{{#Wiki_filter:CLINTON POWER STATION Job Performance Measure Review a completed SRV actuation report JPM Number: 3821.0102 Revision Number: 00 Date: 7/28/03 Developed By:     T. Pickley                       7/24/03 Instructor                         Date Validated By:   J. Anderson                       10/16/03 SME or Instructor                   Date Review By:     P. Ryan                           8/18/03 Operations Representative           Date
{{#Wiki_filter:CLINTON POWER STATION Job Performance Measure Review a completed SRV actuation report JPM Number: 3821.0102 Revision Number: 00 Date: 7/28/03 Developed By:
T. Pickley 7/24/03 Instructor Date Validated By:
J. Anderson 10/16/03 SME or Instructor Date Review By:
P. Ryan 8/18/03 Operations Representative Date


JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
________    1. Task description and number, JPM description and number are identified.
: 1. Task description and number, JPM description and number are identified.
________    2. Knowledge and Abilities (K/A) references are included.
: 2. Knowledge and Abilities (K/A) references are included.
________    3. Performance location specified. (in-plant, control room, or simulator)
: 3. Performance location specified. (in-plant, control room, or simulator)
________    4. Initial setup conditions are identified.
: 4. Initial setup conditions are identified.
________    5. Initiating and terminating cues are properly identified.
: 5. Initiating and terminating cues are properly identified.
________    6. Task standards identified and verified by SME review.
: 6. Task standards identified and verified by SME review.
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
: 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev. _____ Date _____________
Procedure Rev. _____ Date _____________
________    9. Pilot test the JPM:
: 9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
: b. ensure performance time is accurate.
________    10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
10.If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
11.When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor                                         Date SME/Instructor                                         Date SME/Instructor                                         Date
SME/Instructor Date SME/Instructor Date SME/Instructor Date


CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3831.0102                         REVISION: 00 Revision Record (Summary)
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3831.0102 REVISION: 00 Page 3 of 1 Revision Record (Summary)
: 1. Revision 00, This is a new JPM Page 3 of 1
: 1. Revision 00, This is a new JPM  


CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3831.0102                                                     REVISION: 00 Operators Name:                                       SSN:
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3831.0102 REVISION: 00 Page 4 of 1 Operators Name:
SSN:
Job
Job


==Title:==
==Title:==
o NLO o RO o SRO o STA o SRO Cert JPM Title/Number: 3831.0101, Review a completed SRV actuation report Revision Number:00 Task Number and
o NLO o RO o SRO o STA o SRO Cert JPM Title/Number: 3831.0101, Review a completed SRV actuation report Revision Number: 00 Task Number and


==Title:==
==Title:==
383101.01, Complete Control Room actions to document data on failures and actuation's of the Safety Relief Valves in the Main Steam System and to generate reports required by the Nuclear Regulatory Commission Suggested Testing Environment: Any Actual Testing Environment: n Simulator o Plant o Control Room Testing Method: o Simulate                       Faulted: o   Yes n Perform             Alternate Path: o   No Time Critical: o     No Estimated Time to Complete: 16 _minutes           Actual Time Used:           minutes
383101.01, Complete Control Room actions to document data on failures and actuation's of the Safety Relief Valves in the Main Steam System and to generate reports required by the Nuclear Regulatory Commission Suggested Testing Environment: Any Actual Testing Environment: n Simulator o Plant o Control Room Testing Method: o Simulate Faulted: o Yes n Perform Alternate Path: o No Time Critical: o No Estimated Time to Complete: 16 _minutes Actual Time Used:
minutes


==References:==
==References:==
EVALUATION  
EVALUATION  


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?     o       Yes   o     No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: o Satisfactory               o Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
o Yes o
No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
o Satisfactory o
Unsatisfactory Comments:
Evaluators Name: __________________________
Evaluators Name: __________________________
Page 4 of 1


CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3831.0102                         REVISION: 00 Evaluators Signature:                       Date:
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3831.0102 REVISION: 00 Page 5 of 1 Evaluators Signature:
Page 5 of 1
Date:


CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3831.0102                                                       REVISION: 00 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues.
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3831.0102 REVISION: 00 Page 6 of 1 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues.
When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
SIMULATOR SET-UP CONDITIONS:
SIMULATOR SET-UP CONDITIONS:
Line 70: Line 77:


==REFERENCES:==
==REFERENCES:==
CPS 9056.02, SAFETY/RELIEF VALVE ACTUATION TEST CPS 3831.01, SAFETY RELIEF VALVE REPORT EVALUATOR INSTRUCTIONS:
CPS 9056.02, SAFETY/RELIEF VALVE ACTUATION TEST CPS 3831.01, SAFETY RELIEF VALVE REPORT EVALUATOR INSTRUCTIONS:
Amplifying cues are provided within the JPM steps.
Amplifying cues are provided within the JPM steps.
Provide the operator with the following:
Provide the operator with the following:
* CPS 9056.02, SAFETY/RELIEF VALVE ACTUATION TEST

* CPS 9056.02C001, SAFETY/RELIEF VALVE MANUAL ACTUATION CHECKLIST
CPS 9056.02, SAFETY/RELIEF VALVE ACTUATION TEST
* CPS 3831.01, SAFETY RELIEF VALVE REPORT

* CPS 3831.01D002, ACTUATION LOG
CPS 9056.02C001, SAFETY/RELIEF VALVE MANUAL ACTUATION CHECKLIST
* DCS Display 6D-04

* DCS Display D05AD1
CPS 3831.01, SAFETY RELIEF VALVE REPORT
* DCS Display DD5BD3

* SRV Tailpipe temperature graph INITIAL CONDITIONS AND INITIATING CUE:
CPS 3831.01D002, ACTUATION LOG

DCS Display 6D-04

DCS Display D05AD1

DCS Display DD5BD3

SRV Tailpipe temperature graph INITIAL CONDITIONS AND INITIATING CUE:
CPS 9056.02, SAFETY/RELIEF VALVE ACTUATION TEST and CPS 3831.01, SAFETY RELIEF VALVE REPORT have been completed. You are to review and approve them.
CPS 9056.02, SAFETY/RELIEF VALVE ACTUATION TEST and CPS 3831.01, SAFETY RELIEF VALVE REPORT have been completed. You are to review and approve them.
START TIME:
START TIME:  
Page 6 of 1
 
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3821.0102 REVISION: 00 Page 7 of 1


CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3821.0102                       REVISION: 00 Page 7 of 1
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3821.0102 REVISION: 00 Page 8 of 1


CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3821.0102                                                          REVISION: 00
==========================================================================
==========================================================================
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
==========================================================================
==========================================================================
PERFORMANCE STEPS
PERFORMANCE STEPS
*1                         Reviews through block 309 Standard                   Determines that block 309 is incorrect, the tail pipe has not returned to normal and that the SRV is leaking.
*1 Reviews through block 309 Standard Determines that block 309 is incorrect, the tail pipe has not returned to normal and that the SRV is leaking.
CUE Comments SAT       UNSAT         Comment Number 2                         Reviews blocks 310 through 314 Standard                   Determines block 314 is coded incorrectly and should be coded as an A and/or E at this time.
CUE Comments SAT UNSAT Comment Number 2
CUE Comments SAT       UNSAT         Comment Number Page 8 of 1
Reviews blocks 310 through 314 Standard Determines block 314 is coded incorrectly and should be coded as an A and/or E at this time.
CUE Comments SAT UNSAT Comment Number


CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3821.0102                       REVISION: 00 Page 9 of 1
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3821.0102 REVISION: 00 Page 9 of 1


CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3821.0102                                   REVISION: 00 STOP TIME:       _____________
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3821.0102 REVISION: 00 Page 10 of 1 STOP TIME:
TERMINATING CUES:
TERMINATING CUES:
The SRV actuation log has been reviewed.
The SRV actuation log has been reviewed.
K/A REFERENCE NUMBERS Importance Rating K/A SYSTEM NUMBER                           K/A NUMBER     RO           SRO 2.1.32                                                       3.4           3.8 2.1.25                                                       2.8           3.1 Page 10 of 1
K/A REFERENCE NUMBERS Importance Rating K/A SYSTEM NUMBER K/A NUMBER RO SRO 2.1.32 3.4 3.8 2.1.25 2.8 3.1


CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3821.0102                                           REVISION: 00 INITIATING CUE CPS 9056.02, SAFETY/RELIEF VALVE ACTUATION TEST and CPS 3831.01, SAFETY RELIEF VALVE REPORT have been completed. You are to review and approve them.
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3821.0102 REVISION: 00 Page 11 of 1 INITIATING CUE CPS 9056.02, SAFETY/RELIEF VALVE ACTUATION TEST and CPS 3831.01, SAFETY RELIEF VALVE REPORT have been completed. You are to review and approve them.
Page 11 of 1


Attachments Page 12 of 1
Attachments Page 12 of 1

Latest revision as of 03:34, 16 January 2025

Initial Admin SRO JPM 3821.0102
ML041070068
Person / Time
Site: Clinton Constellation icon.png
Issue date: 01/06/2004
From: James Anderson, Pickley T, Ryan P
Exelon Generation Co, Exelon Nuclear
To:
Office of Nuclear Reactor Regulation
References
-RFPFR, 50-461/04-301, JPM 3821.0102, Rev 00 50-461/04-301
Download: ML041070068 (15)


Text

CLINTON POWER STATION Job Performance Measure Review a completed SRV actuation report JPM Number: 3821.0102 Revision Number: 00 Date: 7/28/03 Developed By:

T. Pickley 7/24/03 Instructor Date Validated By:

J. Anderson 10/16/03 SME or Instructor Date Review By:

P. Ryan 8/18/03 Operations Representative Date

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 11 below.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, or simulator)
4. Initial setup conditions are identified.
5. Initiating and terminating cues are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. _____ Date _____________

9. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

10.If the JPM cannot be performed as written with proper responses, then revise the JPM.

11.When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3831.0102 REVISION: 00 Page 3 of 1 Revision Record (Summary)

1. Revision 00, This is a new JPM

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3831.0102 REVISION: 00 Page 4 of 1 Operators Name:

SSN:

Job

Title:

o NLO o RO o SRO o STA o SRO Cert JPM Title/Number: 3831.0101, Review a completed SRV actuation report Revision Number: 00 Task Number and

Title:

383101.01, Complete Control Room actions to document data on failures and actuation's of the Safety Relief Valves in the Main Steam System and to generate reports required by the Nuclear Regulatory Commission Suggested Testing Environment: Any Actual Testing Environment: n Simulator o Plant o Control Room Testing Method: o Simulate Faulted: o Yes n Perform Alternate Path: o No Time Critical: o No Estimated Time to Complete: 16 _minutes Actual Time Used:

minutes

References:

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

o Yes o

No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

o Satisfactory o

Unsatisfactory Comments:

Evaluators Name: __________________________

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3831.0102 REVISION: 00 Page 5 of 1 Evaluators Signature:

Date:

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3831.0102 REVISION: 00 Page 6 of 1 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues.

When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

SIMULATOR SET-UP CONDITIONS:

None TASK STANDARDS:

The SRV has been identified as leaking and the failure mode is coded incorrectly.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

None PROCEDURAL/

REFERENCES:

CPS 9056.02, SAFETY/RELIEF VALVE ACTUATION TEST CPS 3831.01, SAFETY RELIEF VALVE REPORT EVALUATOR INSTRUCTIONS:

Amplifying cues are provided within the JPM steps.

Provide the operator with the following:



CPS 9056.02, SAFETY/RELIEF VALVE ACTUATION TEST



CPS 9056.02C001, SAFETY/RELIEF VALVE MANUAL ACTUATION CHECKLIST



CPS 3831.01, SAFETY RELIEF VALVE REPORT



CPS 3831.01D002, ACTUATION LOG



DCS Display 6D-04



DCS Display D05AD1



DCS Display DD5BD3



SRV Tailpipe temperature graph INITIAL CONDITIONS AND INITIATING CUE:

CPS 9056.02, SAFETY/RELIEF VALVE ACTUATION TEST and CPS 3831.01, SAFETY RELIEF VALVE REPORT have been completed. You are to review and approve them.

START TIME:

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3821.0102 REVISION: 00 Page 7 of 1

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3821.0102 REVISION: 00 Page 8 of 1

==============================================================

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

==============================================================

PERFORMANCE STEPS

  • 1 Reviews through block 309 Standard Determines that block 309 is incorrect, the tail pipe has not returned to normal and that the SRV is leaking.

CUE Comments SAT UNSAT Comment Number 2

Reviews blocks 310 through 314 Standard Determines block 314 is coded incorrectly and should be coded as an A and/or E at this time.

CUE Comments SAT UNSAT Comment Number

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3821.0102 REVISION: 00 Page 9 of 1

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3821.0102 REVISION: 00 Page 10 of 1 STOP TIME:

TERMINATING CUES:

The SRV actuation log has been reviewed.

K/A REFERENCE NUMBERS Importance Rating K/A SYSTEM NUMBER K/A NUMBER RO SRO 2.1.32 3.4 3.8 2.1.25 2.8 3.1

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3821.0102 REVISION: 00 Page 11 of 1 INITIATING CUE CPS 9056.02, SAFETY/RELIEF VALVE ACTUATION TEST and CPS 3831.01, SAFETY RELIEF VALVE REPORT have been completed. You are to review and approve them.

Attachments Page 12 of 1