{{#Wiki_filter:Nuclear Power Business Unit TEMPORARY CHANGE REVIEW AND APPROVAL Notc" Refer to NP 1.2.3, Temporary Procedure Changes.for requirements.                                                                             Page 1 of I - INITIATION Doc Number           _*-           /6/.,4                             Current RevJ//                 Unitj             Temp Chaplain.                             .      y-Document Title 'j, ,E f ',,-"- /&--,/ ,',,                                       ,                        *, r. e,,/, ///.
{{#Wiki_filter:Nuclear Power Business Unit TEMPORARY CHANGE REVIEW AND APPROVAL Notc" Refer to NP 1.2.3, Temporary Procedure Changes. for requirements.
                                                                                                        "ill,/                    &,        ar' k 1-/i4---    .. . ",
Page 1 of I - INITIATION Doc Number _*-  
Existing Effective Temporary Changes                           e/'7                                                             ,
/6/.,4 Current RevJ//
Brief Description ,c-/*.-                                 /   -          _s                           .
Unitj Temp Chaplain.
(Identify specific changes on 1-rrm PBF-0026e Document Review and Approval Continuation, and include                       nZhthe package)
y-Document Title 'j,  
,E f  
/&--,/,',,  
"ill,/ r.
e,,/,  
///.
ar k 1-/i4-..
Existing Effective Temporary Changes e/'7 Brief Description  
,c-/*.-  
/
_s (Identify specific changes on 1-rrm PBF-0026e Document Review and Approval Continuation, and include nZh the package)
PBF-0026h and include with the change.
PBF-0026h and include with the change.
Other     documents     required to be effective concurrently with the temporary change:                                 '% .,-*
Other documents required to be effective concurrently with the temporary change:
Changes pre-screened according to NP 5.1.8?                         El NO WYES Provide documentation according to NP 5 19)
Changes pre-screened according to NP 5.1.8?
Screening completed according to NP 5.1.8?                           I*NA           El YES (Attach copy)
El NO WYES Provide documentation according to NP 5 19)
Safety Evaluation Required?                 NO E YES (ifYes.         aresion    rmaybe processed or fnral rev*,*s andapprovals shall be obu*ned beforoimplmeneng)
Screening completed according to NP 5.1.8?
I*NA El YES (Attach copy)
Safety Evaluation Required?
NO E YES (if Yes.
a resion rmay be processed or fnral rev*,*s and approvals shall be obu*ned beforo implmeneng)
Determine if the change constitutes a Change Of Intent to the procedure by evaluating the following questions.
Determine if the change constitutes a Change Of Intent to the procedure by evaluating the following questions.
(If any answers are YES, a revision may be processed or final reviews and approvals shall be obtained before implementing)
(If any answers are YES, a revision may be processed or final reviews and approvals shall be obtained before implementing)
Will the proposed change:                                                                                                                             YES             NO I. Require a change to, affect cr invalidate a requirement, commitment, evaluation or                                                         El description in the Current or ISFSI Licensing Basis (as defined in NP 5.1.8 and NP 5.1.7)7
Will the proposed change:
: 2. Cause an increase in magnitude, significance or impact such that it should be processed as a revision?
YES NO I.
: 3. Delete or modify a prerequisite, initial condition, precaution, limitation or other steps that could have safety significance or affect the procedure's margin of safety?
Require a change to, affect cr invalidate a requirement, commitment, evaluation or El description in the Current or ISFSI Licensing Basis (as defined in NP 5.1.8 and NP 5.1.7)7
: 4. Delete QC hold points, Independent Verification or Concurrent Check steps without the related step(s) that require the performance also being deleted?
: 2.
: 5. Change Tech Spec or other regulatory acceptance criteria other than for re-baselining                                                       [
Cause an increase in magnitude, significance or impact such that it should be processed as a revision?
: 3.
Delete or modify a prerequisite, initial condition, precaution, limitation or other steps that could have safety significance or affect the procedure's margin of safety?
: 4.
Delete QC hold points, Independent Verification or Concurrent Check steps without the related step(s) that require the performance also being deleted?
: 5.
Change Tech Spec or other regulatory acceptance criteria other than for re-baselining
[
purposes?
purposes?
Group Supervisor       (print/sign)--/p.tt     1 *.                   -ZI-                      I-Zg~I2 4                                    Date_____
Group Supervisor (print/sign)--/p.tt 1 *.
I-Zg~I24
-ZI-Date_____
(Cannot be the Initiator)
(Cannot be the Initiator)
This change Senior Reactor     Operator B(nninsign)     does not adversely-i. affect Plant operating        " conditions.
This change does not adversely affect Plant operating conditions. (Safety Related procedures only)
                                                                                            /'-               / -Related procedures only) Date (Safety                                      ____'_.,_-__
Senior Reactor Operator B(nninsign)  
(Group Supervio)/sign)                                                                               Date E     Hold cchanie until procedure completend if                                   approval still re           ired wihin 14 days of initial approval)
-i.
Ap QRc/MSS Tindicates Review NOT         appidivl not does7Required  (AdrfNS   anyfectPlant sessed,  .. nly)
/'-  
                                                          .QR speraetings/eoaditions.
/ -
Review RequI*S     (afeyRelaed.      Review Requiredtonly te)dtso penmnau~nmads                  -Ra           ,
Date ____'_.,_-__
ProcedureThiq Owner     (print/sign)                                   pnleted and processeI    "                      /                      Date Ch--nee and supponin2 iecoutre-Mints -corre*iliv com TV - FINAL REVIEW AND APPR VAL, completed witahin cha be nMust                          lngs approval) cT he Initiator, QR and                 AanVohan rrity callnb                       nr)           eptendentofrd SIndicates 50.59/72-4S ipp'cbilhty assessed. any necessary scemefnmgs/cvaldtfions j~c-Aormed. dc"ie?-miatlon made as to whethef add~toaal MS       etnAuthorityo (print/sign)               (e--" ,_ *Approval        -                      -0 a         . i L                       Date     sle'_Z V -REVISION INFORMATION FOR PERMANENT CHANGES                                                                                             F Post Typing Review (printisign)                                                             /Date                                                                       l.-
(Group Supervio)/sign)
Incorporated into Revision Number                                                                                                 Effective Date
Date Tindicates does7 not appidivl
: sessed, anyfectPlant speraetings/eoaditions. (afeyRelaed.
penmnau~nmads tonly te)dtso E
c Hold chanie until procedure completend if approval still re ired wihin 14 days of initial approval)
Ap QRc/MSS Review NOT Required (AdrfNS..
nly)  
.QR Review RequI*S Review Required
-Ra Procedure Owner (print/sign)
I Date Thiq Ch--nee and supponin2 iecoutre-Mints -corre*iliv com pnleted and processe
/
TV - FINAL REVIEW AND APPR VAL, nMust be completed witahin cha lngs approval) cT he Initiator, QR and AanVoh rrity callnb an eptendentofrd nr)
SIndicates 50.59/72-4S ipp'cbilhty assessed. any necessary scemefnmgs/cvaldtfions j~c-Aormed. dc"ie?-miatlon made as to whethef add~toaal MS etn o
*Approval Authority (print/sign)
(e--",_  
-0 a  
. i L Date sle'_Z V -REVISION INFORMATION FOR PERMANENT CHANGES F
Post Typing Review (printisign)  
/Date l.-
Incorporated into Revision Number Effective Date  


==References:==
==References:==
NP 1.2.3 Rvsoi--U1U3O       6 Revision 13 011!6/02
NP 1.2.3 Rvso i--U1U3O 6
Revision 13 011!6/02


Point Beach Nuclear Plant DOCUMENT REVIEW AND APPROVAL CONTINUATION
Point Beach Nuclear Plant DOCUMENT REVIEW AND APPROVAL CONTINUATION
                                                                                                                                    ?a~e!     of 3 Doc Number                         //4Revision                                                                                         Unit/
?a~e !
Title A7---sFtrLf,2                                   g!                 A/s~t                                 A       67 Temporary Change Number             A'P         -   0 '2 Description of Chahges:
of 3 Doc Number  
//4Revision Unit/
Title A7---sF trLf,2 g!
A/s~t A
67 Temporary Change Number A'P  
- 0 '2 Description of Chahges:
Step
Step
* Change/Reason s-- $ri         zXIAý~
* Change/Reason
                              ,c<I*.               , ~*,5*S~4,4~~  iW 27.,. ./ '*'*3. //!A ,/>-. *                                         (
$ri  
4/0 Other Comments
,c ' <I*.  
Note: Recording of Step Numberts) is not required for multiple occurrences of identical information or when not beneficial to reviewers.
, ~*,5*
PBF-0026c
iW 27.,../ '*'*3. /!A,/>-. *
                                                                                                                                              .NP
(
s--
/
zXIA&#xfd;~
S~4,4~~
4/0 Other Comments Note: Recording of Step Numberts) is not required for multiple occurrences of identical information or when not beneficial to reviewers.
PBF-0026c Revision 6 04118/01


==References:==
==References:==
NP 1.13. 1.2.3 Revision 6 04118/01
NP 1.13.  
.NP 1.2.3


Point Beach Nuclear Plant TEMPORARY CHANGE AFFECTED MANUAL LOCATION Page0 _           of   "
Point Beach Nuclear Plant TEMPORARY CHANGE AFFECTED MANUAL LOCATION Page0 _
__________________________________                                                    Revision               Unit Procedure Number             _                                                                                  Revision/_ Unit Title C,,i , 7/, eEZ 7-'        - a .i,.           ,,v,/S,'           *.        A,,:                   Aer*..1                        ,&#xa2;/56 Temporary Change Number .,Z?67. - 63,24" I - IMMEDIATELY AFTER INITIAL APPROVAL ON PBF-0026e (Non-Intent changes)
of Revision Unit Procedure Number Revision/_ Unit Title  
.i,.  
,,v,/S,'
A,,:
C,,i 7/,
eEZ 1
7-' a Aer*..  
,&#xa2;/56 Temporary Change Number.,Z?67. - 63,24" I - IMMEDIATELY AFTER INITIAL APPROVAL ON PBF-0026e (Non-Intent changes)
(after Final Approval if change of intent involved)
(after Final Approval if change of intent involved)
Date This procedure change has been processed as follows: (Manual/Location)                                                                 Performed E]         Copy included in work package for field implementation. (WO No.                                                           )
Date This procedure change has been processed as follows: (Manual/Location)
E]         Copy filed in Control Room temp change binder (Operations only).
Performed E]
[]         Original change package provided to                             6, qz.-(               to obtain Procedure Owner                 -    -&deg; ...
Copy included in work package for field implementation. (WO No.  
Review (e.g.. Owner review         may be coordinated by In-Group OA 1, Procedure Writer. Procedure Supervisor. etc.).
)
El LI El El LI Performed By (print and sign)                         -                                    /C                 . ec-,-,           Date   5_-     -c2..
E]
II - PROCEDURE OWNER REVIEW ON PBF-0026e (may be performed by OA II, Procedure Writer, etc.)
Copy filed in Control Room temp change binder (Operations only).
Date This procedure change has been processed as follows: (Manual/Location)                                                                   Performed El       Copy sent to Document Control Distribution Lead for Master File.
[]
Original change package provided to 6, qz.-(
to obtain Procedure Owner  
-&deg;...
Review (e.g.. Owner review may be coordinated by In-Group OA 1, Procedure Writer. Procedure Supervisor. etc.).
El LI El El LI Performed By (print and sign)  
/C ec-,-,
Date 5_-  
-c2..
II - PROCEDURE OWNER REVIEW ON PBF-0026e (may be performed by OA II, Procedure Writer, etc.)
Date This procedure change has been processed as follows: (Manual/Location)
Performed El Copy sent to Document Control Distribution Lead for Master File.
(Not required for one-time use change)
(Not required for one-time use change)
E)       Copy filed it Group satellite file.                 (Not required for one-time use changes.)
E)
El       Copy filed in Group one-time use file.
Copy filed it Group satellite file. (Not required for one-time use changes.)
[]       Original Temp Change provided to                               *      .                  to obtain Final Approvals                         Z_..-
El Copy filed in Group one-time use file.
[]
Original Temp Change provided to to obtain Final Approvals Z_..-
(e g. final approval may be coordinated by In-Group OA JL Procedure Writer. Procedure Supervisor. etc.)
(e g. final approval may be coordinated by In-Group OA JL Procedure Writer. Procedure Supervisor. etc.)
Performed By (print and sign) *--,                             _t,.----                   /         .".'i,,(_.                   Date ,-- :,_-oZ..
Performed By (print and sign) *--,
PBF-0026h                                                                                                                              
_t,.----  
/  
.".'i,,(_.
Date,-- :,_-oZ..
PBF-0026h Revision 5 06/13/01


==Reference:==
==Reference:==
NP 12.3 Revision 5 06/13/01
NP 12.3


Point Beach Nuclear Plant 10 CFR 50.59/72.48 PRE-SCREENING REVIEW Page ..f of__
Point Beach Nuclear Plant 10 CFR 50.59/72.48 PRE-SCREENING REVIEW Page..f of__
Brief Activity Title or   Temp Change to IT-10A
Brief Activity Title or Temp Change to IT-10A  


==
==
Description:==
Description:==
This form is required to be completed and attached to the applicable activity change forms (i.e., PBF-0026a/c, etc.) to document use of Pre-screening Criterion 3 through 6 for 10 CFR 50.59 / 72 48 review of proposed changes (see NP 5.1.8, 10 CFR 50.59/72.48 Applicability, Screening and Evaluation (New Rule) Section 4.6 and Attachment A.)
This form is required to be completed and attached to the applicable activity change forms (i.e., PBF-0026a/c, etc.) to document use of Pre-screening Criterion 3 through 6 for 10 CFR 50.59 / 72 48 review of proposed changes (see NP 5.1.8, 10 CFR 50.59/72.48 Applicability, Screening and Evaluation (New Rule) Section 4.6 and Attachment A.)
Pre-screening Criterion 3 - Activity Covered by Existing 10 CFR 50.59 / 72A8 Screening or Evaluation Criterion 3 is Z Not Applicable to the proposed activity.
Pre-screening Criterion 3 - Activity Covered by Existing 10 CFR 50.59 / 72A8 Screening or Evaluation Criterion 3 is Z Not Applicable to the proposed activity.
Identify the screening or evaluation number(s) (SE for old 50.59/72A8 rule evaluations, EVAL for new rule evaluations):
Identify the screening or evaluation number(s) (SE for old 50.59/72A8 rule evaluations, EVAL for new rule evaluations):
SCR / SE / EVAL #(s):                                 SPEED # (NP 9.3.3, Rev. 3 or later ONLY):
SCR / SE / EVAL #(s):
SPEED # (NP 9.3.3, Rev. 3 or later ONLY):
If applicable, briefly summarize the parts of the proposed activity that are covered by Pre-screening Criterion 3.
If applicable, briefly summarize the parts of the proposed activity that are covered by Pre-screening Criterion 3.
Pre-screening Criterion 4 - Activity Covered by ExistingApproved and Valid Plant Procedure Criterion 4 is EQ Not Applicable to the proposed activity.
Pre-screening Criterion 4 - Activity Covered by ExistingApproved and Valid Plant Procedure Criterion 4 is EQ Not Applicable to the proposed activity.
Line 107: Line 185:
Criterion 6 is [D Not Applicable to the proposed activity.
Criterion 6 is [D Not Applicable to the proposed activity.
If applicable, briefly summarize the parts-of the proposed activity that are covered by Pre-screening Criterion 6.
If applicable, briefly summarize the parts-of the proposed activity that are covered by Pre-screening Criterion 6.
VERIFY THAT NONE OF THE FOLLOWING CHANGES ARE PRE-SCREENED TO CRITERION 6:                                             Verified No changes to structure, system or component design, performance, acceptance criteria, types of materials,                 []
VERIFY THAT NONE OF THE FOLLOWING CHANGES ARE PRE-SCREENED TO CRITERION 6:
Verified No changes to structure, system or component design, performance, acceptance criteria, types of materials,
[]
torque values outside of vendor recommended values, etc. (NOTE: Use Criterion 3 for SPEEDs.)
torque values outside of vendor recommended values, etc. (NOTE: Use Criterion 3 for SPEEDs.)
PBF-1515b Revision 1 04/03/02                                                                                            
PBF-1515b Revision 1 04/03/02  


==Reference:==
==Reference:==
NP 5.1.8
NP 5.1.8


Point Beach Nuclear Plant 10 CFR 50.59/72.48 PRE-SCREENING REVIEW                                         P         "f Page 2_of No temporary alterations to support maintenance or modification installation will be in place longer than 90             []
Point Beach Nuclear Plant 10 CFR 50.59/72.48 PRE-SCREENING REVIEW P  
"f Page 2_of No temporary alterations to support maintenance or modification installation will be in place longer than 90
[]
days. (If there is any doubt whether the temporary alteration will be removed in 90 days, perform a screening.)
days. (If there is any doubt whether the temporary alteration will be removed in 90 days, perform a screening.)
No changes in acceptance criteria in technical specification surveillance or post-maintenance test procedures.           []
No changes in acceptance criteria in technical specification surveillance or post-maintenance test procedures.
10 CFR 50.59/72.48 PRE-SCREENING REVIEW CONCLUSION Preparer and Reviewer signatures below signify that the portions of the proposed activity as described above are within the scope of Prescreening Criteria 3, 4, 5, or 6 of NP 5.1.8.
[]
EITHER preparer OR reviewer shall be 50.59/72.48 screening or evaluation qualified.
10 CFR 50.59/72.48 PRE-SCREENING REVIEW CONCLUSION PBF-1515b Revision 1 04/03/02
Performed By                      Ryan Rode                /
* Date    05/04/2002 Name (Print)                            " ture Reviewed By                                        /          /*a"      Seg>aZ-1r                  Date Name (Print)                          Signature PBF-1515b Revision 1 04/03/02                                                                                          


==Reference:==
==Reference:==
NP 5.1.8
NP 5.1.8 Preparer and Reviewer signatures below signify that the portions of the proposed activity as described above are within the scope of Prescreening Criteria 3, 4, 5, or 6 of NP 5.1.8.
 
EITHER preparer OR reviewer shall be 50.59/72.48 screening or evaluation qualified.
                - *Point                                     Beach Nuclear Plant PROCEDURE RECORD AND FIELD COPY TRACKING Record/Field Copy Identification                                   Field Copy Number RED - Record Copy; BLACK - Field Copy Procedure Number           72T- IOA                                 Unit       I Revision Number        /f(
Performed By Ryan Rode
Revision Date */u,        /,,0ap, Procedure Title         gfap6fep Procedure Revision Checked anjd Current; Vzo~ng,Checked for Teniporary ClhA~s:-'
/
By           l.Y     J       2 c0*j             _________
Date 05/04/2002 Name (Print)
Date   s     4(d Record Copy Holder/Location               Cc' /             CQif(dI         3-FIELD COPY DISTRIBUTION Copy No.                                   Holder/Location                         Issue Date       Return Date 1                       7ef4                           (2-ad-                       A, 2
" ture Reviewed By
/
/*a" Seg>aZ-1r Date Name (Print)
Signature
* Point Beach Nuclear Plant PROCEDURE RECORD AND FIELD COPY TRACKING Record/Field Copy Identification Field Copy Number RED - Record Copy; BLACK - Field Copy Procedure Number 72T-IOA Unit I
Procedure Title gfap6fep Procedure Revision Checked anjd Current; Vzo~ng, Checked for Teniporary ClhA~s:-'
By l.Y J
2 c0*j Revision Number
/ f(
Revision Date */u,
/,,0ap, Date s
4(d Record Copy Holder/Location Cc' /
CQif(dI 3-
FIELD COPY DISTRIBUTION Copy No.
Holder/Location Issue Date Return Date 1
7ef4 (2-ad-A, 2
3 4
3 4
5 6
5 6
7 8
7 8
9 10 NOTE 1:       ANY TEMPORARY CHANGES MADE TO THIS PROCEDURE SHALL BE MADE TO THE RECORD COPY AND ALL OTHER FIELD COPIES THAT HAVE BEEN ISSUED.
9 10 NOTE 1:
NOTE 2:       RETURN ALL FIELD COPIES TO THE HOLDER OF THE RECORD COPY UPON PROCEDURE COMPLETION.
ANY TEMPORARY CHANGES MADE TO THIS PROCEDURE SHALL BE MADE TO THE RECORD COPY AND ALL OTHER FIELD COPIES THAT HAVE BEEN ISSUED.
PBF-0026i                                                                                                    
NOTE 2:
RETURN ALL FIELD COPIES TO THE HOLDER OF THE RECORD COPY UPON PROCEDURE COMPLETION.
PBF-0026i Revision 2 2/21101


==Reference:==
==Reference:==
NP 1.1.4 Revision 2 2/21101
NP 1.1.4


r  t
IT 10A TEST OF ELECTRICALLY-DRIVEN AUXILIARY FEED PUMPS AND VALVES WITH FLOW TO UNIT 1 STEAM GENERATORS (QUARTERLY)
  .. i IT 10A TEST OF ELECTRICALLY-DRIVEN AUXILIARY FEED PUMPS AND VALVES WITH FLOW TO UNIT 1 STEAM GENERATORS (QUARTERLY)
DOCUMENT TYPE:
DOCUMENT TYPE: Technical CLASSIFICATION:         Safety Related 11 REVISION:
CLASSIFICATION:
EFFECTIVE DATE: July 5, 2001 REVIEWER:       Qualified Reviewer APPROVAL AUTHORITY:             Department Manager PROCEDURE OWNER (title): Group Head OWNER GROUP:         Operations Verified Current Copy:
REVISION:
Signature                     Date        Time List pages used for Partial Performance               Controlling Work Document Numbers
EFFECTIVE DATE:
REVIEWER:
APPROVAL AUTHORITY:
PROCEDURE OWNER (title):
OWNER GROUP:
Verified Current Copy:
Signature List pages used for Partial Performance Technical Safety Related 11 July 5, 2001 Qualified Reviewer Department Manager Group Head Operations Date Time Controlling Work Document Numbers t
r i


POINT BEACH NUCLEAR PLANT                                         IT 10A SAFETY RELATED INSERVICE TESTS Revision 11 July 5, 2001 TEST OF ELECTRICALLY-DRIVEN AUXILIARY FEED PUMPS AND VALVES WITH FLOW TO UNIT 1 STEAM GENERATORS (QUARTERLY)
POINT BEACH NUCLEAR PLANT INSERVICE TESTS TEST OF ELECTRICALLY-DRIVEN AUXILIARY FEED PUMPS AND VALVES WITH FLOW TO UNIT 1 STEAM GENERATORS (QUARTERLY)
INITIALS 4.0   INITIAL CONDITIONS 4.1   This test is being done to satisfy:
IT 10A SAFETY RELATED Revision 11 July 5, 2001 INITIALS 4.0 INITIAL CONDITIONS 4.1 This test is being done to satisfy:
X" The normally scheduled callup. Task sheet No.         977 **-'.3 NOTE:       If this test is being performed to satisfy PMT or off-normal frequency requirements, Shift Management may N/A those portions of the procedure that are NOT applicable for the performance of the PMT. The use of N/A is NOT acceptable for Initial Conditions, Precautions and Limitations, or procedure steps that pertain to the equipment requiring PMT, nor is it acceptable for restoration of equipment/components unless the component has been declared inoperable.
X" The normally scheduled callup. Task sheet No. 977 **-'.3 NOTE:
NOTE:       If this test is being performed to satisfy pump PMT requirements any vibration levels above 0.325 ips measured at any ASME Section XI Code required location shall be evaluated by engineering prior to declaring the pump operable.
If this test is being performed to satisfy PMT or off-normal frequency requirements, Shift Management may N/A those portions of the procedure that are NOT applicable for the performance of the PMT. The use of N/A is NOT acceptable for Initial Conditions, Precautions and Limitations, or procedure steps that pertain to the equipment requiring PMT, nor is it acceptable for restoration of equipment/components unless the component has been declared inoperable.
NOTE:
If this test is being performed to satisfy pump PMT requirements any vibration levels above 0.325 ips measured at any ASME Section XI Code required location shall be evaluated by engineering prior to declaring the pump operable.
___ Post maintenance operability test Equipment ID WO No(s).
___ Post maintenance operability test Equipment ID WO No(s).
Task Sheet No.(s)
Task Sheet No.(s)
Special test - no numbers. Explain:
Special test - no numbers. Explain:
4.2 Auxiliary feed system lined up for critical operation per CL 13E Part 2, Auxiliary Feedwater Valve Lineup Motor-Driven..
4.2 Auxiliary feed system lined up for critical operation per CL 13E Part 2, Auxiliary Feedwater Valve Lineup Motor-Driven..
4.3 Standby emergency power shall be available to the 4160 V safeguards buses 1A05, 1A06, 2A05, 2A06, or the component(s) to be tested is/are in the same train that is out of service.
4.3 Standby emergency power shall be available to the 4160 V safeguards buses 1A05, 1A06, 2A05, 2A06, or the component(s) to be tested is/are in the same train that is out of service.
4.4 Chemistry notified about auxiliary feed injection.
4.4 Chemistry notified about auxiliary feed injection.
4.5 Reactor power reduced a minimum of 2% OR to a power level directed by DSS. (Mark step NIA if in CTS: Hot or Cold Shutdown {ITS: Modes 3,4, I          5, 6, & defueled})
4.5 Reactor power reduced a minimum of 2% OR to a power level directed by DSS. (Mark step NIA if in CTS: Hot or Cold Shutdown {ITS: Modes 3,4, 5, 6, & defueled})
4.6 Permission to Perform Test The conditions required by this test are consistent with required plant conditions, including equipment operability. Permission is granted to perform this test.
4.6 Permission to Perform Test The conditions required by this test are consistent with required plant conditions, including equipment operability. Permission is granted to perform this test.
DSS N         b101            TIME_____       DATE_614~/pi Page 5 of 53                       CONTINUOUS USE
DSS N b1 01 TIME_____ DATE_614~/pi CONTINUOUS USE I
Page 5 of 53


POINT BEACH NUCLEAR PLANT                                         IT 10A SAFETY RELATED INSEERVICE TESTS Revision 11 July 5, 2001 TEST OF ELECTRICALLY-DRIVEN AUXILIARY FEED PUMPS AND VALVES WITH FLOW TO UNIT 1 STEAM GENERATORS (QUARTERLY)
POINT BEACH NUCLEAR PLANT INSEERVICE TESTS TEST OF ELECTRICALLY-DRIVEN AUXILIARY FEED PUMPS AND VALVES WITH FLOW TO UNIT 1 STEAM GENERATORS (QUARTERLY)
INITIALS NOTE:     Attachment L shall be used to document performance of multiple step performance and to record data. A separate copy of Attachment L shall be prepared for each step series requiring multiple performance and all copies shall be attached to this procedure when the procedure is complete.
IT 10A SAFETY RELATED Revision 11 July 5, 2001 INITIALS NOTE:
5.0 PROCEDURE I      5.1     IF in CTS: cold shutdown {ITS: Modes 5, 6, or defueled},
Attachment L shall be used to document performance of multiple step performance and to record data. A separate copy of Attachment L shall be prepared for each step series requiring multiple performance and all copies shall be attached to this procedure when the procedure is complete.
5.0 PROCEDURE 5.1 IF in CTS: cold shutdown { ITS: Modes 5, 6, or defueled},
THEN verify the following:
THEN verify the following:
(Otherwisd mark this step as N/A)
(Otherwisd mark this step as N/A)
* The Steam Generators are drained to a level sufficient to accept AFW flows.                                                             A! IM
* The Steam Generators are drained to a level sufficient to accept AFW flows.
* The RCS is NOT solid.
* The RCS is NOT solid.
NOTE:       When operability testing of Train A is NOT required, then N/A Steps 5.2 through 5.33.
NOTE:
5.2     TRAIN A TEST 5.2.1     IF performing Section 5.2, THEN the following auxiliary feedwater pumps with their associated flow paths, are operable as applicable.
When operability testing of Train A is NOT required, then N/A Steps 5.2 through 5.33.
5.2 TRAIN A TEST 5.2.1 IF performing Section 5.2, THEN the following auxiliary feedwater pumps with their associated flow paths, are operable as applicable.
(N/A the step that is NOT applicable.)
(N/A the step that is NOT applicable.)
: a. For two-unit operation:
: a. For two-unit operation:
P-38B, 1P-29, and 2P-29 are operable                       a    PW
P-38B, 1P-29, and 2P-29 are operable
: b. For single-unit operation:
: b. For single-unit operation:
P-38B and 1P-29 are operable for Unit 1 OR P-38B and   2P-29 are operable for Unit 2                     &sect;Qf -
P-38B and 1P-29 are operable for Unit 1 OR P-38B and 2P-29 are operable for Unit 2 5.2.2 IF sufficient qualified operators are NOT available on shift to support Step 5.2.3, THEN consider the equipment unavailable per Maintenance Rule AND N/A Step 5.2.3.
5.2.2     IF sufficient qualified operators are NOT available on shift to support Step 5.2.3, THEN consider the equipment unavailable per Maintenance Rule AND N/A Step 5.2.3.                                           A?
CONTINUOUS USE A! IM I
Page 6 of 53                         CONTINUOUS USE
a PW
&sect;Qf -
A?
Page 6 of 53


POINT BEACH NUCLEAR PLANT                                         IT 1OA SAFETY RELATED INStERVICE TESTS                                                   Revision 11 July 5, 2001 TEST OF ELECTRICALLY-DRIVEN AUXILIARY FEED PUMPS AND VALVES WITH FLOW TO UNIT 1 STEAM GENERATORS (QUARTERLY)
POINT BEACH NUCLEAR PLANT INStERVICE TESTS TEST OF ELECTRICALLY-DRIVEN AUXILIARY FEED PUMPS AND VALVES WITH FLOW TO UNIT 1 STEAM GENERATORS (QUARTERLY) 5.2.3 IT 1OA SAFETY RELATED Revision 11 July 5, 2001 Assign a Level 4 Dedicated Operator in the Control Room AND a Level 4 Dedicated Operator in the field per OM 3.26, Use of Dedicated Operators, to perform the restoration steps of Attachment J, if required. (Otherwise mark this step as N/A) 5.3 Enter a CTS: LCO (ITS: Action Condition) for P-38A.
INITIALS INITIALS 5.2.3     Assign a Level 4 Dedicated Operator in the Control Room AND a Level 4 Dedicated Operator in the field per OM 3.26, Use of Dedicated Operators, to perform the restoration steps of Attachment J, if required. (Otherwise mark this step as N/A)                                                     y4 I      5.3   Enter a CTS: LCO (ITS: Action Condition) for P-38A.
(N/A this step if not required for current plant conditions per CTS:
I            (N/A this step if not required for current plant conditions per CTS:
Technical Specification 15.3.4 (ITS: 3.7.5))
1&#xfd;'4 5 7-Technical Specification   15.3.4 (ITS: 3.7.5))
1&#xfd;'4 5 7-TIME  
TIME     *-'DATE                     5 /3     /0-L 5.4 IF an Auxiliary Feedwater Initiation is required during the performance of
*-'DATE 5 /3  
                !is test, THEN immediately perform Attachment J to recover Train A.
/0-L 5.4 IF an Auxiliary Feedwater Initiation is required during the performance of  
!is test, THEN immediately perform Attachment J to recover Train A.
(N/A this step if not required.)
(N/A this step if not required.)
y4
&#xa9;~
&#xa9;~
Page 7 of 53                         CONTINUOUS USE
CONTINUOUS USE INITIALS Page 7 of 53 INITIALS I I


POINT BEACH NUCLEAR PLANT                                       IT 10A INSERVICE TESTS                                                 SAFETY RELATED Revision 11 July 5, 2001 TEST OF ELECTRICALLY-DRIVEN AUXILIARY FEED PUMPS AND VALVES WITH FLOW TO UNIT 1 STEAM GENERATORS (QUARTERLY)
POINT BEACH NUCLEAR PLANT INSERVICE TESTS TEST OF ELECTRICALLY-DRIVEN AUXILIARY FEED PUMPS AND VALVES WITH FLOW TO UNIT 1 STEAM GENERATORS (QUARTERLY)
INITIALS 5.14 Check AF-4007, P-38A AFP Mini-Recirc Control, mini-recirculation valve open.
IT 10A SAFETY RELATED Revision 11 July 5, 2001 5.14 Check AF-4007, P-38A AFP Mini-Recirc Control, mini-recirculation valve open.
5.15 Check mini-recirculation flow equal to or greater than 70 gpm on FIT-4050A.
5.15 Check mini-recirculation flow equal to or greater than 70 gpm on FIT-4050A.
U 5.16 Check the packing glands for excessive leakage or overheating.               1, 5.17 Check pump and motor for unusual noise or overheating.
5.16 Check the packing glands for excessive leakage or overheating.
                                                                                  . &#xfd;'T 5.18 WHEN P-38A has run for five-minutes, THEN record the following on Attachment B.
5.17 Check pump and motor for unusual noise or overheating.
          "*    PI-4011, Pump Discharge Pressure.
5.18 WHEN P-38A has run for five-minutes, THEN record the following on Attachment B.
          "*    PI-4010A, Pump Suction Pressure.
PI-4011, Pump Discharge Pressure.
          "*    FIT-4050A, Mini-Recirculation Flow.
PI-4010A, Pump Suction Pressure.
          "*    Recirculation Flow Vibration Data.
FIT-4050A, Mini-Recirculation Flow.
0 Page 12 of 53                       CONTINUOUS USE
Recirculation Flow Vibration Data.
U 1,
&#xfd;'T CONTINUOUS USE INITIALS 0
Page 12 of 53


POINT BEACH NUCLEAR PLANT                                       IT 10A INSERVICE TESTS                                                 SAFETY RELATED Revision 11 TEST OF ELECTRICALLY-DRIVEN AUXILIARY FEED                     July 5, 2001 PUMPS AND VALVES WITH FLOW TO UNIT 1 STEAM GENERATORS (QUARTERLY)
POINT BEACH NUCLEAR PLANT INSERVICE TESTS TEST OF ELECTRICALLY-DRIVEN AUXILIARY FEED PUMPS AND VALVES WITH FLOW TO UNIT 1 STEAM GENERATORS (QUARTERLY)
INITIALS INITIALS 5.46 Check AF-4014, P-38B AFP Mini-Recirc Control, mini-recirculation valve open.
IT 10A SAFETY RELATED Revision 11 July 5, 2001 5.46 Check AF-4014, P-38B AFP Mini-Recirc Control, mini-recirculation valve open.
5.47 Check mini-recirculation flow equal to or greater than 70 gpm on FIT-4050B.
5.47 Check mini-recirculation flow equal to or greater than 70 gpm on FIT-4050B.
465 5.48 Check packing glands for excessive leakage or overheating.
5.48 Check packing glands for excessive leakage or overheating.
5.49 Check the pump and motor for unusual noise or overheating.
5.49 Check the pump and motor for unusual noise or overheating.
5.50 WHEN P-38B has run for five-minutes, THEN record the following data on Attachment F:
5.50 WHEN P-38B has run for five-minutes, THEN record the following data on Attachment F:  
          "*   PI-4018, Pump Discharge Pressure
"* PI-4018, Pump Discharge Pressure  
          "*   PI-4017A, Pump Suction Pressure
"* PI-4017A, Pump Suction Pressure  
          "*   FIT-4050B, Mini-Recirculation Flow
"* FIT-4050B, Mini-Recirculation Flow
* Recirculation Flow Vibration Data 40 &#xfd;11 Page 25 of 53                      CONTINUOUS USE
* Recirculation Flow Vibration Data 465 CONTINUOUS USE INITIALS INITIALS Page 25 of 53 40 &#xfd;11


POINT BEACH NUCLEAR PLANT                                   IT 10A INSERVICE TESTS                                             SAFETY RELATED Revision 1I TEST OF ELECTRICALLY-DRIVEN AUXILIARY FEED                 July 5, 2001 PUMPS AND VALVES WITH FLOW TO UNIT I STEAM CWNFPR ATORS (OUARTERLY' REMARKS SECTION:         7-mA; I cat         rc-h-r z,&#xfd;                 fer R 1=F-Vo20 o/,,F-YVo2Z               Z71F-/e13             2-AlF-/0'--.
POINT BEACH NUCLEAR PLANT INSERVICE TESTS TEST OF ELECTRICALLY-DRIVEN AUXILIARY FEED PUMPS AND VALVES WITH FLOW TO UNIT I STEAM CWNFPR ATORS (OUARTERLY' IT 10A SAFETY RELATED Revision 1I July 5, 2001 CONTINUOUS USE REMARKS SECTION:
      *,.*~d;..q_         cJ +a.,L       ,/e.o       (,su*ozo39?7)         .. ,'
7-mA; I cat rc z,&#xfd;  
            //
-h-r fer R 1=F-Vo20 o/,,F-YVo2Z Z71F-/e13 2-AlF-/0'--.  
7h-,,-       . 7-/1,-,-     2 .cs- c                f               3//?/
*,.*~d;..q_
Page 35 of 53                     CONTINUOUS USE
cJ  
+a.,L  
,/e.o
(,su*ozo39?7)  
//
7h -,,-
7 -/1,-,-
c 2  
.cs f
3//?/
Page 35 of 53


POINT BEACH NUCLEAR PLANT                                               IT 10A INSERVICE TESTS                                                         SAFETY RELATED Revision 11 TEST OF ELECTRICALLY-DRIVEN AUXILIARY FEED                             July 5, 2001 PUMPS AND VALVES WITH FLOW TO UNIT 1 STEAM GENERATORS (OUARTERLY)
POINT BEACH NUCLEAR PLANT INSERVICE TESTS TEST OF ELECTRICALLY-DRIVEN AUXILIARY FEED PUMPS AND VALVES WITH FLOW TO UNIT 1 STEAM GENERATORS (OUARTERLY)
ATTACHMENT B P-38A, AFW PUMP PERFORMANCE DATA (RECIRCULATION FLOW)
IT 10A SAFETY RELATED Revision 11 July 5, 2001 ATTACHMENT B P-38A, AFW PUMP PERFORMANCE DATA (RECIRCULATION FLOW)
NOTE 1: The data recorded on Attachment B is for information only.
NOTE 1: The data recorded on Attachment B is for information only.
NOTE 2:   Vibration points which are shaded must be recorded by the Micro-logger but are NOT required to be transferred to the table. Only points marked A, B, C, D, and E must be transferred to the table and are required for ASME Section XI. See Figure 1 for locations.
NOTE 2: Vibration points which are shaded must be recorded by the Micro-logger but are NOT required to be transferred to the table. Only points marked A, B, C, D, and E must be transferred to the table and are required for ASME Section XI. See Figure 1 for locations.
Step No.                 Parameter Measured           I Units     Reading   Acceptance Criteria   Initials 5.10.3   PI-4010A, P-38A AFP Suction Pressure           psig                                     INA 5.13   PI-4010A, P-38A AFP Suction Pressure           psig     (.                 >7 5.18   PI-4011 Pump Discharge Pressure                 psig   *3i               N/A 5.18   PI-4010A, P-38A AFP Suction Pressure           psig                       NIA 5.18   FIT-4050A, Mini-Recirc Flow                     gpm     "_79S             N/A 5.18   Recirculation Flow Vibration Data             INSTRUMENT           UNITSREAIANGS P38A 1V ips                                   Note 2       Micro-logger       IPS pk C.-
Step No.
P38A 1H ips                                   Note 2       Micro-logger       IPS pk P38A 1H ae                                     Note 2       Micro-logger       G env P38A IH ace                                   Note 2       Micro-logger         G pk P38A IA ips                                   Note 2       Micro-logger       IPS pk P38A 2V ips                                   Note 2       Micro-logger       IPS pk       _    _
Parameter Measured I Units Reading Acceptance Criteria Initials 5.10.3 PI-4010A, P-38A AFP Suction Pressure psig INA 5.13 PI-4010A, P-38A AFP Suction Pressure psig
P38A 2H ips                                   Note 2       Micro-logger       IPS pk P38A 2H ae                                     Note 2       Micro-logger         G env P38A 2H ace                                   Note 2       Micro-logger         G pk       _
(.  
P38A 2A ips                                   Note 2       Micro-logger       IPS pk P38A 3V ips                                   Note 2       Micro-logger       IPS pk P38A 3H ips                                   Note 2       Micro-logger       IPS pk P38A 3H ae                                     Note 2       Micro-logger         G env P38A 3H ace                                   Note 2       Micro-logger         G pk P38A 4V ips                                     Note 2       Micro-logger       IPS pk P38A 4H ips                                     Note 2       Micro-logger       IPS pk P38A 4H ae                                     Note 2       Micro-logger         G env P38A 4H ace                                     Note 2       Micro-logger         G pk P38A 4A ips                                     Note 2       Micro-logger       IPS pk Page 39 of 53                           CONTINUOUS USE
>7 5.18 PI-4011 Pump Discharge Pressure psig  
*3i N/A 5.18 PI-4010A, P-38A AFP Suction Pressure psig NIA 5.18 FIT-4050A, Mini-Recirc Flow gpm  
"_79S N/A 5.18 Recirculation Flow Vibration Data INSTRUMENT UNITSREAIANGS P38A 1V ips Note 2 Micro-logger IPS pk P38A 1H ips Note 2 Micro-logger IPS pk P38A 1H ae Note 2 Micro-logger G env P38A IH ace Note 2 Micro-logger G pk P38A IA ips Note 2 Micro-logger IPS pk P38A 2V ips Note 2 Micro-logger IPS pk P38A 2H ips Note 2 Micro-logger IPS pk P38A 2H ae Note 2 Micro-logger G env P38A 2H ace Note 2 Micro-logger G pk P38A 2A ips Note 2 Micro-logger IPS pk P38A 3V ips Note 2 Micro-logger IPS pk P38A 3H ips Note 2 Micro-logger IPS pk P38A 3H ae Note 2 Micro-logger G env P38A 3H ace Note 2 Micro-logger G pk P38A 4V ips Note 2 Micro-logger IPS pk P38A 4H ips Note 2 Micro-logger IPS pk P38A 4H ae Note 2 Micro-logger G env P38A 4H ace Note 2 Micro-logger G pk P38A 4A ips Note 2 Micro-logger IPS pk CONTINUOUS USE C.-
Page 39 of 53


POINT BEACH NUCLEAR PLANT                                               IT 10A INSERVICE TESTS                                                         SAFETY RELATED Revision 11 July 5, 2001 TEST OF ELECTRICALLY-DRIVEN AUXILIARY FEED PUMPS AND VALVES WITH FLOW TO UNIT I STEAM GENERATORS (OUARTERLY)
POINT BEACH NUCLEAR PLANT INSERVICE TESTS TEST OF ELECTRICALLY-DRIVEN AUXILIARY FEED PUMPS AND VALVES WITH FLOW TO UNIT I STEAM GENERATORS (OUARTERLY)
ATTACHMENT F P-38B, AFW PUMP PERFORMANCE DATA (RECIRCULATION FLOW)
IT 10A SAFETY RELATED Revision 11 July 5, 2001 ATTACHMENT F P-38B, AFW PUMP PERFORMANCE DATA (RECIRCULATION FLOW)
NOTE 1: The data recorded on Attachment F is for information only.
NOTE 1: The data recorded on Attachment F is for information only.
NOTE 2: Vibration points which are shaded must be recorded by the Micro-logger but are NOT required to be transferred to the table. Only points marked A, B, C, D, and E must be transferred to the table and are required for ASME Section XI. See Figure 1 for Locations.
NOTE 2: Vibration points which are shaded must be recorded by the Micro-logger but are NOT required to be transferred to the table. Only points marked A, B, C, D, and E must be transferred to the table and are required for ASME Section XI. See Figure 1 for Locations.
Step No.                 Parameter Measured               Units     Reading   Acceptance Criteria Initials 5.42.3   PI-4017A, P-38B AFP Suction Pressure           psig         '              NIA 5.45     PI-4017A, P-38B AFP Suction Pressure           Psig       "j>7" 5.50     PI-4018 Pump Discharge Pressure                 psig                       N/A 5.50     PI-4017A. P-38B AFP Suction Pressure           psig                       N/A 5.50     FIT-4050B, Mini-Recirc Flow                     gpm       "7+/-L4L           N/A 5.50     Recirculation Flow Vibration Data               INSTRUMENT           UNITS       READINGS" P38B IVips                                      Note 2       Micro-logger       IPS pk P38B IH ips                                     Note 2       Micro-logger       IPS pk P38B IH ae                                     Note 2       Micro-logger         Genv P38B 1H acc                                     Note 2       Micro-logger         G pk P38B 1A ips                                     Note 2       Micro-logger       IPS pk P38B 2V ips                                     Note 2       Micro-logger       IPS pk P38B 2H ips                                     Note 2       Micro-logger       IPS pk P38B 2H ae                                     Note 2       Micro-logger         Genv P38B 2H acc                                     Note 2       Micro-logger         Gpk    N' P38B 2A ips                                     Note 2       Micro-logger       IPS pk P38B 3V ips                                     Note 2       Micro-logger       IPS pk P38B 3H ips                                     Note 2       Micro-logger       IPS pk P38B 3H ae                                     Note 2       Micro-logger       Genv P38B 3H acc                                     Note 2       Micro-logger         Gpk P38B 4V ips                                     Note 2       Micro-logger       IPS pk P38B 4H ips                                     Note 2       Micro-logger       IPS pk P38B 4H ae                                     Note 2       Micro-logger       G ean P38B 4H acc                                     Note 2       Micro-logger         G pk P38B 4A ips                                     Note 2       Micro-logger       IPS pk
Step No.
Parameter Measured Units Reading Acceptance Criteria Initials 5.42.3 PI-4017A, P-38B AFP Suction Pressure psig NIA 5.45 PI-4017A, P-38B AFP Suction Pressure Psig "j>7" 5.50 PI-4018 Pump Discharge Pressure psig N/A 5.50 PI-4017A. P-38B AFP Suction Pressure psig N/A 5.50 FIT-4050B, Mini-Recirc Flow gpm "7+/-L4L N/A 5.50 Recirculation Flow Vibration Data INSTRUMENT UNITS READINGS" P38B IV ips Note 2 Micro-logger IPS pk P38B IH ips Note 2 Micro-logger IPS pk P38B IH ae Note 2 Micro-logger G env P38B 1H acc Note 2 Micro-logger G pk P38B 1A ips Note 2 Micro-logger IPS pk P38B 2V ips Note 2 Micro-logger IPS pk P38B 2H ips Note 2 Micro-logger IPS pk P38B 2H ae Note 2 Micro-logger G env P38B 2H acc Note 2 Micro-logger G pk N'
P38B 2A ips Note 2 Micro-logger IPS pk P38B 3V ips Note 2 Micro-logger IPS pk P38B 3H ips Note 2 Micro-logger IPS pk P38B 3H ae Note 2 Micro-logger G env P38B 3H acc Note 2 Micro-logger G pk P38B 4V ips Note 2 Micro-logger IPS pk P38B 4H ips Note 2 Micro-logger IPS pk P38B 4H ae Note 2 Micro-logger G ean P38B 4H acc Note 2 Micro-logger G pk P38B 4A ips Note 2 Micro-logger IPS pk
/
/
Page 45 of 53                           CONTINUOUS USE}}
CONTINUOUS USE Page 45 of 53}}

Latest revision as of 11:34, 16 January 2025

Temporary Change Review and Approval, IT 10A, Revision 11, Temp Change No. 2002-0324
ML030870670
Person / Time
Site: Point Beach  
Issue date: 05/06/2002
From: Larson T, John Miller, Sokol K
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2003-0094, TCN-2002-0324 PBF-0026c
Download: ML030870670 (15)


Text

Nuclear Power Business Unit TEMPORARY CHANGE REVIEW AND APPROVAL Notc" Refer to NP 1.2.3, Temporary Procedure Changes. for requirements.

Page 1 of I - INITIATION Doc Number _*-

/6/.,4 Current RevJ//

Unitj Temp Chaplain.

y-Document Title 'j,

,E f

/&--,/,',,

"ill,/ r.

e,,/,

///.

ar k 1-/i4-..

Existing Effective Temporary Changes e/'7 Brief Description

,c-/*.-

/

_s (Identify specific changes on 1-rrm PBF-0026e Document Review and Approval Continuation, and include nZh the package)

PBF-0026h and include with the change.

Other documents required to be effective concurrently with the temporary change:

Changes pre-screened according to NP 5.1.8?

El NO WYES Provide documentation according to NP 5 19)

Screening completed according to NP 5.1.8?

I*NA El YES (Attach copy)

Safety Evaluation Required?

NO E YES (if Yes.

a resion rmay be processed or fnral rev*,*s and approvals shall be obu*ned beforo implmeneng)

Determine if the change constitutes a Change Of Intent to the procedure by evaluating the following questions.

(If any answers are YES, a revision may be processed or final reviews and approvals shall be obtained before implementing)

Will the proposed change:

YES NO I.

Require a change to, affect cr invalidate a requirement, commitment, evaluation or El description in the Current or ISFSI Licensing Basis (as defined in NP 5.1.8 and NP 5.1.7)7

2.

Cause an increase in magnitude, significance or impact such that it should be processed as a revision?

3.

Delete or modify a prerequisite, initial condition, precaution, limitation or other steps that could have safety significance or affect the procedure's margin of safety?

4.

Delete QC hold points, Independent Verification or Concurrent Check steps without the related step(s) that require the performance also being deleted?

5.

Change Tech Spec or other regulatory acceptance criteria other than for re-baselining

[

purposes?

Group Supervisor (print/sign)--/p.tt 1 *.

I-Zg~I24

-ZI-Date_____

(Cannot be the Initiator)

This change does not adversely affect Plant operating conditions. (Safety Related procedures only)

Senior Reactor Operator B(nninsign)

-i.

/'-

/ -

Date ____'_.,_-__

(Group Supervio)/sign)

Date Tindicates does7 not appidivl

sessed, anyfectPlant speraetings/eoaditions. (afeyRelaed.

penmnau~nmads tonly te)dtso E

c Hold chanie until procedure completend if approval still re ired wihin 14 days of initial approval)

Ap QRc/MSS Review NOT Required (AdrfNS..

nly)

.QR Review RequI*S Review Required

-Ra Procedure Owner (print/sign)

I Date Thiq Ch--nee and supponin2 iecoutre-Mints -corre*iliv com pnleted and processe

/

TV - FINAL REVIEW AND APPR VAL, nMust be completed witahin cha lngs approval) cT he Initiator, QR and AanVoh rrity callnb an eptendentofrd nr)

SIndicates 50.59/72-4S ipp'cbilhty assessed. any necessary scemefnmgs/cvaldtfions j~c-Aormed. dc"ie?-miatlon made as to whethef add~toaal MS etn o

  • Approval Authority (print/sign)

(e--",_

-0 a

. i L Date sle'_Z V -REVISION INFORMATION FOR PERMANENT CHANGES F

Post Typing Review (printisign)

/Date l.-

Incorporated into Revision Number Effective Date

References:

NP 1.2.3 Rvso i--U1U3O 6

Revision 13 011!6/02

Point Beach Nuclear Plant DOCUMENT REVIEW AND APPROVAL CONTINUATION

?a~e !

of 3 Doc Number

//4Revision Unit/

Title A7---sF trLf,2 g!

A/s~t A

67 Temporary Change Number A'P

- 0 '2 Description of Chahges:

Step

  • Change/Reason

$ri

,c ' <I*.

, ~*,5*

iW 27.,../ '*'*3. /!A,/>-. *

(

s--

/

zXIAý~

S~4,4~~

4/0 Other Comments Note: Recording of Step Numberts) is not required for multiple occurrences of identical information or when not beneficial to reviewers.

PBF-0026c Revision 6 04118/01

References:

NP 1.13.

.NP 1.2.3

Point Beach Nuclear Plant TEMPORARY CHANGE AFFECTED MANUAL LOCATION Page0 _

of Revision Unit Procedure Number Revision/_ Unit Title

.i,.

,,v,/S,'

A,,:

C,,i 7/,

eEZ 1

7-' a Aer*..

,¢/56 Temporary Change Number.,Z?67. - 63,24" I - IMMEDIATELY AFTER INITIAL APPROVAL ON PBF-0026e (Non-Intent changes)

(after Final Approval if change of intent involved)

Date This procedure change has been processed as follows: (Manual/Location)

Performed E]

Copy included in work package for field implementation. (WO No.

)

E]

Copy filed in Control Room temp change binder (Operations only).

[]

Original change package provided to 6, qz.-(

to obtain Procedure Owner

-°...

Review (e.g.. Owner review may be coordinated by In-Group OA 1, Procedure Writer. Procedure Supervisor. etc.).

El LI El El LI Performed By (print and sign)

/C ec-,-,

Date 5_-

-c2..

II - PROCEDURE OWNER REVIEW ON PBF-0026e (may be performed by OA II, Procedure Writer, etc.)

Date This procedure change has been processed as follows: (Manual/Location)

Performed El Copy sent to Document Control Distribution Lead for Master File.

(Not required for one-time use change)

E)

Copy filed it Group satellite file. (Not required for one-time use changes.)

El Copy filed in Group one-time use file.

[]

Original Temp Change provided to to obtain Final Approvals Z_..-

(e g. final approval may be coordinated by In-Group OA JL Procedure Writer. Procedure Supervisor. etc.)

Performed By (print and sign) *--,

_t,.----

/

.".'i,,(_.

Date,-- :,_-oZ..

PBF-0026h Revision 5 06/13/01

Reference:

NP 12.3

Point Beach Nuclear Plant 10 CFR 50.59/72.48 PRE-SCREENING REVIEW Page..f of__

Brief Activity Title or Temp Change to IT-10A

==

Description:==

This form is required to be completed and attached to the applicable activity change forms (i.e., PBF-0026a/c, etc.) to document use of Pre-screening Criterion 3 through 6 for 10 CFR 50.59 / 72 48 review of proposed changes (see NP 5.1.8, 10 CFR 50.59/72.48 Applicability, Screening and Evaluation (New Rule) Section 4.6 and Attachment A.)

Pre-screening Criterion 3 - Activity Covered by Existing 10 CFR 50.59 / 72A8 Screening or Evaluation Criterion 3 is Z Not Applicable to the proposed activity.

Identify the screening or evaluation number(s) (SE for old 50.59/72A8 rule evaluations, EVAL for new rule evaluations):

SCR / SE / EVAL #(s):

SPEED # (NP 9.3.3, Rev. 3 or later ONLY):

If applicable, briefly summarize the parts of the proposed activity that are covered by Pre-screening Criterion 3.

Pre-screening Criterion 4 - Activity Covered by ExistingApproved and Valid Plant Procedure Criterion 4 is EQ Not Applicable to the proposed activity.

Identify the applicable plant procedure.

Procedure number, revision and title:

If applicable, briefly summarize the parts of the proposed activity that are covered by Pre-screening Criterion 4.

The temp change to IT-10 A was made so the test can be completed properly. Due to modifications to add backup nitrogen to the mini recirc valves, IT-10 was changed to include the newly added components. IT-IOA was not included in the list of procedures that needed to be updated as a result of this modification. This change has already been incorporated into IT-10 Rev 44 which was screened for nuclear safety and licensing implications. This change exactly matches what is in IT-10 for performing a shut test of.AF-133 and AF-153 Pre-screening Criterion 5 - NRC has Reviewed and Approved the Activity.

Criterion 5 is CK Not Applicable to the proposed activity.

Identify the NRC Safety Evaluation Report Number and/or Date.

NRC SER(s) # or Date(s):

If applicable, briefly summarize the parts of the proposed activity that are covered by Pre-screening Criterion 5.

Pre-screening Criterion 6 - Maintenance Activity (NOTE: Dry cask or ISFSI facility maintenance CANNOT use this criterion. A screening is required for dry cask or ISFSI facility maintenance.)

Criterion 6 is [D Not Applicable to the proposed activity.

If applicable, briefly summarize the parts-of the proposed activity that are covered by Pre-screening Criterion 6.

VERIFY THAT NONE OF THE FOLLOWING CHANGES ARE PRE-SCREENED TO CRITERION 6:

Verified No changes to structure, system or component design, performance, acceptance criteria, types of materials,

[]

torque values outside of vendor recommended values, etc. (NOTE: Use Criterion 3 for SPEEDs.)

PBF-1515b Revision 1 04/03/02

Reference:

NP 5.1.8

Point Beach Nuclear Plant 10 CFR 50.59/72.48 PRE-SCREENING REVIEW P

"f Page 2_of No temporary alterations to support maintenance or modification installation will be in place longer than 90

[]

days. (If there is any doubt whether the temporary alteration will be removed in 90 days, perform a screening.)

No changes in acceptance criteria in technical specification surveillance or post-maintenance test procedures.

[]

10 CFR 50.59/72.48 PRE-SCREENING REVIEW CONCLUSION PBF-1515b Revision 1 04/03/02

Reference:

NP 5.1.8 Preparer and Reviewer signatures below signify that the portions of the proposed activity as described above are within the scope of Prescreening Criteria 3, 4, 5, or 6 of NP 5.1.8.

EITHER preparer OR reviewer shall be 50.59/72.48 screening or evaluation qualified.

Performed By Ryan Rode

/

Date 05/04/2002 Name (Print)

" ture Reviewed By

/

/*a" Seg>aZ-1r Date Name (Print)

Signature

  • Point Beach Nuclear Plant PROCEDURE RECORD AND FIELD COPY TRACKING Record/Field Copy Identification Field Copy Number RED - Record Copy; BLACK - Field Copy Procedure Number 72T-IOA Unit I

Procedure Title gfap6fep Procedure Revision Checked anjd Current; Vzo~ng, Checked for Teniporary ClhA~s:-'

By l.Y J

2 c0*j Revision Number

/ f(

Revision Date */u,

/,,0ap, Date s

4(d Record Copy Holder/Location Cc' /

CQif(dI 3-

FIELD COPY DISTRIBUTION Copy No.

Holder/Location Issue Date Return Date 1

7ef4 (2-ad-A, 2

3 4

5 6

7 8

9 10 NOTE 1:

ANY TEMPORARY CHANGES MADE TO THIS PROCEDURE SHALL BE MADE TO THE RECORD COPY AND ALL OTHER FIELD COPIES THAT HAVE BEEN ISSUED.

NOTE 2:

RETURN ALL FIELD COPIES TO THE HOLDER OF THE RECORD COPY UPON PROCEDURE COMPLETION.

PBF-0026i Revision 2 2/21101

Reference:

NP 1.1.4

IT 10A TEST OF ELECTRICALLY-DRIVEN AUXILIARY FEED PUMPS AND VALVES WITH FLOW TO UNIT 1 STEAM GENERATORS (QUARTERLY)

DOCUMENT TYPE:

CLASSIFICATION:

REVISION:

EFFECTIVE DATE:

REVIEWER:

APPROVAL AUTHORITY:

PROCEDURE OWNER (title):

OWNER GROUP:

Verified Current Copy:

Signature List pages used for Partial Performance Technical Safety Related 11 July 5, 2001 Qualified Reviewer Department Manager Group Head Operations Date Time Controlling Work Document Numbers t

r i

POINT BEACH NUCLEAR PLANT INSERVICE TESTS TEST OF ELECTRICALLY-DRIVEN AUXILIARY FEED PUMPS AND VALVES WITH FLOW TO UNIT 1 STEAM GENERATORS (QUARTERLY)

IT 10A SAFETY RELATED Revision 11 July 5, 2001 INITIALS 4.0 INITIAL CONDITIONS 4.1 This test is being done to satisfy:

X" The normally scheduled callup. Task sheet No. 977 **-'.3 NOTE:

If this test is being performed to satisfy PMT or off-normal frequency requirements, Shift Management may N/A those portions of the procedure that are NOT applicable for the performance of the PMT. The use of N/A is NOT acceptable for Initial Conditions, Precautions and Limitations, or procedure steps that pertain to the equipment requiring PMT, nor is it acceptable for restoration of equipment/components unless the component has been declared inoperable.

NOTE:

If this test is being performed to satisfy pump PMT requirements any vibration levels above 0.325 ips measured at any ASME Section XI Code required location shall be evaluated by engineering prior to declaring the pump operable.

___ Post maintenance operability test Equipment ID WO No(s).

Task Sheet No.(s)

Special test - no numbers. Explain:

4.2 Auxiliary feed system lined up for critical operation per CL 13E Part 2, Auxiliary Feedwater Valve Lineup Motor-Driven..

4.3 Standby emergency power shall be available to the 4160 V safeguards buses 1A05, 1A06, 2A05, 2A06, or the component(s) to be tested is/are in the same train that is out of service.

4.4 Chemistry notified about auxiliary feed injection.

4.5 Reactor power reduced a minimum of 2% OR to a power level directed by DSS. (Mark step NIA if in CTS: Hot or Cold Shutdown {ITS: Modes 3,4, 5, 6, & defueled})

4.6 Permission to Perform Test The conditions required by this test are consistent with required plant conditions, including equipment operability. Permission is granted to perform this test.

DSS N b1 01 TIME_____ DATE_614~/pi CONTINUOUS USE I

Page 5 of 53

POINT BEACH NUCLEAR PLANT INSEERVICE TESTS TEST OF ELECTRICALLY-DRIVEN AUXILIARY FEED PUMPS AND VALVES WITH FLOW TO UNIT 1 STEAM GENERATORS (QUARTERLY)

IT 10A SAFETY RELATED Revision 11 July 5, 2001 INITIALS NOTE:

Attachment L shall be used to document performance of multiple step performance and to record data. A separate copy of Attachment L shall be prepared for each step series requiring multiple performance and all copies shall be attached to this procedure when the procedure is complete.

5.0 PROCEDURE 5.1 IF in CTS: cold shutdown { ITS: Modes 5, 6, or defueled},

THEN verify the following:

(Otherwisd mark this step as N/A)

  • The RCS is NOT solid.

NOTE:

When operability testing of Train A is NOT required, then N/A Steps 5.2 through 5.33.

5.2 TRAIN A TEST 5.2.1 IF performing Section 5.2, THEN the following auxiliary feedwater pumps with their associated flow paths, are operable as applicable.

(N/A the step that is NOT applicable.)

a. For two-unit operation:

P-38B, 1P-29, and 2P-29 are operable

b. For single-unit operation:

P-38B and 1P-29 are operable for Unit 1 OR P-38B and 2P-29 are operable for Unit 2 5.2.2 IF sufficient qualified operators are NOT available on shift to support Step 5.2.3, THEN consider the equipment unavailable per Maintenance Rule AND N/A Step 5.2.3.

CONTINUOUS USE A! IM I

a PW

§Qf -

A?

Page 6 of 53

POINT BEACH NUCLEAR PLANT INStERVICE TESTS TEST OF ELECTRICALLY-DRIVEN AUXILIARY FEED PUMPS AND VALVES WITH FLOW TO UNIT 1 STEAM GENERATORS (QUARTERLY) 5.2.3 IT 1OA SAFETY RELATED Revision 11 July 5, 2001 Assign a Level 4 Dedicated Operator in the Control Room AND a Level 4 Dedicated Operator in the field per OM 3.26, Use of Dedicated Operators, to perform the restoration steps of Attachment J, if required. (Otherwise mark this step as N/A) 5.3 Enter a CTS: LCO (ITS: Action Condition) for P-38A.

(N/A this step if not required for current plant conditions per CTS:

Technical Specification 15.3.4 (ITS: 3.7.5))

1ý'4 5 7-TIME

  • -'DATE 5 /3

/0-L 5.4 IF an Auxiliary Feedwater Initiation is required during the performance of

!is test, THEN immediately perform Attachment J to recover Train A.

(N/A this step if not required.)

y4

©~

CONTINUOUS USE INITIALS Page 7 of 53 INITIALS I I

POINT BEACH NUCLEAR PLANT INSERVICE TESTS TEST OF ELECTRICALLY-DRIVEN AUXILIARY FEED PUMPS AND VALVES WITH FLOW TO UNIT 1 STEAM GENERATORS (QUARTERLY)

IT 10A SAFETY RELATED Revision 11 July 5, 2001 5.14 Check AF-4007, P-38A AFP Mini-Recirc Control, mini-recirculation valve open.

5.15 Check mini-recirculation flow equal to or greater than 70 gpm on FIT-4050A.

5.16 Check the packing glands for excessive leakage or overheating.

5.17 Check pump and motor for unusual noise or overheating.

5.18 WHEN P-38A has run for five-minutes, THEN record the following on Attachment B.

PI-4011, Pump Discharge Pressure.

PI-4010A, Pump Suction Pressure.

FIT-4050A, Mini-Recirculation Flow.

Recirculation Flow Vibration Data.

U 1,

ý'T CONTINUOUS USE INITIALS 0

Page 12 of 53

POINT BEACH NUCLEAR PLANT INSERVICE TESTS TEST OF ELECTRICALLY-DRIVEN AUXILIARY FEED PUMPS AND VALVES WITH FLOW TO UNIT 1 STEAM GENERATORS (QUARTERLY)

IT 10A SAFETY RELATED Revision 11 July 5, 2001 5.46 Check AF-4014, P-38B AFP Mini-Recirc Control, mini-recirculation valve open.

5.47 Check mini-recirculation flow equal to or greater than 70 gpm on FIT-4050B.

5.48 Check packing glands for excessive leakage or overheating.

5.49 Check the pump and motor for unusual noise or overheating.

5.50 WHEN P-38B has run for five-minutes, THEN record the following data on Attachment F:

"* PI-4018, Pump Discharge Pressure

"* PI-4017A, Pump Suction Pressure

"* FIT-4050B, Mini-Recirculation Flow

  • Recirculation Flow Vibration Data 465 CONTINUOUS USE INITIALS INITIALS Page 25 of 53 40 ý11

POINT BEACH NUCLEAR PLANT INSERVICE TESTS TEST OF ELECTRICALLY-DRIVEN AUXILIARY FEED PUMPS AND VALVES WITH FLOW TO UNIT I STEAM CWNFPR ATORS (OUARTERLY' IT 10A SAFETY RELATED Revision 1I July 5, 2001 CONTINUOUS USE REMARKS SECTION:

7-mA; I cat rc z,ý

-h-r fer R 1=F-Vo20 o/,,F-YVo2Z Z71F-/e13 2-AlF-/0'--.

  • ,.*~d;..q_

cJ

+a.,L

,/e.o

(,su*ozo39?7)

//

7h -,,-

7 -/1,-,-

c 2

.cs f

3//?/

Page 35 of 53

POINT BEACH NUCLEAR PLANT INSERVICE TESTS TEST OF ELECTRICALLY-DRIVEN AUXILIARY FEED PUMPS AND VALVES WITH FLOW TO UNIT 1 STEAM GENERATORS (OUARTERLY)

IT 10A SAFETY RELATED Revision 11 July 5, 2001 ATTACHMENT B P-38A, AFW PUMP PERFORMANCE DATA (RECIRCULATION FLOW)

NOTE 1: The data recorded on Attachment B is for information only.

NOTE 2: Vibration points which are shaded must be recorded by the Micro-logger but are NOT required to be transferred to the table. Only points marked A, B, C, D, and E must be transferred to the table and are required for ASME Section XI. See Figure 1 for locations.

Step No.

Parameter Measured I Units Reading Acceptance Criteria Initials 5.10.3 PI-4010A, P-38A AFP Suction Pressure psig INA 5.13 PI-4010A, P-38A AFP Suction Pressure psig

(.

>7 5.18 PI-4011 Pump Discharge Pressure psig

  • 3i N/A 5.18 PI-4010A, P-38A AFP Suction Pressure psig NIA 5.18 FIT-4050A, Mini-Recirc Flow gpm

"_79S N/A 5.18 Recirculation Flow Vibration Data INSTRUMENT UNITSREAIANGS P38A 1V ips Note 2 Micro-logger IPS pk P38A 1H ips Note 2 Micro-logger IPS pk P38A 1H ae Note 2 Micro-logger G env P38A IH ace Note 2 Micro-logger G pk P38A IA ips Note 2 Micro-logger IPS pk P38A 2V ips Note 2 Micro-logger IPS pk P38A 2H ips Note 2 Micro-logger IPS pk P38A 2H ae Note 2 Micro-logger G env P38A 2H ace Note 2 Micro-logger G pk P38A 2A ips Note 2 Micro-logger IPS pk P38A 3V ips Note 2 Micro-logger IPS pk P38A 3H ips Note 2 Micro-logger IPS pk P38A 3H ae Note 2 Micro-logger G env P38A 3H ace Note 2 Micro-logger G pk P38A 4V ips Note 2 Micro-logger IPS pk P38A 4H ips Note 2 Micro-logger IPS pk P38A 4H ae Note 2 Micro-logger G env P38A 4H ace Note 2 Micro-logger G pk P38A 4A ips Note 2 Micro-logger IPS pk CONTINUOUS USE C.-

Page 39 of 53

POINT BEACH NUCLEAR PLANT INSERVICE TESTS TEST OF ELECTRICALLY-DRIVEN AUXILIARY FEED PUMPS AND VALVES WITH FLOW TO UNIT I STEAM GENERATORS (OUARTERLY)

IT 10A SAFETY RELATED Revision 11 July 5, 2001 ATTACHMENT F P-38B, AFW PUMP PERFORMANCE DATA (RECIRCULATION FLOW)

NOTE 1: The data recorded on Attachment F is for information only.

NOTE 2: Vibration points which are shaded must be recorded by the Micro-logger but are NOT required to be transferred to the table. Only points marked A, B, C, D, and E must be transferred to the table and are required for ASME Section XI. See Figure 1 for Locations.

Step No.

Parameter Measured Units Reading Acceptance Criteria Initials 5.42.3 PI-4017A, P-38B AFP Suction Pressure psig NIA 5.45 PI-4017A, P-38B AFP Suction Pressure Psig "j>7" 5.50 PI-4018 Pump Discharge Pressure psig N/A 5.50 PI-4017A. P-38B AFP Suction Pressure psig N/A 5.50 FIT-4050B, Mini-Recirc Flow gpm "7+/-L4L N/A 5.50 Recirculation Flow Vibration Data INSTRUMENT UNITS READINGS" P38B IV ips Note 2 Micro-logger IPS pk P38B IH ips Note 2 Micro-logger IPS pk P38B IH ae Note 2 Micro-logger G env P38B 1H acc Note 2 Micro-logger G pk P38B 1A ips Note 2 Micro-logger IPS pk P38B 2V ips Note 2 Micro-logger IPS pk P38B 2H ips Note 2 Micro-logger IPS pk P38B 2H ae Note 2 Micro-logger G env P38B 2H acc Note 2 Micro-logger G pk N'

P38B 2A ips Note 2 Micro-logger IPS pk P38B 3V ips Note 2 Micro-logger IPS pk P38B 3H ips Note 2 Micro-logger IPS pk P38B 3H ae Note 2 Micro-logger G env P38B 3H acc Note 2 Micro-logger G pk P38B 4V ips Note 2 Micro-logger IPS pk P38B 4H ips Note 2 Micro-logger IPS pk P38B 4H ae Note 2 Micro-logger G ean P38B 4H acc Note 2 Micro-logger G pk P38B 4A ips Note 2 Micro-logger IPS pk

/

CONTINUOUS USE Page 45 of 53