{{#Wiki_filter:January 23, 2004 EN-04-003 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee:       FirstEnergy Nuclear Operating Company         (EA-03-197)
{{#Wiki_filter:January 23, 2004 EN-04-003 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee:
FirstEnergy Nuclear Operating Company (EA-03-197)
Perry Nuclear Power Plant Docket No. 50-440
Perry Nuclear Power Plant Docket No. 50-440


Line 25: Line 26:
ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION AND NOTICE OF VIOLATION This is to inform the Commission that a Notice of Violation associated with a White Significance Determination Process (SDP) finding will be issued on or around January 28, 2004, to FirstEnergy Nuclear Operating Company as a result of inspections at the Perry Nuclear Power Plant. This White finding, an issue with low to moderate increased importance to safety, involved the Essential Service Water A pump shaft failure on September 1, 2003 due to improper reassembly. The failure to properly reassemble the pump was identified as a violation of Technical Specification 5.4. Accordingly, a Notice of Violation associated with the White finding is being issued.
ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION AND NOTICE OF VIOLATION This is to inform the Commission that a Notice of Violation associated with a White Significance Determination Process (SDP) finding will be issued on or around January 28, 2004, to FirstEnergy Nuclear Operating Company as a result of inspections at the Perry Nuclear Power Plant. This White finding, an issue with low to moderate increased importance to safety, involved the Essential Service Water A pump shaft failure on September 1, 2003 due to improper reassembly. The failure to properly reassemble the pump was identified as a violation of Technical Specification 5.4. Accordingly, a Notice of Violation associated with the White finding is being issued.
It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule of issuance and notification is:
It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule of issuance and notification is:
Mailing of Final Significance Determination         January 28, 2004 Telephone Notification of Licensee                   January 28, 2004 The State of Ohio will be notified.
Mailing of Final Significance Determination January 28, 2004 Telephone Notification of Licensee January 28, 2004 The State of Ohio will be notified.
Contacts: J. Dixon-Herrity, OE, 415-1980     C. Nolan, OE, 415-3360 Distribution:
Contacts: J. Dixon-Herrity, OE, 415-1980 C. Nolan, OE, 415-3360 Distribution:
OWFN                     OWFN                  TWFN                    Regional Offices Chairman Diaz           EDO                    OCFO                    RI      RII Comm. McGaffigan         DEDR                  OP CENTER                RIII    RIV Comm. Merrifield         DEDE                   NMSS SECY                    OE                    NSIR OCA                      OGC                    OIG                     MAIL PA                      NRR                    OCIO                     ADAMS IP                      OI                    RES SP                    ACRS ADAMS Accession No. ML040230445 C:\ORPCheckout\FileNET\ML040230445.wpd OFFICE         OE:ES                 OE:Section Chief NAME           JDixon-Herrity         CNolan DATE           1/23/04               1/23/04}}
OWFN Chairman Diaz Comm. McGaffigan Comm. Merrifield SECY OCA PA IP OWFN EDO DEDR DEDE OE OGC NRR OI SP TWFN OCFO OP CENTER NMSS NSIR OIG OCIO RES ACRS Regional Offices RI RII RIII RIV MAIL ADAMS ADAMS Accession No. ML040230445 C:\\ORPCheckout\\FileNET\\ML040230445.wpd OFFICE OE:ES OE:Section Chief NAME JDixon-Herrity CNolan DATE 1/23/04 1/23/04}}

Latest revision as of 06:25, 16 January 2025

EN-04-003, Firstenergy Nuclear Operating Company
ML040230445
Person / Time
Site: Perry 
Issue date: 01/23/2004
From: Jennifer Dixon-Herrity, Nolan M
NRC/OE
To:
Dixon-Herrity J
References
EA-03-197 EN-04-003
Download: ML040230445 (1)


Text

January 23, 2004 EN-04-003 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee:

FirstEnergy Nuclear Operating Company (EA-03-197)

Perry Nuclear Power Plant Docket No. 50-440

Subject:

ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION AND NOTICE OF VIOLATION This is to inform the Commission that a Notice of Violation associated with a White Significance Determination Process (SDP) finding will be issued on or around January 28, 2004, to FirstEnergy Nuclear Operating Company as a result of inspections at the Perry Nuclear Power Plant. This White finding, an issue with low to moderate increased importance to safety, involved the Essential Service Water A pump shaft failure on September 1, 2003 due to improper reassembly. The failure to properly reassemble the pump was identified as a violation of Technical Specification 5.4. Accordingly, a Notice of Violation associated with the White finding is being issued.

It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule of issuance and notification is:

Mailing of Final Significance Determination January 28, 2004 Telephone Notification of Licensee January 28, 2004 The State of Ohio will be notified.

Contacts: J. Dixon-Herrity, OE, 415-1980 C. Nolan, OE, 415-3360 Distribution:

OWFN Chairman Diaz Comm. McGaffigan Comm. Merrifield SECY OCA PA IP OWFN EDO DEDR DEDE OE OGC NRR OI SP TWFN OCFO OP CENTER NMSS NSIR OIG OCIO RES ACRS Regional Offices RI RII RIII RIV MAIL ADAMS ADAMS Accession No. ML040230445 C:\\ORPCheckout\\FileNET\\ML040230445.wpd OFFICE OE:ES OE:Section Chief NAME JDixon-Herrity CNolan DATE 1/23/04 1/23/04