDENCE-LETTERS, NRC TO VENDOR/MANUFACTURER, OUTGOING CORRESPONDENCE
| page count = 2
}}
 
=Text=
{{#Wiki_filter:DISTRIBUTION:
Docketu70-754 :
PDR NMSS r/f FCAF r/f JUL 161986
$ue" FBrown JLong Region V Docket No. 70-754 General Electric Company Vallecitos Nuclear Center ATTN: Mr. G. E. Cunningham Senior Licensing Engineer P.O. Box 460 Pleasanton, CA 94566 Gentlemen:
--7mt 3
This letter is to acknowledge receipt of the revised' pages dated March 1985 and June 1986, as submitted in your letters of March"8;i1985 and June 16, 1986, for the Vallecitos Nuclear Center Radiologicaldoptingency Plan. We apologize for not previously acknowledging the recehit of the 1985 revisions.
Both sets of revisions are acceptable and have repigced:the appropriate pages in your plan, although we do find one change questioitable.
du, In Section 7.4 of your plan, the schedule -for plaWrbli'ew was changed from an annual to biennial review. The Guidelines for< Radio}og'ical Contingency Plans (NUREG-0762) specifically states there should be an genual review of all radiological contingency plans.
DuringaphonecalbtoMr.GaryComfortof the NRC on July 14, Mr. Earl Strain of Vallecitos Nuclear. Center stated that Vallecitos would continue to review its radiological! tontingency plan at least annually. We believe that the annual review (schedule should be reinstated in your contingency plan and request a revised page returning to an annual review schedule be included with your next submission of radiological contingency plan revisions.
Sincerely, original samwd by Leland C. Ro. se Leland C. Rouse, Chief Advanced Fuel and Spent Fuel Licensing Branch Division of Fuel Cycle and Material Safety 0FC: FCAF
:FCAFM :
-..--A.-.------V-.4w--------..----------------.-----....-------------.-
3 NAME:GComfort/jl:LCRouse :
4 DATE:07/16/86-----.----------..h/86:
:07/
0FFICIAL RECORD COPY 8607230294 e60716 PDR ADOCK 07000754 C
PDR
 
NMSS/ Fuel Cycle Material FCUF FCAF.
R.i, 90-we twieet o-
%uW VM tyk Return to 9/uw SS 396 l
. -}}

Revision as of 12:12, 23 May 2025

Ack Receipt of Revised Pages Dtd Mar 1985 & June 1986 for Radiological Contingency Plan,As Submitted in 850308 & s.Revs Acceptable,Although One Change Questionable.Annual Review Schedule Should Be Reinstated
ML20211P579
Person / Time
Site: 07000398
Issue date: 07/16/1986
From: Rouse L
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Cunningham G
GENERAL ELECTRIC CO.
References
RTR-NUREG-0762, RTR-NUREG-762 NUDOCS 8607230294
Download: ML20211P579 (2)


Text

DISTRIBUTION:

Docketu70-754 :

PDR NMSS r/f FCAF r/f JUL 161986

$ue" FBrown JLong Region V Docket No.70-754 General Electric Company Vallecitos Nuclear Center ATTN: Mr. G. E. Cunningham Senior Licensing Engineer P.O. Box 460 Pleasanton, CA 94566 Gentlemen:

--7mt 3

This letter is to acknowledge receipt of the revised' pages dated March 1985 and June 1986, as submitted in your letters of March"8;i1985 and June 16, 1986, for the Vallecitos Nuclear Center Radiologicaldoptingency Plan. We apologize for not previously acknowledging the recehit of the 1985 revisions.

Both sets of revisions are acceptable and have repigced:the appropriate pages in your plan, although we do find one change questioitable.

du, In Section 7.4 of your plan, the schedule -for plaWrbli'ew was changed from an annual to biennial review. The Guidelines for< Radio}og'ical Contingency Plans (NUREG-0762) specifically states there should be an genual review of all radiological contingency plans.

DuringaphonecalbtoMr.GaryComfortof the NRC on July 14, Mr. Earl Strain of Vallecitos Nuclear. Center stated that Vallecitos would continue to review its radiological! tontingency plan at least annually. We believe that the annual review (schedule should be reinstated in your contingency plan and request a revised page returning to an annual review schedule be included with your next submission of radiological contingency plan revisions.

Sincerely, original samwd by Leland C. Ro. se Leland C. Rouse, Chief Advanced Fuel and Spent Fuel Licensing Branch Division of Fuel Cycle and Material Safety 0FC: FCAF

FCAFM :

-..--A.-.------V-.4w--------..----------------.-----....-------------.-

3 NAME:GComfort/jl:LCRouse :

4 DATE:07/16/86-----.----------..h/86:

07/

0FFICIAL RECORD COPY 8607230294 e60716 PDR ADOCK 07000754 C

PDR

NMSS/ Fuel Cycle Material FCUF FCAF.

R.i, 90-we twieet o-

%uW VM tyk Return to 9/uw SS 396 l

. -