PLA-5986, NRC Notification of NPDES Permit Authorization Permit PA-0047325 Correction to Previous Submittal: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
StriderTol Bot change
 
Line 2: Line 2:
| number = ML053410377
| number = ML053410377
| issue date = 11/30/2005
| issue date = 11/30/2005
| title = NRC Notification of NPDES Permit Authorization Permit #PA-0047325 Correction to Previous Submittal
| title = NRC Notification of NPDES Permit Authorization Permit PA-0047325 Correction to Previous Submittal
| author name = Mckinney B
| author name = Mckinney B
| author affiliation = PPL Susquehanna, LLC
| author affiliation = PPL Susquehanna, LLC
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Britt T. McKinney               PPL Susquehanna, LLC Sr. Vice President & Chief Nuclear Officer               769 Salem Boulevard pp I<..;
{{#Wiki_filter:Britt T. McKinney Sr. Vice President & Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3149 Fax 570.542.1504 btmckinney pplweb.com
                                                                                                          # 00 Berwick, PA 18603                   3*-W  -
# 00 3*-W -
Tel. 570.542.3149 Fax 570.542.1504 btmckinney pplweb.com NOV 3 0 2005 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station OP1-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION NRC NOTIFICATION OF NPDES PERMIT AUTHORIZATION PERMIT #PA-0047325 CORRECTION TO PREVIOUS SUBMITTAL                                                     Docket Nos. 50-387 PLA-5986                                                                                    and 50-388
pp I<..;
NOV 3 0 2005 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station OP1-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION NRC NOTIFICATION OF NPDES PERMIT AUTHORIZATION PERMIT #PA-0047325 CORRECTION TO PREVIOUS SUBMITTAL PLA-5986 Docket Nos. 50-387 and 50-388


==Reference:==
==Reference:==
: 1)   PLA-5952, B. T. McKinney (PPL) to USNRC, "NRC Notification of NPDES Permit Authorization Permit#PA-0047325," datedSeptember 2, 2005.
: 1)
PLA-5952, B. T. McKinney (PPL) to USNRC, "NRC Notification of NPDES Permit Authorization Permit #PA-0047325, " dated September 2, 2005.
The purpose of this letter is to transmit a correction to the PPL Susquehanna, LLC (PPL)
The purpose of this letter is to transmit a correction to the PPL Susquehanna, LLC (PPL)
NPDES Permit #PA-0047325 [Reference 1].
NPDES Permit #PA-0047325 [Reference 1].
Line 27: Line 29:
Please replace page 9 in your current version of Reference I with the new page 9 (attached).
Please replace page 9 in your current version of Reference I with the new page 9 (attached).
If you have any questions please contact Mr. Duane L. Filchner at (610) 774-7819.
If you have any questions please contact Mr. Duane L. Filchner at (610) 774-7819.
Sincerely, B. T. McKinney Attachment Copy:   NRC Region I Mr. B. A. Bickett, NRC Sr. Resident Inspector Mr. R. V. Guzman, NRC Project Manager Mr. R. Janati, DEP/BRP
Sincerely, B. T. McKinney Attachment Copy:
NRC Region I Mr. B. A. Bickett, NRC Sr. Resident Inspector Mr. R. V. Guzman, NRC Project Manager Mr. R. Janati, DEP/BRP


3800-PM-WSWMOO11             4/2005 Permit                                                                                                                                                               Permit No. PA-0047325
3800-PM-WSWMOO11 4/2005 Permit Permit No. PA-0047325
: 1. For Outfall 079                     Latitude 41&deg;05'30"             ,    Longitude     76'08'30"             . River Mile Index                 ,    Stream Code_
: 1.
For Outfall 079 Latitude 41&deg;05'30" Longitude 76'08'30" River Mile Index Stream Code_
which receives wastewater from sewage treatment plant
which receives wastewater from sewage treatment plant
: a. The perniittee is authorized to discharge during the period from Sentember 1. 2005 through August 31. 2010.
: a.
: b. Based on the anticipated wastewater characteristics and flows described in the permit application and its supporting documents and/or amendments, the following effluent limitations and monitoring requirements apply (see also Additional Requirements, Footnotes and Supplemental Information).
The perniittee is authorized to discharge during the period from Sentember 1. 2005 through August 31. 2010.
Effluent Limitations                                                   Monitoring Requirements Mass Units (Ibs)   )                                   fConcent ations (mg/L                             Minimum (a)
: b.
Discharge Parameter                                                                           Average                                             Measurement           Required (8)
Based on the anticipated wastewater characteristics and flows described in the permit application and its supporting documents and/or amendments, the following effluent limitations and monitoring requirements apply (see also Additional Requirements, Footnotes and Supplemental Information).
Monthh         (     Annual(4)         Minimum           Monthly       Maximum                               Frequency         Sample Type Ammonia-N                                   Report                                   XXX           Report           XXX                                 2/MonthW-t 8 Hr. Comp.
Effluent Limitations Monitoring Requirements Mass Units (Ibs) )
Kjeldahl -N                                 Report                                   XXX           Report           XXX                                 2/Month           8 Hr. Comp.
fConcent ations (mg/L Minimum (a)
Nitrate-Nitrite as N                       Report                                   XXX           Report           XXX                                 2/Month           8 Hr. Comp.
Discharge Parameter Average Measurement Required (8)
Total Nitrogen(5)                           Report               Report             XXX             Report           XXX                                 2/Month             Calculate Total Phosphorus                           Report               Report             XXX             Report           XXX                                 2/Month 7'J         8 Hr. Comp.
Monthh
Sampics takcn in compliance with the monitoring requirements specified above shall be taken at the following location(s): Outfall 079 I. When sampling to determine compliance with mass effluent limitations, the discharge flow at the time of sampling must be measured and recorded.
(
: 2. Daily Discharge = Daily Flow x Daily Sample Concentration x 8.34
Annual(4)
: 3. Monthly Mass Load = (The sum of the Daily Discharge / n) x (Number of Days In Month), where n is the number of samples per month.
Minimum Monthly Maximum Frequency Sample Type Ammonia-N Report XXX Report XXX 2/MonthtW-8 Hr. Comp.
: 4. Annual Mass Load = The sum of the Monthly Mass Loads, taken over the last 12 months.
Kjeldahl -N Report XXX Report XXX 2/Month 8 Hr. Comp.
: 5. Total Nitrogen = Kjeldahl-N + Nitrate-N + Nitrite-N
Nitrate-Nitrite as N Report XXX Report XXX 2/Month 8 Hr. Comp.
: 6. This is the minimum number of sampling events required. Pernittees are encouraged, and it may be advantageous in demonstrating compliance, to perform more than the minimum number of sampling events required.
Total Nitrogen(5)
: 7. If an effluent limit on Ammonia-N or Total Phosphorous, established elsewhere in this permit, requires sampling more frequently than 2/month, that sampling frequency must be observed. The results of this 2/month sampling for nutrients may be used; however, to fulfill the number of samples required at the higher frequency.
Report Report XXX Report XXX 2/Month Calculate Total Phosphorus Report Report XXX Report XXX 2/Month 7'J 8 Hr. Comp.
Sampics takcn in compliance with the monitoring requirements specified above shall be taken at the following location(s): Outfall 079 I.
When sampling to determine compliance with mass effluent limitations, the discharge flow at the time of sampling must be measured and recorded.
: 2.
Daily Discharge = Daily Flow x Daily Sample Concentration x 8.34
: 3.
Monthly Mass Load = (The sum of the Daily Discharge / n) x (Number of Days In Month), where n is the number of samples per month.
: 4.
Annual Mass Load = The sum of the Monthly Mass Loads, taken over the last 12 months.
: 5.
Total Nitrogen = Kjeldahl-N + Nitrate-N + Nitrite-N
: 6.
This is the minimum number of sampling events required. Pernittees are encouraged, and it may be advantageous in demonstrating compliance, to perform more than the minimum number of sampling events required.
: 7.
If an effluent limit on Ammonia-N or Total Phosphorous, established elsewhere in this permit, requires sampling more frequently than 2/month, that sampling frequency must be observed. The results of this 2/month sampling for nutrients may be used; however, to fulfill the number of samples required at the higher frequency.
: 8. Required sample type is to be consistent with current permitting requirements.
: 8. Required sample type is to be consistent with current permitting requirements.
: 9. Test Methods:
: 9.
Parameter                                       40CFR Part136, Table IB
Test Methods:
: 1. Kjeldahl nitrogen as nitrogen                         31
Parameter 40CFR Part 136, Table IB
: 2. Nitrate-Nitrite as nitrogen                           39
: 1. Kjeldahl nitrogen as nitrogen 31
: 3. Phosphorus                                             50
: 2.
: 4. Ammonia as nitrogen                                     4
Nitrate-Nitrite as nitrogen 39
: 5. Total Nitrogen = Kjeldahl-N + Nitrate-Nitrite as nitrogen
: 3.
                                                                                                  }}
Phosphorus 50
: 4.
Ammonia as nitrogen 4
: 5.
Total Nitrogen = Kjeldahl-N + Nitrate-Nitrite as nitrogen }}

Latest revision as of 13:10, 15 January 2025

NRC Notification of NPDES Permit Authorization Permit PA-0047325 Correction to Previous Submittal
ML053410377
Person / Time
Site: Susquehanna  
Issue date: 11/30/2005
From: Mckinney B
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PA-0047325, PLA-5986
Download: ML053410377 (2)


Text

Britt T. McKinney Sr. Vice President & Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3149 Fax 570.542.1504 btmckinney pplweb.com

  1. 00 3*-W -

pp I<..;

NOV 3 0 2005 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station OP1-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION NRC NOTIFICATION OF NPDES PERMIT AUTHORIZATION PERMIT #PA-0047325 CORRECTION TO PREVIOUS SUBMITTAL PLA-5986 Docket Nos. 50-387 and 50-388

Reference:

1)

PLA-5952, B. T. McKinney (PPL) to USNRC, "NRC Notification of NPDES Permit Authorization Permit #PA-0047325, " dated September 2, 2005.

The purpose of this letter is to transmit a correction to the PPL Susquehanna, LLC (PPL)

NPDES Permit #PA-0047325 [Reference 1].

On September 9, 2005, the Pennsylvania Department of Environmental Protection (DEP) notified PPL that the referenced NPDES permit contained an error on page 9. Outfall 079 was referenced as outfall 001 in the line of text immediately below the Effluent Limitations Table. Accordingly, a new page 9 has been provided which corrects this error. In addition, this new page also includes current changes to the Chesapeake Bay Tributary Nutrient Reduction Strategy monitoring and reporting requirements plus footnotes that have been added to the form.

Please replace page 9 in your current version of Reference I with the new page 9 (attached).

If you have any questions please contact Mr. Duane L. Filchner at (610) 774-7819.

Sincerely, B. T. McKinney Attachment Copy:

NRC Region I Mr. B. A. Bickett, NRC Sr. Resident Inspector Mr. R. V. Guzman, NRC Project Manager Mr. R. Janati, DEP/BRP

3800-PM-WSWMOO11 4/2005 Permit Permit No. PA-0047325

1.

For Outfall 079 Latitude 41°05'30" Longitude 76'08'30" River Mile Index Stream Code_

which receives wastewater from sewage treatment plant

a.

The perniittee is authorized to discharge during the period from Sentember 1. 2005 through August 31. 2010.

b.

Based on the anticipated wastewater characteristics and flows described in the permit application and its supporting documents and/or amendments, the following effluent limitations and monitoring requirements apply (see also Additional Requirements, Footnotes and Supplemental Information).

Effluent Limitations Monitoring Requirements Mass Units (Ibs) )

fConcent ations (mg/L Minimum (a)

Discharge Parameter Average Measurement Required (8)

Monthh

(

Annual(4)

Minimum Monthly Maximum Frequency Sample Type Ammonia-N Report XXX Report XXX 2/MonthtW-8 Hr. Comp.

Kjeldahl -N Report XXX Report XXX 2/Month 8 Hr. Comp.

Nitrate-Nitrite as N Report XXX Report XXX 2/Month 8 Hr. Comp.

Total Nitrogen(5)

Report Report XXX Report XXX 2/Month Calculate Total Phosphorus Report Report XXX Report XXX 2/Month 7'J 8 Hr. Comp.

Sampics takcn in compliance with the monitoring requirements specified above shall be taken at the following location(s): Outfall 079 I.

When sampling to determine compliance with mass effluent limitations, the discharge flow at the time of sampling must be measured and recorded.

2.

Daily Discharge = Daily Flow x Daily Sample Concentration x 8.34

3.

Monthly Mass Load = (The sum of the Daily Discharge / n) x (Number of Days In Month), where n is the number of samples per month.

4.

Annual Mass Load = The sum of the Monthly Mass Loads, taken over the last 12 months.

5.

Total Nitrogen = Kjeldahl-N + Nitrate-N + Nitrite-N

6.

This is the minimum number of sampling events required. Pernittees are encouraged, and it may be advantageous in demonstrating compliance, to perform more than the minimum number of sampling events required.

7.

If an effluent limit on Ammonia-N or Total Phosphorous, established elsewhere in this permit, requires sampling more frequently than 2/month, that sampling frequency must be observed. The results of this 2/month sampling for nutrients may be used; however, to fulfill the number of samples required at the higher frequency.

8. Required sample type is to be consistent with current permitting requirements.
9.

Test Methods:

Parameter 40CFR Part 136, Table IB

1. Kjeldahl nitrogen as nitrogen 31
2.

Nitrate-Nitrite as nitrogen 39

3.

Phosphorus 50

4.

Ammonia as nitrogen 4

5.

Total Nitrogen = Kjeldahl-N + Nitrate-Nitrite as nitrogen