ML031750504: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:June 24, 2003 NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee:           Nuclear Management Company, LLC Name of Facilities:         Prairie Island Nuclear Generating Plant, Unit 1 Docket No:                   50-282 Date and Time of Meeting:   August 25, 2003, 1:00 p.m. - 4:00 p.m.
{{#Wiki_filter:June 24, 2003 NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee:
Location of Meeting:         U. S. Nuclear Regulatory Commission Region III 801 Warrenville Road Lisle, Illinois 60532-4351 Purpose of Meeting:         Discuss Unit 1 Steam Generator Replacement activities.
Nuclear Management Company, LLC Name of Facilities:
Category:                   This is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
Prairie Island Nuclear Generating Plant, Unit 1 Docket No:
50-282 Date and Time of Meeting:
August 25, 2003, 1:00 p.m. - 4:00 p.m.
Location of Meeting:
U. S. Nuclear Regulatory Commission Region III 801 Warrenville Road Lisle, Illinois 60532-4351 Purpose of Meeting:
Discuss Unit 1 Steam Generator Replacement activities.
Category:
This is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
NRC Attendees:
NRC Attendees:
R. Caniano, Deputy Director, Division of Reactor Safety Others as designated Licensee Attendees:
R. Caniano, Deputy Director, Division of Reactor Safety Others as designated Licensee Attendees:
Mr. Joseph Solymossy, Site Vice-President K. Albrecht, Steam Generator Replacement Project Manager R. Pearson, Project Engineer, Design Others as designated NOTE:         Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Dave Hills 630/829-9733 by COB August 21, 2003.
Mr. Joseph Solymossy, Site Vice-President K. Albrecht, Steam Generator Replacement Project Manager R. Pearson, Project Engineer, Design Others as designated NOTE:
Approved by:     /RA/
Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Dave Hills 630/829-9733 by COB August 21, 2003.
Approved by: /RA/
David E. Hills, Chief Mechanical Engineering Branch Division of Reactor Safety See Attached Distribution
David E. Hills, Chief Mechanical Engineering Branch Division of Reactor Safety See Attached Distribution


Notice of Significant                             Licensee Meeting Distribution:
Notice of Significant Licensee Meeting Distribution:
B. W. Sheron (BWS), Associate Director for Projects Licensing and Technical Review, NRR J. Zwolinski (JAZ), Director, Division of Licensing Project Management, NRR B. Boger (BAB2), Director, Division of Inspection Program Management, NRR H. Nieh (HKN), Region III Coordinator, OEDO W. Roland (WHR), Project Directorate, Division of Licensing and Project Management, NRR T. Kim, Project Manager, Project Directorate, Division of Licensing Project Management, NRR G. E. Grant (GEG), Director, Division of Reactor Projects, RIII S. A. Reynolds (SAR1), Deputy Director, Division of Reactor Projects, RIII C. D. Pederson (CDP1), Director, Division of Reactor Safety, RIII R. J. Caniano (RJC1), Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief J. Adams, SRI, Prairie Island DRS Branch Chiefs (RNG, DEH, RDL, SDB2)
B. W. Sheron (BWS), Associate Director for Projects Licensing and Technical Review, NRR J. Zwolinski (JAZ), Director, Division of Licensing Project Management, NRR B. Boger (BAB2), Director, Division of Inspection Program Management, NRR H. Nieh (HKN), Region III Coordinator, OEDO W. Roland (WHR), Project Directorate, Division of Licensing and Project Management, NRR T. Kim, Project Manager, Project Directorate, Division of Licensing Project Management, NRR G. E. Grant (GEG), Director, Division of Reactor Projects, RIII S. A. Reynolds (SAR1), Deputy Director, Division of Reactor Projects, RIII C. D. Pederson (CDP1), Director, Division of Reactor Safety, RIII R. J. Caniano (RJC1), Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief J. Adams, SRI, Prairie Island DRS Branch Chiefs (RNG, DEH, RDL, SDB2)
R. M. Lickus (RML2), Regional State Liaison Officer, RIII PMNS RIII Public Affairs (RJS2, VTM)
R. M. Lickus (RML2), Regional State Liaison Officer, RIII PMNS RIII Public Affairs (RJS2, VTM)
J. Kweiser (JRK1), ORA P. Buckley (PLB1), ORA}}
J. Kweiser (JRK1), ORA P. Buckley (PLB1), ORA}}

Latest revision as of 09:14, 16 January 2025

Public Meeting with Nuclear Management Co., LLC, Prairie Island Re Discuss Unit 1 Steam Generator Replacement Activities
ML031750504
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 06/24/2003
From: Dave Hills
Division of Reactor Safety III
To:
References
Download: ML031750504 (2)


Text

June 24, 2003 NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee:

Nuclear Management Company, LLC Name of Facilities:

Prairie Island Nuclear Generating Plant, Unit 1 Docket No:

50-282 Date and Time of Meeting:

August 25, 2003, 1:00 p.m. - 4:00 p.m.

Location of Meeting:

U. S. Nuclear Regulatory Commission Region III 801 Warrenville Road Lisle, Illinois 60532-4351 Purpose of Meeting:

Discuss Unit 1 Steam Generator Replacement activities.

Category:

This is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

NRC Attendees:

R. Caniano, Deputy Director, Division of Reactor Safety Others as designated Licensee Attendees:

Mr. Joseph Solymossy, Site Vice-President K. Albrecht, Steam Generator Replacement Project Manager R. Pearson, Project Engineer, Design Others as designated NOTE:

Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Dave Hills 630/829-9733 by COB August 21, 2003.

Approved by: /RA/

David E. Hills, Chief Mechanical Engineering Branch Division of Reactor Safety See Attached Distribution

Notice of Significant Licensee Meeting Distribution:

B. W. Sheron (BWS), Associate Director for Projects Licensing and Technical Review, NRR J. Zwolinski (JAZ), Director, Division of Licensing Project Management, NRR B. Boger (BAB2), Director, Division of Inspection Program Management, NRR H. Nieh (HKN), Region III Coordinator, OEDO W. Roland (WHR), Project Directorate, Division of Licensing and Project Management, NRR T. Kim, Project Manager, Project Directorate, Division of Licensing Project Management, NRR G. E. Grant (GEG), Director, Division of Reactor Projects, RIII S. A. Reynolds (SAR1), Deputy Director, Division of Reactor Projects, RIII C. D. Pederson (CDP1), Director, Division of Reactor Safety, RIII R. J. Caniano (RJC1), Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief J. Adams, SRI, Prairie Island DRS Branch Chiefs (RNG, DEH, RDL, SDB2)

R. M. Lickus (RML2), Regional State Liaison Officer, RIII PMNS RIII Public Affairs (RJS2, VTM)

J. Kweiser (JRK1), ORA P. Buckley (PLB1), ORA