{{#Wiki_filter:Southern Nuclear Operating Company, Inc.
{{#Wiki_filter:Southern Nuclear Operating Company, Inc.
Post Office Box 1295 Birmingham, Alabama 35201-1295 Tel 2059925000 SOUTHERN COMPANY A
Post Office Box 1295 Birmingham, Alabama 35201-1295 Tel 2059925000 SOUTHERN A COMPANY July 14, 2008 Energy to Serve Your World'*
July 14, 2008                                                       Energy to Serve Your World'*
Docket Nos.: 50-348 NL-08-1033 50-364 U. S. Nuclear Regulatory Commission AnN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant - Units 1 and 2 Response to Request for Additional Information Regarding the Fourth Ten-Year Intervallnservice Testing Program Update Ladies and Gentlemen:
Docket Nos.: 50-348                                                 NL-08-1033 50-364 U. S. Nuclear Regulatory Commission AnN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant - Units 1 and 2 Response to Request for Additional Information Regarding the Fourth Ten-Year Intervallnservice Testing Program Update Ladies and Gentlemen:
In {{letter dated|date=August 14, 2007|text=letter dated August 14, 2007}}, Southern Nuclear Company (SNC) submitted the Fourth 10-Year Intervallnservice Testing (1ST) Program for Farley Nuclear Plant (FNP) Units 1 and 2 for NRC review and approval. In accordance with 10 CFR SO.5Sa(f)(4)(ii), the updated 1ST program was written to meet the requirements of the ASME OM Code 2001 edition though 2003 addenda, except where proposed requests for alternatives and/or proposed requests for relief are documented in the Farley 1ST Program. The Fourth 1ST Interval began on December 1, 2007 and ends on November 30,2017.
In letter dated August 14, 2007, Southern Nuclear Company (SNC) submitted the Fourth 10-Year Intervallnservice Testing (1ST) Program for Farley Nuclear Plant (FNP) Units 1 and 2 for NRC review and approval. In accordance with 10 CFR SO.5Sa(f)(4)(ii), the updated 1ST program was written to meet the requirements of the ASME OM Code 2001 edition though 2003 addenda, except where proposed requests for alternatives and/or proposed requests for relief are documented in the Farley 1ST Program. The Fourth 1ST Interval began on December 1, 2007 and ends on November 30,2017.
On June 11, 2008, a NRC Request for Additional Information (RAI) was received regarding the proposed program. This RAI was discussed in a telecon with the NRC Staff on June 23,2008. SNC is withdrawing relief requests RR-P-1 and RR-V-1 since SNC will comply with the appropriate 1ST requirements for the associated components. SNC is requesting interim approval for RR-P-3 until July 1, 2009 to allow additional testing be performed for the motor driven auxiliary feedwater pumps to determine if a substantial flow rate can be achieved for 1ST.
On June 11, 2008, a NRC Request for Additional Information (RAI) was received regarding the proposed program. This RAI was discussed in a telecon with the NRC Staff on June 23,2008. SNC is withdrawing relief requests RR-P-1 and RR-V-1 since SNC will comply with the appropriate 1ST requirements for the associated components. SNC is requesting interim approval for RR-P-3 until July 1, 2009 to allow additional testing be performed for the motor driven auxiliary feedwater pumps to determine if a substantial flow rate can be achieved for 1ST.
The SNC response to the requested information is provided in Enclosure 1. A SNC commitment made in this response is listed in Enclosure 2.
The SNC response to the requested information is provided in Enclosure 1. A SNC commitment made in this response is listed in Enclosure 2.
If you have any questions, please advise.
If you have any questions, please advise.
Sincerely, M. J. Ajluni Manager, Nuclear Licensing MJAlBDM/phr
Sincerely, M. J. Ajluni Manager, Nuclear Licensing MJAlBDM/phr  


U. S. Nuclear Regulatory Commission Nl-08-1033 Page 2
U. S. Nuclear Regulatory Commission Nl-08-1033 Page 2  


==Enclosures:==
==Enclosures:==
: 1) Response to Request for Additional Information Regarding the Fourth Ten-Year Intervallnservice Testing Program Update
: 1) Response to Request for Additional Information Regarding the Fourth Ten-Year Intervallnservice Testing Program Update
: 2) Commitment Table cc:   Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. J. R. Johnson, Vice President - Farley Mr. D. H. Jones, Vice President - Engineering RTYPE: CFA04.054; lC# 14793 U. S. Nuclear Regulatory Commission Mr. l. A. Reyes, Regional Administrator Mr. R. A. Jervey, NRR Project Manager - Farley Mr. E. l. Crowe, Senior Resident Inspector - Farley
: 2) Commitment Table cc:
Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. J. R. Johnson, Vice President - Farley Mr. D. H. Jones, Vice President - Engineering RTYPE: CFA04.054; lC# 14793 U. S. Nuclear Regulatory Commission Mr. l. A. Reyes, Regional Administrator Mr. R. A. Jervey, NRR Project Manager - Farley Mr. E. l. Crowe, Senior Resident Inspector - Farley  


Joseph M. Farley Nuclear Plant - Units 1 and 2 Enclosure 1 Response to Request for Additional Information Regarding the Fourth Ten-Year Intervallnservice Testing Program Update
Joseph M. Farley Nuclear Plant - Units 1 and 2 Response to Request for Additional Information Regarding the Fourth Ten-Year Intervallnservice Testing Program Update Response to Request for Additional Information Regarding the Fourth Ten-Year Intervallnservice Testing Program Update NRC Question RR-P-3-01 The relief request states that the 2 inch minimum flow fixed resistance line limits flow to 50 gpm which provides only minimal data for determining pump operational readiness. The relief request also states that each pump is provided with a 4 inch return line to the condensate storage tank but that significant piping vibration was experienced when attempts were made to utilize the piping for full flow testing of the Auxiliary Feedwater (AFW) pumps. Please discuss the ramifications of using the 4 inch return line at flow rates greater than 50 gpm but less than 350 gpm for the quarterly Group A test.
 
Enclosure 1 Response to Request for Additional Information Regarding the Fourth Ten-Year Intervallnservice Testing Program Update NRC Question RR-P-3-01 The relief request states that the 2 inch minimum flow fixed resistance line limits flow to 50 gpm which provides only minimal data for determining pump operational readiness. The relief request also states that each pump is provided with a 4 inch return line to the condensate storage tank but that significant piping vibration was experienced when attempts were made to utilize the piping for full flow testing of the Auxiliary Feedwater (AFW) pumps. Please discuss the ramifications of using the 4 inch return line at flow rates greater than 50 gpm but less than 350 gpm for the quarterly Group A test.
SNC Response Additional evaluation and testing will be required to address this question.
SNC Response Additional evaluation and testing will be required to address this question.
: 1. FNP will perform additional testing utilizing the 4-inch return line and determine if a substantial flow rate can be achieved for 1ST. A flow rate of
: 1. FNP will perform additional testing utilizing the 4-inch return line and determine if a substantial flow rate can be achieved for 1ST. A flow rate of  
        ~ 280 gpm (80% of accident flow rate) would satisfy the code requirement for the Group A Test.
~ 280 gpm (80% of accident flow rate) would satisfy the code requirement for the Group A Test.
: 2. FNP will conduct this additional testing and evaluation and provide the results to the NRC no later than jUly 1, 2009 which allows for testing during a refueling outage on each unit, if necessary.
: 2. FNP will conduct this additional testing and evaluation and provide the results to the NRC no later than jUly 1, 2009 which allows for testing during a refueling outage on each unit, if necessary.
: 3. FNP's final response will include either a revised relief request justifying any flow rate < 280 gpm or withdrawal of the relief request if testing in accordance with the Code is achievable.
: 3. FNP's final response will include either a revised relief request justifying any flow rate < 280 gpm or withdrawal of the relief request if testing in accordance with the Code is achievable.
: 4. Therefore, FNP requests interim approval for RR-P-3 until July 1,2009.
: 4. Therefore, FNP requests interim approval for RR-P-3 until July 1,2009.
E1- 1
E1-1  
 
Joseph M. Farley Nuclear Plant - Units 1 and 2 Enclosure 2 Commitment Table


Enclosure 2 Commitment Table Type           Scheduled Commitment                                        Completion Date One-Time  Continuing  (If Required)
Joseph M. Farley Nuclear Plant - Units 1 and 2 Commitment Table Commitment Table Commitment Type Scheduled Completion Date (If Required)
Action   Compliance Test MDAFW pumps to determine if >50 prior to July 01 ,
One-Time Action Continuing Compliance Test MDAFW pumps to determine if >50 gpm flow can be achieved and provide the results to the NRC.
gpm flow can be achieved and provide the         X 2009 results to the NRC.
X prior to July 01,
E2 -1}}
2009 E2 -1}}

Latest revision as of 17:05, 14 January 2025

Response to Request for Additional Information Fourth Ten-Year Interval Inservice Testing Program Update
ML081970245
Person / Time
Site: Farley  
(NPF-002, NPF-008)
Issue date: 07/14/2008
From: Ajluni M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-08-1033
Download: ML081970245 (6)


Text

Southern Nuclear Operating Company, Inc.

Post Office Box 1295 Birmingham, Alabama 35201-1295 Tel 2059925000 SOUTHERN A COMPANY July 14, 2008 Energy to Serve Your World'*

Docket Nos.: 50-348 NL-08-1033 50-364 U. S. Nuclear Regulatory Commission AnN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant - Units 1 and 2 Response to Request for Additional Information Regarding the Fourth Ten-Year Intervallnservice Testing Program Update Ladies and Gentlemen:

In letter dated August 14, 2007, Southern Nuclear Company (SNC) submitted the Fourth 10-Year Intervallnservice Testing (1ST) Program for Farley Nuclear Plant (FNP) Units 1 and 2 for NRC review and approval. In accordance with 10 CFR SO.5Sa(f)(4)(ii), the updated 1ST program was written to meet the requirements of the ASME OM Code 2001 edition though 2003 addenda, except where proposed requests for alternatives and/or proposed requests for relief are documented in the Farley 1ST Program. The Fourth 1ST Interval began on December 1, 2007 and ends on November 30,2017.

On June 11, 2008, a NRC Request for Additional Information (RAI) was received regarding the proposed program. This RAI was discussed in a telecon with the NRC Staff on June 23,2008. SNC is withdrawing relief requests RR-P-1 and RR-V-1 since SNC will comply with the appropriate 1ST requirements for the associated components. SNC is requesting interim approval for RR-P-3 until July 1, 2009 to allow additional testing be performed for the motor driven auxiliary feedwater pumps to determine if a substantial flow rate can be achieved for 1ST.

The SNC response to the requested information is provided in Enclosure 1. A SNC commitment made in this response is listed in Enclosure 2.

If you have any questions, please advise.

Sincerely, M. J. Ajluni Manager, Nuclear Licensing MJAlBDM/phr

U. S. Nuclear Regulatory Commission Nl-08-1033 Page 2

Enclosures:

1) Response to Request for Additional Information Regarding the Fourth Ten-Year Intervallnservice Testing Program Update
2) Commitment Table cc:

Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. J. R. Johnson, Vice President - Farley Mr. D. H. Jones, Vice President - Engineering RTYPE: CFA04.054; lC# 14793 U. S. Nuclear Regulatory Commission Mr. l. A. Reyes, Regional Administrator Mr. R. A. Jervey, NRR Project Manager - Farley Mr. E. l. Crowe, Senior Resident Inspector - Farley

Joseph M. Farley Nuclear Plant - Units 1 and 2 Response to Request for Additional Information Regarding the Fourth Ten-Year Intervallnservice Testing Program Update Response to Request for Additional Information Regarding the Fourth Ten-Year Intervallnservice Testing Program Update NRC Question RR-P-3-01 The relief request states that the 2 inch minimum flow fixed resistance line limits flow to 50 gpm which provides only minimal data for determining pump operational readiness. The relief request also states that each pump is provided with a 4 inch return line to the condensate storage tank but that significant piping vibration was experienced when attempts were made to utilize the piping for full flow testing of the Auxiliary Feedwater (AFW) pumps. Please discuss the ramifications of using the 4 inch return line at flow rates greater than 50 gpm but less than 350 gpm for the quarterly Group A test.

SNC Response Additional evaluation and testing will be required to address this question.

1. FNP will perform additional testing utilizing the 4-inch return line and determine if a substantial flow rate can be achieved for 1ST. A flow rate of

~ 280 gpm (80% of accident flow rate) would satisfy the code requirement for the Group A Test.

2. FNP will conduct this additional testing and evaluation and provide the results to the NRC no later than jUly 1, 2009 which allows for testing during a refueling outage on each unit, if necessary.
3. FNP's final response will include either a revised relief request justifying any flow rate < 280 gpm or withdrawal of the relief request if testing in accordance with the Code is achievable.
4. Therefore, FNP requests interim approval for RR-P-3 until July 1,2009.

E1-1

Joseph M. Farley Nuclear Plant - Units 1 and 2 Commitment Table Commitment Table Commitment Type Scheduled Completion Date (If Required)

One-Time Action Continuing Compliance Test MDAFW pumps to determine if >50 gpm flow can be achieved and provide the results to the NRC.

X prior to July 01,

2009 E2 -1