ML022630562: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[NRC 2002-0078, August 2002 Monthly Operating Report for Point Beach Units 1 & 2]]
{{Adams
| number = ML022630562
| issue date = 09/09/2002
| title = August 2002 Monthly Operating Report for Point Beach Units 1 & 2
| author name = Webb T
| author affiliation = Nuclear Management Co, LLC
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000266, 05000301
| license number = DPR-024, DPR-027
| contact person =
| case reference number = GL-97-002, NRC 2002-0078
| document type = Letter, License-Monthly Operating Report
| page count = 6
}}
 
=Text=
{{#Wiki_filter:Nucl Committed to Nuclear Excellence Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC NRC 2002-0078 September 9, 2002 GL 97-02 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:
Dockets 50-266 And 50-301 Point Beach Nuclear Plant, Units I And 2 Monthly Operating Reports Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of August 2002.
Sincerely, T. J. Webb Regulatory Affairs Manager KML Attachment cc:
J. D. Loock, PSCW NRC Region EIl NRC Senior Resident Inspector NRC Project Manager 6590 Nuclear Road 0 Two Rivers, Wisconsin 54241 Telephone: 920.755 2321
 
Docket 50-266 and 50-301 NRC-2002-0078 ATTACHMENT 1 Letter from Thomas J. Webb (NMC)
To Document Control Desk (NRC)
Dated September 09, 2002 Re: Monthly Operating Report -August 2002
 
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE 50-266 POINT BEACH NUCLEAR PLANT - UNIT 1 09/05/02 COMPLETED BY Kim M. Locke TELEPHONE REPORTING PERI 920-755-6420 OD August - 2002
: 1. DESIGN ELECTRICAL RATING (MWE-NET)
: 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET)
YEAR TO DATE CUMULATIVE
: 3. NUMBER OF HOURS REACTOR WAS CRITICAL
: 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE
: 5.
UNIT RESERVER SHUTDOWN HOURS
: 6.
NET ELECTRICAL ENERGY (MWH) 372,657.0 2,931,491.5 104,507,011.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997 515.0 510.0 MONTH 744.0 744.0 0.0 5,831.0 5,831.0 229,440.8 225,925.0 0.0 846.9
 
UNIT SHUTDOWNS DOCKET NO.
50-266 UNIT NAME:
Point Beach, Unit I DATE:
09/05/2002 COMPLETED BY:
Kim M. Locke TELEPHONE:
755-6420 REPORTING PERIOD:
August 2002 (Month/Year)
(1) Reason (2) Method A. Equipment Failure (Explain) 1 Manual B.
Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction
: 4. Continuation E. Operator Training/license Examination F.Administrative
: 5. Other (Explain)
G. Operational Error (Explain) H.Other (Explain)
 
==SUMMARY==
Unit 1 average daily power for the month of August was 500.9 MWe.
There were no Licensee Event Reports (LERs) submitted to the NRC.
There were no Significant Operating Events.
NO.
DATE TYPE DURATION REASON (1)
METHOD OF CAUSE/CORRECTIVE ACTIONS F:
FORCED (HOURS)
SHUTTING S:
SCHEDULED DOWN (2)
COMMENTS N/A N/A N/A N/A N/A N/A N/A
 
OPERATING DATA REPORT DOCKET NO.
50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 09/05/02 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD August - 2002
: 1. DESIGN ELECTRICAL RATING (MWE-NET)
: 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET)
YEAR TO DATE CUMULATIVE
: 3. NUMBER OF HOURS REACTOR WAS CRITICAL
: 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE
: 5.
UNIT RESERVER SHUTDOWN HOURS
: 6. NET ELECTRICAL ENERGY (MWH) 378,938.0 2,506,750.5 103,290,259.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997 515.0 512.0 MONTH 744.0 744.0 0.0 5,042.4 5,006.6 222,824.1 219,836.7 0.0 302.2
 
UNIT SHUTDOWNS DOCKET NO.
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-301 Point Beach, Unit 2 09/05/2002 Kim M. Locke 755-6420 REPORTING PERIOD:
August 2002 (Month/Year)
(1) Reason A. Equipment Failure (Explain)
B.
Maintenance or Test C. Refueling D. Regulatory Restriction E. Operator Training/license Examination F.Administrative G.Operational Error (Explain) H.Other (Explain)
(2) Method 1 Manual 2 Manual Trip/Scram 3 Automatic Trip/Scram
: 4. Continuation
: 5. Other (Explain)
 
==SUMMARY==
Unit 2 average daily power for the month of August was 509.3 MWe.
There were no Licensee Event Reports (LERs) submitted to the NRC.
There were no Significant Operating Events.
NO.
DATE TYPE DURATION REASON (1)
METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)
SHUTTING S:
SCHEDULED DOWN (2)
COMMENTS N/A N/A N/A N/A N/A N/A}}

Latest revision as of 15:49, 16 January 2025

August 2002 Monthly Operating Report for Point Beach Units 1 & 2
ML022630562
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/09/2002
From: Webb T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, NRC 2002-0078
Download: ML022630562 (6)


Text

Nucl Committed to Nuclear Excellence Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC NRC 2002-0078 September 9, 2002 GL 97-02 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:

Dockets 50-266 And 50-301 Point Beach Nuclear Plant, Units I And 2 Monthly Operating Reports Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of August 2002.

Sincerely, T. J. Webb Regulatory Affairs Manager KML Attachment cc:

J. D. Loock, PSCW NRC Region EIl NRC Senior Resident Inspector NRC Project Manager 6590 Nuclear Road 0 Two Rivers, Wisconsin 54241 Telephone: 920.755 2321

Docket 50-266 and 50-301 NRC-2002-0078 ATTACHMENT 1 Letter from Thomas J. Webb (NMC)

To Document Control Desk (NRC)

Dated September 09, 2002 Re: Monthly Operating Report -August 2002

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE 50-266 POINT BEACH NUCLEAR PLANT - UNIT 1 09/05/02 COMPLETED BY Kim M. Locke TELEPHONE REPORTING PERI 920-755-6420 OD August - 2002

1. DESIGN ELECTRICAL RATING (MWE-NET)
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET)

YEAR TO DATE CUMULATIVE

3. NUMBER OF HOURS REACTOR WAS CRITICAL
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE
5.

UNIT RESERVER SHUTDOWN HOURS

6.

NET ELECTRICAL ENERGY (MWH) 372,657.0 2,931,491.5 104,507,011.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997 515.0 510.0 MONTH 744.0 744.0 0.0 5,831.0 5,831.0 229,440.8 225,925.0 0.0 846.9

UNIT SHUTDOWNS DOCKET NO.

50-266 UNIT NAME:

Point Beach, Unit I DATE:

09/05/2002 COMPLETED BY:

Kim M. Locke TELEPHONE:

755-6420 REPORTING PERIOD:

August 2002 (Month/Year)

(1) Reason (2) Method A. Equipment Failure (Explain) 1 Manual B.

Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction

4. Continuation E. Operator Training/license Examination F.Administrative
5. Other (Explain)

G. Operational Error (Explain) H.Other (Explain)

SUMMARY

Unit 1 average daily power for the month of August was 500.9 MWe.

There were no Licensee Event Reports (LERs) submitted to the NRC.

There were no Significant Operating Events.

NO.

DATE TYPE DURATION REASON (1)

METHOD OF CAUSE/CORRECTIVE ACTIONS F:

FORCED (HOURS)

SHUTTING S:

SCHEDULED DOWN (2)

COMMENTS N/A N/A N/A N/A N/A N/A N/A

OPERATING DATA REPORT DOCKET NO.

50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 09/05/02 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD August - 2002

1. DESIGN ELECTRICAL RATING (MWE-NET)
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET)

YEAR TO DATE CUMULATIVE

3. NUMBER OF HOURS REACTOR WAS CRITICAL
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE
5.

UNIT RESERVER SHUTDOWN HOURS

6. NET ELECTRICAL ENERGY (MWH) 378,938.0 2,506,750.5 103,290,259.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997 515.0 512.0 MONTH 744.0 744.0 0.0 5,042.4 5,006.6 222,824.1 219,836.7 0.0 302.2

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-301 Point Beach, Unit 2 09/05/2002 Kim M. Locke 755-6420 REPORTING PERIOD:

August 2002 (Month/Year)

(1) Reason A. Equipment Failure (Explain)

B.

Maintenance or Test C. Refueling D. Regulatory Restriction E. Operator Training/license Examination F.Administrative G.Operational Error (Explain) H.Other (Explain)

(2) Method 1 Manual 2 Manual Trip/Scram 3 Automatic Trip/Scram

4. Continuation
5. Other (Explain)

SUMMARY

Unit 2 average daily power for the month of August was 509.3 MWe.

There were no Licensee Event Reports (LERs) submitted to the NRC.

There were no Significant Operating Events.

NO.

DATE TYPE DURATION REASON (1)

METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)

SHUTTING S:

SCHEDULED DOWN (2)

COMMENTS N/A N/A N/A N/A N/A N/A