{{#Wiki_filter:Exelon Generation                  www.exeloncorp.com Exelkn  Nuclear 4300 Winfield Road Warrenville, IL60555 10 CFR 50.55a RS-08-152 November 18, 2008 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-1 1 and NPF-1 8 NRC Docket Nos. 50-373 and 50-374
{{#Wiki_filter:}}
 
==Subject:==
Supplemental Information Concerning Relief Request CR-26 Associated with the Second 10-Year Inservice Inspection (ISI) Interval
 
==Reference:==
Letter from Patrick R. Simpson (Exelon Generation Company, LLC) to the NRC, "Relief Request CR-26, Inservice Inspection Program Relief Regarding Examination Coverage for Second 10-Year Inservice Inspection Interval," dated October 1, 2008 In the referenced letter, Exelon Generation Company, LLC (EGC), requested relief from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components," for LaSalle County Station (LSCS) Units 1 and 2. Specifically, CR-26 requested relief on the basis that compliance with the specified requirements is impractical due to plant design. This relief applies to the second 10-year interval inservice inspection program, which concluded on October 1, 2007.
In a teleconference on November 6, 2008, EGC agreed to provide supplemental information to the NRC regarding relief request CR-26. This supplemental information is provided in the attachment to this letter.
This letter contains no regulatory commitments. If you have any questions regarding this letter, please contact Ms. Tricia A. Mattson at (630) 657-2813.
Respectfully, atrick R. mpson Manager - Licensing
 
==Attachment:==
Supplemental Information Regarding Relief Requests Associated With the Second Inservice Inspection Interval - LaSalle County Station, Units 1 and 2
 
November 18, 2008 U. S. Nuclear Regulatory Commission Page 2 cc:    Regional Administrator - NRC Region III NRC Senior Resident Inspector - LaSalle County Station
 
Attachment Supplemental Information LaSalle County Station Units 1 and 2 Relief Request CR-26
 
REVI          'me 44e-22o              W46 91            &C0 SEt 0          c,7e          A      E1.fjZI4  NI      Brou"Tht      Upto        154      /417
_ ....__  -*    i -4 2oQ- "  *  *s", tu  ,,
                                                                                        #at f*.      i, /    -, 4ete l    ,.,A                                            WFC 1- 7-76 Pc. No. Prefix                                                                                    Pc. No. Prefix D.W.P.              and                                                                        D.W.P.                      and Weld No. Suffix  Dwg. No.                  Title                            Dwg. No.            Weld No. SuffixI Dwg. No.              _'itle Dwg. No.
301        E- 232- 7883 General Arrangement - Elevation 302        E-232- 843 General ArsngemePt - Plans A-245-515            303        E-232- 898 Stainlees Steel Safe Ends 304 305        E-232-789    vessel Shells Forming & Fit-up A-245-830            3o6                      Bottom Head Machining & Welding 307 E-2320"      Lower Vessel Shell Ass'y. Machinilng and A-245-831                        E-232-790 Welding A-245-832            308        E-232-791    Upper Vessel Shell Ass'y. Machining and Welding A-245-833            309        E-23?-861 Vessel Support Skirt - Details & Ass'y.
A-245-834            310        E-232-862 Bottom Head--Penetrations 311        E-232-792 Vessel Machining A-245-836            312        E-232-793 Vessel Machining A-245-837            313        E-232-794 Vessel Assembly A-245-838            314        E-232-879 Nozzle Details A-245-839            315        E-2132e93Q Nozzle Details                                                                          A-200-263        Miscellaneous Repairs and                    ;'emporar[;
316        E-232-863 Nozzle Details                                                                                              Attachments (DWP)
A-245-84o A-245-841            317        E=232-880 Nozzle Details                                                                            A-200-081        Standard Notes A-245-842            318        E-232-839 'loSure Head Nozzle Details                                                              A-200-083        Material Notes A-245-843            319        E-232-911 Closure Head Machining & Welding                                                          A-200-085        M&P Specs.
320        E-232-801 Closure Head Final Machining                                        h                I _________        I A-245-845            321        E-232-936 Miscellaneous Details 322        F-233-814 Miscellaneous Details 323        E-232-795 Vessel Internal Attachments A-245-847            324        E-232-796 Vessel External Attachments A-245-849            325        E-232-797 Vessel External Attachments 326        E-232- 923 Stud, Nut, and Washer Details A-245-851            327        E-232- 937 Shroud Support, Details & Ass'y.
A-245-852            328        E-232-840 Nozzle Thermal Liners A-245-853            329        E.232-802 In--Service Inspectign Patchbu A-245-854            330        E-232-924 Mat'l. for Fabricating Test Specimen 331        E-232-799    Mat'l. Identification 332        E-232-781    As-Built Dimensions E-232-782    As-Built Dimensions - Bot. Hd. Penet.
333 334        E-232-928 Closure Head Shipping Details & Ass'y.
335        E-232-841 Nozzle Shipping Covers                                                                                              o-  ,CHATTANOOGA              to,-      286'(
A-245-857            336        R-232-930 Flange Cover Details & Ass'y.                                                                                                SRAWING PLAR- LT-A-245-858            337        P-232-931 Lifting Beam Details & Ass'y.
A-24 5-8 59          338        R-232-932 Vessel Upending Device & Lower Cover Details & Ass'y.                                                                                                _. NERAL ELECTiRIC CO.
251" I.D. B-TI 339        E-232-933 Vessel Shipping Rig Details 340        E-232-847 Vessel Shipping Assay.
V      341        E-232-814 Shipping Arrangement on Barge 2-?45-863        342        E-232- 939 Miscellaneous Shipping Details                                                                                    COMBUSTIO  "'~ '..w,-  .Ik~nf'o I.N ENGIEERIN.    ,NC.. WINDSOR.CONN.
I-      343        E-232-800 Modified Vessel Shipping Rig Assembly A-*2.4..-94-9          .344        E-232-02 LIT ICALISRKTION8 BLOCV tETKILS                                                                          11        ORAWINO D      -
NO NO  .
n~~nkaL..
                                                                                                                                                                                  -2 *-      -
V-W7I7'ý%
 
I    7                            6                                      5                I -<                                4 I
.109"ZCz-:3 4,4
                                                                                                                            ~7A~L  t'(B-SJ 04fl0' SCA4E
            .7 441 41 0~
                                                                                        'o)
Amr Ti C~404W      ~          AM                            v/43WO/Gj a,6,~-    ~      4 0' DA'a I
27d-~
V4-4 EED*3.7O
                                                                      -"-S    't.9)
                                              -'      - ---                                              J71
                                                                                                                                                                                            -- I, i i
                                                                                                                                ,                          I M9r=ES C-A'FA',4 0f L 444M4                r      = 0    ZrW)-WACT          4/  L-          .LU3 I            4~~0C~054  C0
* S0  ~~rzzZ M7~1    CLOSURqEHEADOF7AAL K
MACHINING N-        ic 01 O
A fl
                                                                                                                                                            *~    ~          1232iL-801Z3 I        I
_6.                7
 
  -                  a--                                            /                                        S              I                                      ,            ~.      4          -          I
                                                                                            /          c.'*            l n_                                                                                          C    AC ~fl
                                                -        . ..                    " ,                                                                                                                                4. COAtAC atat.' aSs'S I.
____,,_                      k                                  \ \ "\*_                L                            Tz; ELL-Em 4Q L~ .
                                                                                                                                                                                                                                              * -                    .. 7"/-- .              400'-                  tC_ .      .
tl__2
                                                                                                                                                                                                                                                                                              -i , O~ttr.
                                                                                                                                                                                                            .                                                    I
__o_*_IE/    x,-",'                          *          *          -
                                                                                                                                                                    -,L-"6,-            .                                                                                                                                SCA&#xfd;C
                                                                                                                                          /D.
                                                                                                                                                                                                                                                              ....,-*AU'. O-Z "4,,i
        ,    I.WI.wr
                                                      .        :L              -      '
* J//                      a.a.
                                                                                                                                      .        .I'                                                                                                                  .*                                                                            FK*
: a.
* j"                      -;-f*'r*.*
: *  . *        "=--.    .'--2f=l:]i
                                                                            .-*-      -...  .  ... '  "    =.:..,-
o.----.,** ...b *
                                *- f,-t--*:*-              -- <':.... . ....
                                                            - ........  .... . ... _ . *... __ _ *                                                :_- ..          -j _*_
__ - _=:*
A ~t  AtrtaAt            07*5 57* ink tao j AVAA~tCA&S 400.4Cr                    -            I aIr                      state      .                                                      -..-    ..                    .                                                                          i    i        i      i                                                        i                i F A        ~'              SAn 04 5 MatS 550Sf ScwSaSA            -,        '0 A                *~* '*~* 'P ms          ,,    apACasit      .,    .47
                                                                                                                                                                                                                                                          -            a.tM.,r (AC)      -,
                                                                                                                                                                                                                    'D~~      ~TfeAC~~                'an      SA              70-e isa. -                  I          aSCiT a.      /M5~* S..                                  Car      tat Mraa.ta 4            Ma TA            -                    ST.      -
S    7) .au~aM            ZI                            *7*5  .
74,~    '(65)                                    CAOSSW    'ado          S 'SO-At/Os)                    ta's/k  Men a,'-
                                                                                                                                                                                                                                                  -            -                                                            I
                                                            .A..                  A. - 4A1M                                              --                                      .-                                                                                                                      *                                          -
                                                                                                                                                                                                    .......          I-                              ff.                          a 7A                A25.
          . -i- _e      .I,..-
 
5 H
A                                                                                              j  73-                !
                                                                    ;0'm45-.        W-I                      -m1 IJ                                -0              AA                    :  Z"~4 0- . l&#xfd;                                      -                                                        M      DK        3.8 -
G I?-  r                                                t          lt4                        C7,'
                                          -=EWW                                                              UNA~
33.-a  ~      '.      -a55 AA    A7WY      WL A137OF05-sC AeaSA4V~SAlA                    3 SAtSAE2tosn                                      --
130    /IS  REA-cr-C                                                                          000?'A                                  A eo0 OAAO              A (-'
rv./e~AA,
  -I!""                                                                                                          rl
                        -6    I E2279C6 5                                          -I-i;&#xfd;Wj      &#xfd;    - -
 
I                9 a                                                  3              2                                            t II*-*"
H I . !..    ..  ... - ........ .. -  I, .. ,1" '
I    I (AZZE                              IN VENT A~ZZLE ASSEMBlY SAS54-I'-O.
d
                                                                              #'I.W,*AXM 0,      ,
                  -L,    4
* FIRa F      4-a                      ",**
I4~e'aao 3
SSSe    31811                                                                                          vA A'IJMBWVrA7A7 OV
                                                                                  /NST!&#xfd;          IWZ    55              1
                            -ala~~~C~
Ms-      ~z                                                                                                                            C.,
AW, MI    IsIS
                                                                                                                                  -        DW        lMM0      '0
_____________-IS--                                                  '50  C"l    ir    MN
                                                                                                                                                      -ZZ            SMoO.,S                      5 Ma              ,        0I $ S' 'M ft-                        - f M S  T E  2 I  00r tNAJ AS                  0AA..
cm0          Acreso                                                                      .- ,o,-swi W,  A&#xfd;&#xfd;                                                                                                      SO.      ~
O,.'W
                                                                                                              .A.'oWn-                            ~                  232-839 1,.AI~.                        .
a      I                              !1                          3                                              1I                Z.41.t&
 
P
                                                                                                                                                                                                                                                              ~L~    ,WWSEDFtS'~-3Z  -          t,#
W    ~                          4  44 0                                          'I H
                                                                                                                                                                    -,' ,        -_I*-*              7___ -*----
                                                                                                                                                                                                              - i          _----
F JA,      .        .          --    "  .          -
                                -o . . . .. .e        o        -          ..
4
                                                                                                                                                                                          '2 i~4o.to.*&#xa3;H o.H~~H    -
I
                                                                                                                                                                                                                                                                                                                  -l I.
                                                                                          ,7      ,                                                                                    -~        -
2    i~
I
                                                                                                                                                                                                                                              *    '&#xa3; A7AtMAS~    ta'AAdtJ    CflvOnr A                                              E~4I          III                                                      j
                                          - t tO r SIAn                                                  tr~q    a  AEZAAt
                                                                                                                                                                                                              ~        ~fu-'
          .7                      410
                                              ,~
                                                                                                                                                                                                                                  &#xfd;_U 7--I sc&r.- 7KWK                                            &~~cAr~                                            I-0' r        WI2A.                                                                    E&#xfd;l "4  .7A I-      I _=1 =I.
                                                                                                                                                                                                                                    .    ... I CtNE2AL A'OTfJ                            Ai'7W1(T &#xa3;tOM~ 'I            LIHC'2    ,'~        &#xb6;i      I2~4      fAAH~'5                          .    ..    .
                                                          .'    -In    An tat.. 2 4.4flO44u-arIzct            -                                      at,-,~      s'.'      ova. ASAK
                                                                                                                                                                                                                                                                                        'I.      -
at    'HWan., tat  ACSMC            0* ALa ct                                                                                                                                            1[-1
                                                                                                                                        *    .              OH                  '2  5-
                                                    ,..W1t
* 44,4w jD.~.rA,4.CoK( ~0O A&#xa3;0 toot Ati aaa 2*7*a? 'H st OW7IS oar,'- ats,.W    .~AS Isaun 23        8...7 H
i 1              "    5
* I
                                                                                                                      --- ~---~-----~---~-.-      -----------*--~--              --            A
 
                                                                                                                                                                                                                                                                                                                    ---  I          -
A                                                                              N                Ir                                                                                                                J a          1-                                                                -.1-                                              a
                                                                                                                                                                                                                                                                                      -,      flOw                3,3.0,                CC      7~0 004710
                                                                                                                                                                                                                                                                                  ~ Cr4 PC3,3-O, AC3,600 #4! C.                  A' iCC        47
                                                                                                                                                                                                                                                                                                              ,Ow$r.iwSa
                                                                                                                                                                                                                                                                                                ~          ~44iC                          -      -
                                                                                                                                                                                                                                                                                      *. ~            it3i5C4 H                                                                                                                                                                                                                                                                                                ?EOMVAOMO-              -                            H
                ~                                                                                                                                                                                                                                                                                                .,          -          a'
                                                                                                                                                                                                                                                                                    -      ?0CL.
                                                                                                                                                                                                                                                                                    -            -,=-  AC-,n..A,,          -
                ~~dwui                -
                                                                                                                                                                                                                                                                                            ~                  ~                              ,
e~-    2Ww'0'C7'Y'-S5a            ,0 4
                                                                                                                                                                                                                                                                                  -        ~              o~an~O-                        -
30,~=                        J*~mii~~~      -j  -~        ____                ____                  _____
4    .3 40050 a,04C ACACCC    WSTdWfl        "'      ICC
            -    ~0C~                -
00CC0050              9.EWSA      3.
                                                                                                                                                                                                                                                                                        -, SIw&AC*.40 ~      '0*0                          w~- -
I, F                                      -
A2y 7v ve3sfL7.
                            ~.#A; 4.~C CfDVAL/UC S)Z'~A4 ~4~fA'        MV&'ZF CeflAW:-.flC -r ann            e~na MCCC'rr..-n.
5
    *1. -    ~              -          -
                                      -3
                                                                                                                                                                                                                    -Al Sr        SSEM          -      -_--  -          -_  5rThP'Z I4ACY1VNN qip --  w~                                                __,44ZC        00          0*'S    -C3~~(CCA xe I
wUk    v 4
A6,  W-          0axx                      .V                          &#xfd;
                                                                                                                                                                                                                                                            $.-g        0        JAOoiaC 4iT00C4440
                                                                                                                                                                                                                                                                                                        ~'-~""~
                                                                                                                                                                                  --                  n~-I0-~---.-                  -
                                                                                                                                                                                                      ,WAC ra I.                                                                            -'a      ..a                                                    -
                                              -    -------.--      ----                                --------------                      -              -------      *44C0_~-'                                                          S.  -            -            --  -              C--'                                -            _
G6A~eA1      A~7t.Y                            I    OM~L              OA~'1      ~                340C~        ~            --                    ~                                      --                            ~                            -
                                .W*S,          'a  44004.0      ',a~dqg.wWwsr                        tea        &          .flfl              MV.          St *610                                -          .~            -  -
A 3,i    0061t    &#xa3;00 ~ *0 nnfO WI *W~V                          T St? .~
0033, A-~t        A
                                                                                                                                ,0yS        *  -, ,A.OS  *45 C                                                      -                                          --      ~                          M~'1ZLE --~TAILS
                                *aen        A.36      AS          0.0*' 00.                      -    --        -    -    -      -      ---.      .        .    .                                                                                                                          V,3,SSAAdttr'
  -      -                    44e0in(nn,.                                                          -      -        -              -=-'-  -- ----  --  -          -'    -                                                                        ...- ,m'----.--    -
rio 54.0 MC MO 30080 OOwWZO wWTCw              40470'                                                                                                          -            --          -                            .rr A4Ce-rr~3~rnaArMCS~W 0,00.580 3.410 CC~*,        3005 1304 toOt MaAIC        C!")
E 232-938 S----                          ----                                -~                              ~2A677ii~                            -                      _
                                                                                                                                                                                                                                                                                                                ~                                    4 0            I                    7                                  -      0  - ~          I-                  5a.                --- A------<'      -.        '-        -    ~                                                                          -      ~0        -
 
z      4
                      ~  I                      A DE7IX__
I wo                A 4.
44M5004.4MM  O&#xfd;            Ai* V05)...T, m
                                                    . o                                *c as                  t WU A3ZA(4C0                      WO 6LCA                      &, aw    wc~,,    wawlg AV    ^,r%,    w-4~~~~~VZ        f 4/4 a44 SCASMOI' O",S                          A45'A 00
                                    &Amrv                                  Alm.s                                      -M-"
 
II                                                                    II                                  g                                                                                                                        2 A
9                                                                      A                                    3                                            4                                      3                                    I
  -2ve-EEZ-3                                Jl D_&#xfd; Y  ~          ~            0~
                                                                                                                                                                                                                        -I-c
                                                                                                                                                                                                                                  -s      -
1 .000~7 A..
E  b0ct~-bO.. n~  -
H--
Oft  00711. Wi-PLAA'        LYI
                                                                                                                                                -      103fr  TO      MEAD
                                                  ~~8OTTO~90 HEA12SEM1Z_1 II, 0C~rej~,C                                                                  30,.70t DETAIL    Do-,)
a' 5.-I.                  -
r--    S/AtM oror                                30100 ~
                                                                                                                                                          ,                    ~e.
WIMO  WflW
                                                                                                                                    -. 5~,.-        .                                      3'AON    P D                                                                                                                                                                                                                                                                                        D I WELDAVOL O('P          .
C~)                                                                    NOE3 43
                  ..        -          ~710,0.      ae    --o 0CIAO                        '      rCA W l See I  a.-r~~~~o                0      ('.7      -                                  DET~~ZY7AIL      C r-,.                                                      -        .0.s.*,4urr.                  39),nsev A  ------  5-36  -------              ...--
S"O~qt      ..  -    ~
                                                                                      .-- *~.  --                  -  -      -    JC41ret.76-                                    -  -      -
SEC
                                                          -    ~ ~~ ~
                                                                ~
A-
                                                                                              ~          ~    .
                                                                                                                -~&&#xfd;-
                                                                                                                      ~          ~                      ~              ~
                                                                                                                                                                --- ____ ----        ~
S~J#4~T
                                                                                                                                                                                          -      ~ -        ~ 7zz ~              f    j jA sea1f'3  89 0000~~~~~~~~W HWS      0                  a  s        --                            ~-          '00            SW_3
                                                                                                                                                                                                          -    ~f -    0    -              DOMMSLVfa                    Now
__________  a  ~2'a Ra A                2-                                                                                  OfV      .                                      M Vt                                                          -ca~        -Arpc.-
8                                                                                                                            . I! .....                  A4                                                                                                                r &#xfd;4 I-                                                                              -:-I-K a                                7.            1                                                    1,.
7 am      n~.                p      'Or-a
                                                                                                                                                                                                                                                                                  ~aflS q~                  .. - ... -____
PC ~a54471~40 q                                                                                                                                                                                                                                                    F' "tJ*0 H,
                                                                                                                                                                                                                                                                                &#xa3;47-a CO'000    ~
                                                                                                                                                                                                                                                                                      .fl,.0000                  e~'Cr
                                ?                                                                                                                                                                                                                                                V.40 .4~7705>Z0 0tEW OOTTR4SJ j177.                                                                                                                                                                                                              ~,0T&#xa3;407 ,u.        r 05000    7'4~0 .. a 004MOS 0fl.g0'.AtS0070051      t-TAa.t4.
I
                                                                                    ;        -
* La&deg;            zv*                                                                                                                                                                                                      G 1--
8 F
                                ~~i'a            Ve4.
: 0.                      A,'
                                                    ")M0* w4 E
                                                                                                                                                                                                                                                                    -                  74B4E*4
                                                                                                                                                                                                                                                                ~          IN  TOO4V POMPPEMWS&#xa3; 71j 30      r.                                                                                                                      or,      ~                iowan ozoiom        ~                                        ..00OM5000    C rrtT~L...jzzTfv.zzLmxzz
                                                                                                                                                                                                                                                                                                                                              " m* F :
                                                                .........................              I;-[....        -*'*Y--:'*" =  "'*
                                                                                                                                                                      '-a,
                                                                                                                                                                                              -lt-                                                                "oF'    I~
D
                                                                                                                                                                                      'I-iM
                                                                                                                                                                                                                        -                                :7 a-.
I                                                                                                                  Zr        .s      '77
                                                                                                                                                                                                                                                                      .    .T. /*5 M8LE                                                                                                                                                              .7S.-
                                                                                                                                                                                      '.-al f
II                                                                                                                                                                                                                                                                                                                                                C
* t..
NsO8 t7A&#xfd;-
fe
:      Z.          ..            *      -*v = ***      * .=** .
___      ,      - -      I      .-- --
T~ . Z 7    '.S    --                                ... .                .          ..    .      .
                                                                                                                                                "                            .      ..          .    . .  .    .A..          *
                                                                                                                                      -I
-III-                                                                                                                                                  .-        P..,.'-,.                                                                    ._          -          Cir.nT    -    As-Co* '            wr            .  .      ._      "
4W ,-Wom ol0                              .              _* . :, --                                              1-joI
                                                                                                                                                                                                                  * - .      I
                                                                                                                                                                                                                                * -                      -I--Io,.                                                ..                  .
i
______            I Ii..oiofl II                                                                                                                              q            ,-              -                                            *    * '-"                        . A* & 8 T          /l - '          $          -
I~'I
                                                                                                                                                                                                                                                                                                                                                  /
    .0,50070 00    810 I 0.471 0047130471 MWCr0V70.00055S&#xa3;001                                SVAWWWAMOM"A.4t                        ~AV.                                                                      .....              ~~~~~~~~~~~
                                                                                                                                                                                            ~! u -I=              .--            -.    *,w      nAf..                                      E232-781
                                                                                                                                                                                                                                                                                                  ,toi                            ,-7      ._;*
g
                                      *    ~ ~          ~~~~                    -          ,
                                                                                                                  . I
                                                                                                                                      .s"I        ---1 .    .
* I..      ..          3...        .    .      .--    '      ..            ..        I.      .      ....                , .        . *=
 
II a        I-            q 9                                                                                                            2
      ~31 9j6 Lla-
_Fzre cor.n        7r3.
w f-                            /g
                                                                                                                                                                                                                      .3L-0.aD IISC1 aD.      LE~**
                                                                                                                                *4,5'      ~                    CA'J4113ACCA0 K,                                      1-
                                                                                                            '40-4*4.14.17Is 014500. 1451/24 AE0A~...
iOt9SZ14*5 ZIS% 441 PCSA4'I5 1414044*4*IIW*A              C 1.1.3 K
                                                                                          -                  -.                  RI
  -13                                          ___1~~                                                14                                    14*
4._w 6.1)
                                                                                                -  -                4E5~20          3' sw~I
                                                                                            - 414.4m1 DET            -)
4$A7A4$  A-ElF      77
                                                        .3.
47530.44575
                                                                                                                                                                                  #qlww          335' 3    C .. 30E *4w3/04s5 c0'11Z IQ
                                                    ---                    7777-_
i.
                                                                                                  -              ___    7_
          ~SR7~W4t (L!IM~r.~A*
                                                                                                                                                                                                                                                      ..^.1, i    i ........                                  -                  I AC .4133 34$      3  'eSSeC-,,4-0,14c 11;3534lA3PC 444.4014111              .      I I 04EYlISA',r Ge~fA~4 A~~                    RAr      e                                55...
A01104 IUGINNC 14.145404-51414
                                                                                                                                                                                ~    ~            ~
31475,4St A401          Z" W&#xfd;0 s =ff.-*~
I--                                            vCSSEL Ofl33&#xb6;        ArbTAC/A4LTS
                                    -  ~40A  aaq14e'0~',sE4                                                                                                              !:                                                      a.-
I i                    I mm 1232-79
                                  -  -            U                          I  5....                              ..                                                  ~I....12 w F&#xfd;A
 
I                    so S
                                                                  -        Us7 F
F, 45          I IL-                                -        --------
C~A,            . ef-.
                                                        -~~~~~~~    -          * ~ - 5 ~ - ~ -.---        -- ----        ----- --
A'/3Z~~~tn    SCSD.
7--am--    Stfl'C    O
-- ,      I 2/-t-  e*s~~Vof~            g/
    - ,rAo                U  'sar~ll.      ,in-t, NSA      U      -1.                                      ---- --
 
4  4      4+        +G 100
            -0  --        S 66A'&"AZ          L~
2TESC~i'~AC ~L~A/801 AW10kfi                &#xfd;  l            1    -    - -      -          2DAXAFlDBWWJVr  L" A- -4"                                  EAz2-a-232-843
                                          .                3 zwmI    I    2    -2 8 4  =    -
 
R                                          7                                                                                                                                                                              'l                                                        i 7~-z~                                                                                                                                    4
[I i  I  ,I 4.2.7A....S-      --
  --H o**r , eo.,o.# 24#                                                  ___"      I
                                                                                                                                    , :                            002 1-                                                              ,
                                                                                                                                                                    " TA I        .I
                                                                                                                    . 2 03      0 2
(                                                                                                                                                                                                                                                                                                                                                      G
                                                                                                    .  . .....  .  .                                                                                                        S~1102~Gf
                                                                                          .          .            ..                                    "04 -- a                                                            e F                                                                                                                                                                                                                                                                                                                                                      F It.A                                                                            ,,-      I 5LALs.ral.&#xfd;Ld
                                                                                                                                                                                                                                                ~n              ~
0(1.. 'GB4
                                                                                                                                                                                                                                -4i                              -
tJPPO!T sKIRT R d0          TOM I-WBAD    M5
                                  -                  -            -                      -          -              -            -            -                                                                                                                N/
E L.309                    (N                                                                            '                o r0L,2,.
22o2.212---.                                                                        -      -          ------                                                                                                (41'5 7
FI                                                6~-
:-,I    ...............
                          -p                                                  N                                                                        2        L-~
7-.-                                                                                                                              71 AH
                                              -j
                                                                                                                                                                                                                                                                  '5. 0
                                                                                                                                                                                                                                                                                            ~;  .L{~1...                        'Nl~l l A O:E      I5JPOPT    1;:' DIMIN                                                                                                                                                                                                  (.1)4.
                                                                                                                                                                                                                                                -I                                                      504004 AS 540PM
                                                                                                                                              ..                  -_  - ._ ,-                        .t..                  Ve-w-.
                                                    ,-/233                      M4                                                                    _&#xfd;PBA5PLAT      A5S-r(e    4*.*z*o#zo                              I/N*CTION          CO/LA'ASSr 220?A10 I                                                                                                                                                                                                                                                                                                                                                jir 5IOIJ  D-D4~sI                                                                -    ~        SIP          ~      IAm      t                Al,000
                                                                                                                                                                                                                                                                                    'I  44.470CC1010 O 0905060103 0                PAAI        Srs SCAlA S 'i-C d-D I                  2A            ""      L      J
                                                                                                                                                    -:_&. i 9'r+      _
S  #  ,        .,
_2]25k SCALE                  AL
                            "  I- L2_                  W p---            -    . . .
                                                                                                                                                                          . _- .      "  __"0- "    5          *
* 0  CAOrT    .i3'r40- '"F::      IT~,/
                                                                                                                                                                                                                                                                                  -    I                                  t A        - .
                                                                                                                                                        =s    -A .*          .d"-
il:;:    *r,!#"8
                                                                                                                                                                                                      -. ,,..o
                                                                                                                                                                                                                  '                                                                        SS.
W IITM                  ,                      1cf U  I
                                        &#xfd;U          T        SLOW I4r1:T" A&F-aLY SCAL.          -O-
                                                                                        ,'NE- AL NorTmO                        CONTPAC.  ..          P-F-. D'                3  PI      R        ..                -D06'        cWG.          "DWG o---o--oI                    ...
                                                                                                                                                                                                                                                                            '04',                  -"      "1G-A-                                        ~
22iZ
                                                                                                                                                                                                                                                                                                                    . ....VE.SEL iT    .
A5Y AND OGTAiL5
                                                                                                                                                                                                                                                                                                                                              .=*
Sam                                                              123 2- 861i V                                                                                      U
 
ELEV. 745.25" ELEV. 723.38" SHELL RING 5 ELEV. 589.0" NOTES, I - ALL M.EWS ARE, LOKING AT VESSEL FROM OUTSIDE.
2 - A-SENSOR IDENTIFICATIONS.
rcat        H0sC1IG4 em UKow.
NOT  FRc K9M0. C0tIC"MXM. OR01ME SWM1-Q0A=~Nm LASALLE      COUNTY STATION        1, UNIT      1 INSERVMCE INSPECTION RPV WELD & SENSOR LAYOUT
 
A am, SHOW 70P HEADO WaDS, CLAD PATCHES, STUO LOCATOL NOZZLES (N7. NO, NIB) AND nlANU TOP HEAD WELD DESIGNATIONS FOR UNIT fl VESSEL
                                                                                      .ME-rnoWi l      tamuitmme.mva-onu.
am    am  I.WM                                                  SALLE        LASAU.E CaTu        STATlON SNow          -                  --                      r---
                                                            "ENGNEERNG                        UNIT  1 I_        _    __  _ _ __
_I__ _MAP
_      ___EMTOP VESSE    HEAD        sGL10A
 
                                                                                                            -3~.    *1 900L-130-is w
lalli8 BOTTOM VESSEL HEAD WELD DESIGNATIONS FORUt .3                                          m  m  nmmm  m a. w-m in  am  I Now=          mum-                              I    SALLE                          Cmmy1 STATm LASALLE UNIT A_____ _____ _        New_
_________      _  _ISERACE        PISPECTN        IWAI.L WiO.
MA____                BOTTOM  VESSE          9CL10 i~-E-      rA SYSTEM          HEAD ASSEMBLY TE_______________
_____________        _r_  ME    T    I
 
6*,0-1I-PUMP LOCATION F-9 REF. INSPEClION CHECKLIST    IHP-PU ELEV. 673'                            mT ,m m-  mm~m W    IU 1.mA m %mUS
                                                                  *ma          "m I    NoIhmNEERING              UT
_____        .I!SELICE SISPECTION  _        _No MJAP            HP PUM    ASSEMBLY      ISI-GEL-1049A m          )ST-Mm ,                              ZHT    W    I
 
0901-130'41I PUMP LOCATION B-14 REF. INSPECTION CHECICUST      LP-PU 1W W  -00  -oomo= a -M vomnm
            -. _____ - iL ____ - SALL                            CouNTYSTATIN  m
__ _NEE__N  ___I___            _    .s NSPEC_                NG.EN MAP                  LP PUMP ASSEMB.Y          IS1-EL-1050 SYSTEM I                                I DUT    or
 
COO L PUMP LOCATION IA      G-14 Is      C-9 iC      1-10 REF. INSPECTION CHECKUSTS IRH-PU-IARH-PU-1I ELEV. 673'                                                RH-PU-IC
                                                        -I m-in        rim x.*
                                                        -i -w ,-il          -l
                                                                          .lnL"l N  wa      1H.
* _-- "&#xfd;      ="            SALLE        LASALLE      CouNY STAI          tON, I          ___]E__            ENGINEERING              UNIT  1
_I_
MAP          R    PUMP ASSEMBY              ISI-GEL-1003 SYSTEM  _____IA
 
A  B  C  0 NMT      A. .L C. 0 ARE EQUALLY SPACED (W". 90. 1W. 2717 NO1TE LOCA7lON HXIA 0 H A 145 HX1B 0S    & 10 SER*ACE WATER INLET  UEREICE WAlER OUTLET LASAULE COUNlY STAllON INSERIVIE INSPECI1ON IRH-HX1A, 10 RHR HEAT EXCHANGERS
 
COMMONWEALTH EDISON COMPANY                                                                                      Page 20 of 22 Procedure No. NDT-C-30 Rev.                  2                                                                    December, 1993 ULTRASONIC TESTING DATA SHEET                  NDT-DS-C2A STATION/UNIT:        .ASA(It-      /I-                                                              PAGE:        /      OF PROCEDURE:    NDT                REV.            DATA SHEET NO.:                        /30            DATE:      :-10-fr CALIBRATION SHEET NO.(S)
ST. BEAM:        C-C) _3                  ANGLE BEAM: axial                C-03        5-      circ.        C_-C7_3_,_    _
COMPONENT INSPECTED SYSTEM:    _        '_                    WELD#:        6EL -I o      -A&          WELD TYPE:          T"      >
PIPE SIZE:        611              THICKNESS/SCHEDULE:                V. 75'            MATERIAL:          0-5 COMPONENT TEMPERATURE:                          -/6V      'F7A  3 SCAN GAIN CONTROL SETTINGS ANGLE BEAM AXIAL:                6 0.8id3 STRAIGHT BEAM: w*                  ./57                                                .f COUPLANT/
BATCH #:      LL.rArtL            3      ot ' 4 Q                        ANGLE BEAM CIRC.:          -e6.2oJ1 EXAMINATION SCANS Performed                    Indications YES      NO      NO                    YES
: 1) Base Metal Straight Beam                                  >
  / \  2)  Angle Beam-Normal-Against                Flow          >                ><
: 3)  Angle Beam-Normal-With Flow
: 4)  Angle Beam-Along Weld-CW
: 5) Angle Beam-Along Weld-CCW                                                    ><
L    6)  Straight Beam of Weld                                                      ><
0 W    7)  Thickness Across Weld & Base Metal                                              A//A              P/A          /A UP STRM          WELD          DN STR ADDITIONAL COMMENTS
                                      ~A PJ
                                      'S*            al      R (I-CcT
                                                                    -        S    IQ% - 30% XbRLL PART.AL            COVJ6r.A66-          C) N        ol      SC hv        'tue      1-ro    LP-7 OotoPir L        ATliho iJ.      L-)    _D.srAoj0(          p f    .f      Rva62o                  A&    LQ&Lb
                                  *St-    A tj 't      'IR~f ltCTS              'g*
ACt4WhOt(.
PRV1"vuL      Y'      ReoJ 61          OIL_ Z'J 1> 'CAToor-4          o'956Ryep, -Augwago% 8ecygTAA6L                    LtjvL EXAMINER:                                                            LEVEL:                      DATE:          /    9-REVIEWER:/                                                          LEVEL: JLLL-                DATE:      Z-/Y*,-
OTHER-:                      6?                                      LEVEL:    ZRT                DATE:______
STATION: c*~.J                    ~DATE:______
ANI I:                  -..                                          DATE:
 
GE Nuclear Energy Top Head to Flange Weld, GEL-1009- AG. (0&deg; to 1800)
Due to the Flange configuration the following coverage was achieved.
00          450        60      'Exam area 78.5%      97.4%      96.0%      Base Material 78.5%      78.5%    CW, Circ scans 78.5%      78.5%    CCW, Circ scans 100.0%      100.0%      Ax Up 46.6%        26.5%    Ax On 466%          26.5%    Ax Dn 78.5%      80.2%        75.9%    Totals Composite coverage = 78.2% due to the Flange.
Also, 166" of weld was limited to a 'W' of 5.5" due to OD machining. These areas are 32" at weld DM, 97" at weld DQ and 37" at weld DR. This limitation of 166" resulted in an additional 6.3% of the required volume not examined.
Total coverage achieved = 71.9%
Scale: Half REPORT NO.:
96    O DATE SMAD REVIEW *"DATE PAGE -    _ F        _
GE REVIEWED BY        LEVEL  DATE                UTILITY REVIEW fO&#xfd;  &#xfd;4= %*-&#xfd;..
 
COMMONWEALTH EDISON COMPANY                                                                                  Page 20 of 22 Procedure No. NDT-C-30 Rev.              2                                                                  December, 1993 ULTRASONIC TESTING DATA SHEET                NDT-DS-C2A STATION/UNIT:            LAS*1k,5  /i                                              "    *.        PAGE:        /      OF  /
PROCEDURE: NDT- C3O            REV.        _DATA SHEET NO.:                      -        /A 131      DATE:            -TEf CALIBRATION SHEET NO.(S)
ST. BEAM:    -*-/-"-                ANGLE BEAM:        axial        C-c36                  circ.      f-C3*
COMPONENT INSPECTED SYSTEM:        RV                    WELD 0:        C, (      -A                  WELD TYPE:            -rH PIPE SIZE:          A/16        THICKNESS/SCHEDULE:                    75"            MATERIAL:          CS COMPONENT TEMPERATURE:                    &deg;f    '/!5 9 783 SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:            IV                      ANGLE BEAM AXIAL:            ___-_          _.__J_
COUPLANT/
BATCH #:          LuLTIF  C,    C      0 cl '10*C t                  ANGLE BEAM CIRC.:                        0-c EXAMINATION SCANS Performed                      Indications YES          NO      NO                  YES
: 1)  Base Metal Straight Beam                                                ,V/A VI
    /  \  2)  Angle Beam-Normal-Against              Flow
: 3)  Angle Beam-Normal-With Flow                                                                          A,
: 4)  Angle Beam-Along Weld-CW                                .,
,          5) Angle Beam-Along Weld-CCW                o-F L    6)  Straight      Beam of Weld                                              M IA/I  _
0 W    7)  Thickness Across Weld & Base Metal                                          A//IA,/
A                          IV/h-UP STRM        WELD          DN STR ADDITIONAL COMMENTS
                                    '-;-  A OA4      d      ?.f 6 IC-TS        Iel % rO~oX                      I-oL PART-#AL          Co\16- A&6        0,.J
* SCA,,      "b      ,    o  FL    ,,pj&6 C 0r,4 C-i...-u kA -r t 0  J,            ~5 T-AN 'j 3D          cc-                          wT~-  L r A&LJL EXAMINER:- ,.0t*            0                                  LEVEL:      _          _      DATE:      ________
REVIEWER:                                                      LEVEL:__________                DATE:_______
OTHER:-                                                        LEVEL:DATE:
STATIONf&#xfd;                  C-.DAE ANI I:__________________                                      DATE:        tS
 
NDT-B-I Revision 6 December,    1993 Page 43 of 44 FORM NDT-B-l-F1 MAGNETIC PARTICLE EXAMINATION DATA SHEET DATE  2-/0 -76            STATION & UNIT      LaSalleUnitI              DATA SHEET #              1--/3_
EXAMINER    E.          rT      e-,                                        LEVEL    W7 SYSTEM    RPV                                                    coMPoNENT        GEL-1009-AG SECTION XI EDITION & ADDENDA            1989 Edition, No Addenda                CODE CLASS      I SECTION XI CATEGORY        B-A                                          ACCEPTANCE STD.        IWB-3510.3 PROCEDURE # & REVISION          NDT-B-I Rev. 6                  SKETCH SHEET USED: YES                    NO X COMM3ENTS:      Configuration: THD        &#xa3;-X ,fr/u    iJ    c9-/          0'    &-t-L.          L-/OQY-Ag MAGNETIC PARTICLE EXAM:
Manufacturer            Model/Type                      S/N Yoke                        ParKer                  ujuu*          PAA -AC HTv- t            Current AC X DC Particles                  Magnaflux                                    c 3 A 0 145            Color A'ED Black Light                  N/A                    N/A                      NIA B.L.M. Readings              N/A B.L.M. Time Checks              Initial            NIA                    Final              NIA EXAM RESULTS ACCEPT    X                                          REJECT REVIEWED BY:
EXAMINER:    i.                                            LEVEL:                        DATE:  2-ID- ?b REVIEWER:                                                  LEVEL:                        DATE:
OTHER:            .      L                                LEVEL:  ______              DATE:
33TATION:                      t                                                        DATE:
DATE:
37.0
 
COMMONWEALTH EDISON COMPANY                                                                                  Page 20 of 22 Procedure No. NDT-C-30 Rev.                        2                                                        December, 1993 ULTRASONIC TESTING DATA SHEET                  NDT-DS-C2A STATION/UNIT:                Ap._*Lt              '/                                              PAGE:        /      OF PROCEDURE:      NDT-        C-30 REV.            Z. DATA SHEET NO.:      _      _-    ___      DATE:        12_-_
CALIBRATION SHEET NO.(S)
ST. BEAM:        (f_-_040                      ANGLE BEAM: axial        C-'1/2/l                circ.      (f_-_/
COMPONENT INSPECTED SYSTEM:    _            /_______WELD                S/ML            /O      ,      WELD TYPE:    7W,,!:>
PIPE SIZE:      _      ____THICKNESS/SCHEDULE:                          4,              MATERIAL:        C COMPONENT TEMPERATURE:                      d.6.1 Po: #.5 -'    77?3 SCAN GAIN CONTROL              SETTINGS STRAIGHT BEAM: :Pc.              A/ 7-.0 /SANGLEBEAM                  AXIAL:            Al -le" COUPLANTI//&#xa3;          *      -    Z COPATBATCH.                                                                ANGLE BEAM CIRC.:_______
EXAMINATION        SCANS
                                                                        -Performed                  Indications YES        NO    NO              YES
: 1)  Base Metal Straight Beam                                    *
    / \    2)  Angle Beam-Normal-Against                    Flow
: 3)  Angle Beam-Normal-With Flow
: 4)  Angle Beam-Along Weld-CW
.(          5)  Angle Beam-Along Weld-CCW                                  V F
L    6)  Straight Beam of Weld 0
W    7)  Thickness Across Weld & Base Metal                                                        ^11S/4 UP STRM      WELD          DN STR ADDITIONAL COMMENTS EXAMINER: -                                                        LEVEL:                      DATE: _2
__2          -9_
REVIEWER:              *i        4          Z'*                  LEVEL:      _-Z-7          DATE:__________
OTHER:                                                              LEVEL:_____  -      o t-*  DATE:"    /
STATION.&#xfd;&#xfd;                                                          DATE:___________
ANI I:                                                k~    ~      DATE:      3-~~)-~
 
GE NuclearEnergy                                                                Weld # AL-`
Typical for welds, GEL-1009-DM, Data Sheet 96-146 & 147 and GEL-1009-DP Data Sheet 96-150 & 151 Due to the welded lifting lugs an area 6.5" x 24" was I
unavailable for inspection. Thisarea represents 35% of the required examination volume, however some coverage was obtained with the axial scans from the clockwise and counter clockwise side of the weld.
Area of Limitation I24" Composite coverage achieved = 77.2%
due to Welded Lug z
I                6.5"                                                                          /
I I  A1                                            KI  I 6.5"
                                                                          ,*\
WELD 3 I.5" Weld # AG I
REPORT NO.:
GE REVIEWED BY LEVEL    DATE I MI LEVEL~~~
rrv POIn II Tml
* lbWW
_r  ,
DATE
                                                                                        &#xfd;'
SMAD RQEWR EIWDT    40:4
_?/1-y/14 DATE 1USA 96-146 PAGE,2    OF:  2L fi~'Pb.f~  7Y&#xfd;-          L)7g        ,OMU MWRE &
 
COMMONWEALTH EDISON COMPANY                                                                                                Page 20 of 22 Procedure No. NDT-C-30 Rev.                    2                                                                          December, 1993 ULTRASONIC TESTING DATA S                    NDT-DS-C2A STATION/UNIT:              /.9sq      zz          //                                                          PAGE:          J      OF PROCEDURE:        NDT-&#xfd;_:30        REV.      2      DATA SHEET NO.:                    I_ //7                    DATE:        .2-/2-74 CALIBRATION SHEET NO.(S)
ST. BEAM:            101_4_                ANGLE BEAM:  axial      _    -_    _      __z          circ.        _      _____
COMPONENT INSPECTED SYSTEM:    _____                  ___WELD          0:  G~-/O        -/>"                WELD TYPE:          ________
PIPE SIZE:        __/_              THICKNESS/SCHEDULE:              447s"                  MATERIAL:                e COMPONENT TEMPERATURE:                  &    " 'z //15-472  3 SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:%/4                                    ANGLE BEAM AXIAL:
* 0 COUPLANT/                                                                              BN            R        ___,______
BATCH 0:          //1                                                      ANGLE BEo      AM      C1C.
EXAMINATION SCANS
                                                                    -'erformed                              Indications YES            NO        NO                        YES
: 1)  Base Metal Straight Beam
  / I\  2)  Angle Beam-Normal-Against Flow                                                        ,
: 3)  Angle Beam-Normal-With Flow                                  -                            __
: 4)  Angle Beam-Along Weld-CW                                                          .7
: 5)  Angle Beam-Along Weld-CCW                                                          .7 F
L    6)  Straight Beam of Weld 0
W    7)  Thickness Across Weld & Base Metal                                      V            g//*                -/        j  '/*
UP STRM              WELD.        DN STR ADDITIONAL COMMENTS i~'    c~4          c/  &s        73        ,,,    ,,r              A      ;.
EXAMINER:        _*          $*1 2i.1        .--              LEVEL:              Z                DATE:__________
REVIEWER:.                                                        LEVEL:-              _77              DATE:            2-2          4 OTHER:                                                            LEVEL:______                          DATE:_11;_________
STATION                        C.                                DA DATE:    &#xfd;      //o ANTI:                                                            DATE:        3
 
COMMONWEALTH EDISON COMPANY                                                                              Page 20 of 22 Procedure No. NDT-C-30              Rev. 2                                                            December, 1993 ULTRASONIC TESTING DATA SHEET              NDT-DS-C2A STATION/UNIT:          /3        '    c        //PAGE:                                                    /    OF      PROCEDURE: NDT-C-          3 REV. Z    DATA SHEET NO.:      fe-/,C)                  DATE: .2 -/2-9 CALIBRATION SHEET NO.(S)
ST. BEAM:      C-0          0            ANGLE BEAM:    axial      C-O"//                circ. _-_      __/          _
COMPONENT INSPECTED SYSTEM:      _    _            _    _WELD      #:        -/O'7-        )        ELD TYPE:
W'E-                7__ -,'D PIPE SIZE:          A,/4 -        THICKNESS/SCHEDULE:                        "      MATERIAL:    _
COMPONENT TEMPERATURE:                      04 #
                                            "-      XT-477-"3 SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:                    7. i'          ANGLE BEAM AXIAL:
* Ia.      4  c/(
COUPLANT/                                                        1 BATCH 0:        117AW          eI                    &#xfd;                ANGLE BEAM CIRC.:'A EXAMINATION        SCANS                                          "Pe romed                    Indications YES        NO      NO                  YES
: 1) Base Metal Straight Beam
  /I \    2)  Angle Beam-Normal-Against              Flow                            /
: 3)  Angle Beam-Normal-With Flow                                            /
: 4)  Angle Beam-Along Weld-CW
: 5)  Angle Beam-Along Weld-CCW                          V F
0 L    6)  Straight Beam of Weld                              b.,
W      7)  Thickness Across Weld & Base Metal                                        ///9-  f    )/#          ,//4 UP STRM        WELD          DN STR ADDITIONAL COMMENTS EX              A    M      I    NER:Re'I.                  LEVEL:_                        DATE:____/2_              _*_
REVIEWER:                                                      EL                            AE OTHER:                                                        LEVEL:                        DATE:    ~-/7 STATIO 10    i            (.                                DATE: ?___________
ANII:            (~4j'V~"DATE:
 
S
                                                                                            .- w                  ___    .
GE Nuclear Energy Typical for welds, GEL-1009-DM, Data Sheet 96-146 & 147 Weld # AL"'
10" t
and GEL-1009-DP Data Sheet 96-150 & 151 Due to the welded lifting lugs an area 6.5" x 24" was unavailable for Inspection. This-area represents 35% of            !'
the required examination volume, however some coverage was obtained with the axial scans from the 24 clockwise and counter clockwise side of the weld.
Area of Limitation Composite coverage achieved = 77.2%                                        due to Welded Lug 6.5" 34.5" Weld # AG m                      -
REPORT NO.:
GE REVIEWED BY      LEVEL    DATE czZ~          z'4~:
UTILITY REVIEW  DATE                    SMAD REVIEW        DATE PAGE: 2 S96.15a (oF 2
                                                                                          '4 qlL                  &#xfd;K 0  -&#xfd; _'-_( 0      r~Mt.* -  -*
 
COMMONWEALTH EDISON COMPANY                                                                            Page 20 of 22 Procedure No. NDT-C-30 Rev. 2                                                                          December, 1993 I          I        I ULTRASONIC TESTING DATA SHEET          NDT-DS-C2A STATION/UNIT:          / 4 Y4/          -                                                  PAGE:      _          OF    /
PROCEDURE: NDT-e-30          REV. 2-    DATA SHEET NO.:              1 /5-' 5            DATE:          .2-/Z-9tC CALIBRATION SHEET NO. (8)
ST. SEAM:  __          _  _      ANGLE BEAM: axial      _        -_____              circ. __________-
COMPONENT INSPECTED SYSTEM:          PRPI              WELD 0:                      L) 1*-)/?7-WELD      TYPE:      7 PIPE SIZE:        A/_/_. THICKNESS/SCHEDULE7                .1      "6
                                                                          '        MATERIAL:        C5 COMPONENT TEMPERATURE:            .4 0Fr    .C    /4    .3 SCAN GAIN CONTROL SETTINGS STRAIGHT SEAM:              44'ANGLE                      B3EAM AXIAL:          d3. L)
COUPLANT/,
BATCH #:'.~-
                                            ~ANGLE I              BEAM CIRC.:        ~        .'d EXANINALTION      SCANS                                    EOPerfozrme Indications YES        NO        NO                  YES
: 1)  Base Metal Straight Beam
  / I\  2)  Angle Beam-Normal-Against Flow                    .
: 3)  Angle Beam-Normal-With Flow
: 4) Angle Beam-Along Weld-CW
: 5)  Angle Beam-Along Weld-CCW F
L 0W    6) Straight Beam of Weld
: 7) Thickness Across Weld & Base Metal                        a            A//*a-  I  #//*
UP STRM      WELD              DN STR ADDITIONAL COMMENTS EXAMINER:                                                LEVEL:          7              DATE:              1-/2-94.
REVIEWER:                                                LEVEL:        -777-            DATE:                -i-/    .
OTHER:      74      ~      6  L      d      (LEVEL:                          Z        DATE:_____
STATIOq!.                6                              DATE:
ANII:                                            -      DATE:      3-          9.
 
COMMONWEALTH EDISON COMPANY                                                                              Page 20 of 22 Procedure No. NDT-C-30 Rev.            2                                                                  December, 1993 ULTRASONIC TESTING DATA SHEET            NDT-DS-C2A STATION/UNIT:        !ASA/iE      /1                                                    PAGE:              /      OF PROCEDURE: NDT-Cq              REV. 2    DATA SHEET NO.:      _        -    _    _        DATE:          2- Z/- %
CALIBRATION SHEET NO.(S)
ST. BEAM:      (  -Q 73            ANGLE BEAM:  axial    __      -_______          circ. __-______/
COMPONENT INSPECTED SYSTEM:    -A  tPV                WELD #-: LCS--'4f"                      WELD TYPE:FANrr                    o*$E55"r4.
r,0 PIPE SIZE:        N.IA          THICKNESS/SCHEDULE:      -7.          ..        MATERIAL:        CS COMPONENT TEMPERATURE:          8'  f    i  .15fOO7 SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:        , f_2.aWW8              ANGLE BEAM AXIAL:            ir  5-7. y COUPLANTT                                                  -] ANGLE BEAM CIRC.: ."                    ,/ O'R EXAMINATION SCANS Performed                      Indications YES            NO    NO                  YES
: 1) Base Metal Straight Beam                          V                V
  /I\  2)  Angle Beam-Normal-Against          Flow          v                    v
: 3)  Angle Beam-Normal-With Flow                      -4                                N
: 4)  Angle Beam-Along Weld-CW                                                            X4
: 5)  Angle Beam-Along Weld-CCW                        v/
L    6)  Straight    Beam of Weld                                            v                    ....
0 W    7) Thickness Across Weld & Base Metal                                    v/1AV/A                        I/A UP STRM          WELD              DN STR ADDITIONAL COMMENTS
                        'i-7CAAI    Wei      "'FLFC7= JOt                          A144P
                                                                                                                            '.4)
No      ELtrAM      PER.ef*7R      *:,                "      7c"4
                                                                        - 0..      /Off*-      Z,/0' 009 To EME                          -LEVEL:
* DATE:      2 L.2 REVIEWER:                                              LEVEL:                          DATE:                4    -,94 OTHERLEVEL:                                                                              DATE:_                _      _
LANII:
STATION:
              -h 6.
                            .z DATE:____________
DATE:
 
GE NuclearEnergy Vessel to Flange Weld, GEL-1009-AF. Exam performed for 360&deg; Due to the Flange configuration the following coverage was achieved.
0&deg;      450        600    Exam area 54.5% 75.0%          65.4%  Base Material 54.5%      54.5%  CW Circ. scans 54.5%      54.5%  CCW Circ. scans 100.0% 100I0%        Ax Down o1no/.      0f1n. Av fin
                                            .5% 56.8%      U!9%    Total        Composite coverage = 55.4%
                                                                                                                                  /
INz I                                                              Scale: Half REPORT NO.:
WWz&---
GE REVIEWED BY
                  -zzz:- J-27--d)4 LEVEL  DATE                  UTILITY REVIEW          DATE                SVM REVIEW        DATE    PAGE:-- 2 OF: 2 GE~~~~~~~
DAT                          REiE            LEE ~16            SMAD&#xfd;Rr
                                                                                          ,EIEE            kBY    ,TLT  AE          aEIWDT
 
COMMONWEALTH EDISON COMPANY                                                                              Page 20 of 22 Procedure No. NDT-C-30 Rev.                  2                                                            December, 1993 ULTRASONIC TESTING DATA sHET              NDT-DS-C2A STATION/UNIT:          LAAI5  I....  /A                                                    PAGE:            /    OF PROCEDURE: NDT- fQ                REV.            DATA SHEET NO.:      19_-_.2_"__l              DATE:          11-9a CALIBRATION SHEET NO.(S)
ST. BEAM:            A/I                ANGLE BEAM: axial            C)    ?5          circ.            -c7-COMPONENT INSPECTED SYSTEM:        9PV                      WELD 0:    L-CS---AF                  WELD TYPE:    _      __e-_      _    /
PIPE SIZE:          AKIA            THICKNESS/SCHEDULE:        7                  MATERIAL:        CS COMPONENT TEMPERATURE:              )          0  15 5007 SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:              IV/A                  ANGLE BEAM AXIAL:                7 -i COUPLANT/
BOPANTCH0    _tL1RAGrft-tI2' * "A'        3.2 ,s                    ANGLE BEAM CIRC.:        ~
EXAMINATION SCAMS Performed                  Indications YES        NO    NO                YES
: 1) Base Metal Straight Beam.'                                              //
      \    2)  Angle Beam-Normal-Against              Flow
: 3)  Angle Beam-Normal-With Flow                                              A/      /a
: 4) Angle Beam-Along Weld-CW                                                                      AA
(    F      5)  Angle Beam-Along Weld-CCW                                              V L    6)  Straight      Beam of Weld                            -              NIA 0
W    7)  Thickness Across Weld & Base Metal                                      A1/1A        g//          A//A UP STRM        WELD          ON STR ADDITIONAL COMMENTS
                                        *5CAF4            R6FL6CYS_          /06~
A)t      6XAM'        26& ORM67\d              fO 6, r0:        AT-c            io5    '        t~
L .A&          LcP,    "r--1      3,      F3Ro,-"        LT-      T-oe, EXAMINER:                                                    LEVEL: .. LLL-            DATE:          2/4 REVIEWER:-                                                    LEVEL: -B-                  DATE:    .? 7 OTHER:                                                        LEVEL:    -. Z,.            DATE:__        _____
STATION:        IDATE:                                                        2i ANII:    +,._..,;_-._,/                                  __DATE:      -'+i*"7
 
COMMONWEALTH EDISON COMPANY                                                                                                            Page 20 of 22 Procedure No. NDT-C-30                      Rev. 2                                                                                    December, 199 ULTRASONIC TESTING DATA SHEET                            NDT-DS-C2A STATION/UNIT:            L-ASALL_- /I                                                                                        PAGE:              OF PROCEDURE:          NDT-    C_-._7,      REV.        .      DATA SHEET NO.:              96-/5a                              DATE:
CALIBRATION SHEET NO.(S)
ST. BEAM:      _      _-_                        ANGLE      BEAM:  axial                      W4 q        _        circ.        C-      L414 COMPONENT INSPECTED SYSTEM:              ARR                          WELD o: LCS-I- MIR                                    WELD TYPE:                A-'Sh PIPE SIZE:              Aq"                THICKNESS/SCHEDULE:                  4,.J""MATERIAL:                                        (LS COMPONENT TEMPERATURE:                                  :80 SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:                          ,t)td*                    ANGLE BEAM AXIAL:                        (3,0)4B COUPLANT/
BATCH        :      ULTPA          EL    L.-/91wa,.                                  ANGLE BEAM CIRC.:                            .45od EXAMINATION SCANS                                                                    Performed                                Indications YES              NO      NO                      YES
: 1)    Base Metal        Straight          Beam                                    _..._  --
  /    \ 2) Angle Beam-Normal-Against Flow                                                                    -
: 3)    Angle Beam-Normal-With Flow
: 4)    Angle Beam-Along Weld-CW
                                                                                                              .7'      ____
: 5)    Angle Beam-Along Weld-CCW FL    6)    Straight Beam of Weld 0
W      7)    Thickness      Across Weld              & Base Metal                          /              '/A                              /
UP STRM            WELD          DN STR ADDITIONAL COMMENTS
      ?Ea P-CM,4/"      E-1J) 4_:XAW*-                      2  0        S A/ta e-XAM          PtcUPOMEIJ&#xfd; OW\ )4O2Z-Lf -SIl(e oF:                      IA.39L6LLbU                7TC,    )4Xf          Cc43PL(Ak1-zoM.
AU                      &#xfd;-    A'    /ao                75-~ .2
                                                                ?  W P,~,.                            7&#xfd;  1                      2IeW A,le    7~
EXAMINER:              ,LEVEL:                                                                                          DATE:              --
REVIEWER:                                                                    LEVEL:              /                    DATE:____________
OTHER:                                                                        LEVEL:
* DATE:    _3_________
            'STATION:            6DATE                                                :_
ANII:                                                                        DATE
 
GE NuclearEnergy Typical for Welds LCS-1-NiA, Data Sheets 96-152 & 153 and LCS-1-NIB, Data Sheets 96-154 & 155.
Due to the configuration of the nozzle no exams were performed from the nozzle side. This limits the coverage achieved to:
0&deg; = 56.25%
450 = 60.75%
60&deg; = 58.81%
Coverage due to nozzle = 58.6%
Weld LCS-1-NIA was also limited at 180&deg; due to a 3.25" thermocouple located 2.5" from weld toe. This results In an additional .66% coverage not achieved.
Total composite coverage for LCS-1-NIA = 57.94%
N                                I REPORT NO.:
                                                                                                                      -9U    GE REVIEWED BY      LEVEL    DATE                UTILITY REVIEWDATE              SMAD REVIEW            DATE PAGE:--  OF 2 A , I #-  '-- I I- - " -*I'-' " - --
 
COMMONWEALTH EDISON COMPANY                                                                                              Page 20 of 22 Procedure No.          NDT-C-30            Rev. 2                                                                    December, 1993 ULTRASONIC TESTING DATA SHEET                      NDT-DS-C2A STATION/UNIT:            Zf 1,91-t    Lt/                                                                    PAGE:          (      OF    /
PROCEDURE:        NDT-                REV. 7-          DATA SHEET NO.:                      - /53            DATE:        2-/*
CALIBRATION SHEET NO.(S)
ST. BEAM:    _        _/_      _            ANGLE    BEAM:  axial              C-
* circ. _      -___        _-
COMPONENT INSPECTED SYSTEM:          114                            WELD #: ICS-/-                A/IA          WELD TYPE:        N-S PIPE SIZE:          2'l    1            THICKNESS/SCHEDULE:                e.q5"                MATERIAL:      C 5 COMPONENT TEMPERATURE:                            I SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:                AAANGLE                                  BEAM AXIAL:
BATCH 0:
COUPLANT/                  -L7/    ItM        -r5325-                              ANGLE BEAM CIRC.,        .C/o          d EXAMINATION SCANS Performed                    Indications YES      NO        NO                YES
: 1)  Base Metal Straight Beam                                                  V1
  / J\    2)  Angle Beam-Normal-Against                    Flow                        V
: 3)  Angle Beam-Normal-With                    Flow                    7
: 4)  Angle Beam-Along Weld-CW                                          V/        ,            _
: 5)  Angle Beam-Along Weld-CCW                                          V                  V F
L    6)  Straight Beam of Weld                                                      V 0
W    7)  Thickness Across Weld & Base Metal                                                      AI        IV A              AI A UP STRM        WELD          DN STR ADDITIONAL COMMENTS A/D 15                      0105,    0 VA/  #VOZZ.AL15,)    45~~~
0U    (4je  t          'V'    &07L4      Covla yaoi,'
  'vc'  e-6~9N ,06JFo?r-?zQV9          .OE    7Tb    3.25    *Pip~rL'A          -rV&A  ~co(A ipcs        /Ocqrs&'        z. 5'
  )rkyAo"    NJO        roc          Air-    go"'
EXAMINER:                        ca_        l            -LEVEL:                        .        ~        DATE:_______
REVIEWER:            Waec                                              LEVEL:-~                          DATE:      2-7        5e OHR                  DLEVEL:                                                            DATE:      /2~':;    Ayr-STATION                        6DATE:______
ANII:                                                                  DATE:.j3c
 
COMMONWEALTH EDISON COMPANY                                                                            Page 20 of 22 Procedure No. NDT-C-30          Rev. 2                                                            December, 199*
ULTRASONIC TESTING DATA SHEET              NDT-DS-C2A STATION/UNIT:        4A 5QLLL      1                                                    PAGE:              OF  _
PROCEDURE:    NDT-          REV. c_*    DATA SHEET NO.:          96-)541                DATE:      &#xfd;-jS-j CALIBRATION SHEET NO.(S)
ST. BEAM:        c__q3              ANGLE BEAM:      axial                          circ.      C-0q4 COMPONENT INSPECTED SYSTEM:    __                      WELD    #:    LCS-1-AItA                WELD TYPE:      ,/-S PIPE SIZE:        2jj          THICKNESS/SCHEDULE:            *,IS'              MATERIAL:
COMPONENT TEMPERATURE:        ___          sq_
SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:      _          . _          ANGLE BEAM AXIAL:        _        (o______dis COUPLANT/
BATCH #:        L.TZAG&e---. :.2/      9.53a5                    ANGLE BEAM CIRC.:        _    _,____
EXAMINATION      SCANS                                          Performed                  Indications YES        NO    NO                YES
: 1) Base Metal Straight Beam
  / \    2)  Angle Beam-Normal-Against            Flow                    /
: 3)  Angle Beam-Normal-With Flow                                          VA
: 4)  Angle Beam-Along Weld-CW F
: 5)  Angle Beam-Along Weld-CCW                                            7                        _
L    6)  Straight Beam of Weld                                    ___
W    7)  Thickness Across Weld & Base Metal                                    As/A          Ad/eq          /
UP STRM      WELD          DN STR]
ADDITIONAL COMMENTS
    ?P-EoLpEt        E4PtYrM  WadT      0 0 L I g4SOS NO1  fj~o    PP~eFo(4flit) OM A102-2--&            510t  OP Ucfk1iS DLLI, TO        PJOZZLE      Co(.)F16LkATi M.
EXAMI14ER: 2*LEVEL:______                                                                DATE:_______
REVIEWER:___                                                LEVEL:_                    DATE:
OTHER:                                                      LEVEL:                      DATE:__
S T ATIO0N:A                                                DATE:_______
ANII:                                                        DATE:
 
GE Nuclear Energy Typical for Welds LCS-1-N1A, Data Sheets 96-152 & 153 and LCS-1-NIB, Data Sheets 96-154 & 155.
Due to the configuration of the nozzle no exams were performed from the nozzle side. This limits the coverage achieved to:
0 = 56.25%
450 = 60.75%
600 = 58.81%
Total composite coverage = 58.6%
k
                                                                                                              /
REPORT NO.:
i 54-LEVEL  DATE Y4,                                      I GE REVIEWED BY                                    UTILTY REVIEW ;&#xfd;/eE-          SMAD REVIEW DATE PAGE:--2    OF ANL,
 
COMMONWEALTH EDISON COMPANY                                                                                  Page 20 of 22 Procedure No. NDT-C-30 Rev.                2                                                                December, 199.
ULTRASONIC TESTING DATA SHEET                  NDT-DS-C2A STATION/UNIT:        4A    I.PLLAS  /(L4ilT-                                                      PAGE:                  OF PROCEDURE: NDT-                REV. a      DATA SHEET NO.:                                      DATE:      76-/155
_-/_"____
CALIBRATION SHEET NO.(S)
ST. BEAM:      tv/A/                    ANGLE BEAM:    axial    _-______circ.                          (-0145 COMPONENT INSPECTED SYSTEM:    IM                          WELD 0:      LC5-    I-AiIf                  WELD TYPE:    A/-_              _    _
PIPE SIZE:      2              THICKNESS/SCHEDULE:            S'/5                      MATERIAL:      (l COMPONENT TEMPERATURE:            75&deg;            /
SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:                AiA                      ANGLE BEAM AXIAL:            6-5    J'4 couPLANT/
BATCH 0:                    TT5_*7_                                AN ANGLE      BEAM CIRC.:        5 ,1bJ EXAMINATION SCANS, Performed                        Indications YES            NO      NO                YES
: 1) Base Metal Straight            Beam                      --
: 2)  Angle Beam-Normal-Against              Flow                          V/
: 3)  Angle Beam-Normal-With              Flow                              -        w
: 4)  Angle Beam-Along Weld-CW                              V                      v
: 5)  Angle Beam-Along Weld-CCW                              '7                    V F
L    6)  Straight Beam of Weld                                                '7 0W    7)  Thickness Across Weld & Base Metal                                    V/
UP STRM      WELD            DN STR ADDITIONAL COMMENTS NO 60rt-l*    P*E~j41H    C1-2RopJ      A*'?ZL*r      S)DE    or--      w,-1-9        VVtE  7"0 A.1O*ZCLC          C,.*e#C-EXAMINER:                            _LEVEL:___                                  ________DATE:        Z/5/7 REVIEWER:                        ,LEVEL                            ,              , ,,      DATE:
OTHER:-                                                      LEVEL:      7Z?"                DATE:_          ____
STATION                  KDATE:_______
ANI I:  C  )jlS1-\DATE:                                                    Z
 
COMMONWEALTH EDISON COMPANY                                                                            Page 20 of 22 Procedure No. NDT-C-30 Rev.            2                                                              December, 1993 ULTRASONIC TESTING DATA SHEET            NDT-DS-C2A STATION/UNIT:        LASALL        /1                                                      PAGE:          I      OF PROCEDURE:    NDT-          REV. _      DATA SHEET NO.:      _    _16d --                  DATE:    _-__-__
CALIBRATION SHEET NO.(S)
ST. BEAM:      C2-o*C,            ANGLE BEAM:    axial            - 051                circ.      C--051 COMPONENT    INSPECTED SYSTEM:            /WS              ELD  i: LCS -I- A3A                    WELD TYPE:              /iS PIPE SIZE:          .2(o      THICKNESS/SCHEDULE:            .                  MATERIAL:          CS COMPONENT TEMPERATURE:                *I0* qa1 SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:          Soqds                ANGLE BEAM AXIAL:                      5.
COUPLANT/
BATCH #:      ULTUAGEL            9x53as                      ANGLE BEAM CIRC.                    _      _      __
EXAMINATION      SCANS                                  -
Performed                        Indications YES            NO    NO                YES 1 ) Base Metal Straight Beam
  / \  2)  Angle Beam-Normal-Against        Flow                                  -
: 3)  Angle Beam-Normal-With Flow
: 4)  Angle Beam-Along Weld-CW`                                            V    __
: 5)  Angle Beam-Along Weld-CCW L    6)  Straight Beam of Weld W    7) Thickness Across Weld & Base Metal                          V/          -V/      A                    'VIA UP STRM        WELD            DN STR ADDITIONAL COMMENTS 1M&SIcuS4-)                    J    MDLSLL Ab .
rw            i    GIM          -4LOU&J
                                                                        "        ,.      pC.c*.cRLF.          /..      -LS..
  )4o OZZI&#x17d;LE~ SIM~ blP W1ELLS                fci-yupjIKt        bu          To      NC&#x17d;zzLL    C~ICbA.'-GLp'Tier.-
EXAMINER:_*          _____LEVEL:                                    ____                  DATE:-      2-3-96 REVIEWER:__                                              LEVEL:                _          DATE:    /I      .
oLHER:-'7-"                                                EVEL:
* DATE:______
STATION:        ____                                    DATE:    9 -Ye. -
ANII:    *~'--~,DATE:_____
 
SGE            NuclearEnergy Typical for Welds: LCS-1-N3A, Data Sheets 96-162 & 163 LCS-1-N3B, Data Sheets 96-164 & 165 LCS-1-N3C, Data Sheets 96-166 & 167 LCS-1-N3D, Data Sheets 96-168 & 169 Due to the configuration of the nozzle no exams were performed from the nozzle side. This limits the coverage achieved to:
            .0&deg;= 57.85%
450 = 61.60%
600 = 60.40%
Total composite coverage = 59.95%
                                                                                                    /
REPORT NO.:
1;
                                                  &#xfd;-, / , e--)-
UTILITY REVIEW DATE            DATE PAGE: 2    OF:    2 GE REVIEWED BY      LEVEL    DATE                                    SMAD REVIEW
                                                                            -.    ~              FORMUT,02REV.8
 
COMMONWEALTH EDISON COMPANY                                                                              Page 20 of 22 Procedure No. UDT-C-30 Rev. 2                                                                            December, 1993 ULTRASONIC TESTING DATA SKE                NDT-DS-C2A STATION/UNIT:      I^ L4LL//                                                                    PAGE:          I OF  /
PROCEDURE: NDT- C-3_b          REV. -Z      DATA SHEET NO.:                -/.3  e              DATE:      2___/_-  _
CALIBRATION SHEET NO.(S)
ST. BEA*:  A/l                        ANGLE DEAM: axial          C      0,--              circ. _      -0_-._. _
COMPONENT INSPECTED SYSTEM:    MS                          WELD#:    LCS-f- A3A                  WELD TYPE:          N5 PIPE SIZE:      2                THICKNESS/SCHEDULE:        7.0"                  MATERIAL:        C-5 COMPONENT TEMPERATURE:            YqI    /Lj2 SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:              IVA4                  ANGLE BEAM AXIAL:
COUPLANT//
BATCH #:  (* LrA"    L zr        _f,'                      j ANGLE BEAM CIRC.:
EXAMINATION SCANS Perforued                          Indications YES          NO        NO                  YES
: 1) Base Metal Straight Beam                                        V
  / \  2)  Angle Beam-Normal-Against Flow
: 3)  Angle Beam-Normal-With Flow                                              .,
: 4) Angle Beam-Along Weld-CW                          -__"_,/
F
: 5)  Angle Beam-Along Weld-CCW                          V                    V      _
L    6)  Straight Beam of Weld                                                          _-
0 W    7)  Thickness Across Weld & Base Metal                                          A.,      I    V,          ?VA UP STRM        WELD        DN STR ADDITIONAL COMMENTS A4?IsOvgrVeDx    EXM          Airi    60'S 1V0 A/Q5ZZ((5    Sjbo            f o.Ae'-b    ~'j              u606 -10 A1-07Z(6'              eCo11(4v1,24r~
EXAMINER:            '                                  LEVEL:                  :        DATE:    "      ;-
REVIEWER:                                                LEVEL:        z=.-                DATE:      -1 ?
OTHER:                    5)    J    #4tLEVEL:                      ________              DATE:    .3104 AF STAT ION:                                                DATE:        9,4/
ANII:  **>            ----------                        DATE:    -z-  -' f
 
COMMONWEALTH EDISON COMPANY                                                                                        Page 20 of 22 Procedure No. NDT-C-30 Rev.                        2                                                              December, 1993 ULTRASONIC TESTING DATA SHEET              NDT-DS-C2A STATION/UNIT:                  L-RSALLU.-            1 I                                                PAGE:      J        OF PROCEDURE:          NDT-        C.-3. REV. _        DATA SHEET NO.:        96- /6!]                    DATE:      .--      9, CALIBRATION SHEET NO.(S)
ST. BEAM:            C-__SO                  ANGLE BEAM:    axial        C.-CSJ                circ.        C-CS COMPONENT INSPECTED SYSTEM:              MS                      WELD #:      LCS Ml?                  WELD TYPE:            AJS PIPE SIZE:          __(Ito              THICKNESS/SCHEDULE:            '.0"              MATERIAL:              C  S COMPONENT TEMPERATURE:                    M40      *154 JI SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:                                        ANGLE BEAM AXIAL:            _          _o COUPLANT/
BATCH 1:            JLTRAC              XL-17,      5                    ANGLE BEAM CIRC.:                  50 EXAMINATION SCANS Performed                      Indications YES        NO      NO                  YES
: 1) Base Metal Straight Beam                                                      V
      \  2)  Angle Beam-Normal-Against                  Flow                              -
: 3)  Angle Beam-Normal-With Flow                              /    */
: 4)  Angle Beam-Along Weld-CW                                    V/
F*    5)  Angle Beam-Along Weld-CCW                                  V/
L      6)  Straight          Beam of Weld Ow    7) Thickness Across Weld & Base Metal                                    /V./1      ^/1                          A/
UP STRH          WELD          DN STR ADDITIONAL          COMMENTS WIZVEMED                  &#xa3;X~Arw, 1Airr1A  O'L    4L Im'DcSJ~TIaj              Cl0a1EI&#xfd;Q    JAI M10 WAPLL Rtericpi          M- C-Qu-3    i        OpQALf.. L90eULLS.
A/fJAJO22.ta -Si                  OF: LI~m.      FLr~m_      b~f    -Th 1.Jc2ZLL              oF&..T EXAMINER:            .        ,LEVEL:                                          -                    DATE:_______
REVIEWER:                                                            LEVEL:                    j    DATE:      4,2 - /9  "
OTHER:                              e                                LEVEL:                          DATE:      ./3-4        '/'
STATION:                                          -;                DATE:_        ___
ANII:        -                        -                            DATE:
 
oGE          NuclearEnergy Typical for Welds: LCS-1-N3A, Data Sheets 96-162 & 163 LCS-I-N3B, Data Sheets 96-164 & 165 LCS-1-N3C, Data Sheets 96-166 & 167 LCS-1-N3D, Data Sheets 96-168 & 169 Due to the configuration of the nozzle no exams were performed from the nozzle side. This limits the coverage achieved to:
00 = 57.85%
450 = 61.60%
60&deg; = 60.40%
Total composite coverage = 59.95%
K REPORT NO.:
IXz GE REVIEWED BY ee 22w?
LEVEL Ae 2.2Y DATE                ,UTILITY REVIEW    DATE              EVIEWDATE SMAD      PAGE: 2 OF: 2 UliLITY~~OR REVIE SMDRVIWDT                REV.
 
COMMONWEALTH EDISON COMPANY                                                                                                Page 20 of 22 Procedure No. NDT-C-30 Rev.                    2                                                                            December, 1993 ULTRASONIC TESTING DATA SKEET                    NDT-DS-C2A STATION/UNIT: Li              SItltl/-                                                                            PAGE:        (  OF /
PROCEDURE: NDT-            -__o      REV. 2-      DATA SHEET NO.:                  9_i'_        __/6            DATE:    2-/3-7 CALIBRATION SHEET NO.(S)
ST. BEAM:      A/k                        ANGLE BEAM:        axial        Cf-0-2                        circ. _    __f  -    _
COMPONENT INSPECTED SYSTEM:      M      S                      WELD    0:  LC 5-      I-bA36                      WELD TYPE:        A)
PIPE SIZE:            26              THICKNESS/SCHEDULE:                  T0                        MATERIAL:        CS COMPONENT TEMPERATURE:                  yq9    IS/yZ)
SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:            At'4                          ANGLE BEAM AXIAL:                          (*3    I BATCH 0:      iii    jr/bd(.        ZL    T5 z5                            ANGLE BEAM CIRC.:
EXAMINATION SCANS Performed                            Indications YES            NO        NO                  YES
: 1) Base Metal Straight Beam
  / \  2)  Angle Beam-Normal-Against                  Flow
: 3)  Angle Beam-Normal-With Flow
: 4)  Angle Beam-Along Weld-CW                                        /
: 5) Angle Beam-Along Weld-CCW                                        V1                      V/
F L    6)  Straight Beam of Weld                                                        V 0
W    7)  Thickness Across Weld & Base Metal UP STRM          WELD      DN STR ADDITIONAL COMMENTS INDIC%*TIOS              08        gfVEp  IN
                                              /V      fID L41LL          AKf-q4              8t%
RFCorV1%15Le              Lc-%JC-LS Afo Ao1zLz5"S1"6, of p,*,e"..                        5A"1,,jeA              bug'          -m      yozzC.          Co,v"1j"u1      ,o,1.
EXAMINER:                                                              LEVEL:_                    _          DATE:        2" 3-qc(,
REVIEWER:                                                              LEVEL:          .                    DATE: ______-______
OTHER:/            Z/-%7          &'                                    LEVEL:_                    _          DATE:      310*/*i6'6 STATION:
* DATE:        c/?i ANII:      -                        ===-                              DATE:    -.-            '
 
COMMONWEALTH EDISON COMPANY                                                                        Page 20 of 22 Procedure No. NDT-C-30 Rev.            2                                                        December, 1993 ULTRASONIC TESTING DATA SHEET          NDT-DS-C2A STATION/UNIT:            L1SALU          J1                                            PAGE:    1    OF PROCEDURE:    NDT-    C-__  REV. _.      DATA SHEET NO.:      q6_16- /DATE:                      -1 /q-96 CALIBRATION SHEET NO.(S)
ST. BEAM:        C-    OS3          ANGLE BEAM:    axial      Cd0514              circ. C-os(
COMPONENT INSPECTED SYSTEM:            /)7s              WELD #:    L*S-I-A      C            WELD TYPE:          )S PIPE SIZE:          _26        THICKNESS/SCHEDULE:          7.0 I            MATERIAL:          CS COMPONENT TEMPERATURE:          9qF-1qqA SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:              6p.                ANGLE BEAM AXIAL:                56. S COUPLANT/                                                        AC                    .:      5 9-0 BATCH #:      (JLTiZAGELP_,        S3_                        ANGLE BEAM CIRC.:              59,o EXAMINATION SCANS Performed                    Indications YES        NO    NO                YES Y          N        O
: 1)  Base Metal Straight Beam
  / \  2)  Angle Beam-Normal-Against            Flow                          -
: 3)  Angle Beam-Normal-With Flow
: 4)  Angle Beam-Along Weld-CW
: 5)  Angle Beam-Along        Weld-CCW                                  V/1 F
L    6)  Straight Beam of Weld                            V.,
0 W    7)  Thickness Across Weld & Base Metal                        /          .VA/      I A'/      I  /I UP STRM        WELD      DN STR ADDITIONAL COMMENTS OMoEE          EXAM~I  W3TRk LL      4  4' A10'A101zL&      SIDE 6FLaELC OF    ftyXM      LMOLF  TO      oA1Q-7Lq_      CaGfIE-%~AL-rtQ0-'~
EXAMINER:                                                LEVEL: -                      DATE:________
OTHER:                                                    LEVEL:..                      DATE:
OTE:A)LEVEL:                                                            DATE:_    _____
STATION                --                                DATE: ______/____
ANII:      =::          "                                DATE:    &#xfd;&#xfd;- ! -1 (
 
SGE            Nuclear Energy Typical for Welds: LCS-1-N3A, Data Sheets 96-162 & 163 LCS-1-N3B, Data Sheets 96-164 & 165, LCS-1-N3C, Data Sheets 96-166 & 167 LCS-1-N3D, Data Sheets 96-168 & 169 Due to the configuration of the nozzle no exams were performed from the nozzle side. This limits the coverage achieved to:
00 = 57.85%
450 = 61.60%
600 = 60.40%
Total composite coverage = 59.95%
REPORT NO.:
DATE                  PAGE: 2    OF:    2 GE REVIEWED BY      LEVEL    DATE                UTILIY REVIEW      SMAD REVIEW DATE FORMUTrYR1v,
 
COMMONWEALTH EDISON COMPANY                                                                      Page 20 of 22 Procedure No. NDT-C-30 Rev. 2                                                                    December, 1993 ULTRASONIC TESTING DATA SHEET1            DT-DS-C2A STATION/UNIT: L N LyLLE            J                                                  PAGE:        /  OF  /
PROCEDURE: NDT-C-30_          REV. 2. DATA SHEET NO.:    __    -_/    _7      DATE:        1 2-/&#xa5;"  C.
CALIBRATION SHEET NO.(S)
ST. BEAM:    A,                      ANGLE BEAM: axial          C      0-,        circ.      C-  -
COMPONENT INSPECTED SYSTEM:      P1 5                    WELD #:    LCS"-
bAl/3 C              WELD TYPE:    NS PIPE SIZE:    _____,          THICKNESS/SCHEDULE:          7.0"            MATERIAL:      C5 COMPONENT TEMPERATURE:            *c    l    wS*21 SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:t                                  ANGLE BEAM AXIAL:                    C/X BATCH N:      i)rA 4 Q 6-5*                  2-
                                            ;7_                  ANGLE BEAM CIRC.:,4 EXAMINATION SCANS Performed                Indications YES      No    no                YES
: 1) Base Metal Straight Beam
  / \  2)  Angle Beam-Normal-Against            Flow
: 3)  Angle Beam-Normal-With Flow                                      Ve
: 4)  Angle Beam-Along Weld-CW                                          V,
: 5)  Angle Beam-Along Weld-CCW                                        V L    6)  Straight Beam of Weld W    7)  Thickness Across Weld & Base Metal                          V/                ilN% k.      r' UP STEM      WELD        DN STR ADDITIONAL COMMENTS
        )c 4 ds epA-A,            t XA-kW        %4(      *s
  ,goG*7-rJ0F4S      COX&~VEJD  IA' M1D PALL.      Veql*PiJ  f3etta.. MECOMDASLLI        E V!-L S A/C mtoz~zLC jit)6          ooc' Wee-          d~4?A6          buc5  -ro A/ozzcC  r    ~    -C~e4-1~
EXAMINER:                                                  LEVEL:.                  DATE:  *2-* *-
REVIEWER:                                                  LEVEL:____        __    DATE: .2.-'-
OTHER:                      c2 &#xfd;4                        LEVEL:    7?DATE:                  /6' STATION:    2                                            DATE:
ANII:        ---
iL.      ,-*                                DATE:
 
COMMONWEALTH EDISON COMPANY                                                                              Page 20 of 22 Procedure No.      NDT-C-30      Rev. 2                                                                December, 1993 ULTRASONIC TESTING DATA SHEET              NDT-DS-C2A STATION/UNIT:              LAS-- A      .      ) 2.                                            PAGE:      J      OF PROCEDURE:      NDT-            REV.            DATA SHEET    NO.:      C1__-/6S        _      DATE:    _    _lq_____
CALIBRATION SHEET NO.(S)
ST. BEAM:        C- oS3                ANGLE BEAM: axial            C- S'-              circ.      C..- 06 COMPONENT INSPECTED SYSTEM:          MS                      WELD #:      LCS - I- '    .90        WELD TYPE:          AS M
PIPE SIZE:              '      THICKNESS/SCHEDULE:                1O  "            MATERIAL:          CS COMPONENT TEMPERATURE:            po *LS6            J SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:                    .g                ANGLE BEAM AXIAL:              56.
COUPLANT/
BATCH    #:  ULTRA&.&t      7r(        S13[-Jf                    ANGLE BEAM CIRC.:              6 EXAMINATION SCANS Performed                  Indications YES        NO    NO              YES
: 1) Base Metal Straight Beam
  / \    2)  Angle Beam-Normal-Against              Flow
: 3)  Angle Beam-Normal-With              Flow
: 4)  Angle Beam-Along Weld-CW
: 5)  Angle Beam-Along Weld-CCW                            .        _
L    6)  Straight Beam of Weld                                                  _
0 W    7)  Thickness Across Weld & Base Metal                                        A/                      A7 AL*/
UP STRM      WELD        DN STR ADDITIONAL COMMENTS
    ?F* oL*hf-      f--A        %z*      66L    t, 4S6_
jAIbICATIGAMS    n&tcjP~f,0t      1.1    Mej    LA.AL-L 9fC.-o.        "Bo.E..  '&#xfd;EC  btA&_L    LAe cLtfS.
  )A40                            ")E2L2O      F y_&P 141j&#xfd;  Q.LLO1-6 Mc5ZZL~                cNft~
EXAMINER:                                                      L, LEVEL:          1r_          DATE:      Z--91 REVIEWER:                  ..                                LEVEL:____                    DATE: _    _
OTE:LEVEL:                                                                  DATE:_______
STATIO(&#xfd;:&#xfd;
                      &#xfd;DATE:.
ANI I:                    --                                  DATE:
 
S          GE Nuclear Energy Typical for Welds: LCS-1-N3A, Data Sheets 96-162 & 163 LCS-I-N36, Data Sheets 96-164 & 165 LCS-1-N3C, Data Sheets 96-166 & 167 LCS-1-N3D, Data Sheets 96-168 & 169 Due to the configuration of the nozzle no exams were performed from the nozzle side. This limits the coverage achieved to:
0&deg; = 57.85%
450 = 61.60%
600 = 60A0%
Total composite coverage = 59.95%
N REPORT NO.:
                                                                    <-&#xfd;Xe/&#xfd; d                        2 OF: 2 GE REVIEWED BY      LEVEL    DATE                UTILITY REVIEW  DATE    SMAD REVIEW DATE PAGE:
DATE UllUlY REVIEW
 
COMMONWEALTH EDISON COMPANY                                                                                        Page 20 of 22 Procedure No.        NDT-C-30        Rev.      2                                                                  December, 1993 ULTRASONIC TESTING DATA SHEET                        N=-DS-C2A STATION/UNIT:              A-ASA/F 1        /    Z                                                      PAGE:                OF PROCEDURE: NDT-          _        EV.              DATA SHEET        O./                                DATE:      ____-      __
CALIBRATION SHEET NO.(S)
ST. SEAM:      IVA                          ANGLE BEAM: axial              C-    0  &#xa3;-J          circ.      C--O*-Z-COMPONENT INSPECTED SYSTEM:      _ A7]                        WELD #:          -C5-f-AJ-3D                  WELD TYPE:            A/ S PIPE SIZE:        :2              THICKNESS/SCHEDULE:                  7. 0                  MATERIAL:          C 5 COMPONENT TEMPERATURE:-            *                ./  I SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:                  ZA4                        ANGLE BEAM AXIAL:
COUPLANT/
B3ATCH 0:    (LP/.L                                                          ANGLE BEAM CIRC.:          _______
EXAMINATION SCANS Performed                    Indications YES        NO      NO                  YES
: 1) Base Metal Straight Beam
  / \  2)  Angle Beam-Normal-Against                    Flow
: 3)  Angle Beam-Normal-With Flow                                >                    '
: 4)  Angle Beam-Along Weld-CW                                  ><
: 5)  Angle Beam-Along Weld-CCW F
L    6)  Straight Beam of Weld 0
W    7) Thickness Across Weld & Base Metal                                                  A/AIA1A                      Al/A UP STRM        WELD          DN STR ADDITIONAL COMMENTS PFLd'r-21yr,          eXANi        W~r          60*4    s
  //glc~rjof4&                                  IN)f M  ArB WALL.        A'ee~ror4        OffL  v fic-bvfVLE              LI-iVff-L.
Alo  AI~7?L~          ~    ~    t~~C    L~iQL1l    ~TtAii  IA/Ic~JA    A b~    -Th    A(Oz7/6        C~Aljc~a U2AT~av.
A10  A1e07_7Zj5      _"&#xfd;jA15      eioc tueg-b        151,4-&#xfd;IA1157.6      bQ9      -m    ovo r-e-e Cootlz-16vg4nqw&#xfd; EXAMINER:                                                            LEVEL:        -.Z'7            DATE:    Z-/L-      71-REVIEWER:                                                            LEVEL:"
D9T      *-                    DATE:          7 OTER_LEVEL:
                        ;&#xfd;                                                                          DATE:
STATION:6&#xfd;&#xfd;            &#xfd;..-E                                        DATE:.
ANII:      .~Q-2              --        -                            DATE:        -
 
ComEd                                                                                                          Page 19 of 20 Procedure No.        NDT-C-2      Rev. 22                                                                September, 199 ULTRASONIC TESTING DATA SHE                  NDT-DS-C2A STATION/UNIT:          L-If//e          1/2                                                        PAGE :          /      OF    2-P PROCEDURE: NUT- C-2.              REV. 5~DATA          S EET NO.:      ____2___                    DATE:          -?        4 CALIBRATION SHEET NO. (S)                                                    2      0 ST. BEAM:    __/_/_        _            ANGLE  BEAM: axial    ___-_______                circ. __-______
COMPONENT INSPECT SYSTEM:          #//l'                    WELD #t:/,/-A'i-_                          WELD TYPE:      /          -- ,*,z1/
PIPE SIZE:          R-"            THICKNESS/SCHEDULE:            ],/                  MATERIAL:    C-5 COMPONENT TEMPERATURE:              l4ao.L                ;'-J*                                                                  I SCAN GAIN CONTROL SETZINGS STRAIGHT BEAMt        _        _//                ANGLE BEAM AXIAL:                  -,o.      dL COUPLANT/
BATCH #:          l7e-,VA      _    - /    9J-p                    ANGLE BEAM CIRC.:                o..        d EZAMINATION SCAkNS                                              --
I Performed Indications YES            NO    NO                YES
: 1)    Base Metal Straight Beam
  / \  2) Angle Beam-Normal-Against Flow
: 3)  Angle Beam-Normal-With Flow
: 4)  Angle Beam-Along Weld-CW s)  Angle Beam-Along Weld-CCW L    6)  Straight Beam of Weld W    7) Thickness Across Weld & Base Metal                                            ,/.          .-      "          *//
UP STRM    WELD              DN STR ADDITIONAL COMMENTS EXAMINER:                                                      LEVEL:                        DATE:    ;7--17-9a REVIEWER:                                                      LEVEL:--,        _-I?-i'-      DATE:
OTHER:                                                          LEVEL:              ~DATE:
.STATION    __6DATE:                                                          47f ANII:                    ----                                  DATE:      S1
 
WALL THICKNESS              SITE:    LaSalle Unit I                        REPORT NO.-
GE NuclearEnergy                      PROFILE SHEET              PROJECT:  LIR07                                  '2 2 SYSTEM:          #13                        COMPONENT ID q //Ie  -. i
: 0. 90`  180"  270'                                                j<    Is-. 1                      1.5    ->  1 POSITION CROWN HEIGHT:Ee-'A            'II                      2              4                [ii 2                                      CROWN WIDTH:____r-__________.____
                        /                NOM DIAMETER-      '
4        _E                            LD                                                      -  _
WELD LENGTH:___________                                    FLOW RH-HXIB-1
: 1. Due to the configuration of the nozzle, no axial exams were performed on the base material of the nozzle.
: 2. Due to the cladding on the ID two direction coverage from one side is not possible.
Because of these two limiting factors, 80% coverage of the code required volume was achieved.          ,;__
LEV-  . A-TE DRAWN BY        LEVEL    DATE GE REVIEWED BY        LEVEL    DATE
 
NDT-D-2 Revision      10 October,      1994 FORM NDT-D-2-FI Page 47 of 48 LIQUID PENETRANT EXAMINATION DATA SHEET DATE:          -                STATION & UNIT:                  LaSalle Unit I                  DATA SHEET #      ('6  -Oi3*5 EXAMINER:                            V6A          .A6              ~LEVEL:                                    2Z SYSTEM:                          1-4/fC 5                                            MATERIAL:        (5 COMPONENT:
SECTION XI EDITION & ADDENDA:                      1989 Edition, No Addenda                      CODE CLASS:    _      _    _    _
SECTION XI CATEGORY:                            C    -  6                            ACCEPTANCE STD.:      /1    /C "-55/f5 PROCEDURE # & REVISION:                  NDT-D-2 Rev. 10                              SKETCH SHEET USED: YES ___          NO COMMENTS:        Configuration:                )            440,-4-_" -
                                                            ,_                            ,              /7-0
  ,(A      e*tK9,M1A1,0/r/
4r                                                  -~- 70?9            ~      Z'T        9Z*  7    /u52?J*/
LIQUID PENETRANT EXAM:
MATERIAL:
MATERIAL MANUFACTURE:                Magnaflux TYPE                        BATCH PRE-EXAM CLEANER:                      SKC-S                      *        -      "      DRYING                              MINUTES PENETRANT:                            SKL-SP                              0  y e        PENETRATION                        MINUTES PENETRANT CLEANER:                    SKC-S                    I/-.)      5              DRYING
                                                                                                              /O 5            MINUTES DEVELOPER:                            SKD-S2                                              DEVELOPING                        MINUTES POST EXAM CLEANER:                    SKC-S SURFACE TEMPERATURE:      .E          " &deg;      /ffq/9 _3
* LIGHT SOURCE:
EXAMINATION RESULTS:
ACCEPT                                                REJECT          ltll'4
                                                                                                /
REVIEWED BY:
EXAMINER:-_      _  _  _  _    _  _  _ __    _  _  _ _  _    _  _  _
LEVEL:              DATE:
REVIEWER:_______________                                        ____          LEVEL:              DATE:
OTHER:    &#xfd;-/6?'42.'z                    4~ i                                LEVEL:              DATE:
STATION:        *~::.-6ih                                                                          DATE:
ANI I:            *%      -L--N                                                                    DATE:
 
Revision 10 October, 1994 W
UDT-D-2-V2    Page 48 of 48 STLH sS=lUSHEET FOR  IUITD P      MT      Dm            'T
(                                                                        WnTASETo_
(XH 9(o,__              STATION A MIT: L    -&    (  VAJlr 5,.'
                        -,,A)              C Pu1-- e-                    LMM CMC' CEME-r          ~c) 'b7 ~2    3oOp~5~T5
                                                                                  'p22,.,77      v*"'m  ,,<
7*;7-//5 .'e,,'*;7"  /' .2V:
S  1//
a'(A &d    *      *_x _
                                                            *3t#
ci=&WA6 TO Eyirq1Ikf Ak&EA~                        S1&wA-) Oui 7-0 LJ1C/< 6'F --                        A PI/YI5/C&#xfd;P9          //ccE65s bPOf          W161-,- P'PETh        5d/DCOLIts in/c1 9-r 6                6011' c~/,'00e    g/ 0 776 LZM6        29 IUC67- /PAO9kY4i C
BY:
PEVIEWEDi7
        *.                    <:        K    rzv*/**a-                j  DAT.:_______
ANII
 
EXAMINATION
 
==SUMMARY==
SHEET                                            Repor No.:
GE NUCLEAR ENERGY                                          LaSalle Unit I LIR08                                        ".01 11.0083.2                LCS-1-N6A                            N-SH                  GEL-1109                  RPV                B-D ID Number:              Component ID:                    Configuration:                Drawing:              System:        ASME Cat.:
Examination      Cert          Exam                Exams          Data      Cal                Procedum              Calibration Personnel        Level      Completed          Performed        Sheet      Sheet                Revision                Block CE Frakes                !I        11/04/99                0          D-147      D-147          UT-DRD-300V3 R.0            01-91-03 45S          D-148      D-148          Ut-DRD-300V3 R.0            01-91-03 60S          D-149      D-149          UT-DRD-300V3 R.0            01-91-03 Examination Results:
Ultrasonic examinations were performed using a combination of 0%45&deg; and 60' shear wave search units.
No examination performed from the nozzle side due to configuration.
No recordable indications were detected.
69.5% coverage of the required ASME Section Xl volume was achieved.
(
Examination results were compared to data report        D673,675,677  from      L IR03      outage with  X    No Change These examinations were performedunder Work Order.                                                          N/A    Change This Summary and the following data sheets have been reviewed and accepted by the followingpersonnel:          RWP:        1107
                                                        -/.4                                                              Dose:      t00      mr.
Revi      By-                    Level:      Date:        Station Reviewed By:
 
==Title:==
Date:
777R      ,ae7 A N R , 0weB:                            it              atPg                      f Reviewed By:                      Level:      Date:        ANII R wed By:
 
==Title:==
Date:          Page    1 of      9
 
LaSalle Unit I N6 Nozzle Examination coverage obtained      no limitations.
CROSS SECTIONAL AREA (per slice)                                        TOTAL CODE COVERAGE code cross              area                  area          % of code area % of code area  degrees        degrees              percent      percent sectional            scanned                scanned            scanned      scanned      scanned        scanned            scanned        scanned area              automated              manually          automated    manually    automated        manually          automated      manually 0&deg; wm                                62.4                  0.0                  32.3                0.0          51.8          0.0          360.0                  0.0          51.8 45' T-scan                          62.4                  0.0                  51.2                0.0          82.1        0.0            360.0                0.0          82.1 60" T-scan                          62,4                  0.0                  54.6                0.0          87.5        0.0            360.0                0.0          87.5 45' P-scan  CW                      62.4                  0.0                  40.1                0.0          64.3          0.0          360.0                  0.0          64.3 45" P-scan  CW                      62.4                  0.0                  40.1                0.0          64.3          0.0            360.0                0.0          64.3 60' P-scan  CW                      62.4                  0.0                  42.6                0.0          68.3        0.0            360.0                0.0          68.3 60' P-scan  CCW                    62.4                  0.0                  42.6                0.0          68.3        0.0            360.0                  0.0          68,3 0.0          69.5 Manual scans were not restricted.
No credit taken for initial 1/4" of material in Code coverage calculations due to near field effects.                                                Total Composite Coverage -  69.5%
                              *. ??,o'A 2/1-        r,22
 
Lasalle 1 LPCI 45&deg; and 60" T-scan exammination coverage 0" L-wave scan coverage 60*T 60'
    ?~  e24)-
A~2~  i/!PA  7 401&#xfd; 91
: e. -g e&#xfd;
                                                            ,PO&#xfd;
 
Lasalle 1 LPCI 45  and 60 P-scan examination coverage
  /    ,,:,<.,-2 6~          1 19i/7L-      ,-
/ 44i2 /A
        ~        -
7j    14 2 Z/ b2  4
 
IQ&Report                                                  EXAMINATION
 
==SUMMARY==
SHEET                                                    No.:
GE NUCLEAR ENERGY                                        LaSalle Unit I LI R08 11.0085.2                LCS-1-N6C                          N-SH                      GEL-1109                    RPV                B-D ID Number:              Component ID:                    Configuration:                  Drawing:                System:        ASME Cat.:
Examination      Cert        Exam                Exams          Data        Cal                  Procedure            Calibration Personnel        Level      Completed          Performed        Sheet        Sheet                Revision                Block CE Frakes                l        11/04/99                0          D-150        D-150        LUT-DRD-300V3 R.0            01-91-03 45S          D-151        D-151          rlT-DRD-300V3 R.0          01-91-03 60S          D-152        D-152        UT-DRD-300V3 R.0              01-91-03 Examination Results:
Ultrasonic examinations were performed using a combination of 0', 45" and 60&deg; shear wave search units.
No examination performed from the nozzle side due to configuration.
No recordable indications were detected.
69.5% coverage of the required ASME Section XI volume was achieved.
(
Examinationresults were compared to data report -    D674,676,678    from      L 1R03      outage with    X    No Change These examinations were performed under Work Order:                                                          N/A    Change This Summary and the following data sheets have been reviewed and accepted by the following personnel            RWP:        1107 Dose:      100  mr.
Rev wedB%                        Level:        &#xfd;e:
Da        Station Reviewed By:
 
==Title:==
Date:
Reviewed By:                    Level:      Date:      ANII R6(ewed By:
 
==Title:==
Date:        Page    1    of  9 Reiee B:Lee:                    ae        NI  ~we        y                ile          Dte          ag          o/
 
LaSalle Unit I N6 Nozle Examination coverage obtained no limitations, CROSS SECTIONAL AREA (per slice)                                        TOTAL CODE COVERAGE code cross              area                area            % of code area % of code area  degrees          degrees            percent      percent sectional            scanned            scanned                scanned      scanned      scanned          scanned            scanned        scanned area              automated            manually              automated      manually    automated        manually          automated      manually 0&deg; wm                                62.4                0.0                32.3                    0.0          51.8        0.0            360.0                0.0          51.8 45' T-scan                          62.4                  0.0                51.2                    0.0          82.1        0.0            360.0                0.0          82.1 60* T-scan                            62.4                0.0                54.6                    0.0          87.5        0.0  -        360.0                0.0          87.5 45' P-scan  CW                      62.4                0.0                40.1                    0.0          64.3          0.0            360.0                0.0          64.3 45" P-scan  CW                      62.4                  0.0                40.1                    0.0          64.3        0.0            360.0                0.0          64.3 60" P-scan  CW                      62.4                  0.0                42.6                    0.0          66.3        0.0            360.0                0.0          68.3 60" P-scan  CCW                    62.4                  0.0                42.6                    0.0          68.3        0.0            360.0                0.0          68.3 0.0          69.5 Manual scans were not restricted.
No credit taken for initial 1/4" of material in Code coverage calculations due to near field effects.                                                Total Composite Coverage =  69.5%
                  # ??.o 4EPR                0
                                      .-        1      ,    -'-
                                                    ---      ,,/
~6A~
or)
 
Lasalle 1 LPCI 450 and 60" T-scan exammination coverage 0* L-wave scan coverage l ,
64- , -/5,    - S2.
r
 
Lasalle 1 LPCI 45' and 60" P-scan examination coverage 60"1
    ?~ o/~
-# O-/S~5, ~-~'5J    , 6 -/5L
  ~        1/4 /~?
  ~          ~
Pci;;r 2 z, -
 
Report No.:
EXAMINATION
 
==SUMMARY==
SHEET                                                  1R9-016 GE NUCLEAR ENERGY Site and Unit:                    LaSalle                            Component ID:                              LCS-1-N10 Outage:                LI R09                                                                          N-SH System:      RPV      ASME Cat.:          B-D      ASME Item              B3.90            Aug Requirements:                N/A Exams Performed      Data Sheet        Cal Sheet          Procedure          Calibration Block        Examination    C      Level      Date I                                          7Personnel 600 Shear          RPV-036              N/A        UT-EXLN-300 V4              01-91-03          3 Paul Anderson      I1          01/17/2002 0&deg; Long.        R, RPV-037              N/A        UT-EXLN-300 V4              01-91-03            Paul Anderson      1II          01/17/2002 At
;,,i45 Shear          "  RPV-035              N/A        UT-EXLN-300 V4              01-91-03            Paul Anderson        II        01t17/2002 Examination Results:
Manual 0O weld and base metal, 450/600 S transverse and parallel scans were performed on the N10 Recirculation inlet nozzle in accordance with procedure UT-EXLN-300 V4.
Manual scanning was performed 3600 around the nozzle.
There were no recordable indications.
Due to the nozzle configuration it is not possible to examine 100% of the ASME code required area.
Ultrasonic examination results were acceptable to the requirements of ASME B&PVC Section Xl 1989 Edition, no Addenda, Category B-D welds and USNRC Reg. Guide 1.150 Revision 1 (Alternate Method).
Previous examination results were reviewed, no change.
Manual composite coverage = 72.4%
Examinaton results were compared to data report      D-680, 682, 684 from            R03      outage with    []    No Change These examinations were performed under Work Order:            99270105                                      D      Change p
2_..),..                              RWP:          N/A This Summary and the following data sheets have been reviewed and accepte&#xfd;    ,yt    e folowing personnel:
rJ            _ti/"1*  -                                                ,0              Dose:      N/A      mr.
Prepared By:                  Level:        Date:    Utility Reviewed By
 
==Title:==
Date:
Reviewed By    /              Level:        Date:    ANII Reviewed By:
 
==Title:==
Date:          Page    1    of
 
LaSalle Unit1 CRD (NIO NOZZLE)
Jan-02 CODE CROSS-SECTIONAL AREA                                TOTAL CODE COVERAGE P
                  .0 Area Scanned              % of Area Scanned  Degrees Scanned              % Scanned 0
0            2 Area Inch      Auto          Manual        Auto        Manual Auto        Manual        Auto        Manual 00 WELD METAL    N    60.51          0.0          32.6          0.0          53.9  0.0          360.0        0.0          53.9 45' T-SCAN  N    60.51          0.0          49.4          0.0          81.7  0.0          360.0        0.0          81.7 45' T-SCAN NIA    60.51          0.0            0.0          0.0          0.0  0.0          0.0        0.0            0.0 450 T-SCAN N/A    60.51          0.0            0.0          0.0          0.0  0.0          0.0        0.0            0.0 600 T-SCAN  N    60.51          0.0          52.1          0.0          86.1  0.0          360.0        0.0          86.1 60&deg; T-SCAN N/A    60.51          0.0            0.0          0.0          0.0  0.0          0.0        0.0            0.0 60' T-SCAN N/A    60.51          0.0            0.0          0.0          0.0  0.0          0.0        0.0            0.0 450 P-SCAN CW    N    60.51          0.0          47.7          0.0          78.9  0.0          360.0        0.0          78.9 600 P-SCAN CW    N    60.51          0.0          50.7          0.0          83.8  0.0          360.0        0.0          83.8 450 P-SCAN CCW    N    60.51          0.0          47;7          0.0          78.9  0.0          360.0        0.0          78.9 600 P-SCAN CCW      N    60.51          0.0          26.2          0.0          43.3  0.0          360.0        0.0          43.3 Coverages      0.0          72.4 Total Composite Coverage =    72.4 COMMENTS:
Manual UT scans were limited due to the OD blend radius.
CovCalc.xis 10/6/00
 
LaSalle 1 CRD (N10) 11N Codia Required 00 450 and 600 T-Scan Exam Volume - 60.51 Sq. In.
0T Exam Volume - 32.61 Sq. In.
456 T-Scan Exam Volume - 49.42 Sq. In.
600 T-Scan Exam Volume - 52.07 Sq. In.
100 600 03
                                                                        --o 0
 
LaSalle 1 CRD (N10)
Code Required 450 and 600 P-Scan Exam Volume - 60.51 Sq. In.
45 0 F'-Scan Exam Volume - 47.72 Sq. In.
60 0 F'-Scan Exam Volume - 50.72 Sq. In.
450 0
 
Report No.:
EXAMINATION
 
==SUMMARY==
SHEET                                                1R9-017 GE NUCLEAR ENERGY Site and Unit:                    LaSalle                          Component D:                            LCS-1-N2B Outage:                L1R09                                                                      N-SH System:      RPV        ASME Cat.:        B-D    ASME Item            B3. 90            Aug Requirements:                N/A Exams Performed      Data Sheet        Cal Sheet        Procedure          Calibration Block      Examination      Certl Exm                    PoPersonnel 60
* Shear        RPV-012              N/A          UT-EXLN-300 yq          01-91-03          Charles Barrett        II      01/15/2002 0- Long.        RPV-004              N/A          UT-EXLN-300 V4          01-91-03            Todd Ginder          II      01/15/2002
        .ea45She,    ''RPV-008                N/A          UT-EXLN-300 V/q          01-91-03          Edward Mazyck          II      01/15/2002 Examination Results:
Manual 00 weld and base metal, 450/600 S transverse and parallel scans were performed on the N2B Recirculation inlet nozzle in accordance with procedure UT-EXLN-300 V4.
Manual scanning was performed 360' around the nozzle.
There were no recordable indications.
Due to the nozzle configuration it is not possible to examine 100% of the ASME code required area.
Ultrasonic examination results were acceptable to the requirements of ASME B&PVC Section XI 1989 Edition, no Addenda,
,,    Category B-D welds and USNRC Reg. Guide 1.150 Revision 1 (Alternate Method).
Previous examination results were reviewed, no change.
Manual composite coverage = 70.9%
Examination results were comparedto data report    D-117,126,136 from            Li R04      outage with    rv    No Change These examinations were performed under Work Order:          99270105                                      ED    Change This Summary and the following data sheets have been reviewed and acce ted by thyfollowing personnel:            R
  /
  *                    .  ;L~-*    A                                      /Dose:                                                    N/A    mr.
repared By:                  Level:        Date:  Utility Reviewed By:
 
==Title:==
ate:
Reviewed By:                    Level:        Date:  ANII Reviewed By:
 
==Title:==
Date:            Page  1    of
 
LaSalle Unit1 N2B Recirculation Inlet JAN. 2002 CODE CROSS-SECTIONAL AREA                                  TOTAL CODE COVERAGE V
Area Scanned              % of Area Scanned  Degrees Scanned                % Scanned 2
Area Inch      Auto          Manual          Auto        Manual Auto        Manual        Auto        Manual 00 WELD METAL    N    76.82          0.0          41.1            0.0          53.4  0.0          360.0        0.0            53.4 450 T-SCAN N      76.82          0.0          63.1            0.0          82.2  0.0          360.0        0.0          82.2 450 T-SCAN N/A    76.82          0.0            0.0            0.0          0.0  0.0          0.0        0.0            0.0 450 T-SCAN N/A    76.82          0.0            0.0            0.0          0.0  0.0          0.0        0.0            0.0 600 T-SCAN N      76.82          0.0          66.1            0.0          86.1  0.0          360.0        0.0            86.1 600 T-SCAN N/A    76.82          0.0            0.0            0.0          0.0  0.0          0.0        0.0            0.0 600 T-SCAN N/A    76.82          0.0            0.0            0.0          0.0  0.0          0.0        0.0            0.0 450 P-SCAN CW    N    76.82          0.0          51.1            0.0          66.5  0.0          360.0        0.0            66.5 600 P-SCAN CW    N    76.82          0.0          54.5            0.0          70.9  0.0          360.0        0.0            70.9 45' P-SCAN CCW          76.82 N                    0.0          51.1            0.0          66.5  0.0          360.0        0.0          66.5 600 P-SCAN CCW    N    76.82          0.0          54'5            0.0          70.9  0.0          360.0        0.0            70.9 Coverages      0.0          70.9 Total Composite Coverage =      70.9 COMMENTS:
Manual UT scans were limited due to nozzle radius.
CovCalc.xls 10/6/00
 
LaSalle 1 Recirculation Inlet (N2) 00 L-Wave Scan examination coverage 450 and 600 T-Scan examination coverage
 
LaSalle 1 Recirculation Inlet (N2) 450 and 600 P-Scan examination coverage I
NJ
-N
 
Report No.:
GE NUCLEAR ENERG Y EXAMINATION
 
==SUMMARY==
SHEET                                              1R9-018
!    Site and Unit:                    LaSalle                          Component ID:                            LCS-1 -N2C Outage:                LI R09                                                                    N-SH System:      RPV          ASME Cat.:        B-D      ASME Item            B3. 90          Aug Requirements:              N/A Exams Performed        Data Sheet        Cal Sheet          Procedure          Calibration Block      Examination    Cert Level      Date7 Personnel 60
* Shear          RPV-013            N/A          UT-EXLN-300 Vy            01-91-03          Charles Barrett      II      01/15/2002 0&deg; Long.          RPV-005 .          N/A          UT-EXLN-300 V            01-91-03          Todd Ginder        II      01/15/2002
  " '&#xfd;- 46P Shear-      ''  RPV-009            N/A          UT-EXLN-300 -t&,          01-91-03          Edward Mazyck        II      01/15/2002 Examination Results:
Manual 00 weld and base metal, 450/600 S transverse and parallel scans were performed on the N2C Recirculation inlet nozzle in accordance with procedure UT-EXLN-300 V4.
Manual scanning was performed 3600 around the nozzle.
There were no recordable indications.
Due to the nozzle configuration it is not possible to examine 100% of the ASME code required area.
(    Ultrasonic examination results were acceptable to the requirements of ASME B&PVC Section Xl 1989 Edition, no Addenda, Category B-D welds and USNRC Reg. Guide 1.150 Revision 1 (Alternate Method).
Previous examination results were reviewed, no change.
Manual composite coverage = 70.9%
Examination results were compared to data report  D-118,127,137 from            LIR04    outage with    []  No Change These examinations were performed under Work Order:            99270105                                      D    Change This Summary and the following data sheets have been revi  7 wed and accept    by    following personnel:
                                                                      /(5)~  /~f                            Z~.-        Dose:      N/A    mr, Prepared By:                    Level:        Date:    Utility Reviewed By:    /
 
==Title:==
Date:
Reviewed By:                    Level:        Date:    ANII Reviewed By:
 
==Title:==
Date:          Page    1 of    7
 
LaSalle Uniti N2C Recirculation Inlet JAN. 2002 CODE CROSS-SECTIONAL AREA                                  TOTAL CODE COVERAGE
                  *0 U
Area Scanned              % of Area Scanned  Degrees Scanned              % Scanned
                  .0 2
Area Inch      Auto          Manual          Auto        Manual Auto      Manual        Auto        Manual O0 WELD METAL    N    76.82          0.0          41.1            0.0          53.4  0.0        360.0        0.0          53.4 450 T-SCAN  N    76.82          0.0          63.1            0.0          82.2  0.0        360.0        0.0          82.2 450 T-SCAN N/A    76.82          0.0            0.0            0.0          0.0  0.0          0.0        0.0          0.0 45' T-SCAN NIA    76.82          0.0            0.0            0.0          0.0  0.0          0.0        0.0          0.0 600 T-SCAN  N    76.82          0.0          66.1            0.0          86.1  0.0        360.0        0.0          86.1 600 T-SCAN N/A    76.82          0.0            0.0            0.0          0.0  0.0          0.0        0.0          0.0 600 T-SCAN N/A    76.82          0.0            0.0            0.0          0.0  0.0          0.0        0.0          0.0 450 P-SCAN CW    N    76.82          0.0          51.1            0.0          66.5  0.0        360.0        0.0          66.5 60' P-SCAN CW    N    76.82          0.0          54.5            0.0          70.9  0.0        360.0        0.0          70.9 450 P-SCAN CCW      N    76.82          0.0          51.1            0.0          66.5  0.0        360.0        0.0          66.5 60' P-SCAN CCW    N    76.82          0.0          54.5            0.0          70.9  0.0        360.0        0.0          70.9 Coverages    0.0          70.9 Total Composite Coverage =    70.9 COMMENTS:
Manual UT scans were limited due to nozzle radius.
0/6/0 Cov~al~xls CovCalc.xls 10/6/00
 
LaSalle 1 Recirculation Inlet (N2) 450 and 600 P-Scan examination coverage
    /
-'I' N
 
LaSalle 1 Recirculation Inlet (N2) 0&deg; L-Wave Scan examination coverage 450 and 600 T-Scan examination coverage I
C,
 
I                    Report No.:
GE NUCLEAR ENERGY                                EXAMINATION
 
==SUMMARY==
SHEET                                            1R9-019 Site and Unit.                      LaSalle                        Component ID:                          L&#xfd;CS-1-N2D
(
Outage:                LI R09 System:                ASME Cat:          B-D      ASME Item            B3. 90          Aug Requirements:            N/A Exams Performed      Data Sheet        Cal Sheet          Procedure        Calibration Block      Examinatibn    Cert Level      Date Personnel SLong.        RPV-017              N/A        UT-EXLN-300 V4            01-91-03        Hermann ct            0          /15/20 450 Shear        RPV-01 8            N/A        UT-EXLN-300 V4            01-91-03        Hermann Schlortt    III      01/15/2002 6    shear        RPV-019              N/A        UT-EXLN-300 V4            01-91-03        Hermann Sclhlortt    III    0111512002 Examination Results:
Manual 00 weld and base metal, 450/600 S transverse and parallel scans were performed on the N2D Recirculation inlet nozzle in accordance with procedure UT-EXLN-300 V4.
Manual scanning was performed 3600 around the nozzle.
There were no recordable indications.
Due to the nozzle configuration it is not possible to examine 100% of the ASME code required area.
Ultrasonic examination results were acceptable to the requirements of ASME B&PVC Section XI 1989 Edition, no Addenda, Category B-D welds and USNRC Reg. Guide 1.150 Revision 1 (Alternative Method).
Previous examination results were reviewed, no change.
Manual Composite Coverage = 70.9%
Examinationresults were compared to data report    D-119, 128,138 from          L1R04    outage with    r]  No Change These examinationswere performed under Work Order:            99270105                                          Change This Summary and the following data sheets have been reviewed and accepted by the following personnel:        RWP:        N/A
___..._        _    Z  *Dose:                                                                N/A    mr.
Prepared By:                    Level:        Date:    Utility Reviewed By:
 
==Title:==
Date:
Reviewed By:                    Level:        Date:    ANII Reviewed By:
 
==Title:==
Date:          Page    1' of    7
 
LaSalle Unit1 N2D Recirculation Inlet JAN. 2002 CODE CROSS-SECTIONAL AREA                                  TOTAL CODE COVERAGE Area Scanned                % of Area Scanned  Degrees Scanned              % Scanned 0  Area Inch 2    Auto          Manual          Auto        Manual Auto        Manual      Auto        Manual 00 WELD METAL    N    76.82          0.0          41.1            0.0          53.4  0.0          360.0        0.0          53.4 450 T-SCAN  N 76.82          0.0          63.1            0.0          82.2  0.0          360.0        0.0          82.2 450 T-SCAN NIA    76.82          0.0            0.0            0.0          0.0  0.0          0.0        0.0          0.0 45&deg; T-SCAN N/A    76.82          0.0            0.0            0.0          0.0  0.0          0.0        0.0          0.0 600 T-SCAN  N    76.82          0.0          66.1            0.0          86.1  0.0          360.0        0.0          86.1 600 T-SCAN N/A    76.82          0.0            0.0            0.0          0.0  0.0          0.0        0.0          0.0 60' T-SCAN N/A    76.82          0.0            0.0            0.0          0.0  0.0          0.0        0.0          0.0 450 P-SCAN CW    N 76.82          0.0          51.1            0.0          66.5  0.0          360.0        0.0          66.5 600 P-SCAN CW    N    76.82          0.0          54.5          0.0          70.9  0.0          360.0        0.0          70.9 450 P-SCAN CCW    N 76.82          0.0          51.1            0.0          66.5  0.0          360.0        0.0          66.5 60' P-SCAN CCW    N    76.82          0.0          54.5            0.0          70.9  0.0          360.0        0.0          70.9 Coveragesi    0.0      1    70.9 Total Composite Coverage =      70.9 COMMENTS:
Manual UT scans were limited due to nozzle radius.
CovCalc.xls 10/6/00
 
LaSalle 1 Recirculation Inlet (N2) 00 L-Wave Scan examination coverage 450 and 600 T-Scan examination coverage
    \/
w 00O
                            -o
-TI
                                                -C
 
LaSalle 1 Recirculation Inlet (N2) 450 and 600 P-Scan examination coverage
                                          -o NA 2~i
 
Report No.:
GE NUCLEAR ENERGY EXAMINATION
 
==SUMMARY==
SHEET                                            IR9-020
(    Site and Unit:                    LaSalle                        Component ID:                          LCS-1 -N2E Outage:                LI R09                                                                  N-SH System:                  ASME Cat.:        B-D    ASME Item          B3. 90          Aug Requirements:            N/A Exams Performed        Data Sheet        Cal Sheet          Procedure        Calibration Block      Examination  Cert Level      Date Lo      g.IPersonnel 00 og            RPV-01 4            N/A        UT-EXLN-300 V4            01-91-03          Chad Olson        11      01/115/2002 450 Shear        RPV-015              N/A        UT-EXLN-300 V4            01-91-03          Chad Olson        II      01/15/2002
  -  *:6OShear
* RPV*016              N/A        UT-EXLN-300 V4            01-91-03          Chad Olson        II      01/15/2002 Examination Results:
Manual 0' weld and base metal, 450/600 S transverse and parallel scans were performed on the N2E Recirculation inlet nozzle in accordance with procedure UT-EXLN-300 V4.
Manual scanning was performed 3600 around the nozzle.
There were no recordable indications.
Due to the nozzle configuration it is not possible to examine 100% of the ASME code required area.
Ultrasonic examination results were acceptable to the requirements of ASME B&PVC Section Xl 1989 Edition, no Addenda, K    Category B-D welds and USNRC Reg. Guide 1.150 Revision 1 (Alternative Method).
Previous examination results were reviewed, no change.
Manual Composite Coverage = 70.9%
Examination results were comparedto data report    D-120,129,139 from          LiR04    outage with    E  No Change These examinations were performed under Work Order:          99270105                                    B    Change This Summary and the following data sheets have been reviewed and accepted b the following personnel.        RWP:        N/A ZIT        ~'u-                                                                Dose:      N/A      mr.
Prepared By:                    Level:        Date:    Utili  Reviewed By:
 
==Title:==
bate:
Reviewed By:  K                Level:        Date:    ANII Reviewed By:
 
==Title:==
Date:        Page    1    of  7'
 
LaSalle Unit1 N2E Recirculation Inlet JAN. 2002 CODE CROSS-SECTIONAL AREA                                TOTAL CODE COVERAGE 0
Area Scanned              % of Area Scanned  Degrees Scanned                % Scanned Area Inch2      Auto        Manual          Auto        Manual Auto        Manual        Auto        Manual N
0&deg; WELD METAL          76.82          0.0          41.1            0.0          53.4 0.0          360.0        0.0          53.4 45&deg; T-SCAN  N 76.82          0.0          63.1            0.0          82.2  0.0        360.0        0.0          82.2 450 T-SCAN N/A    76.82          0.0            0.0            0.0          0.0 0.0          0.0          0.0            0.0 450 T-SCAN NIA    76.82          0.0            0.0            0.0          0.0 0.0          0.0          0.0            0.0 600 T-SCAN  N    76.82          0.0          66.1            0.0          86.1 0.0          360.0        0.0          86.1 600 T-SCAN  N/A    76.82          0.0            0.0            0.0          0.0 0.0          0.0          0.0            0.0 600 T-SCAN  N/A    76.82          0.0            0.0            0.0          0.0 0.0          0.0          0.0          0.0 450 P-SCAN CW N    76.82          0.0          51.1            0.0          66.5 0.0          360.0        0.0          66.5 60' P-SCAN CW    N    76.82          0.0          54.5            0.0          70.9 0.0          360.0        0.0          70.9 45' P-SCAN CCW N    76.82          0.0          51.1            0.0          66.5 0.0          360.0        0.0          66.5 60' P-SCAN CCW    N    76.82          0.0          54.5            0.0          70.9 0.0          360.0        0.0          70.9 Coverages      0.0          70.9 Total Composite Coverage =      70.9 COMMENTS:
Manual UT scans were limited due to nozzle radius.
t, CovCatc.xls 10/6/00 I
 
LaSalle 1 Recirculation Inlet (N2) 00 L-Wave Scan examination coverage 450 and 600 T-Scan examination coverage 600 C
N                                        -o N                                        C, N
0
 
LaSalle 1 Recirculation Inlet (N2) 45* and 60* P-Scan examination coverage
/
                                          -'0 N
* Report No.:
EXAMINATION
 
==SUMMARY==
SHEET                                            IR9 021 GE NUCLEAR ENERGY Site and Unit:                    LaSalle                          Component ID:                          LCS-1-N2F Outage:                LI R09                                                                      N-SH System:
ExmIefre RPV    Dat ASME Cat.:
She B-O I  I ASME Item B3.90            Aug Requirements:            N/A Exams Performed      Data Sheet        Cal Sheet          Procedure          Calibration Block      Examination    Cert Level      Date Personnel 0&deg;Long.            RPV-032            N/A          UT-EXLN-300 V4            01-91-03          Paul Anderson      II      01/17/2002 60  S Shear          RPV-033            N/A          UT-EXLN-300 V4            01-91-03          Paul Anderson      II      01/17/2002
.  '45- Shear -    ['-  RPV-034            N/A          UT-EXLN-300 V4            01-91-03          Paul Anderson      II      01/17/2002 Examination Results:
Manual 00 weld and base metal, 450/600 S transverse and parallel scans were performed on the N2F Recirculation inlet nozzle in accordance with procedure UT-EXLN-300 V4.
Manual scanning was performed 3600 around the nozzle.
There were no recordable indications.
Due to the nozzle configuration it is not possible to examine 100% of the ASME code required area.
Ultrasonic examination results were acceptable to the requirements of ASME B&PVC Section Xl 1989 Edition, no Addenda, Category B-D welds and USNRC Reg. Guide 1.150 Revision 1 (Alternate Method).
Previous examination results were reviewed, no change.
Manual composite coverage = 70.9%
Examination results were comparedto data report    0-121,130,140 from            R04      outage with    7  No Change These examinationswere performed under Work Order:              99270105                                    D    Change This Summary and the following data sheets have been re      wed and accepted by the following personnel:      RWP:        N/A
( 2. ADose:                                                                    N/A    mr.
4repared By:                    Level:        Date:    Utility Reviewed By:
 
==Title:==
/fate Reviewed By:                    Level:        Date:    ANII Reviewed By:
 
==Title:==
Date:        Page    1  of
 
LaSalle Unit1 N2F Recirculation Inlet JAN. 2002 CODE CROSS-SECTIONAL AREA                                  TOTAL CODE COVERAGE 2                      Area Scanned              % of Area Scanned    Degrees Scanned                % Scanned o  Area Inch      Auto          Manual          Auto        Manual Auto        Manual        Auto        Manual 0&deg; WELD METAL    N    76.82          0.0          41.1            0.0          53.4  0.0          360.0        0.0          53.4 450 T-SCAN  N    76.82          0.0          63.1            0.0          82.2  0.0          360.0        0.0          82.2 450 T-SCAN N/A    76.82          0.0            0.0            0.0          0.0  0.0          0.0          0.0          0.0 450 T-SCAN N/A    76.82          0.0            0.0            0.0          0.0  0.0          0.0          0.0          0.0 600 T-SCAN  N    76.82          0.0          66.1            0.0          86.1  0.0          360.0        0.0          86.1 600 T-SCAN N/A    76.82          0.0            0.0            0.0          0.0  0.0          0.0          0.0          0.0 600 T-SCAN N/A    76.82          0.0            0.0            0.0          0.0  0.0          0.0          0.0          0.0 450 P-SCAN CW    N    76.82          0.0          51.1            0.0          66.5  0.0          360.0        0.0          66.5 60' P-SCAN CW    N    76.82          0.0          54.5          0.0          70.9  0.0          360.0        0.0          70.9 450 P-SCAN CCW    N    76.82          0.0          51.1          0.0          66.5  0.0          360.0        0.0          66.5 60' P-SCAN CCW    N    76.82          0.0          54.5          0.0          70.9  0.0          360.0        0.0          70.9 Coverages      0.0          70.9 Total Composite Coverage =      70.9 COMMENTS:
Manual UT scans were limited due to nozzle radius.
(.0
-,4 CovCalc.xis 10/6/00
                                                                                                                                                        ~0 C
 
LaSalle 1 Recirculation Inlet (N2) 0* L-Wave Scan examination coverage 450 and 600 T-Scan examination coverage 0OO N
 
LaSalle 1 Recirculation Inlet (N2) 450 and 600 P-Scan examination coverage I
 
Report No.:
EXAMINATION
 
==SUMMARY==
SHEET                                              IR9-022 GE NUCLEAR ENERGY t*
(  S#e and Unit:                        LaSalle                        Component 1D.                          LCS-1 -N2J Outage:                  LI R09                                                                    N-SH System:        RPV        ASME Cat.:      B-D      ASME Item          83. 90            Aug Requirements:              N/A Exams Performed        Data Sheet                        Procedure          Calibration Block      Examination    Cert Level      Date
_1t~              eetI                                                            Personnel 60
* Shear          RPV-01 1          N/A          UT-EXLN-300 vyv          01-91-03          Charles Barrett  II          01/15/2002 0&deg; Long' e      ]  . RPV-003          N/A          UT-EXLN-300 vj          01-91-03          Todd Ginder          II      01/15/2002 46- Shegr"-;'i  , RPV-007            N/A          UT-EXLN-300 V4          01-91-03          Edward Mazyck        II      01/15/2002 Examination Results:
Manual 01 weld and base metal, 450/600 S transverse and parallel scans were performed on the N2J Recirculation inlet nozzle in accordance with procedure UT-EXLN-300 V4.
Manual scanning was performed 3600 around the nozzle.
There were no recordable indications.
Due to the nozzle configuration it is not possible to examine 100% of the ASME code required area.
Ultrasonic examination results were acceptable to the requirements of ASME B&PVC Section XI 1989 Edition, no Addenda, Category B-D welds and USNRC Reg. Guide 1.150 Revision 1 (Alternate Method).
Previous examination results were reviewed, no change.
Manual composite coverage = 70.9%
Examination results were comparedto data report    D-115,133,143 from            L1 R04    outage with    [    No Change These examinations were performed under Work Order:            99270105                                      D    Change This Summary and the following data sheets have been review d and a      e    by      following personnel.,    RWP:        N/A L.4                                                                                Dose:      N/A      mr.
Prepared By:                      Level:    Date:    Utility Reviewed By:                  le:            :_              _    _    _
Reviewed By:                    Level:    Date:    ANII Reviewed By:
 
==Title:==
Date:          Page  1    of    7
 
LaSalle Unit1 N2J Recirculation Inlet JAN. 2002 CODE CROSS-SECTIONAL AREA                                  TOTAL CODE COVERAGE 0
Area Scanned              % of Area Scanned    Degrees Scanned              % Scanned Area Inch 2    Auto        Manual          Auto        Manual Auto        Manual      Auto        Manual 0Q WELD METAL    N    76.82          0.0          41.1            0.0          53.4  0.0          360.0        0.0          53.4 450 T-SCAN  N 76.82          0.0          63.1            0.0          82.2  0.0          360.0        0.0          82.2 450 T-SCAN NIA    76.82          0.0            0.0            0.0          0.0  0.0          0.0        0.0            0.0 450 T-SCAN NIA    76.82          0.0            0.0            0.0          0.0  0.0          0.0        0.0            0.0 60o T-SCAN  N    76.82          0.0          66.1            0.0          86.1  0.0          360.0        0.0          86.1 600 T-SCAN NIA    76.82          0.0            0.0            0.0          0.0  0.0          0.0        0.0            0.0 60&deg; T-SCAN N/A    76.82          0.0            0.0            0.0          0.0  0.0          0.0        0.0            0.0 450 P-SCAN CW N    76.82          0.0          51.1            0.0          66.5  0.0          360.0        0.0          66.5 600 P-SCAN CW    N    76.82          0.0          54.5            0.0          70.9  0.0          360.0        0.0          70.9 450 P-SCAN CCW N    76.82          0.0          51.1            0.0          66.5  0.0          360.0        0.0          66.5 600 P-SCAN CCW    N    76.82          0.0          54.5            0.0          70.9  0.0          360.0        0.0          70.9 Coverages    0.0          70.9 Total Composite Coverage        70.9 COMMENTS:
Manual UT scans were limited due to nozzle radius.
tJ'
                                                                                                                                                      >41 CavCaic~xis 10/6/00 N
 
LaSalle 1 Recirculation Inlet (N2) 00 L-Wave Scan examination coverage 450 and 600 T-Scan examination coverage I
00
                                              -0
-.4 P'J
 
LaSalle 1 Recirculation Inlet (N2) 450 and 600 P-Scan examination coverage
  /
Na
                                            -0 "N
 
S,,Report                                                                                  No.:
EXAMINATION
 
==SUMMARY==
SHEET                                              1RE23 NUCLEAR ENERGY                                  ETMGE                                                                __ER Site and Unit:                      LaSalle                            Component ID:                            LCS-I -N2K Outage:                  LI R09                                                                        N-SH System:      RPV          ASME Cat.:        B-D        ASME Item              B3.90            Aug Requirements:            N/A Exams Performed      Data Sheet          Cal Shee            Procedure          Calibration Block      Examination    Cert Level      Date
_WI                            _                                                  Personnel 0&deg; Long.        RPV-002              N/A              UT-EXLN-300              01-91-03            Todd Ginder        II      01/15/2002 45&deg; Shear.        RPV-006              N/A              UT-EXLN-300 v*          01-91-03          Edward Mazyck      II      01/15/2002
  ,i            4    RPV-010 XShea*'          N/A              UT-EXLN-300 v(J          01-91-03          Charles Barrett    II      01/15/2002 Examination Results:
Manual 00 weld and base metal, 450/600 S transverse and parallel scans were performed on the N2K Recirculation inlet nozzle in accordance with procedure UT-EXLN-300 V4.
Manual scanning was performed 3600 around the nozzle.
There were no recordable indications.
Due to the nozzle configuration it is not possible to examine 100% of the ASME code required area.
Ultrasonic examination results were acceptable to the requirements of ASME B&PVC Section X1 1989 Edition, no Addenda, Category B-D welds and USNRC Reg. Guide 1.1 50 Revision 1 (Alternate Method).
Previous examination results were reviewed, no change.
Manual composite coverage = 70.9%
Examination results were comparedto data report        D-124,134,144 from            L1 R04    outage with    . No Change These examinations were performed under Work Order:                99270105                                      D    Change This Summary and the following data sheets have been re 'wed and accep              by th following personnel:      RWP:        N/A
                        ,        pJJ4.        i          _~          .                                                Dose:      N/A    mr.
Prepared By:                      Level:        Date:      Utility Reviewed By:      /
 
==Title:==
+Da R  d    Leel          Date:  . ANII R            yta Reviewed By.                      Level:        Date:      ANII Reviewed By:
 
==Title:==
Date:          Page    1 of7
 
LaSalle Unit1 N2K Recirculation Inlet
                                                                                                                      *...=
JAN. 2002
                                                                                                                      *'=..
CODE CROSS-SECTIONAL AREA                                TOTAL CODE COVERAGE 0
Area Scanned              % of Area Scanned  Degrees Scanned                    % Scanned 2
Area Inch      Auto        Manual          Auto        Manual Auto        Manual            Auto        Manual 0
          &deg; WELD METAL  N    76.82          0.0          41.1            0.0          53.4  0.0        360.0            0.0          53.4 450 T-SCAN  N    76.82          0.0          63.1            0.0          82.2  0.0        360.0            0.0          82.2 45&deg; T-SCAN NIA    76.82          0.0            0.0            0.0          0.0 0.0          0.0              0.0            0.0 450 T-SCAN NIA    76.82          0.0            0.0            0.0          0.0  0.0          0.0              0.0            0.0 600 T-SCAN  N    76.82          0.0          66.1            0.0          86.1 0.0          360.0            0.0          86.1 600 T-SCAN NIA    76.82          0.0            0.0            0.0          0.0 0.0          0.0              0.0            0.0 600 T-SCAN N/A    76.82          0.0            0.0            0.0          0.0 0.0          0.0              0.0            0.0 450 P-SCAN CW    N    76.82          0.0          51.1            0.0          66.5 0.0          360.0            0.0          66.5 600 P-SCAN CW    N    76.82          0.0          54.5            0.0          70.9 0.0          360.0            0.0          70.9 450 P-SCAN CCW    N    76.82          0.0          51.1            0.0          66.5 0.0          360.0            0.0          66.5 600 P-SCAN CCW    N    76.82          0.0          54.5            0.0          70.9 0.0          360.0            0.0          70.9 Coverages          0.0          70.9 Total Composite Coverage =          70.9 COMMENTS:
Manual UT scans were limited due to nozzle radius.
*0.~~
N                                                                                                                                      CovCaic.xls 1016/00
 
:=i U
LaSalle 1 Recirculation Inlet (N2)
      -450 and 600 P-Scan examination coverage I
'1~
'4
 
LaSalle 1 Recirculation Inlet (N2) 0* L-Wave Scan examination coverage 450 and 600 T-Scan examination coverage 0o
"-4i
                                            -o 0
                                            'NJ
                                            '%tJ
 
          ~GE              NUCLEAR ENERGY UT EXAMINATION
 
==SUMMARY==
SHEET                                    REPORT NO: 1R9-024 PROJECT              LaSalle Unit 1 - L1RO9 WELD ID:            LCS-1-N4A SYSTEM:              RPV - FEEDWATER INITIAL CALIBRATION ID:                          NOZ.IN1, 70RL.IN.1 CALIBRATION VERIFICATIONS:                      N4A.2, N4A.3, N4A.70RL.1, N4A.70RL.2 DATA SHEETS:                                    n4a.tI.1, n4a.tl.2, n4a.tl.3, n4a.pl.1, n4a.p 2 .1, n4a.70rl.1 FINAL CALIBRATION ID:                            SEE
 
==SUMMARY==
SECTION BELOW MANUAL CALIBRATION:                              NIA EXAMINERS:..-                                    J. Kent Montgomery, Lv II, Mark Hilborn, Lv II Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section XI, 1989 Edition no Addenda, Category B-D welds and USNRC Reg Guide 1.150 Revision 1 (Alternative Method).
Automated 0', 2.25 L-Wave; 450 and 600 Shear 1.0 MHz and 700 RL 2.0 MHz Transverse and Parallel scans were performed in accordance with procedure GE-UT-702 Version 2.
Initial calibrations for the 0&deg;, 450 and 600 Shear automated examinations were performed on code vessel block - SIN -
01-91-03. Calibration for the 700 RL automated examinations were performed on GENE sizing block, S/N -CAL-DPTH-60 ( Refer to G2K-CAL-1 Initial Calibration Summary Sheet).
For final automated calibrations and linearities, refer to Calibration Summary Sheet - G2K-CAL-3.
The GERIS 2000 OD automated UT system 0' reference is located 90' CW of nozzle TDC.
The GERIS 2000 OD system recorded the following non-relevant indications:
0&deg; Weld Metal                  - Entry Surface Noise, Geometry - Clad Noise 450 Transverse                - Entry Surface Noise, Geometry - Clad Noise, Non-Relevant Reflector 600  Transverse              - Entry Surface Noise, Geometry - Clad Noise, Geometry - Nozzle Bore 450  Parallel                - Geometry - Clad Noise 600  Parallel                - Entry Surface Noise, Geometry - Clad Noise 700  Transverse                - Entry Surface Noise 70* Parallel                  - Entry Surface Noise These non-relevant indications were flagged and excluded from the final report.
The GERIS 2000 OD system recorded one (1) indication with the 450 Tranverse search unit over 20% DAC which was found to be acceptable.
No other indications requiring evaluation according to ASME B&PV Code Section X1 or USNRC Reg Guide 1.150 Revision 1 (Alternative Method) were recorded.
Due to nozzle configuration it is not feasible to examine 100% of the ASME Code required volume.
Automated 0',450 and 600 UT Coverage = 72.3%. Credit for the 45&deg;/600 near field taken with the 70*.
Automated 70' Near Surface UT Coverage = 44.7%
Previous data was reviewed prior to the examination, changes are noted below.
The GERIS 2000 Automated system records the complete RF data during scanning, it also utilizes search units with lower frequency elements and'improved ultrasonic coupling. The GERIS 2000 Automated System has shown that with its improvements in examination techniques, indications have better reflectivity with a 1 MHz search unit over a 2.25 MHz.,
which could explain why this indication was not recorded during the prior manual inspection.
Ii LA SALLE SUMNV.DOC                                                                                                        13c PAGEL...OF      -
 
LaSalle Unit I N4A Jan-02 CODE CROSS-SECTIONAL AREA                                        TOTAL CODE COVERAGE "a
Area Scanned              % of Area Scanned        Degrees Scanned                    % Scanned 0    Area Inch 2          Auto          Manual          Auto        Manual    Auto          Manual          Auto        Manual 0OWELD METAL    N      59.12            31.12            0.0          52.6          0.0      360.0            0.0          52.6          0.0 45&deg; T-SCAN N      59.12            47.77            0.0          80.8          0.0      360.0            0.0          808            0.0 60' T-SCAN N      59.12            50.16            0.0          84.8          0.0      360.0            0.0          84.8          0.0 N      59.12              0.0            0.0          0.0          0.0      0.0            0.0            0.0          0.0 450 P-SCAN CW    N      59.12            37.90            0.0          64.1          0.0      360.0            0.0          64.1          0.0 600 P-SCAN CW    N      59.12            47.15            0.0          79.8          0.0      360.0            0.0          79.8          0.0 450 P-SCAN CCW N      59.12            37.90            0.0          64.1          0.0      360.0            0.0          64.1          0.0 600 P-SCAN CCW    N      59.12            47.15            0.0          79.8          0.0      360.0            0.0          79.8          0.0 72.3          0.0 Total 0*, 45* and 60&deg; Coverage =      72.3 70&deg; T-SCAN 70' P-SCAN CW N
N 21.13 21.13 11.75 8.28 0.0 0.0 1    55.6 39.2 0.0 0.0 360.0 360.0 0.0 0.0 55.6 39.2 0.0 0.0 700 P-SCAN CCW    N      21.13            8.28            0.0          39.2          0,0      360.0            0.0          39.2          0,0 44.7          0.0 Total 70&deg; Coverage        44.7 COMMENTS:
IAutomated UT scans were limited due to the nozzle radius.
ICredit for the initial 114" of material in code coverage taken with the 700                                                    1 02/29/01
 
LEsEIe  E FEEl)WATER Coole Required Exam Votume --; 59.12 Sq, In.
0&deg; L-Wave Exam Volume - 31.12 Sq, In, 45&deg; T-Scmn Exam Volume - 47.77 Sq, In, 60* T-Scan Exam Volume 50,16 Sq, In, c~cr
 
LasaUle I FEEDWATER Code Required Exam Volume - 59, 12 Sq, In, 450 P-Scan Exam Volume -  37390 Sq, In, 600 P-Scan Exam Volume 47,15 Sq. In,
 
                            .:3 Lcsatte 1 FEEDWATER Code Required Exam Volume -    26.13 Sq, In, 70&deg; T-Scan Exam VoLume -  11.75 Sq. In, 70* P-Scan Exam VoLume 8,25 Sq, In, 70&deg;T
 
Noazi  r(3)
GOD-SL6C.xls LaSalle I                                                                                                                                  09/18/00 N4 FEEDWATER GERIS-2000 NOZZLE-TO-VESSEL SCANNING LIMITS NOZOD                  25 VSLIR                  127 WALL                  6.69 WELD RAD            17.25 ODBR                    4 TYPE                F    (F-FLANGE OR B-BARREL)
Delay                          INDEX INDEX  STEP        RADIAL DISTANCE  AGATE BE GATE      C GATE FIXTURE CPU CH    TYPE    usec          X        Y      DEG  INCHES  INCHES        START    STOP  STOP  START STOP  STOP    ANGLE ANGLE 4    0.00      B    3.66        0.00      0.00      0.8"  0.501  0.150          0      19.74    91    47    79    56 1    0.00    W      3.66        0.00      0.00      0.8&deg;  0.320  0.150          0      6.36    91    -      -    56        -
2    45.0"      T    13.26      3.00      0.00      0.8&deg;  0.418  0.150          0      13.61    235                  -      7.2&deg;  -7.2&deg; 3    60.0&deg;      T    14.15      -3.00      0.00      0.8&deg;  0.501  0.150          0      19.74    328                      354.0&deg;    6.0&deg; 2    45.00    P1    13.26      3.00      0.00      0.8'  0.341  0.150          0      7.94    235                      300.5&deg;  59.5&deg;    (ccw) 3    60.00    P1    14.15      -3.00      0.00      0.8'  0.383  0.150          0      10.97    328                      295.6-  64.4-    (ccw) 2    45.0&deg;    P2    13.26      3.00      0.00      0.8*  0.341  0.150          0      7.94    235                        78.1  -78.1&deg;    (cw) 3    60.0&deg;    P2    14.15      -3.00      0.00      0.8*  0.383  0.150          0      10.97  328                        47.8&deg;  -47.8&deg;    (cw) 1/17/2002                                                                      Page 1                                                                3108 PM
 
No., 10 GOD-SL6C.xls LaSalle 1                                                                                                                                  09/18/00 N4 FEEDWA TER GERIS-2000 NOZZLE-TO-VESSEL SCANNING LIMITS NOZOD                  25 VSLIR                  127 WALL                  6.69 WELD RAD            17.25 ODBR                    4 TYPE                F    (F-FLANGE OR B-BARREL)
Delay                        INDEX  INDEX  STEP      RADIAL DISTANCE  AGATE  BE GATE      C GATE FIXTURE CPU CH    TYPE  usec          X          Y    DEG  INCHES  INCHES      START    STOP  STOP      START STOP STOP    ANGLE ANGLE 1    70I0'    T      12.00        ,00      0.00    0.8&deg;    0.387  0.150        0      11.27    54                          0.0&deg;  0.0&deg; 2    70.0'    P1    12.00      3.00      0.00    0.8    0.316  0.150,      0      6.10    54 -(ccw)                  28-5&deg;  72.5-3    70,0'    P2    12M0      -3.00      0.00    -0.8*  0.316  0.150        0      6.10    54                          72.5*  -72,5'  :(cw) 1/1712002                                                                      Page 1                                                                *.4in c)Aj
 
OGEUT EXAMINATION      NUCLEAR ENERGY
 
==SUMMARY==
SHEET                      REPORT NO: 1R9-025 PROJECT              LaSalle Unit 1 - L1RO9 WELD ID:            LCS-1-N4B SYSTEM:              RPV - FEEDWATER INITIAL CALIBRATION ID:                          NOZIN., 70RL.IN.1 CALIBRATION VERIFICATIONS:                      N4B.1, N4B.2, N4B.70RL.1, N4B.70RL.2 DATA SHEETS:-                                    n4c.tl.1, n4c.pl.1, n4c.p2.1, n4c.70rI.1 FINAL CALIBRATION ID:                            SEE
 
==SUMMARY==
SECTION BELOW MANUAL CALIBRATION:                              N/A EXAMINERS              ....                      J. Kent Montgomery, Lv II, Mark Hilborn, Lv II Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section Xl, 1989 Edition no Addenda, Category B-D welds and USNRC Reg Guide 1.150 Revision 1 (Alternative Method).
Automated 0', 2.25 L-Wave; 450 and 600 Shear 1.0 MHz and 70&deg; RL 2.0 MHz Transverse and Parallel scans were performed in accordance with procedure GE-UT-702 Version 2.
Automated scanning was limited due to the nozzle OD blend radius.
Initial calibrations for the 00, 450 and 600 Shear automated examinations were performed on code vessel block - SIN -
01-91-03. Calibration for the 700 RL automated examinations were performed on GENE sizing block, SIN -CAL-DPTH-60 ( Refer to G2K-CAL-1 Initial Calibration Summary Sheet).
For final automated calibrations and linearities, refer to Calibration Summary Sheet - G2K-CAL-3.
The GERIS 2000 OD automated UT system 00 reference is located 90* CW of nozzle TDC.
The GERIS 2000 OD system recorded the following non-relevant indications:
0' L-Wave                      - Entry Surface Noise, Geometry - Clad Noise 450 Transverse                - Entry Surface Noise, Geometry - Clad Noise, Geometry - Nozzle b6re 600  Transverse                - Entry Surface Noise, Geometry - Clad Noise, Geometry - Nozzle Bore 450  Parallel                - Entry Surface Noise, Geometry - Clad Noise 600  Parallel                - Entry Surface Noise, Geometry - Clad Noise 700  Transverse                - Entry Surface Noise, Non-Relevant Reflector 700  Parallel                - Non-Relevant  Reflector These non-relevant indications were flagged and excluded from the final report.
The GERIS 2000 OD system recorded one (1) indication with the 70&deg; Tranverse search unit that was found to be acceptable per the requirements of ASME B&PV Code Section Xl, 1989 Edition No Addenda Table IWB 3510-1 No other indications requiring evaluation according to ASME B&PV Code Section Xl or USNRC Reg Guide 1.150 Revision 1 (Alternative Method) were recorded.
Due to nozzle configuration it is not feasible to examine 100% of the ASME Code required volume.
Automated 0',450 and 600 UT Coverage = 72.3%
Automated 700 Near Surface UT Coverage = 44.7%
Credit for the 450/600 near field taken with the 700.
Previous data was reviewed prior to the examination, changes are noted below.
There was no previous 700 Near Surface data to review or compare.
Ii LA SALLE SUMNV.DOC                                                                                              R0 y PAGE          OF
 
LaSalle Unit I N4B Jan-02f
                                                                                                                              +
N4B Jan-02 I*
LaSalle Unit
                                                                                                                            +*
CODE CROSS-SECTIONAL AREA                                    TOTAL CODe COVERAGE Area Scanned          % of Area Scanned        Degrees Scanned                      % Scanned 0                    2 Area Inch            Auto          Manual      Auto        Manual      Auto          Manual            Auto        Manual 0&deg; WELD METAL    N          59.12            31.12          0.0        52.6          0.0      360.0            0.0            52.6          0.0 450 T-SCAN N          59.12            47.77          0.0        80.8          0.0      360.0            0.0            80.8          0.0 600 T-SCAN N          59.12            50.16          0.0        84.8          0.0      360.0            0.0            84.8          0.0 N          59.12              0.0          0.0          0.0          0.0      0.0            0.0              0.0          0.0 450 P-SCAN CW    N          59.12            37.90          0.0        64.1          0.0      360.0            0.0            64.1          0.0 60' P-SCAN CW    N          59.12            47.15          0.0        79.8          0.0      360.0            0.0            79.8          0.0 450 P-SCAN CCW    N          59.12            37.90          0.0        64.1          0.0      360.0            0.0            64.1          0.0 600 P-SCAN CCW    N          59.12            47.15          0.0        79.8          0.0      360.0            0.0            79.8          0.0 72.3          0.0 Total 0&deg;, 450 and 60* Coverage =        72.3 70' T-SCAN  N 21.13            11.75          0.0        55.6          0.0      360.0            0.0            55.6          0.0 70' P-SCAN CW  N          21.13              8.28          0.0        39.2          0.0      360.0            0.0            39.2          0.0 700 P-SCAN CCW    N          21.13              8.28          0.0        39.2          0.0      360.0            0.0            39.2          0.0 44.7          0.0 Total 700 Coverage =      44.7 COMMENTS:
I I..  -      J. I... *=            .      . ..          .
Automated u I scans were limited aue to he nozzle radius.
Credit for the initial 114" of material in code coverage taken with the 700                                                    I &#xfd;"--
 
LcscWle I FEED WATER Code -Required Exam Volume  -  59,12 .&#xfd;q. In, 0* L-WVIve Exaim Volume - 31,12 Sq. It 45&deg; T-Scn Exam Volume - 47.77 Sq, In, 60&deg; T-Scon Exam Volume 50.16 Sq, In,
 
Lasalle 1 FEEDWATER Codle Required Exam Volume 1 59.12 Sq, In, 450 P-Scan Exam Volume -  37,90 Sq, In.
600 P-&deg;Scan Exam Volume 47.15 Sq, In,
 
L*csUle      1 FEEDWATER Code Required Exam Volume - 26,13 Sq, In, 70&deg; T-Scan Exam Volume -  11.75 Sq. In.
70&deg; P-Scan Exam Volume 8,25 Sq, In.
70-T 70-P 70*P                70TT I
I-fl I          I I.___________
 
NozT_,m(3)
GOD-SL6C.xls LaSalle 1                                                                                                                                09/18/00 N4 FEEDWA TER GERIS-2000 NOZZLE-TO-VESSEL SCANNING LIMITS NOZOD                  25 VSLIR                  127 WALL                  6.69 WELD RAD            17.25 ODBR                    4 TYPE                F    (F-FLANGE OR B-BARREL)
Delay                          INDEX INDEX  STEP      RADIAL DISTANCE  AGATE BE GATE      C GATE FIXTURE CPU CH      TYPE  usec          X          Y      DEG  INCHES  INCHES      START    STOP  STOP  START STOP  STOP    ANGLE ANGLE 4    0.00    B      3.66      0.00      0.00      0.8"  0.501  0.150      0      19.74    91    47    79    56 1    0.0"    W      3.66      0.00      0.00      0.8"  0.320  0.150      0      6.36    91    -          56        --
2    45.00    T    13.26      3.00      0.00      0.8"  0.418  0.150      0      13.61    235                        7.2-  -7.2" 3    60.0'    T    14.15      -3.00      0.00      0.8"  0.501  0.150      0      19.74  328                      354.0. 6.0" 2    45.00    P1    13.26      3.00      0.00      0.8"  0.341  0.150      0      7.94    235                      300.5'  59.5"    (ccw) 3    60.0&deg;    P1    14.15      -3.00      0.00      0.8"  0.383  0.150      0      10.97  328                      295.60  64.4"    (ccw) 2    45.0*    P2    1326        3.00      0.00      0.8&deg;  0.341  0.150      0      7.94    235                        78.1  -78.1    (cw) 3    60.00    P2    14.15      -3.00      0.00      0,8    0.383  0.150      0      10.97  328                        47.80  -47.8-    (cw) 1117/2002                                                                    Page I                                                              3:08 PM
 
Noz, W0 GOD-SL6C.xis LaSalle I                                                                                                                            09/18/00 N4 FEEDWA TER GERIS-2000 NOZZLE-TO-VESSEL SCANNING LIMITS NOZOD                    25 VSLIR                  127 WALL                  6.69 WELD RAD              17.25 ODBR                    4 TYPE                  F    (F-FLANGE OR B-BARREL)
Delay                        INDEX INDEX  STEP      RADIAL DISTANCE  AGATE BE GATE    C GATE FIXTURE CPU CH      TYPE  usec          X          Y    DEG  INCHES  INCHES      START    STOP  STOP  START STOP STOP    ANGLE ANGLE 1    70.0"    T      12,00      0.00      0.00    0.8*  0.387  0.150        0      11.27    54                        0.0&deg;  0.0" 2    70.0*    P11    12,00      3.00      0.00    0.8*  0.316  0.150        0      6.10    54                      287.5"  72.5*  (ccw) 3    70.0*    P2    12M0      -3.00      0.00    0."    0.316  0.150        0      6.10    54                      72.5'  -72.5*  (cw) 1/17/2002                                                                      Page I                                                            3A10 PM
 
GE NUCLEAR ENERGY UT EXAMINATION
 
==SUMMARY==
SHEET                                  REPORT NO: 1R9-026 PROJECT              LaSalle Unit 1 - Li R09 WELD ID:              LCS-1-N4C SYSTEM:              RPV - FEEDWATER INITIAL CALIBRATION ID:                          NOZ.IN.1, 70RL.IN.1 CALIBRATION VERIFICATIONS:                      N4B.2, N4C.1, N4D.70RL.1, N4C.70RL.1 DATA SHEETS:                                    n4c.tI.1, n4c.pl.1, n4c.p2.1, n4c.70ri.1 FINAL CALIBRATION ID:                            SEE
 
==SUMMARY==
SECTION BELOW MANUAL CALIBRATION:                              N/A EXAMINERS:                                      J. Kent Montgomery, Lv II, Mark Hilborn, Lv II U6tfrasonic examination results were acceptable to the requirements of ASME B&PV Code Section XI, 1989 Edition no Addenda, Category B-D welds and USNRC Reg Guide 1.150 Revision 1 (Alternative Method).
Automated 0&deg;, 2.25 L-Wave; 450 and 60* Shear 1.0 MHz and 700 RL 2.0 MHz Transverse and Parallel scans were performed in accordance with procedure GE-UT-702 Version 2.
Initial calibrations for the 0&deg;, 450 and 600 Shear automated examinations were performed on code vessel block - S/N -
01-91-03. Calibration for the 70&deg; RL automated examinations were performed on GENE sizing block, SIN -CAL-DPTH-60 ( Refer to G2K-CAL-1 Initial Calibration Summary Sheet).
For final automated calibrations and linearities, refer to Calibration Summary Sheet - G2K-CAL-3.
The GERIS 2000 OD automated UT system 0' reference is located 90' CW of nozzle TDC.
The GERIS 2000 OD system recorded the following non-relevant indications:
0&deg; L-Wave                      - Entry Surface Noise, Geometry - Clad Noise 00 Base Metal                  - Entry Surface Noise 450 Transverse                -Geometry - Clad Noise, Non-Relevant Reflector, Geometry - Nozzle bore 600 Transverse                - Entry Surface Noise, Geometry - Clad Noise, Non-Relevant Reflector, Geometry - Nozzle Bore 450  Parallel                  - Geometry - Clad Noise 600  Parallel                  - Geometry - Clad Noise, Non-Relevant Reflector 70'  Transverse                - Entry Surface Noise 700  Parallel                  - Entry Surface Noise These non-relevant indications were flagged and excluded from the final report.
The GERIS 2000 OD system recorded one (1) indication with the 450 Tranverse search unit over 20% DAC which was found to be acceptable.
No other indications requiring evaluation according to ASME B&PV Code Section XI or USNRC Reg Guide 1.150 Revision 1 (Alternative Method) were recorded.
Due to nozzle configuration it is not feasible to examine 100% of the ASME Code required volume.
Automated 0',45' and 600 UT Coverage = 72.3%. Credit for the 450/600 near field taken with the 700.
Automated 70' Near Surface UT Coverage = 44.7%
Previous data was reviewed prior to the examination, changes are noted below.
The GERIS 2000 Automated system records the complete RF data during scanning, it also utilizes search units with lower frequency elements and improved ultrasonic coupling. The GERIS 2000 Automated System has shown that with its improvements in examination techniques, indications have better reflectivity with a 1 MHz search unit over a 2.25 MHz.,
which could explain why this indication was not recorded durinn the prior manual inspection.
EP        BY      '            REVIE9VED BY        DATIE  '        0"      // 6ATE    ANI4  REVIEW        DATE
__*I OF J
PAGE LA SALLE SUMNV.DOC                                                                                                !  C4 PAGE      I___ Of
 
LaSalle Unit 1 N4C Jan-02 CODE CROSS-SECTIONAL AREA                                          TOTAL CODE GOVERAGE 4D Area Scanned                    % of Area Scanned    Degrees Scanned                    % Scanned 0,            2                                                                Auto          Manual          Auto        Manual Area Inch          Auto            Manual            Auto          Manual 00 WELD METAL    N      59.12            31.12            0.0              52.6            0.0 360.0            0.0          52.6          0.0 45&deg; T-SCAN N      59,12            47.77            0.0              80.8            0.0 360.0            0.0          80.8          0.0 600 T-SCAN N      59.12            50.16            0.0              84.8            0.0 360.0            0.0          84.8          0.0 N      59.12              0.0            0.0                0.0            0.0  0.0            0.0            0.0          0.0 450 P-SCAN CW    N      59.12            37.90            0.0              64.1            0,0 360.0            0.0          64.1          0.0 600 P-SCAN CW    N      59.12            47.15            0.0              79.8            0.0 360.0            0.0          79.8          0.0 450 P-SCAN CCW    N      59.12            37.90            0.0              64.1            0.0 360.0            0.0          64.1          0.0 600 P-SCAN CCW    N      59.12            47.15            0.0              79.8            0.0 360.0          0.0            79.8          0.0
* ________  -________ ________        _______if                                72.3          0.0 Total 00, 450 and 600 Coverage  =      72.3 70* T-SCAN  N      21.13            11.75            0.0              55.6            0.0 360.0            0.0          55.6          0.0 70* P-SCAN CW  N      21.13            8.28            0.0              39.2            0,0 360.0            0.0          39.2          0.0 70* P-SCAN CCW    N      21.13            8.28            0.0              39.2            0.0 360.0            0.0          39.2          0.0 44.7          0.0 Total 700 Coverage =      44.7 COMMENTS:
Automated UT scans were limited due to the nozzle radius.
Credit for the initial 1/4" of material in code coverage taken with the 70&deg;                                                      02/29/0' 102/29/01
 
Lasale 1 FEEDWATER Code Required Exam Votume  - 59.12 Sq. In, 0&deg; L-Wave Exam Volume - 31,12 Sq, In, 45* T-Scan Exam Volume - 47,77 Sq, In.
600 T-Scan Exam Volume 50,16 Sc, In,
 
Lasa~Le 1 FEEDWATER Code Required Exam Volume  -: 59,12 Sq, In, 45* P-Scan Exam Volume - 37.90 Sq, In, 60* P-Scan Exam Volume 47,15 Sco. In, p
 
LasPate 1 FEEDWATER Code Required Exam Volume -  26,13 Sq, In, 70&deg; T-Scan Exam Volume -  11.75 Sq. In.
700 P-Scan Exam Volume 8,25 Sq. In.
70&deg;T
 
Noz'i _r(3)
GOD-SL6C.xls LaSalle 1                                                                                                                                09/18/00 N4 FEEDWA TER GERIS-2000 NOZZLE-TO-VESSEL SCANNING UMITS NOZOD                    25 VSLIR                  127 WALL                  6.69 WELD RAD              17.25 ODBR                    4 TYPE                  F    (F-FLANGE OR B-BARREL)
Delay                          INDEX INDEX  STEP        RADIAL DISTANCE  AGATE BE GATE      C GATE FIXTURE CPU CH      TYPE  usec        X          Y      DEG  INCHES  INCHES        START    STOP  STOP  START STOP  STOP    ANGLE ANGLE 4      0.00      B    3.66      0.00      0.00      0.8*  0.501  0,150        0      19.74    91    47    79    56 1      0.0*    W      3.66      0.00      0.00      0.8&deg;  0.320  0.150        0      6.36    91    -      -    56 2    45.0"      T    13.26      3.00      0.00      0.8*  0.418  0,150        0      13.61  235                        7.2"  -7.2-3    60.0"      T    14.15      -3.00      0.00      0.80  0.501  0.150        0      19.74  328                      354.0. 6.0*
2    45.0&deg;    P1    13.26      3.00      0.00      0.8"  0.341  0.150        0      7.94  235                      300.5*  59.5"    (ccw) 3    60.0"    P1    14.15      -3.00      0.00      0.81  0.383  0.150        0      10.97  328                      295.6'  64.40    (ccw) 2    45.00    P2    13.26      3.00      0.00      0.8"  0.341  0.150        0      7.94  235                        78.1  -78.1    (cw) 3    60.00    P2    14.15      -3.00      0.00      0.8&deg;  0.383  0.150        0      10.97  328                      47.80  -47.8-    (cw) 1/17/2002                                                                      Page I                                                              3:08 PM
 
Noz,' i GOD-SL6C.xls LaSalle I                                                                                                                              09/18/00 N4 FEEDWA TER GERIS-2000 NOZZLE-TO-VESSEL SCANNING LIMITS NOZOD                    25 VSLIR                  127 WALL                  6.69 WELD RAD              17,25 ODBR                    4 TYPE                  F    (F-FLANGE OR B-BARREL)
Delay                        INDEX  INDEX  STEP      RADIAL DISTANCE  AGATE BE GATE    C GATE FIXTURE CPU CH      TYPE  usec          X          Y    DEG  INCHES  INCHES      START  STOP  STOP  START STOP STOP    ANGLE ANGLE 1    70.0&deg;      T    12.00      000        0.00      0.8*  0.387  0150          0    11.27    54                        0.0&deg;  0.0" 2    70.0&deg;    P1    12.00      3.00      0.00      0.8"  0.316  0.150        0    6.10    54                      287.5*  72,50    (ccw) 3    70.0*    P2    1200      -3.00      0.00      0.8&deg;  0.316  0.150        0    6.10    54                      72.5"  -72,5"  (cw) 1/17/2002                                                                      Page I                                                            3:10 PM
 
GE NUCLEAR ENERGY UT EXAMINATION
 
==SUMMARY==
SHEET                                  REPORT NO: 1R9-027 PROJECT              LaSalle Unit 1 - L1RO9 WELD ID:            LCS-1-N4D SYSTEM:              RPV- FEEDWATER INITIAL CALIBRATION ID:                          NOZ.IN.1, 70RL.IN.1 CALIBRATION VERIFICATIONS:                      N4D.1, N4C.70RL.1 DATA SHEETS:                                    n4d.tl.1, n4d.tl.2, n4d.pl,1, n4d.pl.2, n4d.p2.1, n4d.70rl.1 FINAL CALIBRATION ID:                            SEE
 
==SUMMARY==
SECTION BELOW MANUAL CALIBRATION:                              N/A EXAMINERS: .J.                                      Kent Montgomery, Lv II, Mark Hilborn, Lv II Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section XI, 1989 Edition no Addenda, Category B-D welds and USNRC Reg Guide 1.150 Revision 1 (Alternative Method).
Automated 0', 2.25 L-Wave; 450 and 600 Shear 1'0 MHz and 70&deg; RL 2.0 MHz Transverse and Parallel scans were performed in accordance with procedure GE-UT-702 Version 2.
Initial calibrations for the 0&deg;, 450 and 600 Shear automated examinations were performed on code vessel block - SIN -
01-91-03. Calibration for the 700 RL automated examinations were performed on GENE sizing block, S/N -CAL-DPTH-60 ( Refer to G2K-CAL-1 Initial Calibration Summary Sheet).
For final automated calibrations and linearities, refer to Calibration Summary Sheet - G2K-CAL-3.
The GERIS 2000 OD automated UT system 0' reference is located 90&deg; CW of nozzle TDC.
The GERIS 2000 OD system recorded the following non-relevant indications:
0' L-Wave                      - Entry Surface Noise, Geometry - Clad Noise, Non-Relevant Reflector 45* Transverse                - Geometry - Clad Noise, Non-Relevant Reflector, Geometry - Nozzle bore 600 Transverse                - Geometry - Clad Noise, Non-Relevant Reflector, Geometry - Nozzle Bore 450 Parallel                  - Geometry - Clad Noise 60o Parallel                  - Entry Surface Noise, Geometry - Clad Noise 70' Transverse                - Entry Surface Noise, Electrical Noise 700 Parallel                  - Entry Surface Noise, Electrical Noise These non-relevant indications were flagged and excluded from the final report.
The GERIS 2000 OD system recorded three (3) indications with the 450 Tranverse search unit and one (1) indication with the 600 Transverse search unit that were over 20% DAC, all were found to be acceptable. No indications were recorded over 50% DAC.
No other indications requiring evaluation according to ASME B&PV Code Section XI or USNRC Reg Guide 1.150 Revision 1 (Alternative Method) were recorded.
Due to nozzle configuration it is not feasible to examine 100% of the ASME Code required volume.
Automated 00,450 and 60' UT Coverage = 72.3%
Automated 70* Near Surface UT Coverage = 44.7%
Credit for the 450/60' near field taken with the 70'.
Previous data was reviewed prior to the examination, changes are noted below.
The GERIS 2000 Automated system records the complete RF data during scanning, it also utilizes search units with lower frequency elements and improved ultrasonic coupling. The GERIS 2000 Automated System has shown that with its improvements in examination techniques, indications have better reflectivity with a 1 MHz search unit over a 2.25 MHz.,
which could explain why this indication was not recorded during the prior manual inspection.
SUMNV.DOC                                                                                                    LA SALLE PAGE    /    OF .,.i ,..,
 
4.;
LaSalle Unit 1 N4D Jan-02 CODE CROSS-SECTIONAL AREA                                        TOTAL CODE COVERAGE 0I Area Scanned              % of Area Scanned        Degrees Scanned                    % Scanned Area Inch 2          Auto          Manual          Auto        Manual      Auto          Manual          Auto        Manual 00 WELD METAL  N      59.12            31.12            0.0          52.6          0.0      360.0            0.0          52.6          0.0 450 T-SCAN N      59.12            47.77            0.0          80.8          0.0      360.0            0.0          808            0.0 60&deg; T-SCAN N      59.12            50.16            0.0          84.8          0.0      360.0            0.0          84.8          0.0 N      59.12              0.0            0.0          0.0          0.0      0.0            0.0            0.0          0.0 450 P-SCAN CW    N      59.12            37.90            0.0          64.1          0.0      360.0            0.0          64.1          0.0 600 P-SCAN CW    N      59.12            47.15            0.0          79.8          0.0      360.0            0.0          79.8          0.0 45' P-SCAN CCW            59.12            37.90            0.0 N                                                      64.1          0.0      360.0            0.0          64.1          0.0 60' P-SCAN CCW    N      59.12            47.15            0.0          79.8          0.0      360.0            0.0          79.8          0.0 72.3          0.0 Total 0', 450 and 60* Coverage        72.3 70 T-SCAN  N      21.13            11.75            0.0          55.6          0.0      360.0            0.0          55.6          0.0 70&deg; P-SCAN CW  N      21.13            8.28            0.0          39.2          0.0      360.0            0.0          39.2          0.0 70' P-SCAN CCW    N      21.13            8.28            0.0          39.2          0.0      360.0            0.0          39.2          0.0 44.7          0.0 Total 700 Coverage =      44.7 COMMENTS:
I-I-
ni Automated UT scans were limited due to the nozzle radius.
ICredit for the initial 1/4" of material in code coveraae taken with the 700 102/29/01
 
Loasole 1 FEEDWATER Code Required Exam Volume    &#xf7;J 59,12 Sq, In, 0* L-Wave Exam Volume  -  31.12 Sq, In, 45' T-Scn Exam Volume-      47.77 Sq, In, 60" T-Scan Exam Volume  550,16 Sq, In, o ~
I-rTl
 
LasacWe 1 FEEPWATER Code Required Exam Volume    59.12 Sq. In, 45* P-Scan Exam Volume - 37 ,90 Sq, In.
60* P-Scan Exam Volume 47,15 Sq, In, 45Q9 I-I m
C-)
 
Lasctte 1 r-Ir-rTn\ I ATI--F)
Er CLUW H I LR\
Cocde Required Exam Volume - 26,13 Sq. In, 70&deg; T-Scan Exam Volume - 11.75 Sq, In, 70* P-Scan Exam Volume 8,25 Sq, In, 70&deg;T
 
NoziR(3)
GOD-SL6C.xls LaSalle 1                                                                                                                              09/18/00 N4 FEED WA TER GERIS-2000 NOZZLE-TO-VESSEL SCANNING LIMITS NOZOD                  25 VSLIR                  127 WALL                  6.69 WELD RAD            17.25 ODBR                    4 TYPE                F    (F-FLANGE OR B-BARREL)
Delay                          INDEX INDEX  STEP    RADIAL DISTANCE  AGATE BE GATE      C GATE FIXTURE CPU CH      TYPE  usec          X        Y      DEG  INCHES  INCHES    START    STOP  STOP  START STOP  STOP    ANGLE ANGLE 4    0,0*      B    3.66        0.00      0,00      0.8'  0.501  0.150      0      19.74    91    47    79    56 1    0.0&deg;    W    3.66        0.00      0.00      0.8'  0.320  0:150      0      6.36    91    -      -    56        -
2    45.0'      T    13.26        3.00      0.00      0.8*  0.418  0.150      0      13.61  235                  -      7.2'  -7.2' 3    60.0&deg;      T    14.15      -3,00      0.00      0.8&deg;  0.501  0.150      0      19.74  328                      354.0'  6.0' 2    45.0'    P1    13.26        3.00      0.00      0.8'  0.341  0.150      0        7.94  235                      300.5'  59.5'    (ccw) 3    60.0'    P1    14.15      -3.00      0.00      0.8&deg;  0.383  0,150      0      10.97  328                      295.6'  64.4*    (ccw) 2    45.0'    P2    13.26        3.00      0.00      0.8'  0.341  0.150      0        7.94  235                        78.1'  -78.1'    (cw) 3    60.0'    P2    14.15      -3.00      0.00      0.8'  0.383  0.150      0      10.97  328                        47.8'  -47.8'    (cw)
I 1/17/2002                                                                    Page I                                                              3:08 PM
 
Nou 10
                                                                                                                        *._=
GOD-SL6C.xls LaSalle I                                                                                                                                  09/18/00 N4 FEED WA TER GERIS-2000 NOZZLE- TO- VESSEL SCANNING LIMITS NOZOD                  25 VSLIR                127 WALL                6.69 WELD RAD            17.25 ODBR                    4 TYPE                F    (F-FLANGE OR B-BARREL)
Delay                        INDEX INDEX  STEP      RADIAL DISTANCE  AGATE BE GATE    C GATE      FIXTURE CPU CH      TYPE  usec          X          Y    DEG  INCHES  INCHES      START    STOP  STOP  START STOP STOP          ANGLE ANGLE 1    70.0"    T      12.00      0.00      0.00    0.8*  0.387  0.150        0      11.27    54                            00      0.0    (ccw 2    70.0"    P1    12.00      3.00      0.00    0.8"  0.316  0.150        0      6.10    54                            287,5"  72.5"    cw 3    70,0*    P2    12.00      -3.00      0.00    0.8*  0.316  0.150        0      6.10    54                  -72.5"          -72.5"  (cw)
'-I 1/17/2002                                                                      Page 1                                                                  3:10 PM
 
GE NUCLEAR ENERGY UT EXAMINATION
 
==SUMMARY==
SHEET                                      REPORT NO: 1R9-028 PROJECT              LaSalle Unit 1 - L1 R09 WELD ID:            LCS-1-N4E SYSTEM:              RPV- FEEDWATER INITIAL CALIBRATION ID:                          NOZIN1, 70RL.IN.1 CALIBRATION VERIFICATIONS:                      N4D.1, N4E.1, N4F.1, N4E.70RL.1, N4F.70RL.1 DATA SHEETS:                                    n4e.tl.1, n4e.tl.2, n4e.tl.3, n4e.tL.4, n4e.pl.1, n4e.p2.1, n4e.70rl.1 FINAL CALIBRATION ID:                            SEE
 
==SUMMARY==
SECTION BELOW MANUAL CALIBRATION:                              N/A
    ,EXAMINERS:,,                                    J. Kent Montgomery, Lv II, Mark Hilborn, Lv II Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section Xl, 1989 Edition no Addenda, Category B-D welds and USNRC Reg Guide 1.150 Revision 1 (Alternative Method).
Automated 00, 2.25 L-Wave; 450 and 60* Shear 1.0 MHz and 70&deg; RL 2.0 MHz Transverse and Parallel scans were performed in accordance with procedure GE-UT-702 Version 2.
Initial calibrations for the 0&deg;, 450 and 60* Shear automated examinations were performed on code vessel block - SIN -
01-91-03. Calibration for the 700 RL automated examinations were performed on GENE sizing block, S/N -CAL-DPTH-60 ( Refer to G2K-CAL-1 Initial Calibration Summary Sheet).
For final automated calibrations and linearities, refer to Calibration Summary Sheet - G2K-CAL-3.
The GERIS 2000 OD automated UT system 00 reference is located 900 CW of nozzle TDC.
The GERIS 2000 OD system recorded the following non-relevant indications:
0&deg; Base Metal                  - Geometry - Clad Noise, Non-Relevant Reflector 450 Transverse                - Geometry - Clad Noise, Non-Relevant Reflector 600 Transverse                - Geometry - Clad Noise, Non-Relevant Reflector, Geometry - Nozzle Bore 450 Parallel                  - Geometry - Clad Noise, Entry Surface Noise 600 Parallel                  - Entry Surface Noise, Geometry - Clad Noise, Non-Relevant Reflector 70&deg; Transverse                - Entry Surface Noise, Non-Relevant Reflector 70&deg; Parallel                  - Entry Surface Noise These non-relevant indications were flagged and excluded from the final report.
The GERIS 2000 OD system recorded one (1) indication with the 450 Tranverse search unit over 20% DAC which was found to be acceptable.
No other indications requiring evaluation according to ASME B&PV Code Section Xl or USNRC Reg Guide 1.150 Revision I (Alternative Method) were recorded.
Due to nozzle configuration it is not feasible to examine 100% of the ASME Code required volume.
Automated 00,450 and 600 UT Coverage = 72.3%. Credit for the 450/600 near field taken with the 70&deg;.
Automated 70* Near Surface UT Coverage = 44.7%
Previous data was reviewed prior to the examination, changes are noted below.
The GERIS 2000 Automated system records the complete RF data during scanning, it also utilizes search units with lower frequency elements and improved ultrasonic coupling. The GERIS 2000 Automated System has shown that with its improvements in examination techniques, indications have better reflectivity with a 1 MHz search unit over a 2.25 MHz.,
which could explain why this indication was not recorded during the prior manual inspection.
II LA SALLE SUMNV.DOC                                                                                                      R cl PAGE      1  OF  32
 
LaSalle Unit I N4E Jan-02 CODE CROSS-SECTIONAL AREA                                        TOTAL CODE COVERAGE Area Scanned              % of Area Scanned        Degrees Scanned                    % Scanned 0  Area Inch 2        Auto          Manual          Auto        Manual      Auto          Manual          Auto        Manual 0
    &deg; WELD METAL  N    59.12            31.12            0.0          52.6          0.0      360.0            0.0          52.6          0.0 450 T-SCAN N    59.12            47.77            0.0          80.8          0.0      360.0            0.0          80.8          0.0 60' T-SCAN N    59.12            50.16            0.0          84.8          0.0      360.0            0.0          84.8          0.0 N    59.12              0.0            0.0          0.0          0.0      0.0            0.0            0.0          0.0 45" P-SCAN CW    N    59.12            37.90            0.0          64.1          0.0      360.0            0.0          64.1          0.0 600 P-SCAN CW    N    59.12            47.15            0.0          79.8          0.0      360.0            0.0          79.8          0.0 450 P-SCAN CCW    N    59.12            37.90            0.0          64.1          0.0      360.0            0.0          64.1          0.0 600 P-SCAN CCW    N    59.12            47.15            0.0          79.8          0.0      360.0            0.0          79.8          0.0 72.3          0.0 Total 0&deg;, 45&deg; and 600 Coverage =      72.3 700 T-SCAN  N    21.13            11.75            0.0          55.6          0.0      360.0            0.0          55.6 70' P-SCAN CW  N    21.13            8.28            0.0                                                                                0,0 39.2          0.0      360.0            0.0          39.2 0.0 70&deg; P-SCAN CCW    N    21.13            8.28            0.0          39.2          0.0      360.0            0.0          392            AN 44.7          0_0 Total 700 Coverage =      44.7 COMMENTS:
Automated UT scans were limited due to the nozzle radius.
Credit for the initial 114" of material in code coverage taken with the 70&deg; 1 02/29/01
 
2 700&deg;              0 1800 H4-Thermocouptes T-Scan0 Start    o lu-            80 Stop
 
Lascde 1 FEEDWATER 600 T-Scan Exam Volume 50,16 Sq, In, 60&deg; T-Scan Exam Limited to 16,05" from 1080 CCW to 800 'due to thermocouples on vessel wall 600 T-Scan Exam Volume was not limited 16.05' I
I I
1
-~  T) c-i,.-
7.
IN (1.
 
LcasscLRe 1 FEEDWATER Codie Required Exam Volume - 59.12 Sq. In, 0&deg; L-W ve Exam Volume - 31.12 So. In, 45* T-Scan Exam Volume - 47.77 Sq.
60&deg; T-Scon Exam Volume 50,16 Sq, In,
 
LascWte 1 FEEDWATER
* Code Required Exam Volume - 59.12 Sq, In, 45" P-Scan Exam Volume - 37.90 Sq. In, 60&deg; P-Sccin Exom Volume 47,15 So, In,
 
Lasacle 1 FEEDWATER Code Required Exam Volume - 26.13 Sq, In, 700 T-Scan Exam Volume - 11.75 Sq. In, 700 P-Scan Exam Volrume 8,25 Sq. In.
70&deg;T
 
Noz,_IR(3)
GOD-SL6C.xIs LaSalle 1                                                                                                                                  09/18/00 N4 FEEDWA TER GERIS-2000 NOZZLE-TO-VESSEL SCANNING LIMITS NOZOD                  25 VSLIR                  127 WALL                  6.69 WELD RAD              17.25 ODBR                    4 TYPE                F    (F-FLANGE OR B-BARREL)
Delay                          INDEX INDEX  STEP      RADIAL DISTANCE  AGATE  BE GATE      C GATE FIXTURE CPU CH      TYPE  usec          X          Y      DEG  INCHES  INCHES      START    STOP  STOP    START STOP  STOP    ANGLE ANGLE 4      0.0"      B    3.66      0.00      0.00      0.80  0.501    0.150      0      19.74      91    47    79    56 1    0.00    W      3.66      0.00      0.00      0.8"  0.320    0.150      0        6.36      91    -      -    56        -
2    45.0&deg;      T    13.26      3.00      0.00      0.8&deg;  0.418  . 0.150      0      13.61    235                  -      7.22  -7.2' 3    60.00      T    14.15      -3.00      0.00      0.8"  0.501    0.150      0      19.74    328                      354.0'  6.0&deg; 2    45.0'    P1    13.26      3.00      0.00      0.8'  0.341    0.150      0        7.94    *235                      300.5'  59.5'    (ccw) 3    60.0'    P1    14,15      -3.00      0.00      0.8"  0.383    0.150      0      10.97    328                      295.6'  64.4'    (ccw) 2    45.0"    P2    13.26      3.00      0.00      0.8&deg;  0.341    0.150      0        7.94    235                        781&deg;  -78.1'    (cw) 3    60.0'    P2    14.15      -3.00      0.00      0.8'  0.383    0.150      0        10.97    328                        47,80  -47.8'    (cw) 1117/2002                                                                    Page I                                                                3:08 PM
 
Noi i0 GOD-SL6C.xls LaSalle I                                                                                                                            09118/00 N4 FEEDWA TER GERIS-2000 NOZZLE-TO-VESSEL SCANNING LIMITS NOZOD                  25 VSLIR                127 WALL                6.69 WELD RAD            1725 ODBR                , 4 TYPE                F    (F-FLANGE OR B-BARREL)
Delay                        INDEX INDEX  STEP      RADIAL DISTANCE  AGATE BE GATE    C GATE FIXTURE CPU CH    TYPE  usec          X          Y    DEG  INCHES  INCHES      START    STOP  STOP  START STOP STOP    ANGLE ANGLE 1    70.0&deg;    T    12.00      0.00      0.00    0.8"  0.387  0.150        0      11.27    54                        0.0&deg;  0,0" 2    70.0*    P1    12.00      3.00      0.00    0.8&deg;  0.316  0.150        0      6.10    54                      287.50  72.5&deg;  (ccw) 3    70.00    P2    12.00      -3.00      0.00    0.8"  0.316  0.150        0      6.10    54                      72.50  -72.5'  (cw)
U, 1/17/2002                                                                    Page 1                                                          3:10 PM
 
GE NUCLEAR ENERGY UT EXAMINATION
 
==SUMMARY==
SHEET                                    REPORT NO: 1R9-029 PROJECT              LaSalle Unit 1 - L1RO9 WELD ID:            LCS-1-N4F SYSTEM:              RPV - FEEDWATER INITIAL CALIBRATION ID:                          NOZ.IN.1, 70RL.IN.1 CALIBRATION VERIFICATIONS:                      N4F.1, N4A.1, N4F.70RL.1, N4A.70RL.1 DATA SHEETS:                                    n4f.tl.2, n4f.pl.2, n4f.p2.1, n4f.70r1.1 FINAL CALIBRATION ID:                            SEE
 
==SUMMARY==
SECTION BELOW MANUAL CALIBRATION:                              N/A E.MINERS:....                                    J. Kent Montgomery, Lv II, Mark Hilborn Lv II Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section XI, 1989 Edition no Addenda, Category B-D welds and USNRC Reg Guide 1. 150 Revision 1 (Alternative Method).
Automated 0*, 2.25 L-Wave; 450 and 60&deg; Shear 1.0 MHz and 70&deg; RL 2.0 MHz Transverse and Parallel scans were performed in accordance with procedure GE-UT-702 Version 2.
Initial calibrations for the 0&deg;, 45* and 60' Shear automated examinations were performed on code vessel block - SIN -
01-91-03. Calibration for the 70* RL automated examinations were performed on GENE sizing block, S/N -CAL-DPTH-60 ( Refer to G2K-CAL-1 Initial Calibration Summary Sheet).
For final automated calibrations and linearities, refer to Calibration Summary Sheet - G2K-CAL-3.
The GERIS 2000 OD automated UT system 00 reference is located 900 CW of nozzle TDC.
The GERIS 2000 OD system recorded the following non-relevant indications:
0&deg; Weld Metal                  - Geometry - Clad Noise, Non-Relevant Reflector 450 Transverse                - Geometry - Clad Noise, Non-Relevant Reflector 560 Transverse              - Geometry - Clad Noise, Non-Relevant Reflector, Geometry - Nozzle Bore 456 Parallel                  - Geometry - Clad Noise 60' Parallel                  - Entry Surface Noise, Geometry - Clad Noise 700 Transverse                - Entry Surface Noise, Non-Relevant Reflector 700 Parallel                  - Entry Surface Noise, Non-Relevant Reflector These non-relevant indications were flagged and excluded from the final report.
The GERIS 2000 OD system recorded one (1) indication with the 700 Tranverse search unit over 20% DAC which was found to be acceptable.
No other indications requiring evaluation according to ASME B&PV Code Section Xl or USNRC Reg Guide 1.150 Revision 1 (Alternative Method) were recorded.
Due to nozzle configuration it is not feasible to examine 100% of the ASME Code required volume.
Automated 0*,450 and 600 UT Coverage = 72.3%. Credit for the 450/600 near field taken with the 70'.
Automated 700 Near Surface UT Coverage = 44.7%
Previous data was reviewed prior to the examination, changes are noted below.
There was no previous 70* Near Surface data to review or compare.
  &#xfd;REPARED BY              DATE        RE"A                  DATE  j uBY                  DATE  ANI[REVIEW          DATE SUMNV.DC                                                                                                    LA SALLE I "V-L
 
LaSalle Unit I N4F Jan-02 CODE CROSS-SECTIONAL AREA                                        TOTAL CODE COVERAGE 2
6.)
Area Scanned              % of Area Scanned        Degrees Scanned                    % Scanned wo
                        .0 Area Inch2          Auto          Manual          Auto        Manual      Auto          Manual          Auto        Manual 0OWELD METAL    N        59.12            31.12          0.0            52.6          0.0      360.0            0.0          52.6          0.0 450 T-SCAN N        59.12            47.77            0.0          80.8          0.0      360.0            0.0          80.8          0.0 600 T-SCAN N        59.12            50.16            0.0          84.8          0.0      360.0            0.0          84.8          0.0 N        59.12              0.0            0.0          0.0          0.0      0.0            0.0            0.0          0.0 450 P-SCAN CW    N        59.12            37.90            0.0          64.1          0.0      360.0            0.0          64.1          0.0 600 P-SCAN CW    N        59.12            47.15            0.0          79.8          0.0      360.0            0.0          79.8          0.0 450 P-SCAN CCW    N        59.12            37.90          0.0          64.1          0.0      360.0            0.0          64.1          0.0 60" P-SCAN COW    N        59.12            47.15          0.0          .79.8          0.0      360.0            0.0          79.8          0.0 72.3          0.0 Total 0&deg;, 450 and 600 Coverage =      72.3 700 T-SCAN  N 21.13            11.75          0.0            55.6          0.0      360.0            0.0          55.6          0.0 70' P-SCAN CW  N        21.13            8.28            0.0          39.2          0.0      360.0            0.0          39.2          0.0 700 P-SCAN CCW    N        21.13            8.28            0.0            39.2          0.0      360.0            0.0          39.2          0.0 44.7          0.0 Total 700 Coverage =      44.7 o -;
COMMENTS:
l~utomatea U I scans were limirea aue to me nozzle radius.
Credit for the initial 1/4" of material in code coverage taken with the 70&deg;                                                    I rlO/*Qin4
 
LascW~e 1 FEEDWATER V
Code Required Exam Volume  -. 59.12 Sq, In, 0* L-Wave Exam Volume -  31.12 Sq, In, 45&deg; T-Scan Exam Volume - 47.77 Sq, In, 60&deg; T-Scan Exam Volume 50,16 Sq, In, 1/
 
Lasole 1 FEEDWATER Code Required Exam Volume -* 26,13 Sq. In, 70&deg; T-Scan Exam Volume - 11.75 Sq. In, 70&deg; P-Scan Exam Volume 8,25 So, In, I
70&deg;T
 
Noz- ri(3)
GOD-SL6C.xls LaSalle 1                                                                                                                                  09/18/00 N4 FEED WA TER GERIS-2000 NOZZLE-TO-VESSEL SCANNING LIMITS NOZOD                  25 VSLIR                  127 WALL                  6.69 WELD RAD            17.25 ODBR                    4 TYPE                  F    (F-FLANGE OR B-BARREL)
Delay                          INDEX INDEX  STEP      RADIAL DISTANCE  AGATE  BE GATE      C GATE FIXTURE CPU CH    TYPE  usec          X        Y      DEG  INCHES  INCHES    START    STOP  STOP    START STOP  STOP    ANGLE ANGLE 4    0.0'      B    3.66        0.00      0.00      0,8'  0.501  0,150      0      19.74    91    47    79    56 1    0.0*    W      3.66        0.00      0.00      0.8&deg;  0.320  0.150      0        6,36    91      -      -    56        -
2    45.0"      T    13.26        3.00      0,00      0.8"  0.418  0.150      0        13.61    235                  -      7.20  -7.2" 3    60.00      T    14.15      -3.00      0.00      0.8    0.501  0.150      0        19.74    328                  -    354.00    6.0&deg; 2    45,0*    P1    13.26        3.00      0.00      0.8"  0.341  0.150      0        7.94    235                  -    300.50  59.50    (ccw) 3    60,00    P1    14.15      -3.00      0.00      0.8"  0.383  0.150      0        10.97    328                  -    295.60  64.4"    (ccw) 2    45.00    P2    13.26        3.00      0.00      0.8&deg;  0.341  0.150      0        7.94    235                  -    78.1  -78.1    (cw) 3    60.00    P2    14.15      -3.00      0.00      0.81  0.383  0.150      0        10.97    328                  -    47.8*  -47.8-    (cw) 1/17/2002                                                                    Page 1
 
NoZ , i0 GOD-SL6C.xls LaSalle I                                                                                                                            09/18/00 N4 FEED WA TER GERIS-2000 NOZZLE-TO-VESSEL SCANNING LIMITS NOZOD                  25 VSLIR                  127 WALL                  6.69 WELD RAD            17.25 ODBR                    4 TYPE                F    (F-FLANGE OR B-BARREL)
Delay                        INDEX INDEX  STEP      RADIAL DISTANCE  AGATE BE GATE    C GATE FIXTURE CPU CH    TYPE  usec          X        Y      DEG  INCHES  INCHES      START  STOP  STOP  START STOP STOP    ANGLE ANGLE 1    70.0'    T    12.00      0.00      0.00    0.8&deg;  0.387  0.150        0    11.27    54                      0.0&deg;    0,0&deg; 2    70.0&deg;    P1    12.00      3.00      0.00    0.8'  0,316  0.150        0    6.10    54                      287.5&deg;  72.5&deg;  (ccw) 3    70&#xfd;0&deg;    P2    12,00      -3.00      0.00    0.8&deg;  0.316  0.150          0    6.10    54                      72.5*  -725&deg;  (cw) 1/17/2002                                                                    Page 1                                                          &#xfd;. A^ - -
 
Report No.:
G GE NUCLEAR ENERGY EXAMINATION
 
==SUMMARY==
SHEET                                          1R9-136 Site and Unit:                      LaSalle                        Component ID:                        IRH-HXI B-08A Outage:                LI R09                                                                    I Lun System:      RHR        ASME Cat.:        C-C      ASME Item              C3.10          Aug Requirements:            N/A Exams Performed      Data Sheet        Cal Sheet          Procedure          Calibration Block      Examination  Cert Level      Date Personnel N/A            MT-001              N/A          MT-EXLN-102                  N/A            JudithOusley    II        01/11/2002 Examination Results:
During the magnetic particle examination of the above referenced weld, no indications were recorded.
76% of the code required surface area was examined.
This examination meets the requirements of ASME Section Xl, 1989 Edition, no Addenda.
Examination results were comparedto data report            D579      from        1989    outage with    E    No Change These examinations were perfornedunder Work Order:              99270178                                    0    Change This Summary and the following data sheets have been reviewed and accepted by thp following personnel:
                                ",/-/3-l.                      ( ;< z'                -wP:                                    868
__-/3-        __      ---    /.      '      T*                      J/*-*  i    Dose:      N/A    mr.
Prpaed.,                      Level:        Date:    Utility Reviewed By:      /
 
==Title:==
Date:
Reviewed By:                  Level:        Date:    ANII Reviewed By:
 
==Title:==
Date:        Page    1 of    3
 
Weld No.:  IRH-HXIB-08A                                  Configuration:      I LuO Drawing:    GEL-1104                                    System:
Procedure No.:    MT-EXLN-102                      Version / Revision Material:                  Surface Condition:                Item:
Carbon Steel                  Ground                          Weld. Final Magnetizing Apparatus                                                        Black LighIt Mfg:          ParkerResearch    Yoke Calibration: AC - 10 lb. Lift                                Model          Serial Number Model:        Probe B300                                                          Blacklight    N/A            NIA 8164              Yoke Spacing:        6.                        Light Meter  N/A            N/A Serial No.
Thermometer:      218052                  Surface Tern perature:          60' F Technique                                Examination Medium                                Blacklight Intensity Magnetization: AC                  Magnetic Particles:      Dry                                                N/A Biacklight Intensity:
Technique:    Continuous                Magnaflux              8A Red            93A045 Manufacturer:      Particle Type:      Batch No LI        01/1112002 Level    Date e      a-t3-oz-Level    Date Page    ,        of
 
GE Inspection Services GE Ispetio $erlIRH-HXIB4-A,9A Was          ce            & I OA
/
 
Q            GE NUCLEAR ENERGY UT EXAMINA TION
 
==SUMMARY==
SHEET                                  Summary No;          P,11 -025 PROJECT            LaSaife Unit 1. L I R I WELD ID:          GEL- O09-AG 73p Hd to F'aigje SYSTEM:            RFV CALIBRATION ID:            ,N&#xfd;A Manual DATA:                UT-021,022,023, and 024 OPERATORS:                  S h,-kkon Lv Vr,T Girider Ultrasornic examination results were acceprable to the requirements of AWME R&PV Codie Sctkin XI, 1989 Edilfon no Acdenda also Section x)I, i95 Edition wth the 199A6/ddenda as modified by the PFD. progrm description arnd !he Federal Reqsler, Pail 1;, Nuclear Reguiatoiy Ccrrmission, 10 CF&sect;R Part ,O fotoCategory B-A R.(.adcr Pres55ste Vessel ?RPV)
Assembly Welds.
Manual transverse and paralle! scans were oerfor-med frcm'the vessel 00)surface in 3czordance 'with procedure GE-UT- 300 V 10. using 601R9L search units.
Manual parallel scanning was iestficted due ro the Flarge tc weld confiqLrat0on The manual exams recorded no indications, Pre-vous data was (viewed    with no significant changes.
Manual UT C:rn"s* e coveraqe = 49c Magnetic Particle examination was performed in acccrdarinc, with procedure GE. MT-100 V'6. data ,le'ts - MT,006 and MT.-O7O T.tere  were no recordatle indicallis 1,I% of the required area was exammed
                                                                                                        ,i 7'f/
                                                                                                            *1 YA46V        &#xfd;Af-REVIE WED 9Y                CA TE I UTILITY REVIEW        OATE#1/2  ANI EIE                ATE La Sile U, t      Ri 1                                                ae/c Page.-I      D&#xfd;  '?
 
cb                                                                                                                                        R~portNo. 1Ri~-G2~
Report No, I R 11" -025 LaSaile Unit-1 GEL- 1009-AG Spring 2006 CODE CROSS-SECTIONAL AREA                              TOTAL CODE COVERAGE Percent              -
Weld Length =  791.      Required Exam    Area Scanned              of Area            Weld Length              Porcent
            &#xa3;4              Exam Volume z  22.2        Area Sq. In.        Manual                Manual                  Manual              Manual 60' NS T-Scar.        A            7.9                ".9                356%                    3955                . ./
60; S6 T-Scan          A            1                  11                49.5%                  395.5              124%
I'          60- S4 T-Scan          A            3.3                13.                14.9%      "          3G55 60' NS P-Scan          A            79                T4                  33 3%                  395.5                8.3%,"
60* S6 P-S&an          A            11                104                  468%                    395.5              11.7%
60' S4 P-Scan          A            3.3                3.                  14 0%                  395 5                3 5t 60 NS T-Scan                __'_.                          ..                  ........                              _ _
60" S6 T-Scan                                . .      .    . ....        .
F3'0 " 4T-Scan          -  ...                                    L,                  I.    .            eI 60'  NS  P-Scan      -
60' N6 P-Scan                                          .. . .      .. .  ._
60'8*P-Scan                _                              ..... .  .      ....
Comen~    A- ~sm~dacessbl wed enghfrm        1O~cw o    6O      ?      :,~L &    Jlm                              V/.
                                                                                                  % Total Composite Coverage =                  49%
0 1~~                B - P-Scan restriced due to weld to flange configuraton.
0 N*nte --IRL-tncjfl,9 methcos may affect calculated vaiies,
 
(
* LaSalle Unit 1 Flange to Top Head 6r60 NS Exam Volume = 7.9 Sq. In.
60" FV S6 Exam Volume = 11.0 Sq. In.
60 6o    V S4 Exam Volume = 3.3 Sq. In.
60Nr 1S T-Scan achieved  = 7.9 Sq. In.
60  F'V S6 T-Scan achieved = 11.0 Sq. in.
60r FV S4 T-Scan achieved = 3.3 Sq. In.
60  NS P-Scan achieved    = 7.4 Sq. In.
60" FV S6 P-Scan achieved = 10.4 Sq. In.
60r FV S4 P-Scan achieved = 3.1 Sq. In.
1.6 WT                WT          3.0 V                              '
 
GE NuclearEnergy                                  MAGNETIC PARTICLE EXAMINATION REPORT Site: LaSalle Station                  Unit: 1          Project: LIRII                        Report Number:                1RII-025 Sheet No.:                  MT-006 Weld No.:    GEL-1009-AG                                        Configuration:      Top Head - Flanme Drawing:    GEL-1009                                            System:            RPV Procedure No.:        GE-MT-100                        Version I Revision:          V6            DRR:                  N/A Material:                      Surface Condition:                    Item:
CarbonSteel                    Cleaned                              Weld - Final Magnetizing Apparatus                                                              Black Light Mfg:              ParkerResearch      Yoke Calibration: 2015106                                              Model            Serial Number Model:            B-300                                                                    Blacklight:    N/A                N/A Serial No.        5522                  Yoke Spacing:          3"-6"                        Light Meter:  N/A                N/A Thermometer:          246434                      Surface Temperature:              87&deg; F Technique                                    Examination Medium                                        Blacklight Intensity Magnetization: AC                        Magnetic Particles:          Dry                                                    N/A Technique:        Continuous              ParkerResearch                  RP-6            11793                    Blacklight Intensity:
Manufacturer          Particle Type:      Batch No.:
Indication Number                                           
 
== Description:==
Resuls:
                                    --2_
                                      -R
                                              ---                                                                            --          I Comments:
Inspected from 1800 to 2700 Azimuth.
No recordable indications.
Clay Suhler                        II  2/2200            Utility Review                                Date .
Initia E/ainer                Level    Date GE Review                      Level    De                ANII Review                                    Date          Page      *;    of 7
 
GE NuclearEnergy                              MAGNETIC PARTICLE EXAMINATION REPORT Site: LaSalle Station                  Unit: I        Project:      LIR1I                  Report Number:              IRII-025 Sheet No.:                  MT-007 Weld No.:    GEL-1009-AG                                      Configuration:      Too Head- Flange Drawing:    GEL-1009                                        System:              RPV Procedure No.:        GE-MT-100                        Version I Revision:          V6          DRR:                N/A Material:                      Surface Condition:                  Item:
CarbonSteel                    Cleaned                            Weld- Final Magnetizing Apparatus                                                            Black Light Mfg:            ParkerResearch      Yoke Calibration: 2115/06                                            Model          Serial Number Model:          B-300                                                                  Blacklight:    N/A              N/A Serial No.      8164                Yoke Spacing:        3""                        Light Meter:    N/A              N/A Thermometer:        246434                    Surface Temperature:              67&deg; F Technique                                  Examination Medium                                      Blacklight Intensity Magnetization: AC                      Magnetic Particles:        Dry                                                    N/A Technique:      Continuous              ParkerResearch                RP-6            11793                    Blacklight Intensity:
Manufacturer          Particle Type:      Batch No.:
Comments:
Inspected from 270&deg; to 360&deg; Azimuth.
No recordable indications.
Alan Kel/2v                                              Utility.Revie.                                Date Initial                        Level    Date                                              -
GE Review                      Level    Date            ANII Review                                    Date        Page      7      of
 
      ~GE          NUCLEAR ENERGY UT EXAMINATION
 
==SUMMARY==
SHEET                                  Summary No: 1R 11-007 PROJECT          LaSalle Unit 1, L1RlI WELD ID:          GEL-1006-AJ - Bottom Hd. Circumferential Weld SYSTEM:          RPV CALIBRATION ID:            N/A MANUAL DATA:                UT-061, 062, 063, 064 OPERATORS:                  W. Reid Lv II, S. Snyder Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section XI, 1989 Edition no Addenda, and Section XI, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-A Reactor Pressure Vessel (RPV) Assembly Welds.
Manual transverse and parallel scans were performed from the vessel OD surface in accordance with procedure GE-UT-300 V10; using 60' RL search units.
Manual scanning was performed from the top side only, T-scans and P-scans were restricted due to the RPV vessel skirt.
The manual exams recorded no indications.
Previous data was reviewed with no significant changes.
Manual UT composite coverage      = 19 %
REPARED BY            DATE    REVIEWED BY          DATE    UTILITY REVIEW7    DATE    ANII REVIEW            DATE T Level:                      UT Level:
LaSalle Unit-i, Li Ri 1, 2006                                                                                        ,
Page 1 of*_j
 
                                                                                                                                    ,!w  /* 0'16.
Report No. 1R11-9ft5-LaSalle Unit-1                                                        0o07 GEL-1006-AJ Bott. Hd. Circ. Weld Spring 2006 CODE CROSS-SECTIONAL AREA                        TOTAL CODE COVERAGE Percent Weld Length = 657.3      Required Exam    Area Scanned          of Area      Weld Length        Percent Exam Volume = 36.5          Area Sq. In.      Manual              Manual          Manual            Manual 600 NS T-Scan        A            11.3            -2.3                6.3%          328.6              1.6%
60&deg; S6 T-Scan        A            19.9            13.3              36.4%          328.6              9.1%
600 S4 T-Scan        A            5.3      +        5.2              14.2%          328.6              3.6%
600 NS P-Scan        A          11.3              1.6                4.4%          328.6              1.1%
60" S6 P-Scan        A            19.9              4.1              11.2%          328.6              2.8%
600 S4 P-Scan        A            5.3              1.1                3.0%          328.6              0.8%
600 NS T-Scan 600 S6 T-Scan 600 S4 T-Scan 60' NS P-Scan 600 S6 P-Scan 600 S4 P-Scan iIJ                        _
                                                                                    % Total Composite Coverage =          19%
Comments:  A - Examined accessible weld length from 1800 cw to 3600 top side only, T-scans and P-scans were limited due to the RPV vessel skirt.
Note - Rounding methods may affect calculated values.
 
600 NS Exam Volume= 11.3 Sq. In.                LaSalle Unit 1 60' FV S6 Exam Volume = 19.9 Sq. In.
600 FV S4 Exam Volume = 5.3 Sq. In.            Bottom Head (AJ) 600 NS T-Scan achieved = 2.3 Sq. In.            Circ. Weld 600 FV S6 T-Scan achieved = 13.3 Sq. In.
60' FV S4 T-Scan achieved = 5.2 Sq. In.
60' NS P-Scan achieved = 1.6 Sq. In.
600 FV S6 P-Scan achieved = 4.1 Sq. In.
60&deg; FV S4 P-Scan achieved = 1.1 Sq. In.
600TIP 60 0T                    I 2~)
 
0GE                NUCLEAR ENERGY UT EXAMINATION
 
==SUMMARY==
SHEET                                REPORT NO: 1Rl1-003 PROJECT          LaSalle Unit 1 - L1Rl1 WELD ID:          LCS BG SYSTEM:          RPV INITIAL CALIBRATION ID:                    VES.91.1N.1      (L1RO9)
FINAL CALIBRATION ID:                      VES.91.OUT.1 (L1RO9)
GERIS DATA:                                (See weld LCS-1-BG reports from L1RO9)
MANUAL CALIBRATION:                        N/A MANUAL DATA:                                N/A Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code, Section XI, 1989 Edition No Addenda, Category B-A Reactor Pressure Vessel (RPV) Assembly Welds.
Automated 0', 2.25 MHz Weld and Base Metal, 45&deg;S, 1.0 MHz, 601L, 2.0 MHz and 70&deg;RL, 2.0 MHz Transverse and Parallel scans were performed per the requirements of procedure GE-UT-704 V4, in accordance with Appendix VIII.
Automated scanning was restricted on both sides of "BG" due to Instrumentation Nozzle N12-A.
These examinations were performed during the L1R09 outage in 2002 which did not permit single side coverage.
Reevaluation of this recorded data was performed in accordance with procedure GE-UT-704 V8 which is qualified for single sided access. The coverage was recalculated and resulted in an increase in coverage of 9.2%, taking the coverage from 66.1% to 75.3%
Automated UT Composite Coverage = 75.3%
GERIS 2000 Software Revision 5.26 was used for aquisition and analysis.
Li                                                                                                                  II LaSalle Unit 1, L1R11, 2006                                                                Page I of Z
 
Summary No.: lRll-003 LaSalle Unit-1 LCS-1 -BG ASpring                                                              2006 CODE CROSS-SECTIONAL AREA                          LENGTH CALCULATIONS Percent Weld Length = 109.38 Required Exam Area Scanned                  of Area          Weld Length    Percent N-Exam Volume = 52.69        Area Sq. In.          Auto              Auto                Auto        Auto 700 T-Scan          A          8.38                8.38            15.9%              83.88        6.1%
450 T-Scan          A          36.25              36.25            68.8%              83.88        26.4%
600 T-Scan          A          8.06                8,06            15.3%              64.63        4.5%
700 P-Scan          A          8.38                8.38            15.9%              83.88        6.1%
450 P-Scan          A          36.25              36.25            68.8%              83.88        26.4%
600 P-Scan          A          8.06                8.06            15.3%              64.63        4.5%
70' T-Scan 450 T-Scan 600 T-Scan          B          8.06              4.03              7.6%              19.25        0.7%
700 P-Scan 450 P-Scan 60&deg; P-Scan          B          8.06              4.03              7.6%              19.25        0.7%
70' T-Scan 450 T-Scan 600 T-Scan 700 P-Scan 450 P-Scan 600 P-Scan
                                                                                    -/o I otal G~omposit  koverage=    / b.3V Comments:  A - Examined accessible length. Weld length reduced by 3.0" due to the N12-A instrumentation nozzle.
B - Automated exam restricted due to the proximity of the N12-A nozzle pad.
Note - Rounding methods may affect calculated values.
 
GE NUCLEAR ENERGY UT EXAMINATION
 
==SUMMARY==
SHEET                                    REPORT NO: 1R9-010 PROJECT            LaSalle Unit 1 - L1RO9 WELD ID:          LCS BG SYSTEM:            RPV INITIAL CALIBRATION ID:                      VES.9 1.IN. 1 CALIBRATION VERIFICATIONS:                    BM. 1 FINAL CALIBRATION ID:                        VES.91.OUT.1
: I*NGERIS
            *-  DATA:
A *Ib"IB'*TiON:
L                            bgr.1, N/A    bgr.2, bgl.1, bgl.6, bgl.7, bgl.8
      .MANUJAL tALIRATINNA MANUAL DATA:                                  N/A Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code, Section XI, 1989 Edition No Addenda, Category B-A Reactor Pressure Vessel (RPV) Assembly Welds.
Automated 0', 2.25 MHz Weld and Base Metal, 45&deg;S, 1.0 MHz, 60 0L, 2.0 MHz and 70&deg;RL, 2.0 MHz Transverse and Parallel scans were performed per the requirements of procedure GE-UT-704 V4, in accordance with Appendix VIII.
The GERIS 2000 OD system recorded the following indications:
00 Weld Metal    - No Recordable Indications 450 Transverse    - No Recordable Indications 600  Transverse    - No Recordable Indications 700  Transverse    - No Recordable Indications 45&deg;  Parallel      - No Recordable Indications 600  Parallel      - No Recordable Indications 70'  Parallel      - No Recordable Indications Plate segregates on both sides of weld "BG" were observed.
Automated scanning was restricted on both sides of "BG" due to Instrumentation Nozzle N12-A.
Previous examination results were reviewed and there are no changes.
Automated UT Composite Coverage = 66.1%
GERIS 2000 Software Revision 5.26 was used for aquisition and analysis.
(      REPARED BY
      -ATE 0          7 REVI WED BY DATE      0 UTILITY REVIEW DATE ANII REVIEW DATE I
SUMNV.DOC                                                                                                LA SALLE I K ("~I
                                                                                                                  /
PAC    It,
 
Y= 459.50 454I,683 BE Area Scanned Area not scanned on left side 40,5' Y= 390.00 N12-A Y= 349.50 34 2,2 5 Y= 332,25
 
Y= 464.00 454,63" BN Ar'ea Sca~nned N6-A Y= 378.00 N12-Ar Areoa not scanned on right side 47,75 342,25"
 
(                                                              LaSalle Unit-1 Weld BG Jan-02 CODE CROSS-SECTIONAL AREA                              TOTAL CODE COVERAGE Weld Length                          Area Scanned          % of Area Scanned  IWeld Length Scanned          % Scanned 112.38 2
0    Area Inch      Auto        Manual      Auto      Manual    Auto      Manual      Auto          Manual RIGHT SIDE 70: T-SCAN N/A        8.38        0.00        0.00        0.0        0.0      0.0          0.0        0.0            0.0 RIGHT SIDE 45 T-SCAN    N/A      36.25        0.00        0.00        0.0        0.0      0.0          0.0        0.0            0.0 RIGHT SIDE 60 T-SCAN    N/A      8.06        0.00        0.00        0.0        0.0      0.0          0.0        0.0            0.0 70RP-SCAN UP    N/A      8.38        0.00        0.00        0.0        0.0      0.0          0.0        0.0            0.0 450 P-SCAN UP  N/A      36.25        0.00        0.00        0.0        0.0      0.0          0.0        0.0            0.0 60&deg; P-SCAN UP N/A        8.06        0.00        0.00        0.0        0.0      0.0          0.0        0.0            0.0 Unrestricted Scans LEFT SIDE 70* T-SCAN  N/A      8.38        8.38        0.00      100.0        0.0      0.0          0.0        0.0            0.0 LEFT SIDE 45* T-SCAN  N/A      36.25        36.25        0.00      100.0        00      00          0.0        0.0            0.0 LEFT SIDE 60 T-SCAN    N/A      8.06        8.06        0.00      100,0        0.0      0.0          0.0        0.0            0.0 70* P-SCAN DOWN    N/A      8.38        8.38        0.00      100,0        0.0      0,0          0.0        0.0            0.0 45* P-SCAN DOWN    N/A      36.25        36.25        0.00      100.0        0.0      0.0          0.0        0.0            0.0 60* P-SCAN DOWN    N/A      806          8.06        0.00      100.0        0.0      0.0          0.0        0.0            0&#xfd;0 Restricted Scans RIGHT SIDE 70 T-SCAN    Y        8.38        8.38        0.00      100.0        0.0    76.63        0.0      10.8            0.0 RIGHT SIDE 45* T-SCAN    Y      36.25        36,25        0.00      100.0        0.0    76.63        0.0      46.9            0.0 RIGHT SIDE 60 T-SCAN    Y        8.06        8.06        0.00      100.0        0.0    76.63        0.0      10.4            0.0 70&deg; P-SCAN UP    Y        8.38        8.38        0.00      100.0        0.0    76.63        0,0      10.8            0.0 45&deg; P-SCAN UP    Y      36.25        36.25        0.00      100.0        0.0    76.63        0,0      46.9            0.0 60" P-SCAN UP    Y        8.06        8.06        0.00      100.0        0.0    76.63        0.0      10.4            0.0 Restricted Scans
(  LEFT SIDE 70 T-SCAN LEFT SIDE 45&deg; T-SCAN Y
Y 8.38 36.25 8.38 36.25 0.00 0.00 100.0 100.0 0.0 0.0 71.88 71.88 0.0 0.0 10.2 44.0 0.0 0.0 LEFT SIDE 60 T-SCAN    Y        8.06        8.06        0.00      100.0        0.0    71.88        00        9.8            0.0 70&deg; P-SCAN DOWN      Y        8.38        8.38        0.00      100.0        0.0    71.88        0.0      10.2            0.0 45&deg; P-SCAN DOWN      Y      36.25        36.25        0.00      100.0        0.0    71.88        0.0      44.0            0.0 60* P-SCAN DOWN      Y        8.06        8.06          0.00      100.0        0.0    71.88        0.0        9.8            0.0 Coverages    66.1            0.0 Total Composite Coverage        66.1 Comments:
Automated Scanning was restricted on both sides due to Instrumentation Nozzle N12-A Convfl1,. 4314 1121/*002 CovCalc As      112212002 LA SALLE IR&#xfd;              IA _ /
 
LaSalle 1 Shell Course 3 Required 45&deg; Exam Volume - 36.25 Sq In.
Required 600 Exam Volume - 8.06 Sq In.
Required 700 Exam Volume - 8.38 Sq In.
Right and Left Sides T(-I) - .?'
T(dol) - ?J37r
 
LaSalle  I Shell Course    3 Volume    - 8.06 Sq In.
Exam Required 600 p-Scan                    - 36,25 Sq In.
Exam    Volume Required 450 p-Scan 450 and 600 p-Scan
      . als-Tnow)- 1-37W
 
LaSalle 1 Shell Course 3 Required 70&deg; P-Scan Exam Volume - 8.38 Sq In.
I- T(-.) -7.37r
'ii
 
Vest, pk)
LaSalle I                                                                                GOD-SL6C.xIs VESSEL SCANNING LIMITS                                                                    09/18/00 PDI                                      SHELL COURSE:          3 1 <-Normal Package Position              (1or 0)
PULSER OFFSET              0 counts              VSLIR        127 COUNTS/INCH                1                      WALL        6.75 BE-gate          C-gate CH    Beam        TYPE    ROT    DELAY      X        Y    START    STOP  A-GATE START  STOP    STOP 6        0.        0          B      3.66    0.00    0.00    -19.09    5.58    76    47      91        -
1      0o        0          W      3.66    0.00    0.00      -5.58    5.58    76      -        -      64 2      45.        90        T      13.26    1.72    3.14    -14.61    3.86    237    -        -        -
3      600        90        T      14.15  -0.83    3.14    -18.26    6.41    188    -        -
4      450      180        P      13.26    3.27    0.00      -8.85    2.31    237    -        -
5      600      180          P      14.15    3.27    6.12      -8.85    2.31    188    -        -
7      700        90        T      12.00  0.00    6.12    -10.52    5.58    54      -        -
8      700      180          P      12.00    4.27    3.14      -9.85    1.31    54      -        -
1/25/2002                                                      Page I                                                  10: 14 AM
 
GE NUCLEAR ENERGY UT EXAMINATION
 
==SUMMARY==
SHEET                                  REPORT NO: 1R11-004 PROJECT          LaSalle Unit 1 - Li R1 1 WELD ID:          LCS BH SYSTEM:          RPV INITIAL CALIBRATION ID:                    VES.91.IN.1      (Li R09)
FINAL CALIBRATION ID:                      VES.91.OUT.1 (L1RO9)
GERIS DATA:                                (See weld LCS-1-BG reports from L1RO9)
MANUAL CALIBRATION:                        N/A MANUAL DATA:                                N/A Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code, Section XI, 1989 Edition No Addenda, Category B-A Reactor Pressure Vessel (RPV) Assembly Welds.
Automated 0', 2.25 MHz Weld and Base Metal, 450S, 1.0 MHz, 60&deg;L, 2.0 MHz and 70&deg;RL, 2.0 MHz Transverse and Parallel scans were performed per the requirements of procedure GE-UT-704 V4, in accordance with Appendix VIII.
Automated scanning was restricted on both sides of "BH" due to Instrumentation Nozzle N6-A.
These examinations were performed during the L1R09 outage in 2002 which did not permit single side coverage.
Reevaluation of this recorded data was performed in accordance with procedure GE-UT-704 V8 which is qualified for single sided access. The coverage was recalculated and resulted in an increase in coverage of 6.6%, taking the coverage from 82.2% to 88.8%
Automated UT Composite Coverage = 88.8%
GERIS 2000Software Revision 5.26 was used for aquisition and analysis.
1P  EPARED BY                  REVIEWED BY                    UTILITY REVIEW              ANII REVIEW VATE Z-Z_-0,                    DATE 3/"S-o                    DATE                        DATE LaSalle Unit 1, LR1 1, 2006                                                                Page _tof _2
 
Summary No.: 1Ri 1-004 LaSalle Unit-1 LCS-1-BH Spring 2006 CODE CROSS-SECTIONAL AREA                      LENGTH CALCULATIONS Percent Weld Length = 87.5      Required Exam Area Scanned            of Area        Weld Length    Percent "X.
Exam Volume = 52.69        Area Sq. In.            Auto          Auto              Auto          Auto 700 T-Scan          A          8.38                8.38        15.9%              79.38        7.2%
450 T-Scan          A          36.25              36.25        68.8%              79.38        31.2%
60' T-Scan          A          8.06                8.06        15.3%              57.65        5.0%
700 P-Scan          A          8.38                8.38        15.9%              79.38        7.2%
450 P-Scan          A          36.25              36.25        68.8%              79.38        31.2%
600 P-Scan          A          8.06                8.06        15.3%              57.65        5.0%
700 T-Scan 450 T-Scan 600 T-Scan          B          8.06              4.03          7.6%              21.73        0.9%
700 P-Scan 450 P-Scan 60' P-Scan          B          8.06              4.03          7.6%              21.73        0.9%
70' T-Scan 450 T-Scan 600 T-Scan 700 P-Scan 450 P-Scan 600 P-Scan I otal Composite Coverage =  88.8d' Comments:  A - Examined accessible length. Weld length reduced by 25.23" due to N6-A nozzle cutout B - Automated exam restricted due to the proximity of the N6-A nozzle Note - Rounding methods may affect calculated values.
 
GE NUCLEAR ENERGY UT EXAMINATION
 
==SUMMARY==
SHEET                                    REPORT NO: 1R9-011
(
PROJECT            LaSalle Unit 1 - Li R09 WELD ID:          LCS BH SYSTEM:            RPV INITIAL CALIBRATION ID:                        VES.9I.IN.1 CALIBRATION VERIFICATIONS:                    BM.1 FINAL CALIBRATION ID:                          VES.91.OUT.1 GERIS DATA:                                    bhr.3, bhr.4, bhr.5, bhr.6, bhr.7, bhl.1, bhl.2, bhl.3, bhl.4 MANUAL 6AIi6ATiON:
      '..                                            N/A MANUAL DATA:                                  N/A Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code, Section XI, 1989 Edition No Addenda, Category B-A Reactor Pressure Vessel (RPV) Assembly Welds.
Automated 0&deg;, 2.25 MHz Weld and Base Metal, 450S, 1.0 MHz, 60 0L, 2.0 MHz and 70ORL, 2.0 MHz Transverse and Parallel scans were performed per the requirements of procedure GE-UT-704 V4, in accordance with Appendix VIII.
The GERIS 2000 OD system recorded the following indications:
00 Weld Metal    - No Recordable Indications 450 Transverse      - No Recordable Indications 60&deg; Transverse      - No Recordable Indications 700 Transverse    - (2) Indications Recorded - See Indication Data sheet - BH-001, BH-002 450 Parallel        - No Recordable Indications 600 Parallel        - No Recordable Indications 700 Parallel      - No Recordable Indications The two (2) indications recorded above were evaluated and found to be acceptable per the requirements of IWB-3000.
Plate segregates on both sides of weld "BH" were observed.
Automated scanning was restricted on the both sides of weld "BH" due to Nozzle N6-B.
Automated scanning was also limited at the top of weld "BH" due to the proximity of the thermocouple pads.
Previous examination 'results were reviewed and changes are noted. (see below)
The previous examination was performed with an earlier automated GERIS System which did not record the the RF data and only recorded reflectors over 20%.
The present GERIS 2000 Automated system records the complete RF data during scanning, it also utilizes new search units with lower frequency elements and improved ultrasonic coupling.
This examination is also in accordance with ASME Section XI Appendix VIII which is considered more critical of the examination volume, thus, more indications were recorded during this examination than the previous one.
This change in results is not considered to be indicative of changes in the condition of the weld or associated base material.
Automated UT Composite Coverage = 82.2%
GERIS 2000 Software Revision 5.26 was used for aquisition and analysis.
PREPARED BY                        REVIEV/ED BY              F=o UTILlT REV'I- W              ANII REVIEW ATE                            DATE Ln      2      ,          AEDATE                                      Z2-c Z i                                                        ,,,
SUMNVDOC                                                                                                      . L F
 
Y= 455,01 T/C PADS BH N1O                      Area Scanned Y= 398,00 Area due to N6-B Nozzte Ne-B N12-B AC~
Y= 332.50
 
Y= 464.75 00 T/C PADS BH NIO                            Area Scanned Y= 390.00 Area restricted  lue to N6-B Nozzte N6-B N12-B Y= 349.50 AC Y= 332,25
 
(                                                              LaSalle Unit-1 Weld BH Jan-02 CODE CROSS-SECTIONAL AREA                            TOTAL CODE COVERAGE T
Weld Length                        AreaScanned          %of Area Scanned IWeld Length Scanned          % Scanned 87.15 0    Area Inch 2
Auto      Manual      Auto      Manual    Auto      Manual      Auto        Manual Urwustrtted Svens RIGHT SIDE 701 T-SCAN      N      8.38        0.00        0.00        0.0        0.0    0.0          0.0        0.0          0.0 RIGHT SIDE 45 T-SCAN      N      36.25        0.00        0.00        0,0        0.0    0.0          0.0        0.0          0.0 RIGHT SIDE 60*T-SCAN      N      8.06        0.00        0.00        0.0      0.0    0.0          0.0        0.0          0.0 70&deg; P-SCAN UP      N      8.38        0.00        0.00        0.0        0.0    0.0          0.0        0.0          0.0 45' P-SCAN UP      N      36.25        0.00        0.00        0.0        0.0    0.0          00        0.0          0.0 60&deg; P-SCAN UP      N      8.06        0.00        0.00        0.0        0.0    0.0          0.0        0.0          0,0 Unrestricted Scans LEFT SIDE 70 T-SCAN      N      8.38        0.00        0.00        0.0        0.0    0.0          00        0.0          0.0 LEFT SIDE 45* T-SCAN      N      36.25        0.00        0.00        0.0        0.0    0.0          0.0        0.0          0.0 LEFT SIDE 60" T-SCAN      N      8.06        0.00        0.00        0.0        0.0    0.0          00        0.0          0.0 70&deg; P-SCAN DOWN        N      838          0.00        0.00        0.0        0.0    0.0          0.0        0.0          0,0 45&deg; P-SCAN DOWN        N      36.25        0.00        0.00        0.0        0.0    0.0          0.0        0.0          0.0 60&deg; P-SCAN DOWN        N      8.06        0.00        0.00        0.0        0.0    0.0          0,0        0.0          0.0 Restricted Scans RIGHT SIDE 70 T-SCAN      Y      8.38        8.38        0.00      100.0      0,0    71.38        0.0        13.0          0,0 RIGHT SIDE 45&deg; T-SCAN      Y      36.25        36.25        0,00      100.0      0.0    71.38        0.0      56.3          0.0 RIGHT SIDE 60 T-SCAN      Y      8.06        8.06        0.00      100.0      0.0    71.38        0.0        12.5          0,0 70&deg; P-SCAN UP      Y      8.38        8.38        0.00      1000        0.0    71.38        0.0        13.0          0.0 45' P-SCAN UP      Y      36.25        36.25        0.00      100.0      0.0    71.38        0.0      56.3          0.0 60&deg; P-SCAN UP      Y      8.06        8.06        0.00      100.0      0.0    71.38        0.0        12.5          0.0 Restricted Scans
(    LEFT SIDE 70' T-SCAN    Y      8.38        8.38        0.00      100.0      0,0    71.88        0.0      13.1          D.0 LEFT SIDE 45&deg; T-SCAN    Y      36.25        36.25        0.00      100.0      00    71.88        0,0      56.7          0.0 LEFT SIDE 60&deg; T-SCAN    Y      8.06        8.06        0.00      100.0      0.0    71.88        0.0      12.6          0.0 70 P-SCAN DOWN        Y      8.38        8.38        0,00      100,0      0.0    71.88        0.0      13.1          0.0 45* P-SCAN DOWN      Y      36.25        36.25        0.00      100.0      0.0    71.88        0.0      56.7          0.0 60&deg; P-SCAN DOWN      Y      8.06        8.06        0.00      100.0      0.0    71.88        0.0      12.6          0.0 Coveragel    82.2          0.0 Total Composite Coverage      82.2 Comments:
Weld length reduced 25.23" due to N6-B Nozzle cut-out Automated scanning was restricted on both sides of "SH" due to N6-8 Nozzle.
CovCalc~xls, 1/2212002 LA SALLE 1 RCI r'.A 7%      1r
 
LaSalle 1 Shell Course 3 Required 450 Exam Volume - 36.25 Sq In.
Required 600 Exam Volume - 8.06 Sq In.
Required 70' Exam Volume - 8.38 Sq In.
Right and Left Sides T(no) - 6.7V T(di) - 7.37V
 
LaSalle 1 Shell Course 3 Required 600 P-Scan Exam Volume - 8.06 Sq In.
Required 450 P-Scan Exam Volume - 36.25 Sq In.
T(on) - 0.75 T(dl) - ?.375"
 
LaSalle 1 Shell Course 3 Required 700 P-Scan Exam Volume - 8.38 Sq In.
T(n  - 6,715 T(dWO)7.315=
 
Vestpk)
LaSalle I                                                                                      GOD-SL6C.xls VESSEL SCANNING LIMITS                                                                          09/18/00 PD1                                        SHELL COURSE:            3 1 <--Normal Package Position              (1 or 0)
PULSER OFFSET                0 counts                VSLIR          127 COUNTS/INCH                  1                      WALL          6.75 BE-gate          C-gate CH      Beam        TYPE      ROT    DELAY      X        Y      START      STOP    A-GATE START  STOP    STOP 6        00        0          B      3.66    0.00    0.00      -19.09      5.58      76    47      91        -
1        0&deg;        0          W      3.66    0.00    0.00      -5.58      5.58      76      -        -      64 2      450      90          T      13.26    1.72-  3.14      -14.61      3.86    237    -        -        -
3      600      90          T      14.15    -0.83    3.14      -18.26      6.41    188    -        -        -
4        450      180          P      13.26    3.27    0.00      -8.85      2.31    237    -        -        -
5        60'      180          P      14.15    3.27    6.12      -8.85      2.31    188    -        -        -
7        70
* 90          T      12.00    0.00    6.12      -10.52      5,58    54      -        -        -
8        70*      180          P      12.00    427    3.14      -985        1.31    54      -        -        -
1/25/2002                                                        Page 1                                                      r&#xfd;).
Ip PhA
 
GE NUCLEAR ENERGY UT EXAMINATION
 
==SUMMARY==
SHEET                                      Summary No: 1R 11-021 PROJECT            LaSalle Unit 1, L1R11 WELD ID:          GEL-1009-DR Top Hd Meridional SYSTEM:            RPV CALIBRATION ID:            N/A MANUAL DATA:                UT-036 and 37 OPERATORS:                  W. Reid Lv II, Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section Xl, 1989 Edition no Addenda, and Section Xl, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-A Reactor Pressure Vessel (RPV) Assembly Welds.
Manual transverse and parallel scans were performed from the vessel OD surface in accordance with procedure GE-UT-300 V10; using 600 RL search units.
Manual scanning was restricted due to the top head lifting lug and top hd. flange.
The manual exams recorded no indications.
Previous data was reviewed with no significant changes.
Manual UT composite coverage = 68 %
                                                                                                                      /
Ll                                                                                                                  ii LaSalle Unit-i, LR113,  2006 Page 1 of API;
 
Report No. 1R11-021 LaSalle Unit-1 GE-1009-DR Spring 2006 CODE CROSS-SECTIONAL AREA                  TOTAL CODE COVERAGE Percent Weld Length =      67.      Required Exam      Area Scanned    of Area      Weld Length    Percent Exam Volume =      23.3          Area Sq. In.      Manual      Manual          Manual      Manual 600 NS T-Scan          A                5.5              5.5      23.6%              46          8.1%
60' S6 T-Scan          A                14.4            14.4      61.8%              46        21.2%
60' S4 T-Scan          A                3.4              3.4      14.6%              46          5,0%
600 NS P-Scan          A                5.5              5.5      23.6%            46.0          8.1%
60* S6 P-Scan          A                14.4            14.4      61.8%            46.0        21.2%
60' S4 P-Scan          A                3.4              3.4      14.6%            36.0        3.9%
600 NS T-Scan 60' S6 T-Scan 600 S4 T-Scan          B                3.4              1.7        7.3%              10          0.5%
60' NS P-Scan      __B___
600 S6 P-Scan 600 S4 P-Scan Commnts:A wed legth-Examnedaccesibl
                                                                                    % Total Composite Coverage =    68%
Comments:  A - Examined accessible weld length.
B - P-Scan restricted due to lifting lug and top hd. Flange.
Note - Rounding methods may affect calculated values.
 
Cn                                LaSalle Unit 1 Closure Head Meridionals 60 NS Exam Volume = 5.5 Sq. In, 6*V W*    S6 Exam Volume = 14.4 Sq. In.
60' FV S4 Exam Volume = 3.4 Sq. in.
60' NS T-Scan achieved = 5.5 Sq In.
60* FV S6 T-Scan achieved = 14.4 Sq. In.
60WFV S4 T-Scan achieved = 3.4 Sq. In.
60: NS P-Scan achieved = 5.5 Sq. In.
60' FV S6 P-Scan achieved = 14.4 Sq. In.
60' FV S4 P-Scan achieved = 1.7 Sq. In.
607TIP        60TIP 607T    H-  3.0" -      60'T CD CD 0
 
GE NUCLEAR ENERGY UT EXAMINATION
 
==SUMMARY==
SHEET                                      Summary No: 1R11-023 PROJECT          LaSalle Unit 1, LiRl1 WELD ID:          GEL-1009-DT Top Hd Meridional SYSTEM:          RPV CALIBRATION ID:            N/A MANUAL DATA:                UT-038 and 39 OPERATORS:                  W. Reid Lv II, Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section XI, 1989 Edition no Addenda, and Section Xl, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-A Reactor Pressure Vessel (RPV) Assembly Welds.
Manual transverse and parallel scans were performed from the vessel OD surface in accordance with procedure GE-UT-300 V10; using 600 RL search units.
Manual scanning was restricted due to the top head lifting lug and top hd. flange.
The manual exams recorded no indications.
Previous data was reviewed with no significant changes.
Manual UT composite coverage = 68 %
P EPARED BY            DATE    REVIEWED BY          DATE      UTILITY REVIEW    DATE  ANII REVIEW          DATE UTLeveI: ~J                    UT Level:
LaSalle Unit-i, LIR11, 2006 Page 1 of _4
 
Report No. 1R11-023 LaSalle Unit-1 GE-1009-DT Spring 2006 CODE CROSS-SECTIONAL AREA                  TOTAL CODE COVERAGE Percent Weld Length =    67.      Required Exam      Area Scanned    of Area      Weld Length N          Exam Volume =      23.3        Area Sq. In.        Manual      Manual          Manual Percent Manual N        60' NS T-Scan          A              5.5              5.5        23.6%              46          8.1%
600 S6 T-Scan          A              14.4              14.4        61.8%              46        21.2%
600 S4 T-Scan          A              3.4              3.4        14.6%              46          5.0%
60' NS P-Scan          A              5.5              5.5        23.6%            46.0        8.1%
600 S6 P-Scan          A              14.4              14.4      61.8%              46.0        21.2%
600 S4 P-Scan          A              3.4              3.4        14.6%            36.0        3,9%
600 NS T-Scan 600 S6 T-Scan 60' S4 T-Scan          B              3.4              1.7        7.3%              10        0.5%
600 NS P-Scan 60' S6 P-Scan 60'  S4 P-Scan
                                                                                    % Total Composite Coverage =    68%
Comments: A - Examined accessible weld length.
B - P-Scan restricted due to lifting lug and top hd. Flange Note - Rounding methods may affect calculated values.
 
I-D*    *LaSalle                                                    Unit 1 CD      ,Closure                                                    Head Meridionals C        .60' A)*
60' NS Exam Volume = 5.5 Sq. In FV S6 Exam Volume =14.4 Sq. In.
60' FV S4 Exam Volume = 34 Sq. In.
60' NS T-Scan achieved = 5.5 Sq. In.
60' FV S6 T-Scan achieved = 14.4 Sq. In.
60' FV S4 T-Scan achieved = 3.4 Sq. In.
60' NS P-Scan achieved = 55 Sq In.
60' FV S6 P-Scan achieved = 14 4 Sq. In.
60WFV S4 P-Scan achieved = 1.7 Sq. In.
S11.6"0  P            60TIP 60 'T        I  3.0" 160'T CD
 
10, 0t  ManuaL scan area Manuat scanning restricted due to Uting [ug Iaj N
- &.~
36.00"  Manuat scan area
* GE NUCLEAR ENERGY UT EXAMINATION
 
==SUMMARY==
SHEET                                  Summary No: 1 R 11-028 PROJECT            LaSalle Unit 1, L1R11, 2006 WELD ID:            LCS-1-N2A SYSTEM:            Recirculation CALIBRATION ID:                      NOZIN EXAMINATION DATA:                    N2A-01 OPERATORS:                            C. Gauthier Lv II; S. Gauthier Lv II Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section XI, 1989 Edition no Addenda, also Section XI, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-D Reactor Pressure Vessel (RPV)
Assembly Welds.
Automated transverse and parallel scans were performed in accordance with procedure GE-UT-705 V5, using 450 Shear wave, 600 RL, and 700 RL search units, supplemental 00 L-Wave scans were also performed.
Scanning for the inner 15% T volume for radial flaws was performed using 450 Shear wave search units as specified by the "Nozzle Inner Radius and Bore Requirements" sheet, which bas been verified by modeling.
Automated scanning was performed from the vessel OD surface. Automated scanning was restricted due to the nozzle configuration.
The GERIS 2000 OD automated UT system 0 reference is located at 900 CW of nozzle TDC.
For calibrations refer to report G2K-CAL.
K Seven (7) relevant indications were recorded that were found to be acceptable" per the requirements of IWB-3000, no further evaluations were required.
Previous examination data was reviewed, no indications were recorded.
Automated Composite Coverage      = 83.1%.
REPARED BY              DATE    REVIEWED BY          DATE    UTILITY REVIEW        DATE    ANII REVIEW          DATE UT Level: :11:                    UT Level:
LaSalle Unit 1, Li R1 1, 2006                                                    Pagel1of        "-Z1
 
I-02 I'-
LaSalle 1 M
0 N2 Nozzle - Recirculation Inlet 70* Exam Volume = 11.6 Sq. In 45' Exam Volume = 51.4 Sq. In Inner 15%T Exam Volume (60'T & IRS) = 10.6 Sq. In 70' T-Scan achieved = 6.7 Sq. In 45* T-Scan achieved = 46.9 Sq. In 600 T-Scan achieved = 10.6 Sq. In T-Sca s 707T            45&deg;T            60&deg;T I              I                I z-,
 
LaSalle 1 N2 Nozzle - Recirculation Inlet 700 Exam Volume = 11.6 Sq. In 450 Exam Volume = 51.4 Sq. In Inner 15%T Exam Volume (607T & IRS) = 10.6 Sq. In 70' P-Scan achieved = 5.5 Sq. In 450 P-Scan achieved = 42.0 Sq. In
\I                Inner 15% P-Scan achieved = 10.6 Sq. In U- P-Scans 70&deg;P        45 0P
 
Summary No.: 1R1R-028 LaSalle Unit-I, L1 R11 LCS-1 -N2A Spring 2006 CODE CROSS-SECTIONAL AREA                    TOTAL CODE COVERAGE Percent Weld Length =  360. Required Exam    Area Scanned      of Area      Weld Length    Percent Exam Volume =    73.6      Area Sq. In.        Auto          Auto            Auto          Auto 70' T-Scan          A          11.6              6.7          9.1%            360        4.6%
450 T-Scan          A          51.4            46.9          63.7%            360        31.9%
600 T-Scan          A          10.6              10.6        14.4%            360          7.2%
700 P-Scan          A          11.6              5.5          7.5%            360          3.7%
450 P-Scan          A          51.4              42          57.1%            360        28.5%
IRS P-Scan          A          10.6              10.6        14.4%            360          7.2%
700 T-Scan 450 T-Scan 60' T-Scan 700 P-Scan 450 P-Scan IRS P-Scan 700 T-Scan 450 T-Scan 600 T-Scan 70' P-Scan 450 P-Scan IRS P-Scan
                                                                                % Total Composite Coverage =  83.1%
Comments:  A - Scanned 360 deg., Scanning limited due to nozzle configuration.
Note - Rounding methods may affect calculated values.
 
GE NUCLEAR ENERGY UT EXAMINATION
 
==SUMMARY==
SHEET                                  Summary No: 1 R 11-029 PROJECT            LaSalle Unit 1, L R1i1, 2006 WELD ID:            LCS-1-N2G SYSTEM:            Recirculation CALIBRATION ID:                      NOZ.IN EXAMINATION DATA:                    N2G-01 OPERATORS:                          C. Gauthier Lv II; S. Gauthier Lv II Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section XI, 1989 Edition no Addenda, also Section Xl, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II, Nuclear Regulatory Commission; 10 CFR Part 50 for Category B-D Reactor Pressure Vessel (RPV)
Assembly Welds.
Automated transverse and parallel scans were performed in accordance with procedure GE-UT-705 V5, using 450 Shear wave, 600 RL, and 700 RL search units, supplemental 0&deg; L-Wave scans were also performed.
Scanning for the inner 15% T volume for radial flaws was performed using 450 Shear wave search units as specified by the "Nozzle Inner Radius and Bore Requirements" sheet, which has been verified by modeling.
Automated scanning was performed from the vessel OD surface. Automated scanning was restricted due to the nozzle configuration.
The GERIS 2000 00 automated UT system 0 reference is located at 900 CW of nozzle TDC.
For calibrations refer to report G2K-CAL.
Eleven (11) relevant indications were recorded that were found to be acceptable per the requirements of IWB-3000, no further evaluations were required.
Previous examination data was reviewed, no indications were recorded.
Automated Composite Coverage = 83.1%.
EPA ED BY            DATE    REVIEWED BY          DATE    UTILITY REVIEW        DATE    ANII REVIEW          DATE Level:      _UT_                Level:-
LaSalle Unit 1, L1R11, 2006                                                    Page l1of
 
r-LaSalle 1 C)
N2 Nozzle- Recirculation Inlet 700 45' Exam  Volume == 11.6 Sq. In Exam Volume    51.4 Sq. In Inner 15%T Exam V, olume (60'T & IRS) = 10.6 Sq. In 70' T-Scan achieve( = 6.7 Sq. In 450 T-Scan achievec = 46.9 Sq. In 600 T-Scan achieved = 10.6 Sq. In T-Sca s 70'T            4 &deg;T                607T C DI
-o 1'.
 
I-"
0-Cd, a)
N) 0                        LaSalle 1 N2 Nozzle - Recirculation Inlet 700 Exam Volume = 11.6 Sq. In 450 Exam Volume = 51.4 Sq. In Inner 15%T Exam Volume (607T & IRS) = 10.6 Sq. In 70' P-Scan achieved = 5.5 Sq. In
        \I                450 P-Scan achieved = 42.0 Sq. In Inner 15% P-Scan achieved = 10.6 Sq. In P-Scans 70 0 P        45 0P
    ~AJ
 
Summary No.: IR11-029 LaSalle Unit-i, LI R1 1 LCS-1-N2G Spring 2006 CODE CROSS-SECTIONAL AREA                    TOTAL CODE COVERAGE Percent Weld Length =    360. Required Exam      Area Scanned      of Area      Weld Length      Percent Exam Volume =    73.6    Area Sq. In.          Auto          Auto            Auto          Auto 700 T-Scan        A            11.6              6.7          9.1%            360          4.6%
450 T-Scan        A          51.4              46.9          63.7%            360        31.9%
600 T-Scan        A            10.6              10.6        14.4%            360          7.2%
700 P-Scan        A            11.6              5.5          7.5%            360          3.7%
450 P-Scan        A          51.4                42          57.1%            360        28.5%
IRS P-Scan        A            10.6              10.6        14.4%            360          7.2%
700 T-Scan 450 T-Scan 60' T-Scan 700 P-Scan 450 P-Scan IRS P-Scan 700 T-Scan 450 T-Scan 600 T-Scan 70' P-Scan 450 P-Scan IRS P-Scan
                                                                                % Total Composite Coverage =  83.1%
Comments:    A - Scanned 360 deg., Scanning limited due to nozzle configuration.
Note - Rounding methods may affect calculated values.
 
      *GE            NUCLEAR ENERGY UT EXAMINATION
 
==SUMMARY==
SHEET                                  Summary No: 1R 11-030 PROJECT            LaSalle Unit 1, L1R11, 2006 WELD ID:            LCS-1-N2H SYSTEM:            Recirculation CALIBRATION ID:                      NOZIN MANUAL DATA:                          UT-182 EXAMINATION DATA:                    N2H-01 OPERATORS:                            C. Gauthier Lv II; S. Gauthier Lv II Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section XI, 1989 Edition no Addenda, also Section XI, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-D Reactor Pressure Vessel (RPV)
Assembly Welds.
Automated transverse and parallel scans were perfoi'med in accordance with procedure GE-UT-705 V5, using 45&deg; Shear wave, 60* RL, and 70' RL search units, supplemental 0' L-Wave scans were also performed.
Scanning for the inner 15% T volume for radial flaws was performed using 45" Shear wave search units as specified by the "Nozzle Inner Radius and Bore Requirements" sheet, which has been verified by modeling.
Automated scanning was performed from the vessel OD surface. Automated scanning was restricted due to the nozzle configuration and the proximity of the N9-B nozzle.
Manual supplemental scanning was performed in the restricted area from 114.8" to 155.4".
Manual transverse and parallel scans were performed from the vessel OD surface in accordance with procedure GE-UT-300 V10; using 60" RL search units The GERIS 2000 OD automated UT system 0 reference is located at 900 CW of nozzle TDC.
For calibrations refer to report G2K-CAL.
Two (2) relevant indications were recorded that were found to be acceptable per the requirements of IWB-3000, no further evaluations were required.
Previous examination data was reviewed, no indications were recorded.
Automated and Manual Composite Coverage = 83.1%.
_EPARED BY                DATE    REVIEWED Bf          DATE    UTILITY REVIEW      DATE    ANII REVIEW          DATE Level: -T                    UT Level:
LaSalle Unit 1, L1IR11,2006                                                    Page    t  of  1 r-LaSalle 1 o)CD a)                  N2 Nozzle - R ecirculation Inlet 740 Exam Volume = 11., 6 Sq. In 450 Exam Volume = 51..4 Sq. In Inner 15%T Exam Volunne (607T & IRS) = 10.6 Sq. In 6.7 Sq. In 700 T-Scan achieved =
450 T-Scan achieved = 46.9 Sq. In 600 T-Scan achieved = 10.6 Sq. In 607T T-Sca s    70'T            45*T III                          I
                -iL-
    ~ctt
 
(I-CD I-o 0b LaSalle 1 N2 Nozzle - Recirculation Inlet 700 Exam Volume = 11.6 Sq. In 450 Exam Volume = 51.4 Sq. In Inner 15%T Exam Volume (60-T & IRS) = 10.6 Sq. In 70' P-Scan achieved = 5.5 Sq. In 450 P-Scan achieved = 42.0 Sq. In
        \/                  Inner 15% P-Scan achieved = 10.6 Sq. In P-Scans 70&deg;P        45 0P
        --- Z==
    ~l.
0 0
 
N2-J                                                    N2-H 155.40 N9-B                              0
_r 114.80 T/C PADS Automated Scanning restricted due to the proximity of the N9-B nozzle
 
Summary No.: IR1R-030 LaSalle Unit-I, L1R11 LCS-1-N2H Spring 2006 CODE CROSS-SECTIONAL AREA                            TOTAL CODE COVERAGE Percent Weld Length =    360. Required Exam      Area Scanned          of Area          Weld Length    Percent Exam Volume =      73.6    Area Sq. In.        Auto                Auto              Auto          Auto 70' T-Scan          A          11.6              6.7                9.1%                360        4.6%
450 T-Scan          A          51.4              46.9              63.7%                360        31.9%
600 T-Scan          A          10.6              10.6              14.4%              319.4        6.4%
70' P-Scan          A          11.6              5.5                7.5%                360          3.7%
450 P-Scan          A          51.4              42                57.1%                360        28.5%
IRS P-Scan          A          10.6              10.6-              14.4%              319.4        6.4%
70_T-Scan 450 T-Scan 600 T-Scan          B          10.6              10.6              14.4%                40.6        0.8%
700 P-Scan 450 P-Scan IRS P-Scan          B          10.6              10.6              14.4%                40.6        0.8%
700 T-Scan 450 T-Scan 600 T-Scan 70' P-Scan 450 P-Scan IRS P-Scan 7/    I otal Luo posie Coverage =  05. 170 Comments: A - Scanning restricted due-to nozzle configuration and due to the proximity of the N9-B nozzle.
B - Manual supplemental scanning performed in area restricted by N9-B nozzle.
Note - Rounding methods may affect calculated values.
 
(
    'GE                NUCLEAR ENERGY UT EXAMINATION
 
==SUMMARY==
SHEET                                    Summary No: 1R 11-031 PROJECT            LaSalle Unit 1, L1R11, 2006 WELD ID:            LCS-1-N5 SYSTEM:            Core Spray CALIBRATION ID:                      NOZ.IN EXAMINATION DATA:                    N5-01 OPERATORS:                            C. Gauthier Lv II; S. Gauthier Lv II Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section XI, 1989 Edition no Addenda, also Section XI, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-D Reactor Pressure Vessel (RPV)
Assembly Welds.
Automated transverse and parallel scans were performed in accordance with procedure GE-UT-705 V5, using 45" Shear wave, 600 RL, and 70* RL search units, supplemental 0" L-Wave scans were also performed.
Scanning for the inner 15% T volume for radial flaws was performed using 45" Shear wave search units as specified by the "Nozzle Inner Radius and Bore Requirements" sheet, which has been verified by modeling.
Automated scanning was performed from the vessel OD surface. Automated scanning was restricted due to the nozzle configuration.
The GERIS 2000 OD automated UT system 0 reference is located at 900 CW of nozzle TDC.
For calibrations refer to report G2K-CAL.
K  Eleven (11) relevant indications Were recorded that were found to be acceptable per the requirements of IWB-3000, no further evaluations were required.
Previous examination data was reviewed, no indications were recorded.
Automated Composite Coverage        = 85.5%.
  ,.P!EPARED BY              DATE    REVIEWED BY          DATE    UTL0-ITY REVIEW      DATE    ANII REVIEW          DATE UT Level: ]                      UT Level:.
LaSalle Unit 1, L1R11, 2006                                                    PageJOf          Zf
 
I-0 t-E CD 0
LaSalle 1 N5 Nozzle - Core Spray 70&deg; Exam Volume = 9.4 Sq. In 45&deg; Exam Volume = 38.3 Sq. In Inner 15%T Exam Volume (60'T & IRS) = 8.2 Sq. In 700 P-Scan achieved = 5.0 Sq. In 450 P-Scan achieved = 32.4 Sq. In Inner 15% P-Scan achieved = 8.2 Sq. In P-Scans 70 0 P        45&deg;P I
  -El (0
 
o"O            LaSalle 1 N5 Nozzle - Core Spray 70' Exam Volume = 9.4 Sq. In 450 Exam Volume = 38.3 Sq. In Inner 15%T Exam V olume (607T & IRS) = 8.2 Sq. In 70' T-Scan achieved
                                    = 6.2 Sq. In 450 T-Scan achieved = 35.6 Sq. In 600 T-Scan achieved = 8.2 Sq. In T-Scars      707T        4501 T            60'T II                  I                I
-U
-  I
 
Summary No.: IR1I-031 LaSalle Unit-I, LR11I LCS-1-N5 Spring 2006 CODE CROSS-SECTIONAL AREA                      TOTAL CODE COVERAGE Percent Weld Length =    360. Required Exam    Area Scanned      of Area          Weld Length    Percent Exam Volume =    55.9      Area Sq. In.      Auto            Auto              Auto          Auto 700 T-Scan          A            9.4            6.2            11.1%              360          5.5%
450 T-Scan          A          38.3            35.6          63.7%              360        31.8%
600 T-Scan          A            8.2            8.2            14.7%              360          7.3%
700 P-Scan          A            9.4            5.0            8.9%              360          4.5%
450 P-Scan          A          38.3            32.4          58.0%              360        29.0%
IRS P-Scan          A            8.2            8.2            14.7%              360          7.3%
700 T-Scan 450 T-Scan 600 T-Scan 70' P-Scan 450 P-Scan IRS P-Scan 70' T-Scan 450 T-Scan 600 T-Scan 700 P-Scan 450 P-Scan IRS P-Scan
                                                                                          '/o  I otal uomposie Coverage =  85b.5bo
~.. -~.
Comments: A - Scanned 360 deg., Scanning limited due to nozzle configuration.
I-Note - Rounding methods may affect calculated values.
-Ii
 
        ~GE            NUCLEAR ENERGY UT EXAMINATION
 
==SUMMARY==
SHEET                                  Summary No: 1R 11-032 PROJECT            LaSalle Unit 1, Li R1 1, 2006 WELD ID:            LCS-1-N6B SYSTEM:            LPCI CALIBRATION ID:                      NOZ.INIT.IN EXAMINATION DATA:                    N6B-01 OPERATORS:                            C. Gauthier Lv II; S. Gauthier Lv II Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section XI, 1989 Edition no Addenda, also Section Xl, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-D Reactor Pressure Vessel (RPV)
Assembly Welds.
Automated transverse and parallel scans were performed in accordance with procedure GE-UT-705 V5, using 45" Shear wave, 60" RL, and 70&deg; RL search units, supplemental 0&deg; L-Wave scans were also performed.
Scanning for the inner 15% T volume for radial flaws was performed using 45" Shear wave search units as specified by the "Nozzle Inner Radius and Bore Requirements" sheet, which has been verified by modeling.
Automated scanning was performed from the vessel OD surface. Automated scanning was restricted due to the nozzle configuration.
The GERIS 2000 OD automated UT system 0 reference is located at 900 CW of nozzle TDC.
For calibrations refer to report G2K-CAL.
("  Six (6) relevant indications were recorded that were found to be acceptable per the requirements of IWB-3000, no further evaluations were required.
Previous examination data was reviewed, no indications were recorded.
Automated Composite Coverage = 83.7%.
P
  ,PEPARED      BY          DATE    REVIEWED BY          DATE ' UTILITY REVIEW        DATE  ANII REVIEW            DATE "T Level: j--                    UT Level:
LaSalle Unit 1, LiR11, 2006                                                      Page__I    Of  t 9,
 
LaSalle 1 N6 Nozzle - LPCl 700 Exam Volume = 12.0 Sq. In 450 Exam Volume = 44.8 Sq. In Inner 15%T Exam Volume (60&deg;T & IRS) = 9.6 Sq. In 70&deg; T-Scan achieved = 7.1 Sq. In 450 T-Scan achieved = 40.8 Sq. In 60&deg; T-Scan achieved = 9.6 Sq. In 707T        45&deg;T            600 T T-Scans
 
7N LaSalle 1 N6 Nozzle - LPCI 700 Exam Volume = 12.0 Sq. In
(
450 Exam Volume = 44.8 Sq. In Inner 15%T Exam Volume (60&deg;T & IRS) = 9.6 Sq. In 70' P-Scan achieved = 5.9 Sq. In 450 P-Scan achieved = 38.2 Sq. In
____              Inner 15% P-Scan achieved = 9.6 Sq. In P-Scans    700 P        450 P-Scans I
I N
 
Summary No.: 1Rl1-032 LaSalle Unit-I, Li R11 LCS-1 -N6B Spring 2006 CODE CROSS-SECTIONAL AREA                TOTAL CODE COVERAGE Percent Weld Length =    360. Required Exam      Area Scanned  of Area      Weld Length      Percent Exam Volume =      66.4      Area Sq. In.        Auto        Auto            Auto          Auto 70' T-Scan          A            12                7.1      10.7%            360          5.3%
450 T-Scan          A          44.8              40.8      61.4%            360        30.7%
60o T-Scan          A            9.6              9.6      14.5%            360          7.2%
70' P-Scan          A            12                5.9        8.9%            360        4.4%
450 P-Scan          A          44.8              38.2      57.5%            360        28.8%
IRS P-Scan          A            9.6              9.6      14.5%            360          7.2%
70_T-Scan 450 T-Scan 600 T-Scan 700 P-Scan 450 P-Scan IRS P-Scan 700 T-Scan 450 T-Scan 600 T-Scan 70_P-Scan 450 P-Scan IRS P-Scan
                                                                              % Total Composite Coverage =  83.7%
Comments: A - Scanning restricted due to nozzle configuration.
Note - Rounding methods may affect calculated values.
 
GE NUCLEAR ENERGY
(                  UT EXAMINATION
 
==SUMMARY==
SHEET                                  Summary No: 1R 11-033 PROJECT          LaSalle Unit 1, LR1i1 WELD ID:          LCS-1-N7 Top Head Nozzle SYSTEM:          RPV CALIBRATION ID:            N/A MANUAL DATA:              UT-103, 104,113 and 114 OPERATORS:                S. Snyder Lv II, Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section Xl, 1989 Edition no Addenda, and Section Xl, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II,Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-A Reactor Pressure Vessel (RPV) Assembly Welds.
Manual transverse and parallel scans were performed from the vessel OD surface in accordance with procedure GE-UT-300 VI 0; using 60&deg; RL search units. Manual parallel scans of the inner 15%T volume were performed in accordance with procedure GE-UT-31 I V14, using model validated shear wave search units.
Manual scanning was restricted due to the nozzle configuration.
The manual exams recorded no indications.
Previous data was reviewed with no significant changes.
Manual UT composite coverage = 87 %
DATE    ANII REVIEW          DATE 1
LaSalle Unit-l, L1R11, 2006 Page 1 of __
 
Report No. 1R11-033 LaSalle Unit 1, L1R11 LCS-1 -N7 Spring 2006 CODE CROSS-SECTIONAL AREA                      TOTAL CODE COVERAGE Percent Weld Length =      360. Required Exam    Area Scanned        of Area        Weld Length  Percent Exam Volume =        22. Area Sq. In.        Manual          Manual            Manual    Manual 600 T-Scan S4          A          2.2                2.2            10.0%              180.0      2.5%
60' T-Scan S6            A        19.8              16.6            75.5%            180.0      18.9%
IRS P-Scan S4            A          2.2              2.2            10.0%            180.0      2.5%
60' P-Scan S6            A        19.8              15.0            68.2%            180.0      17.0%
Exam Volume =      21.7 60' T-Scan  S4          B          3.8                3.8            17.5%            180.0      4.4%
600 T-Scan  S6          B        17.9              16.7 .          77.0%            180.0      19.2%
IRS P-Scan  S4          B          3.8              3.8            17.5%            180.0      4.4%
600 P-Scan  S6          B        17.9              15.8            72.8%      [      180.0      18.2%
600 T-Scan  S4 600 T-Scan S6 IRS P-Scan  _4 600 P-Scan S6 600 T-Scan S4 60' T-Scan S6 IRS P-Scan S4 60' P-Scan  S6
                                                                                    % Total Composite Coverage =    87%
Comments: A - Top side of offset nozzle. Examined 1800 length. Scanning limited due to nozzle configuration.
B - Bottom side of offset nozzle. Examined 1800 length. Scanning limited.due to nozzle configuration.
Weld length in degrees. IRS examination coverage determined by modeling.
Coverage sheet modified for offset nozzle configurations.
Note - Rounding methods may affect calculated values.
 
Top Side Coverage LaSalle Unit 1        600 NS Exam Volume = 7.3 Sq. In.
600 FV S6 Exam Volume = 12.5 Sq. In.
Top Hd. Spray / Spare 60&deg; FV S4 Exam Volume = 2.2 Sq. In.
60&deg; NS T-Scan achieved = 4.2 Sq. In.
60' FV S6 T-Scan achieved = 12.4 Sq. In.
Bottom Side Coverage                                                      600 FV S4 T-Scan achieved = 2.2 Sq. In.
60' NS Exam Volume = 6.09 Sq. In.                                        600 NS P-Scan achieved = 3.8 Sq. In.
60' FV S6 Exam Volume = 11.8 Sq. In.                                      60' FV S6 P-Scan achieved = 11.2 Sq. In.
60' FV S4 Exam Volume = 3.8 Sq. In.                                      Inner 15%T IRS-Scan achieved = 2.2 Sq. In.
60' NS T-Scan achieved = 4.9 Sq. In.
60* FV S6 T-Scan achieved = 11.8 Sq. In.
60' FV S4 T-Scan achieved = 3.8 Sq. In.
60' NS P-Scan achieved = 4.3 Sq. In.
60' FV S6 P-Scan achieved = 11.5 Sq. In.
Inner 15%T IRS-Scan achieved = 3.8 Sq. In.
5.2-  4.6" 60OT 60'P 9"
10" 45&deg;P 11.0"60&deg;P 60-T r
 
GE NUCLEAR ENERGY UT EXAMINATION
 
==SUMMARY==
SHEET                                  Summary No: 1Ri 1-034 PROJECT          LaSalle Unit 1, LI R1 1 WELD ID:          LCS-1 -N8 Top Head Nozzle SYSTEM:          RPV CALIBRATION ID:            N/A MANUAL DATA:                UT-115, 116, and 117 OPERATORS:                  W. Reid Lv II, Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section Xl, 1989 Edition no Addenda, and Section Xl, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-A Reactor Pressure Vessel (RPV) Assembly Welds.
Manual transverse and parallel scans were performed from the vessel OD surface in accordance with procedure GE-UT-300 V10; using 600 RL search units. Manual parallel scans of the inner 15%T volume were performed in accordance with procedure GE-UT-311 V14, using model validated shear wave search units.
Manual scanning was restricted due to the nozzle configuration.
The manual exams recorded no indications.
Previous data was reviewed with no significant changes.
Manual UT composite coverage = 79 %
(
PEPAkED BY            DATE    REVIEWED BY          DATE    UTIL-TY REVItW      DATE    ANII REVIEW          DATE UT Level:  tIc                  UT Level:
LaSalle Unit-l, L1R11, 2006 Pagelof    _7 o
 
Report No. 1Rll-034 LaSalle Unit 1, L1R11 LCS-1-N8 Spring 2006 CODE CROSS-SECTIONAL AREA                TOTAL CODE COVERAGE Percent Weld Length =    360. Required Exam    Area Scanned    of Area      Weld Length    Percent Exam Volume =    24.8      Area Sq. In.        Manual      Manual          Manual      Manual 600 NS T-Scan        A          7.6              3.5        14.1%            360        7,1%
60' S6 T-Scan        A            14              13.7      55.2%            360        27.6%
60' S4 T-Scan        A          3.2              3.2        12.9%            360        6.5%
60' NS P-Scan        A          7.6              3.1        12.5%            360        6.3%
600 S6 P-Scan        A            14              12.5      50.4%            360        25.2%
60' S4 P-Scan        A          3.2              3.2        12.9%            360        6.5%
60' NS T-Scan 60' S6 T-Scan 600 S4 T-Scan 600 NS P-Scan 600 S6 P-Scan 60' S4 P-Scan
                                                                            % Total Composite Coverage =  79%
Comments: A - Manual scanning restricted due to nozzle configuration.
Note - Rounding methods may affect calculated values.
 
600 NS Exam Volume = 7.6 Sq. In.
600 FV S6 Exam Volume = 14.0 Sq. In. LaSalle Unit 1 600 FV S6 Exam Volume = 3.2 Sq. In.
LCS-1-N8 Top Hd. Vent 60&deg; NS T-Scan achieved = 3.5 Sq. In.
60' FV S6 T-Scan achieved = 13.7 Sq. In.
600 FV S4 T-Scan achieved = 3.2 Sq. In.
60' NS P-Scan achieved = 3.1 Sq. In.
60' FV S6 P-Scan achieved = 12.5 Sq. In.
600 FV S4 P-Scan achieved = 3.2 Sq. In.
                                          "P-Scans 6.4"60OT
                                                          -  1-
                                          -d  4.21    a    KWI
 
    *GE            NUCLEAR ENERGY UT EXAMINATION
 
==SUMMARY==
SHEET                                  Summary No: 1 R1 1-026 PROJECT            LaSalle Unit 1, L'lR'11, 2006 WELD ID:            LCS-1-N16 SYSTEM:            Core Spray CALIBRATION ID:                      NOZIN EXAMINATION DATA:                    N 16-01 OPERATORS:                            C. Gauthier Lv II; S. Gauthier Lv II Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section XI, 1989 Edition no Addenda, also Section Xl, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-D Reactor Pressure Vessel (RPV)
Assembly Welds.
Automated transverse and parallel scans were performed in accordance with procedure GE-UT-705 V5, using 45* Shear wave, 600 RL, and 70' RL search units, supplemental 0&deg; L-Wave scans were also performed.
Scanning for the inner 15% T volume for radial flaws was performed using 45&deg; Shear wave search units as specified by the "Nozzle Inner Radius and Bore Requirements" sheet, which has been verified by modeling.
Automated scanning was performed from the vessel OD surface. Automated scanning was restricted due to the nozzle configuration.
The GERIS 2000 OD automated UT system 0 reference is located at 900 CW of nozzle TDC.
For calibrations refer to report G2K-CAL.
Six (6) relevant indications were recorded that were found to be acceptable per the requirements of IWB-3000, no further evaluations were required.
Previous examination data was reviewed, no indications were recorded.
Automated Composite Coverage = 85.5%.
PEPAR D      BY          DATE    REVIEWED BY          DATE    UTILI      IEW      DATE    ANII REVIEW          DATE TULvelee                            Le__ ,U                                                      _
LaSalle Unit 1, LIR11, 2006                                                      Page  I  Of 19
 
U)4 0              -LaSalle                              1 N16 Nozzle - Core Spray 70' Exam Volume = 9.4 Sq. In 45' Exam Volume = 38.3 Sq. In Inner 15%T Exam V olume (60&deg;T & IRS)    8.2 Sq. In 70' T-Scan achievec -= 6.2 Sq. In 450 T-Scan achievec I = 35.6 Sq. In 600 T-Scan achievec = 8.2 Sq. In Z                        T-Scals  70'T        45&deg; r                60'T
        * =I-I                        I            I                  I m          l  (t!
 
CD)
I-a 0
0)
LaSalle 1 N16 Nozzle - Core Spray 700 Exam Volume = 9.4 Sq. In 450 Exam Volume = 38.3 Sq. In Inner 15%T Exam Volume (60'T & IRS) = 8.2 Sq. In 70' P-Scan achieved = 5.0 Sq. In 450 P-Scan achieved = 32.4 Sq. In Inner 15% P-Scan achieved = 8.2 Sq. In P-Scans 70Tp        45TP I
-U CD 0
 
Summary No.: IR11-026 LaSalle Unit-I, L1R11 LCS-1-N16 Spring 2006 CODE CROSS-SECTIONAL AREA                TOTAL CODE COVERAGE Percent Weld Length = 360.      Required Exam    Area Scanned    of Area      Weld Length    Percent Exam Volume = 55.9          Area Sq. In.      Auto          Auto            Auto          Auto 700 T-Scan          A            9.4            6.2          11.1%            360          5.5%
450 T-Scan          A          38.3            35.6        63.7%            360        31.8%
600 T-Scan          A            8.2            8.2          14.7%            360          7.3%
70' P-Scan          A            9.4            5.0          8.9%            360          4.5%
45' P-Scan          A          38.3            32.4        58.0%            360        29.0%
IRS P-Scan          A            8.2            8.2        14.7%            360          7.3%
700 T-Scan 450 T-Scan 600 T-Scan 700 P-Scan 45' P-Scan IRS P-Scan 700 T-Scan 450 T-Scan 600 T-Scan 700 P-Scan 450 P-Scan IRS P-Scan
                                                                              % Total Composite Coverage =  85.5%
Comments: A - Scanned 360 deg., Scanning limited due to nozzle configuration.
Note - Rounding methods may affect calculated values.
 
        *GE          NUCLEAR ENERGY UT EXAMINATION
 
==SUMMARY==
SHEET                                  Summary No: 1 R 11-027 PROJECT          LaSalle Unit 1, Li R1 1 WELD ID:          LCS-1-N18 Top Head Nozzle SYSTEM:          RPV CALIBRATION ID:            N/A MANUAL DATA:                UT-099, 100, 129 and 130 OPERATORS:                  S. Snyder Lv II, a
Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section Xl, 1989 Edition no Addenda, and Section Xl, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-A Reactor Pressure Vessel (RPV) Assembly Welds.
Manual transverse and parallel scans were performed from the vessel 00 surface in accordance with procedure GE-UT-300 V10; using 600 RL search units. Manual parallel scans of the inner 15%T volume were performed in accordance with procedure GE-UT-31 1 V14, using model validated shear wave search units.
Manual scanning was restricted due to the nozzle configuration.
The manual exams recorded no indications.
Previous data was reviewed with no significant changes.
Manual UT composite coverage = 87 %
Ll                                                                                                                      ii LaSalle Unit-i, L1R11, 2006 Page1 of
 
Report No. 1RII-027 0)
&#xa3;1)
LaSalle Unit 1, L1R11 C                                                                      LCS-1-N18 Spring 2006 r-CODE CROSS-SECTIONAL AREA                      TOTAL CODE COVERAGE Percent Weld Length = 360.        Required Exam    Area Scanned        of Area        Weld Length    Percent Exam Volume = 22.            Area Sq. In.        Manual          Manual            Manual      Manual 600 T-Scan S4          A            2.2              2.2            10.0%              180.0        2.5%
600 T-Scan S6          A          19.8              16.6          75.5%              180.0        18.9%
IRS P-Scan S4          A          2.2              2.2            10.0%              180.0        2.5%
600 P-Scan S6          A          19.8              15.0          68.2%              180.0        17.0%
Exam Volume =      21.7 600 T-Scan S4          B          3.8                3.8          17.5%              180.0        4.4%
60' T-Scan S6          B          17.9              16.7          77.0%              180.0        19.2%
IRS P-Scan S4          B          3.8                3.8          17.5%              180.0        4.4%
600 P-Scan S6          B          17.9              15.8          72.8%              180.0        18.2%
600 T-Scan S4 600 T-Scan  S6 IRS P-Scan S4 600 P-Scan S6 600 T-Scan S4 600 T-Scan  S6                                                                                    ' '
IRS P-Scan  S4 60' P-Scan S6''
STotal Composite Coverage =    87%
Comments: A - Top side of offset nozzle. Examined 1800 length. Scanning limited due to nozzle configuration.
B - Bottom side of offset nozzle. Examined 1800 length. Scanning limited due to nozzle configuration.
Weld length in degrees. IRS examination coverage determined by modeling.
Coverage sheet modified for offset nozzle configurations.
Note - Rounding methods may affect calculated values.
 
I-Top Side Coverage LaSalle Unit 1        600 NS Exam Volume = 7.3 Sq. In.
600 FV S6 Exam Volume = 12.5 Sq. In.
Top Hd. Spray / Spare 60&deg; FV S4 Exam Volume = 2.2 Sq. In.
60' NS T-Scan achieved = 4.2 Sq. In.
600 FV S6 T-Scan achieved 12.4 Sq. In.
Bottom Side Coverage                                                    600 FV S4 T-Scan achieved 2.2 Sq. In.
60' NS Exam Volume = 6.09 Sq. In.                                        600 NS P-Scan achieved = 3.8 Sq. In.
600 FV S6 Exam Volume = 11.8 Sq. In.                                    60' FV S6 P-Scan achieved = 11.2 Sq. In.
60' FV S4 Exam Volume = 3.8 Sq. In.                                      Inner 15%T IRS-Scan achieved = 2.2 Sq. In.
60' NS T-Scan achieved = 4.9 Sq. In.                                                        10,6" 60' FV S6 T-Scan achieved = 11.8 Sq. In.
600 FV S4 T-Scan achieved = 3.8 Sq. In.
600 NS P-Scan achieved = 4.3 Sq. In.
60' FV S6 P-Scan achieved = 11.5 Sq. In.
Inner 15%T IRS-Scan achieved = 3.8 Sq. In.
45-P 60&deg;TIP 5.2" 607T 9-10- 45-P~
1i1.o060*P1&#xfd; 607T    1
 
Report No.:
EXAMINATION
 
==SUMMARY==
SHEET                                              IRII-oel GE NUCLEAR ENERGY Site:          LaSalle Station                            Component ID:                      RPV-SS-1 Outage:                  LIR11                                                                        Lua System:                RPV                ASME Cat.:          B-K          ASME Item        810.10    Aug Req.:            ASME Sec.XI Exams            Data Sheet    .      . Procedure                      Calibration Block          Examination              Cert Level    Date Performed                                                                                                Personnel PT              PT-01I                          V.rr/RvV5 100-PT-OO                          N/A                Alicia Hutton                II1      3/5/2006 VT-1              VT-001              ER-AA-335-Q14 Ver/IRev R2                  N/A                Alicia Hutton                II      3/5/2006 Examination Results:
During the liquid penetrant and the visual examination of the above referenced weld, no recordable indications were detected.
Due to adjacent structures only 66% of the required exam area was accessible for PT inspections. Due to this limiting condition a VT-i examination was performed on 100% of the required examination area.
This examination meets the requirements of ASME Section Xl, 1989 Edition with no Addenda.
Examination results were compared to data report:                D-733        from      1989  outage with          i1*!;  No Change These examinations were performed under Work Order:                  704866                                                  Change This Summary and the following data sheets have been reviewed and accepted by the following personnel:                        RWP:      N/A
_.* ....... &#xfd;l*        Dose:    24      mr.
Utility Review:                                Date:
GE.. RB                      L l:          Dat                R      :                                Dat
                                                                                                              "                  P' GE Review By:                    Level:        Date:        ANII Review:                                  Date:                Page  1  of  3
 
GE Nuclear Energy                                    LIQUID PENETRANT EXAMINATION REPORT Site: LaSalle Station                          Unit:  I        Project: LIRII                  Report Number:                    IRII-061 Sheet No.:                        PT-011 Weld No.:        RPV-SS-i                                              Configuration:  Lua Drawing:        GEL-1109                                              System:          RPV Procedure No.:          GE-PT-1O0                      Ver/Rev.:        V5          DRR:                      N/A Material:                          Surface Condition:                  Item:
Carbon Steel                        Ground                              Weld - Final Technique:                                                                                Cleaner            Penetrant            Developer Visible Solvent Removable (8-3)                                Manufacturer              Maanaflux            Maenaflux              MaRanflux Thermometer        245993                                      Brand I Type                SKC-S                SKL-SPI                SKD-S2 Temperature;      85F                                        Batch No.                  04GO0K                01KOS5                99D14K Black Light:      N/A                                  Light Meter. N/A                          Blacklight Intensity:            N/A pW/cm2 Pre Clean Method:                Spray & Wive                                  Drying Time:                  5 min.
Penetrant Application            Brushing                                      Dwell Time:                  10 min.
Penetrant Removal                Wipe with dry towel                          Drying Time:                  5rmin.
Wipe with damp towel Developer Apjolication:            Sprav                                        Developing Time:              10 mrin.
Indication Number:                                                 
 
== Description:==
Results:
Comments:
Exam Start: 1010.
Exam was performed on the accessible area's 66% tori and both sides. A VT-1 rnrnminatinn w*.q n~rfnrm~v4 nn 1nno1%    nf thA_hin 5== 'iT-I I*nrt VJT-001 m E    forwas performed results. No recordable      sible ar 's 66% too and both sid . A VT-1 examination was nerformed on 1000,L of tha fun See VT-1 Re - VT-on the accindications.
001  for results. No recordable indications I Alicia Hutn                                                                                                      Date Level      Date GE Review                              Level      Date            ANI!        ,                              Date            Page    . of 3 ANII Review
 
Q                GE NuclearEnergy                                          VISUAL EXAMINATION REPORT i eport Number:                R1l1-061 Site:    LaSalle Station                  Unit: 1        Project:      LIR11o:
Sheet No.:                  VT-0O01 Weld No.:    RPV-SS-1                                          Configuration: Lua ASME Code Class:        I                    ASME Category: B-K                      ASME Item:          B10.10 Drawing:          GEL-1109                              System:      RPV Procedure No.:        ER-AA-335-014                Version:        R2          DRR:                    N/A TECHNIQUE                  EQUIPMENT                        LIGHTING                    TOOLS                  RESOLUTION Exam Type: VT-i              i  Minor                      - Flashlight            '*  Six Inch Scale            Gray Card Tehiqe Technique:  Direct          7  Magnifier RemoteBANVideo            [7 Ambient F-,  Other                F]1Bintoculars Welding Gauge                          -3 Remote Color Video            N/A                      Thread Gaug 1otter                                                HO"er N/A                                                      N/A COMPONENT DATA Material                    Surface Condition            Equipment Condition        Component Carbon Stee                Ground                        N/A                        Final Weld Indication Numberj                                           
 
== Description:==
Results:
Comments:
A VT-1 examination was performed on 100% of the lug.
Lug is 14"w* 7" h.
No Recordable Indications Alicia Hutton                  It            3/5'2006            &4                                o(ciIu xaminer                        Level      DateutlyReiwDe GE Review                      Level      Date            ANII Review                                  Date        Page    3      of 3
 
Site.        LaSalle Statio n                            Component ID:                    IHP-PUI-04 Outage:                LIR11                                                                Plate-Shell Svstem:            HPCS            ASME Cat.:        C-C          ASME Item:    C3.30      Aug Req.:      ASME Sec.Xl Exams      Cal I Data Sheet          Procedure              Calibration Block            Examination        !Cert LevelO    Date Performed                                                                                    Personnel MT                              "  E-MT-001
                                          -    VrRev S                  N/A    -          Alicia Hutton            II    i 2122/2006 Examination Results:
During the magnetic particle examination of the above referenced weld, no recordable indications were detected.
16% of the required exam area was examined.
This examination meets the requirements of ASME Section XI, 1989 Edition with no Addenda.
Examinationresults were compared to data report:          NIA          from    N/A    outage with            No Change These examinations were performed under Work Order          704866                                            Change This Summary and the following data sheets have been reviewed and accepted by the following personnel:          RWP:        N/A t-R 13.3I*920o                                        Dose:      3    mr.
Ui        Jiew:                            Date:
GE Review By:                                        ANII Review:                                Date:          Page    1  of
 
GE NuclearEnergy                                MAGNETIC PARTICLE EXAMINATION REPORT Site:    LaSalle Station                Unit: I          Project:      LIR11                  Report Number:              IRII-073 Sheet No.:                  MT-0O01 Weld No.:    IHP-PUI-04                                          Configuration:      Plate-Shell Drawing:      GEL-1049                                            System:            HPCS Procedure No.:        GE-MT-1O0                          Version / Revision:          V6          DRR:                N/A Material:                      Surface Condition:                    Item:
Carbon Steel                    Cleaned                              Weld - Final Magnetizing Apparatus                                                              Black Light Mfg:              ParkerResearch        Yoke Calibration: 2-15-06                                            Model          Serial Number Model:            B-300                                                                    Blacklight:    N/A              N/A Serial No.        5522                  Yoke Spacing:          4"-6"                      Light Meter:  N/A              N/A Thermometer:          245993                    Surface Temperature:              82&deg; F Technique                                    Examination Medium                                      Blacklight Intensity Magnetization: AC                        Magnetic Particles:        Dry                                                    N/A Continuous                ParkerResearch                RP-6              11793                  Blacklight Intensity Technique:
Manufacturer          Particle Type:      Batch No.:
Indication Number:;                                           
 
== Description:==
Results:
NRl Comments:
Examined only 28" of the 171.25" due to concrete pedestal surrounding the pump. See attached photo, No recordable indications.
Alicia Hutton                      I.      2/222006          Util yR v                                    Date I[itainer                      Level      Date GE Review                      Level      Date              ANII Review                                  Date        Page        L    of 3
 
0          GEN'ticlearEngat          SKETCH SHEET            Report No:        IRI1-073 Component ID:        IHP-PUI1-04 Accessable portion of weld prior to paint removal Examiner                      Lv .,      Date  -    -Da-:            Reviewed By:                      -Date:  12 o ,/p Utii~ty Reviewed By:j  -  f$Q      Lv.      D_
Date:  ;I .2l6-0                                        Page  3of _3
 
Site:        LaSalle Station                              Component ID:                    ILP-PU-04 Outage:                LIRII                                                                Plate-Shell System:            LPCS            ASME Cat:          C-C        ASME Item:        C3.30    Aug Req:        ASME Sec.Xl Exams        CalI Data Sheet          Procedure              Calibration Block            Examination        &#xfd;Cert Level4    Date Performed                                                                                    Personnel MT            MT-003            GElMay.&deg; Ver/ev VS .        .      A                  Clay Suhler            _11    1 2/23/2006 Examination Results:
During the magnetic particle examination of the above referenced weld, no recordable indications were detected.
24% of the required exam area was examined.
This examination meets the requirements of ASME Section X1, 1989 Edition with no Addenda.
Examination results were compared to data report:        N/A        from        N/A  outage with          No Change These examinations were performed under Work Order          704866                                            Change This Summary and the following data sheets have been reviewed and accepted by the following personnel:
RWP:        NALI rdyLR    e4-3s-tlo*                            Dose:      3    mr.
Ut.ityR view:                              Date:
GE Review By:                                        ANII Review:                                Date:          Page    1    of  3
 
GE NuclearEnergy                                    MAGNETIC PARTICLE EXAMINATION REPORT Site: LaSalle Station                    Unit: I          Project:        LIRII                  Report Number:              IR11-074 Sheet No.:                  MT-003 Weld No.:      ILP-PU-04                                          Configuration:      Plate-Shell Drawing:      GEL-1050                                          System:              LPCS Procedure No.:        GE-MT-100                          Version / Revision:          V6          DRR:                N/A Material:                      Surface Condition:                      Item:
CarbonSteel                      Cleaned                                Weld - Final Magnetizing Apparatus                                                              Black Light Mfg:              ParkerResearch        Yoke Calibration: 2115/06                                              Model          Serial Number Model:            B-300                                                                      Blacklight:    N/A              N/A Serial No.        5522                  Yoke Spacing:          6"                          Light Meter:  N/A              N/A Thermometer:          246641                      Surface Temperature:            840 F Technique                                    Examination Medium                                      Blacklight Intensity Magnetization: AC                        Magnetic Particles:          Dy                                                    N/A Technique:        Continuous                ParkerResearch                RP-6              11793                  Blacklight Intensity:
Manufacturer            Partide Type:      Batch No.:
Indication Number:;                                           
 
== Description:==
I-Reuts:
                                                                  ....                                                                N RI.
Comments:
Examined only 28" of the 117.20" due to concrete pedestal surrounding the pump. See attached photo.
No recordable indications.
Clay Suhler          60          //      2123/2006        Uti tyReliew                                  Date
$jiti      iner              Level      Date GE Review                      Level      Date              ANII Review                                    Date        Page              of 3
 
W      GE Nuclear Energi,          SKETCH SHEET            Report No:        IR11-074 Component ID:        ILP-PU-04 Accessable portion of weld Rev~ewed By:____________          Lv. V-7Data:        &Z~''D      Reviewed By:                        Date:
Utility Reviewed By:      &#xfd;-' LL-      v Lv.        Dt:Pge3 Date:                                                  Page      o 3 3 of
 
Report No.:
        \~/GE      NUCLEAR ENERGYY                              EXAMINATION
 
==SUMMARY==
SHEET                                      IRI-075 Site:        LaSalle Station                          Component ID:                IRH-PUIC-04 Outage:                LIR11                                                              Plate - Shell System:              RHRR            ASME Cat.:          C-C        ASME Item        C3.30      Aug Req.:      ASME Sec.Xl Exams        T  DataSheet                  Procedure                  Calibration Block          Examination      Cert Level    Date Performed                                                                                          Personnel MT      j      MT-009              GE-MT-1O0 Ver/Rev V6                  NWA                  Alan Kelly          II      2/28/2006 Examination Results:
During the magnetic particle examination of the above referenced weld, no recordable indications were detected.
21% of the required exam area was examined.
This examination meets the requirements of ASME Section X1, 1989 Edition with no Addenda.
Examinationresults were compared to data report:            NIA          from      N/A    outage with          No Change These examinationswere performed under Work Order:              704866                                        1  Change This Summary and the following data sheets have been reviewed and ac epted by the following personnel:
RWP:      N/A
                                                                                                      .O    //cae    Dose:            mr.
eel B:
EReie                    ANReview:
l    a/ite                              Date:          _    1__ of___
GE Review By:                  Level:        Date:      ANII Review:                                Date:        Page  1 of3
 
iW                  GE NuclearEnergy                                  MAGNETIC PARTICLE EXAMINATION REPORT Site: LaSalle Station                  Unit: I              Project: LIR1I                  I Report Number:                        1RIl-075 Sheet No.:                            MT-009 Weld No.:    IRH-PUIC-04                                          Configuration:      Plate- Shell Drawing:    GEL-1003                                              System:              RHR Procedure No.:        GE-MT-100                              Version / Revision:        V6          DRR:                            N/A Material:                      Surface Condition:                      Item:
CarbonSteel                    Cleaned                                Weld - Final Magnetizing Apparatus                                                                    Black Light Mfg:              ParkerResearch        Yoke Calibration: 2115/06                                                    Model              Serial Number Model:            B-300                                                                      Blacklight:        N/A                  N/A Serial No.        8164                  Yoke Spacing:            3"-6"                      Light Meter:        /A                  N/A Thermometer          246541                      Surface Temperature:                  730 F Technique                                          Examination Medium                                        Blacklight Intensity Magnetization: AC                        Magnetic Particles:          Pry                                                            N/A Continuous              ParkerResearch                  RP-6              11793                          Blacklight Intensityt.
Technique:
Manufacturer.          Particle Type:      Batch No.:
Indication Number                                -Description:                                                                              Rsls Comments:
Examined 25" of 116.375" due to concrete pedestal surrounding the pump. See attached photo.
No recordable indications.
Alan Kell                          /_    2/28/2006                                                            Date' Reiaew                      Level      Date IGEReview                      Level      Da te,                ANI Review                                      Date                Page  *,      of 3
 
                ''GE  NucerEyr SKETCH SHEET Report No:  lRll-075 CG'HPOueut LD:
4 Report No:
1R11475                      IRH..PLIC..O Compo~~~~
ID:
Acess    pabe of portion weld I>
Reviewed By:        /&
Lv. W      ae Reviewed By:            ~) ~3Date./~~
Utility Reviewed 8 Lv. -' -  Date:_____
r Y
Page
 
$ENERAL 0 ELECTRIC I
POMP        LOCXATION
: 2.              G-2o c- Is 2.C 2c.
ELEV. CpT5' R),R. POMP AkSSE-MBLY REP. liSPeC'OI&#xfd;f  C.r..KMuSTs IP -Iv3    . -,Zs IP,M e-2,4.
                    ?T-S-8 X4 4*V- - - -
OAK Whoiok.ZLL GEL.- I os
 
UW-9            S LZT7~IJ~                                                                              4.....  *4 I,                        I
                                                                                                                                                'I A
u1  4 S~'
I-I                  MWI jimms, 11          M.A~
L.&AW L&~IIt I                          ..... ,I                                                                                'I.
I
                                                                                                                                                                                                                                                                                *    ~5S~
I                                                                                                                                                                            *p.....    . m
                                                                                                                                                                                                                                              *I*l  , #:
                                                                                                                                                                                                                                                                                  *  . Si RO 4.
T.
Au              I                                                                                    ,  *    ,.
4.
I.,                  ..
                                                                                                                                                                                                                                                          -d 713-I Ail      .1
                                                                                                                                                                  .4
                                                                                        '4'.
3.4.,
                                                                                                                                                                                                                      .I      .
I y                                .  ~
I  .
I  -
                              ..-. S.                                                                                                                .        j i
                                            "B
                                                                                                                                                            .                I-        '          x--    .. _Jm
* u, Lb                                    CNS-                                a' of
                                                    ~                                            r t
                                                                                                                                                                                                                                          "i 3
M_
          .!"780,-"
* I -            ~
                                                                              -                ~
                                                                                                                                            -  I          -
A if!:!
                                                                                                                                                                                                                ,i*  :.
                                                                                                      'At's
                                                                                                                                                                    ~    j'Y*C*
EIJ                1L' eo,* '78 I.
r~.l&deg;*:.
2,,
                            *~
h "Be            V I
                                                                                                                "V
(        I~4.
5;.
I  IIII    I  III    I
                                                                                                                                                                                              &#xa3;4
                                                                                                                                                                                                                          *  - Si K3-I.
a'..                      I~v-'Ia, Air!
                                                                                            *4      .1W*      oar 4N'                  *              :i!(y#
                                                                ,..          - :                          ::          * .....Ii .....      ::                                *'
                                                                                                                                                                              "555
* t          :**
low NO KLEU 31To                                                                                              U                                                                        V. m-EU'Ewll
-  1 snJ~J~ I    4
                                              *d                                                                                                                                                                                                70G.ICO Too          comnw UI%        MCmlNUA
                                                                                                                                                              , "-,.:                                                      -r                                      04LIE5r-&M              8MU~
  ~1.~,i~.a                *1              I
                                                                                                                                                              -4=4                  ASAL El-                            ;~ &#xfd;LASALLE. Coui.t' Ret To94AM Assuo Uin AWOMamtWWV                  -. 4-                                                                                              %T1Jtm I                                                                                                      tCMCIMI ,
I    .*    .
4....................................................                                                                                  &#xfd;EERI, NG' I                                                                                                                                                                              INSORCcc INSECI1OI ii ZI                    i~E                                                                                                                                      *1~--                        'MAP                                                PRO, RAM IrAUNG  NO
                                                      -  I*
                                                                                                                                                                    - U    ~U S YSTEM
 
IGENEIAL 0 ELECTRIC                  LGE&deg; 10 1SO&deg; TOP VESSEL. NEAhO 0irIT **2
 
I GEL- 1001 GENERAL
.I    IF ELECTRIC                        GLIO tWo*                                  so a BOTTOM VESSEL. AE40 OWT z.
 
IGENERAL
* ELECTRIC FG&#xfd;&#xfd;-) i I I MOTE: Aab        c &PAE.
                                        .Q04kLLY SPACED 4OT_: LOCATIC*4 4X2A a M 20.5 semE Wa.    *&A2T                  SERI-ACE  AT".R, OOTLET I R~k-WA&2I,.b R        UET EXC        .MGP.PR
 
I
*~* CURL tLIETUIC RLEF: Imp- P02.
NP POMP ASSM*.*LY OMIT 2.
Q&K BROOKb,,,L.
 
SENERAL
* ELECTRIC GF-L-ZC)%
REF :ILP-POZ LP POMP-ASSEMBLLY OM1k4IT 2
 
COMMONWEALTH EDISON COMPANY                                                                                          Page 20 of 22 Procedure No. NDT-C-30                Rev. 2                                                                          December, 1993 ULTRASONIC TESTING DATA SHEET                    NDT-DS-C2A
(
STATION/UNIT:        /rF?//*                  /    2 PAGE:-:;:;      /        OF PROCEDURE:    NDT-
* 30    REV.      _,    DATA SHEET NO.:                        /  27-    /4      DAM&#xfd;          /a      -    -Z CALIBRATION SHEET NO.(S)
ST. BEAM:              0-2?a            ANGLE BEAM:      axial          At114-                  circ. _        _        _    _  _
COMPONENT INSPECTED SYSTEM:      /2TV                        WELD #: 6&-/0C'          0 - /9              WELD TYPE:        77&#xf7;      -      -
rpIZE:          2/                THICKNESS/SCHEDULE:              S. YC                    MATERIAL:          c      .
COMPONENT TEMPERATURE:                  '/                -
SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:                    <f d6                  ANGLE BEAM AXIAL:                              AAq/
COUPLANT/
BATCH #:          ?;C-&eL_-    :A:    *    -2                          ANGLE BEAM CIRC.:                  ,,4 /(?
EXAMINATION    SCANS Performed                        Indications YES      NO            NO                  YES
: 1) Base Metal        Straight        Beam                      /-                  _
: 2) Angle Beam-Normal-Against                Flow                          -        N
: 3) Angle Beam-Normal-With Flow                                              -        /
(          4) Angle Beam-Along Weld-CW                                              -          i/a
: 5) Angle Beam-Along Weld-CCW                                            -
* F L    6) Straight Beam of Weld                                                              V 0
W    7) Thickness Across Weld & Base Metal                                                                  /
UP STRM      WELD                  DN STR EXAMINER:                                                          LEVEL:    /7i                    DATE:_____
REVIEWER:-                                                        LEVEL:      =/~Zi                DATE:_            _____
OTHER:    C.-                                    5,A;,-V,!57      LEVEL:  -Z    T                DATE:  /            'Z STATION:                    6.DATE:_                                          _____
AN II:          ~              ..                                DATE:      JI~1
 
COMMONWEALTH EDISON COMPANY                                                                                    Page 20 of 22 Procedure No. NDT-C-30              Rev. 2                                                                    December, 199:
ULTRASONIC TESTING DATA SHEET                NDT-DS-C2A
(
STATION/UNIT:        I    <      //-      /
* PAGE,            ( OF      /
PROCEDURE:    NDT- C 30        REV. .2        DATA SHEET NO.:      __      -/    ___            DATk:        /1    27 CALIBRATION SHEET NO. (S)
ST. BEAM:        N/F1-                ANGLE BEAM:    axial          /                      circ.                  (2,-OW COMPONENT INSPECTED SYSTEM:      12 P  V                WELD #: 6E-/"e            - /1          WELD TYPE:          7-4      -
PIPE 4IZE:      .?/              THICKNESS/SCHEDULE:          5.  '/0              MATERIAL:
* S COMPONENT TEMPERATURE:              */        /
SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:            N  //                ANGLE BEAM AXIAL:                  .          d COUPLANT/
BATCH #:    0                    ?7
* ANGLE BEAM CIRC.:                  'q      d EXAMINATION SCANS Performed                      Indications YES        NO      NO                      YES
: 1) Base Metal Straight            Beam                              ,              _      _/_                _    _
: 2)  Angle Beam-Normal-Against Flow                    __                      P.z                ,,
: 3)  Angle Beam-Normal-With Flow
: 4)  Angle Beam-Along Weld-CW                                                7                              _
: 5)  Angle Beam-Along Weld-CCW F
L  6)  Straight      Beam of Weld                                    /-                _        __
0W  7)  Thickness Across Weld & Base Metal                                            /&#xfd;4/A/4 UP STRM              WELD          DN STR ADDITIONAL COMMENTS A~~4p~~~&~~Fr
                                    -,)                                        P/d~ 0    -3cj        ri    2I1
                                              -EVEL"-DATE    LXEVL:______,,_,__--ATE:____*
REVIEWER:                                                  LEVEL:        .                  DATE:___________
OTHER:O      Z7                                            LEVEL:                            DATE:
STATION:.              6.                                DATE:_        ____
ANII:        ~l(~          L~.              ~      <A    DATE:                A
 
COMMONWEALTH EDISON COMPANY                                                                                                Page 20 of 22 Procedure No. NDT-C-30                  Rev. 2                                                                            December, 199.
ULTRASONIC TESTING DATA SHEET                      NDT-DS-C2A
(
STATION/UNIT:            /,A*O//-Z              Z                                                              PAGE:&#xfd;        /      OF PROCEDURE:      NDT-          3      RV. __        DATA SHEET NO.:                ID-    /          --            DATZ:      /0 - Z -    4 CALIBRATION SHEET NO.(S)
ST. BEAM:    ________ANGLE                          BEAM:    axial                ?K (-072            circ.                        -0  -
COMPONENT INSPECTED SYSTEM:              P V,                    WELD #:    *E/-/C:O            -'                WELD TYPE:            7-    -    FL
  ,P P    iZ E:        */                THICKNESS/SCHEDULE:                45.'e-1                MATERIAL:              4 COMPONENT TEMPERATURE:                      J_
I rp SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:                -4 /1                        ANGLE BEAM AXIAL:                                '/'
COUPLANT/
BATCH #:      U(-T:?A cLJ          _-      S 3?_ S                            ANGLE      BEAM CIRC.:            _        -,        ___
EXAMINATION SCANS Performed                          Indications YES            NO      NO                      YES
: 1) Base Metal Straight Beam                                                        -  t/,
: 2)  Angle Beam-Normal-Against                  Flow                                      /
: 3)  Angle Beam-Normal-With Flow
: 4) Angle Beam-Along Weld-CW
: 5) Angle Beam-Along Weld-CCW F
L    6)  Straight          Beam of Weld                                                      '41A 0
W    7)  Thickness Across Weld & Base Metal                                                          /              /              /
UP STRM            WELD          DN STR ADDITIONAL COMMENTS st4E  ~        ~U    ~      ~      ~    /1 7      7 7/
                                                                              /?-,4t474(14        R~ /10        -  30)          T)~
EXAMINER.                                                              LEVEL:      -L                    DATE:_____________
REVIEWER:________                                    ____              LEVEL:_____                        DATE:______
OTHER:    C,.i              Z*        ---            f-w            LEVEL:                            DATE:      /O3/
STATION:                                                              DATE:        _        _      _
ANII:                                                                  C.4 ATE:          -f    c-
 
0GE Nuclear Energy Typical design for Top Head to Flange Weld number GEL-1 060-AG REPORT NO.:
Exam coverage is limited due to the flange configuration
          /.~~PAGE:L            Lo:  /                0%                450                60&deg;      Exam Area 66.70%              66.70%              66.70% CW Circ scans
                                        /,p  12 - 9,4                    66.70%              66.70% CCW Circ scans DATE                              100.0%            100.0% Ax Down GE REVIEWED BY        LEVEL 0.0%                0.0% Ax Up 88.90%              91.30% Base Metal 66.70%              64.46%              64.94%
UTILITY REVIEW          DATE Total composite coverage for Weld GEL-1 060-AG = 65.37%
SMAD REVIEW          DATE 60-S 45&deg;S 60 0S
 
NDT-B-1 Revision 6 December'1 i  1993 Page 4iof    44 FORM NDT-B-l-F1 MAGNETIC PARTICLE EXAMINATION DATA SHEET DATE _e______                  STATION & UNIT        LaSalle Unit2 I L2R07    DAT ASHEET# #
EXAMINER            &xl"A/          (2          777--                        LEVEL
  .....          RSYT
                ,eactor  Pressure Vessel                                      COMPONENT    GEL-1060-AG SECTION XI EDITION & ADDENDA                    1989 Edition, No Addenda              CODE CLASS Class I SECTION XI CATEGORY            B-A                                            ACCEP TANCE STD. IWB-3510 PROCEDURE # & REVISION              NDT-B-1 Rev. 6                      SKETCH SHE ET USED: YES            NO _
COMMENTS:        Configuration: TH-FL
                              ,*).*-.*.            ,*-x,.,n, q-*              /'-    **
/.
Manufacturer                Model/Type                    S/N Yoke                            ram er                    B300                                  Current AC  X DC Particles                      Magnaflux                                                          Color  G,,AV Black Light                      N/A                      NIA                    NIA B.L.M. Readings                NIA B.L.M. Time Checks              Initial                N/A                  Final          NIA EXAM RESULTS ACCEPT                                                  REJECT REVIEWED BY:
EXAMINER-z                        k          &                    LEVEL:                  DATE:
REVIEWER:                                                        LEVEL:    .            DATE:
OTHER:                                                            LEVEL:                  DATE: /i2-J!--
ITATION:                                                                                DATE:
ANII:                                                                                      DATE:  I-f--? 7 34,5r~ncnt
 
COMMONWEALTH EDISON COMPANY                                                                                            C Page 20 of 22 Procedure No.          NDT-C-30      Rev. 2                                                                          December, 1993 ULTRASONIC TESTING DATA SHEET                  NDT-DS-C2A
(
STATION/UNIT:                                          Z=427                                                PAGE:                    OF PROCEDURE: NDT- C-30              REV.      if    DATA SHEET NO.:          ___DAT_____            _/
CALIBRATION SHEET NO.(S)
ST. BEAM:          C-O-  0        -      ANGLE BEAM:      axial      _        _/          _        circ.      _      _        __    _
COMPONENT INSPECTED SYSTEM:                                    WELD    #:/*.-?-/I                            WELD TYPE:          _      /___"_,_"            _
    -PIPE.!&#xfd;.SIZE:        Z5/          THICKNESS/SCHEDULE:                7  ' 5  A              MATERIAL:                      ,..
4 COMPONENT        TEMPERATURE:          7(of        165659 SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:              36    1                  ANGLE BEAM AXIAL:                            ,(-/14 COUPLANT/                                /                                                                                        .
BATCH #:        df        547          !
* ANGLE BEAM CIRC.:
EXAMINATION SCANS                                                                                            Indications Performed YES            NO    NO                      YES
: 1) Base Metal Straight                Beam                    K                    X
: 2)  Angle Beam-Normal-Against              Flow                          X      d
: 3)  Angle Beam-Normal-With              Flow                              x                _        _/_
: 4)  Angle Beam-Along Weld-CW                                              o
: 5) Angle Beam-Along Weld-CCW L      6)  straight      Beam of Weld                              X 0
W      7) Thickness Across Weld & Base Metsa'                                    x            c/
UP STRM            WELD              DN STR ADDITIONAL COMMENTS l*R/4p/qL              ,"*
t.-0                  T  AE /-&#xa3;/ qWe          /j'z%/6,qr                    .. &#xb6; 7OAJ A?4h'//.i.6EX1iO                    /L'C/ &deg; -7*Z)      /- _./&5                        /6&'< /76J 61,44n1A/IEJ      -A                          700 2i6 L-=VEL :                            DATE:        /0      /1        /&
                                                                        .EVEL:            /_    _          DATE:__________
REVIEWER:
LEVEL:                              DATE:______
AN II:                    ~-
 
COMMONWEALTH EDISON COMPANY                                                                            Page 20 of 22 Procedure No. NDT-C-30            Rev. 2                                                              December, 1993 ULTRASONIC TESTING DATA SHEET            NDT-DS-C2A STATION/UNIT:              LASALLF              'J/V/T- 3t 2.                                PAGE:            OF      /
PROCEDURE:      NDT- e-30      REV. __    DATA SHEET NO.:    _        --/_____            DAT*f      /0-8    1-6 CALIBRATION SHEET NO.(S)
ST. BEAM:          A)/4            ANGLE BEAM:    axial        e-                    circ.          -
COMPONENT INSPECTED SYSTEM:          F<PV      *%          WELD #:    LCS-  2-AE                  WELD TYPE:        SH4- FL
  ,,?.Ps SIZE:              -        THICKNESS/SCHEDULE:        7.95/                MATERIAL:        C-S COMPONENT TEMPERATURE:            76 or        6SS8 SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:              IV/A              ANGLE BEAM AXIAL:                  *6. 0    r3 COUPLANT/
BATCH            ULTRA&EL U:                IT    c153 Z5              ANGLE BEAM CIRC.:                6. d '0 d EXAMINATION SCANS Performed                      Indications YES        NO    NO                  YES
: 1)  Base Metal Straight Beam                                  X        V/4
    /  \  2)  Angle Beam-Normal-Against          Flow          A
: 3)  Angle Beam-Normal-With Flow                              06        V IA__
(            4)  Angle Beam-Along Weld-CW                        X                  2_
: 5)  Angle Beam-Along Weld-CCW                        ><                A
      -F L    6)  Straight Beam of Weld                                      K        W/A 0
W    7)  Thickness Across Weld & Base Metal                                      I//A      IAv/            /
UP STRM        WELD        DN STR ADDITIONAL COMMENTS
                                              '95" 5,4 A-Ag 56AW &A*-ii            5ETr/.wU-      7-o  /1b1A/t1TA1A1            A    - 3o%      IL:>
t    o.L 0&S467 VA-P        I'D 1vicL),-Arlolyvs      t5,CO1_4t        PA a)      PARTIAL          EXAA.*I    DUE    TO FLAN,&E"        C0ir-tugA7-j010 EXA                      /8o00-  276-    346f EXAMINER:                  P.LEVEL:                      L            1                DATE:    I-,      ?"6 REVIEWER:                                                  LEVEL:______                  DATE:_________
OTHER: (fA0LEVEL:                                                      -        ~        DATE:  /S~~
STATION                                                    DATE:_____
ANII:DATE:                                            -Z-17___17_
 
COMMONWEALTH EDISON COMPANY                                                                                    ;:tPage 20 of 22 Procedure No. NDT-C-30 Rev. 2                                                                                    December, 1993 ULTRASONIC TESTING DATA SHEET                NDT-DS-C2A
(
STATION/UNIT:                    IIqSA#L.i      /                                                  PAGE:                OF PROCEDURE: NDT-C            C_      RV.            DATA SHEET NO.:        __      -- /__            DAT1k 46 CALIBRATION SHEET NO.(S)
ST. BEAM:                A//4            ANGLE BEAM: axial              (f-- ___--7          circ.        C-eDr7 COMPONENT INSPECTED SYSTEM:    __        __                  WELD #:      LC -a-AE                      WELD TYPE:  ,.H-"L PIPE; IZE:              A_5_/        THICKNESS/SCHEDULE:          Z      .                MATERIAL:    CS COMPONENT TEMPERATURE:
7          /.*
SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:              A11.                    ANGLE BEAM AXIAL:              1.V COUPLANT/
BATCH i:          ULr*        E1_    r                                  ANGLE BEAM CIRC.:                        d_,____B EXAMINATION          SCANS                                            Performed                    Indications YES        NO        NO                YES
: 1) Base Metal Straight Beam                                                  /      //
    / \  2)  Angle Beam-Normal-Against                  Flow                                  U-1
: 3)  Angle Beam-Normal-With Flow                                          7--    7*/
: 4)  Angle Beam-Along Weld-CW                                    V                    v
: 5)  Angle Beam-Along Weld-CCW                                  V F
L    6)  Straight Beam of Weld                                                          /
0 W    7)  Thickness Across Weld & Base Metal                                  V/                      IVA            ,
UP STRM      WELD          DN STR ADDITIONAL COMMENTS 01',,  /-.*1b            .t+      1,] A.'9
                                          ,<o-        L-L 3/- I*
                                                                          ,          LCV 64ANTIAL            tX)AMA      ZkIFZ -T.Z&#xfd;C' EXAMINER:                                                        LEVEL:                          DATE:    .__/__/___,
REVIEWER:      __-__-_-_                                      _LEVEL:_            ____            DATE:__________
OTHER:            ,                          _5'/'A.            LEVEL:-=                        DATE:  /      -,96 STAT ION~c*I~K&~-6.DATE:_______
ANII:            'NDATE:                                                    2t-j
 
Vessel to Flange Weld, LCS-2-AE. This exam was performidifrom 180' to 2700 to SGE 360'. Due to the configuration of the Flange the following coverage was achieved:
(                Nuclear Energy      0o 54,56%
45' 54.56%
600 54.56%
Exam Area CW Circ scans 54.56%                54.56%    CCWCirc scans 100.0%                100.0%    Ax Down 0.0%                  0.0%    Ax Up' 62.51%                66.35%    Base Metal 54.56%              54,32%                55.09%
Total Composite Coverage = 54.65%
                                        ,60 0S                                  FLANGE 45"S 6001 DATE                REPORT NO.:
UTILITY REVIEW GE REVIEWED BY    LEVEL  DATE            SMAD REVIEW                      DATE                PAGE:      O oZ
 
COMMONWEALTH EDISON COMPANY                                                                                          I..Page 20 of 22 Procedure No. NDT-C-30              Rev. 2                                                                          December, 1993 ULTRASONIC TESTING DATA SHEET                  NDT-DS-C2A STATION/UNIT:      ZAA1.            c.PAGE:                                                                        z;,      OF  /
PRoCEDURE: NDT- C30              REV. ta. DATA SHEET NO.:            L- (                            DATaE:.          --
CALIBRATION SHEET NO.(S)
ST. BEAM:    C_-____(__e_              ANGLE    BEAM:  axial      _            /____    ...... circ.
CO,[PONENT INSPECTED SYSTEM:      RPV                      WELD i:        1-C_5_-_"-_IA                  WELD TYPE:            iVZ-          .9 PI?*EQsiz                        THICCESS/SCHEDULE:                6.
(0MTERIAL: "                                  C COM14PONENT TEMPERATURE:                          L'    ~?p. iIF SC.AN GAIN CONTROL SETTINGS STRAIGHT BEAM:              4'. 0  we                ANGLE BEAM AXIAL:                        '
COUPLANT /                                                                                                      /
BATCH #:      ULTRAGEL            i:          95325                    ANGLE BEAM CIRC.:                    W14 EXAMINATION    SCANS Performed                          Indications YES        NO          NO                    YES 1 ) Base Metal Straight Beam                                X          -            X
    / \    2)  Angle Beam-Normal-Against              Flow                      X              N1
: 3)  Angle Beam-Normal-With              Flow                          X*          A114
(,          4)  Angle Beam-Along Weld-CW                              _    _    X              /4
: 5)  Angle Beam-Along Weld-CCW                                          X            11/A L    6)  Straight Beam of Weld                                  x W    7)  Thickness Across Weld            & Base Metal                    X      ....                  I          . NIA UP STRM          WELD          DN STR ADDITIONAL COMMENTS SCANN6D              4 10,1            7T0      JAINrAr1                      0%                3A CK REFLECTION.
NO    RECORDABLE                    TNDrCAT!OJ)5 0o/      LONG1TrUD-WAL EXAM                        'Art                                LEVEL:      'III                    DATE:        10.7-1?96 REVIEW4ER:                                                      LEVEL:    __I77--                  DATE:          /6712ii2&#xfd;4-OTHER.:                                                        LEVEL:                              DATE: //- oy-7 DATE: 1            /
ANII:                                                          DATE: J          L            i
 
COMMONWEALTH EDISON COMPANY                                                                                    Page 20 of 22 Procedure No. NDT-C-30            Rev. 2                                                                  December, 1993 ULTRASONIC TESTING DATA SHEET                NDT-DS-C2A STATION/UNIT:              /-A 5ALL5                  vt4r 7                                      PAGES        JIOF PROCEDURE:      NDT-  c-30      REV.      _  DATA SHEET NO.:            IJ-/(G7.                  DATEI      1O 96*,
CALIBRATION SHEET NO.(S)
ST. BEAM:          A)/I4.            ANGLE BEAM: axial                      06______
7        circ.          e --_    __ 7 COMPONENT INSPECTED SYSTEM:          , PV                  WELD #: LC5-.        -'/ViA              WELD TYPE:            /V1_    -  SH
  ,,Pt.,,SZE:        2H.0          THICKNESS/SCHEDULE:            6,    q 91C          MATERIAL:                  5 COMPONENT      TEMPERATURE:        8 *!f    $    f5 B SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:              AJ/V/                ANGLE BEAM AXIAL:                          8  d.
COUPLANT/
BATCH #:          C-L-TAgA&LL          E      1*3Z5                  ANGLE BEAM CIRC.:                  5_-____
EXAMINATION SCANS Performed                        Indications YES          NO      NO                    YES
: 1) Base Metal Straight            Beam                              X      ,VI__A
      / \  2)  Angle Beam-Normal-Against            Flow                              A4
                                                                                        /A
: 3)  Angle Beam-Normal-With            Flow                                  x
("          4)  Angle Beam-Along Weld-CW F    5)  Angle Beam-Along Weld-CCW L    6)  Straight      Beam of Weld                                      ?<    ,vA._
w    7)  Thickness Across Weld & Base Metal                  _.V_                      A//A                    I  Wv/A UP STRM            WELD        DN STR ADDITIONAL COMMENTS 5 C-AWN  AEOP      /8o    /3Egcrs              /_%V 1        r,  o,,03o        IO IRoLL ORSERVbED        /,P    &-Eo/AhETRY      REio-.'        RE.cofABt&-                  LEVF15.
E    1 NE    -S*  A      E
                                        &#xa3;4M          PE          EV NL            L."u74          A"ZZTEO 26S    FA 9 EXAMINER:                &#xa3;/-.ZLEVEL:                                        J2DATE:                      J?~~
REVIEWER:-                                                    LEVEL:        _L7__            DATE:______
OTHER:L~4&dL                                                  LEVEL:    ..-2&#xfd;                DATE://    STATION:                                                      DATE:/'
ANII:                                                        DATE: L
((j
 
COMMONWEALTH EDISON COMPANY                                                                                    Page 20 of 22 Procedure No. NDT-C-30              Rev. 2                                                                  December, 1993 ULTRASONIC TESTING DATA SHEET                  NDT-DS-C2A STATION/UNIT:                A 11A& Z2                                                            PAGE:        /    OF      7-_
PROCEDURE: NDT-        C30      REV.    ,    DATA SHEET NO.:                      /-I    C--      DATri      /0 -        -7 CALIBRATION SHEET NO.(S)
ST. BEAM:    __        _      __        ANGLE BEAM:      axial                                circ.      (f_-    0_    _ '7 COMPONENT INSPECTED SYSTEM:          RV                          i WELD#:          Cf      1/4    A        WELD TYPE:          //Z -S K,  p;PE ,SIZE.:                      THICKNESS/SCHEDULE:              t.      '"            MATERIAL:    _    2          _S COMPONENT TEMPERATURE:            Aq OF    SS $ l        e e SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:              /V/A                      ANGLE BEAM AXIAL:              6  5,        C COUPLANT/
BATCH #        CCA4TPA        C1*                                      ANGLE BEAM CIRC.:              ( 7(        I*
EXAMINATION SCANS Performed                    Indications YES        NO      NO                YES
: 1) Base Metal Straight Beam                                              X    IV/A
      / \  2)  Angle Beam-Normal-Against              Flow                        X      I//A
: 3)  Angle Beam-Normal-With            Flow                                        X
(        4)  Angle Beam-Along Weld-CW                                  X          -
F
: 5)  Angle Beam-Along Weld-CCW                                A          -
L    6)  Straight Beam of Weld                                  _                    N/A W    7)  Thickness Across Weld & Base Metal                                  X          //A    I      /A          ///
UP STRM        WELD          DN STR ADDITIONAL COMMENTS 0                  6S
                                  -D        D2 Cr6O M 6r            < ,_o15 0                6 COD AZL*EL6          4v          s n~ t-        1    v6D~        6 X AM          TlDA6      TO /V/O,1rL E                c),\jF ( AR          T    Ij*
(00A0F EXAMINER:        aj                                            LEVEL:        1?DATE:                      IC-  7-REV IEWER.                                                        E      E~~                    DATE:    /67./2 '14:
OTHER:                                          f4,V,',,      LEVEL:
* DATE:    /-o      -        ..
                                "STATI*N                          DATE:                  ,,
ANII:                                          ~~~DATE:  ______
* I V/    /
 
GE Nuclear Energy Typical design for Recirculation (N1) RPV Nozzle Assemblies.
REPORT NO.:
Due to the configuration of Nozzle NiA, weld number LCS-2-NIA examination coverage
              ~~f74CPAGE:__-OF: Z            is as follows:
: 0.                  450                60&deg;      Exam Area 65.42%              65.42%            65.42%  CW Circ scans 65.42%            65.42%  CCW Circ scans GE REVIEWED BY      LEVEL  DATE                                        100.0%  Ax Down 100.0%
0.0%              0.0%  Ax Up 89.22%            93.40%  Base Metal UTILITY REVIEW        DATE                                        .64.85%
65.42%              64.01%
I" Total Composite Coverage = 64.76%
SMAD REVIEW          DATE HALF SCALE 600 450 S
 
lit COMMONWEALTH EDISON COMPANY                                                                                                Page 20 of 22 Procedure No.          NDT-C-30            Rev.      2                                                                    December, 199 ULTRASONIC TESTING DATA SHEET                    NDT-DS-C2A STATION/UNIT:              ZA*A)E7              /    '                                                    PAGE0,            /      OF    /
PROCEDURE:        NDT-C_30            REV.      _a    DATA SHEET NO.:              - /*          4          DA      :  2      '-fo CALIBRATION SEET NO. (S)
ST. BEAM:    _        --      __              ANGLE BEAM:      axial  --    VIA                    circ.      _        _        _
COMPONENT      INSPECTED SYSTEM:        A'PV                            WELD i:                                  WC'2A)S'TYPE:
                                                                                          "5")WELD
:*;,-,IZE:            251                  THICKNESS/SCHEDULE:              i.q*"            MATERIAL:          _      _    "__          _
COMPONENT TEMPERATURE:                      I(    '-            /&*9 SCAN GAIN CONTROL SETTINGS STRAIGHT          BEAM:                  av              ANGLE BEAM AXIAL:              _            _            _
COUPLANT!                                jj                                                                    ________
BATCH 0          _L"T___A________
_:                            9S345                      ANGLE BEAM CIRC.:
EXAMINATION SCANS Performed                        Indications YES          NO      NO                      YES Base Metal Straight Beam                                                      i                  I 1)
        /  \  2)  Angle Beam-Normal-Against                      Flow                  z      *
: 3)  Angle Beam-Normal-With Flow                                -        p-        /
(              4)  Angle Beam-Along Weld-CW                                            ,                _            __
: 5)  Angle Beam-Along Weld-CCW                                              V              _/_
L    6) Straight Beam of Weld w    7)  Thickness Across Weld & Base Metal                                                ,'              -t1',:4        I__'!.4 UP STRM            WELD              DN STR ADDITIONAL COMMENTS 4,-        NeAujJro43/4'Jid D                  70- IUWAArV            Z%              ,lA9bCK 1?UrE Te7?06A Oxhi11NA7'OcAJ            4 1-17E0r6            -r4 utPtif~ *JWL&#xfd;I                R/b          Du~e Tro
          ,pt      X1'gcnfwvA.16                      /e101r/C)A)15 EXAMINER:                                                              LEVEL:      V                  DATE:      lo- 9'          *'
REVIEWER:                                                              LEVEL:      CZr7-              DATE:_ ____z                  __
I. OTHER:      C          *              ,-----                      ,    LEVEL:    -2=                    DATE: /1-0 Y-P STATION: *DATE:_____
ANII:                                                                  DATE:-
 
COMMONWEALTH EDISON COMPANY                                                                                      Page 20 of 22 Procedure No. NDT-C-30          Roe.      2                                                                -    December,      1993 C                            ULTRASONIC TESTING DATA SHEET                    NDT-DS-C2A STATION/UNIT:        4A S4 41EljNIT_,V2..                                                          PAGE:'          /    OF  /
PROCEDURE: NDT-C-3__          REV.      ___    DATA SHEET NO.:              >/-C/DAI:                                0    CALIBRATION SHEET NO.(S)
ST. BEAM:        A_)_/4-              ANGLE    BEAM:    axial          6-    J2*-        circ.      _      _      __      _
COMPONENT INSPECTED SYSTEM:          APV                  WELD        I:  _C    2- /a43C          WELD TYPE:        /V-SH
  '"I'PI    IZE:    A  -/        THICKNESS/SCHEDULE:                  7. 4.1"            MATERIAL:      LS COMPONENT TEMPERATURE:          1&#xfd;8'".y5-      165$
SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:        _            /                    ANGLE BEAM AXIAL:                        0. cB COUPLANT/
BATCH #:        V    ?&-gXqL-  U-    952.3                          j  ANGLE BEAM CIRC.:              b@.OdB EXAMINATION SCANS Performed                    Indications YES        NO      NO                    YES
: 1) Base Metal Straight Beam                                            $      N/,
      / \    2)  Angle Beam-Normal-Against Flow
: 3)  Angle Beam-Normal-With Flow                                                AIJA
: 4) Angle Beam-Along Weld-CW                                                    /<
: 5)  Angle Beam-Along Weld-CCW                                ><                A F
L    6)  Straight Beam of Weld                                              A      /    _1_A 0
W    7)  Thickness Across Weld & Base Metal                                                          N///            /V 1A UP STRM        WELD            DN STR ADDITIONAL COMMENTS IV 0 REWCDARLA      E 114EI CA71TW5 - 6AWA STT77"/6                      -IAT,yTAv)VEDP        10%o" 30,,o IO RoLL I D 6&fo1\iE7RZ      oi3SERV&k            BELouA      RECOADARLE              LEVELS 95 &deg; SHEA)?
EXAMINER:              q1* 0    . "                              LEVEL:                      DATE:            I      '9 REVIEWER:    _    _      _        -      _          _      _LEVEL:            7                DATE:      //d-      2 OTHER:                                          5  W* .0          LEVEL:    _z    L      . DATE: _          _____
SAII:                    C                                        DATE:
ANII:                                                              DATE:            2S
 
COMMONWEALTH EDISON COMPANY                                                                                                        Page 20 of 22 Prccedure No. NDT-C-30                          Rev. 2                                                                          December, 1993 ULTRASONIC TESTING DATA SHEET                    NDT-DS-C2A STATION/UNIT:                                LASAi.LF_            / .                                                PAGE:'          /      OF PROCEDURE:              NDT- CL                REV. _        DATA SHEET NO.:                    -?OC                    DATE:        I*191le CAL:BRAT:ON              SHEET NO.(S)
ST.      BEAM:        _    _    /t)  __            ANGLE    BEAM:    axial          Cf -                    circ.      _      _____
COMPONENT            INSPECTED SYSTEM:              RPV.                            WELD #:      LCSC-,2- 3                      WELD TYPE:              A/Z-SH
.,~L)~  i'PE,:*-KIE:*-              1-1""                THICKNESS/SCHEDULE:            Z    ....
5MATERIAL:                              CS COMPONENT TEMPERATURE:                                    3,          ?FtL SCAN      GAIN CONTROL SETTINGS STRAIGHT BEAM:                      AJ/f                      ANGLE BEAM AXIAL:                          .A1 COUPLANT/
BATCH        *:      aLTZA(L7  '&,*,                                                ANGLE BEAM CIRC.:
EXAMINATION SCANS Performed                        Indications YES      NO        NO                    YES
: 1)  Base Metal Straight Beam
: 2)  Angle Beam-Normal-Against                      Flow
: 3)  Angle      Beam-Normal-With              Flow                                      A/    _        _        _        _    _
(              4)    Angle Beam-Along Weld-CW,                                                  -              !
: 5)  Angle Beam-Along Weld-CCW L        6)  Straight            Beam of      Weld                        *_40_                  */  I 0
UP STRM          WELD              DN STR ADDITIONAL COMMENTS AJAM- A/MNTh1tAIFD                        to -p20% PS14            Dea XQ & EOM ETAh Q                          8EE0 Ral6                J?9,fz%4W14P            a'eG7 4,o SYEAR                FAflM.
EXANIA.&#xfd;ER:                                                                    LEVEL:    .YDATE:                            10/76~4 REVIEWER:                                                                      LEVEL:    iZZ                    DATE:        /a.  /2    '5 OTHER:          O      Z                                  l._&#xfd;"V-9zp--        LEVEL: -*                        DATE:      /0
* STAN:0'I:                                                                      DATE:,      9      917 Id ANTI:      _    _    _  _    _    _    _  _  _  _  _    _  _  _    __    DATE:--    __    _  __    _
 
0 GE Nuclear Energy Typical design for Main Steam ( N3 ) RPV Nozzle Assemblies.
REPORT NO.:
Due to the configuration of Nozzle N3D, weld number LCS-2-N3D examination coverage PAGE:--L OF: -
is as follows:
: 0.                45'                60&deg;    Exam Area lX44e,?a 62.15%              62.15%              62.15%  CW Circ scans GE REVIEWED BY        LEVEL  DATE                        62.15%              62.15%  CCW Circ scans 100.0%            100.0%  Ax Down 0.0%              0.0%  Ax Up 84.76%            88.73%  Base Metal UTILITY REVIEW          DATE 62.15%              61.81%              62.60%
Total Composite Coverage = 62.19%
SMAD REVIEW            DATE HALF SCALE
  &0
 
COMMONWEALTH EDISON COMPANY                                                                                    Page 20 of 22 Procedure No. NDT-C-30            Rev. 2                                                                    December, 199.
ULTRASONIC TESTING DATA SHEET                  NDT-DS-C2A STATION/UNIT:        /4SAI-F        /    .,                                                        PAGE          /      OF    /
PROCEDURE: NDT-      c-30 REV.        2Y      DATA SHEET NO.:            6-        / g/9            DATE: /1--            -A.
CALIBRATION SHEET NO.(S)
ST. BEAM:                    ~        '-C ANGLE      BEAM:  axial  ________ciro.
COMPONENT INSPECTED                                                                                    AiVZZ4 6      4 SYSTEM:      A'PV                    WELD #: Z6            -  A'3a      *      -WELD        TYPE:    *&-        7'.*SW2AZ L W!,PN,*SIZE:    &#xfd;&#xfd;_y_          THICKNESS/SCHEDULE:              Z 14                        MATERIAL:                  '--)    )5&#xfd; COMPONENT TEMPERATURE:          __      "    SW1    /;s5'Y&#xfd;p SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:                .00  014&              ANGLE BEAM AXIAL:
BATCH 0:      _V_7',UA,*    E7*                                      ANGLE BEA CIRC.:
EXAMINATION SCANS Performed                        Indications YES            NO      NO                  YES
: 1)  Base Metal Straight Beam
          /\2)  Angle Beam -Normal-Against            Flow                                  -VI
: 3) Angle Beam-Normal-With Flow                                      i-          I            N/
(          4)  Angle Beam-Along Weld-CW                                                                      A F      5)  Angle Beam-Along Weld-CCW                                            -
0L    6)  Straight Beam of Weld                                                        Z.-
: 7) Thickness Across Weld & Base Metal                                  ....                j    ,.
UP STRM      WELD            DN STR ADDITIONAL COMMENTS 5CAA*AED 6Dt.J6      A'l 7-rl        /yAiAT"A1)        go%      rsi$          1AC_<    RFFLEC770, ffXAtAWhA-rlOA' LimrrEo 7Z) UPPE~R _514ELL                            )?)AJ6            OLJE      T-6 COJF&#xfd;1U,?AT4co)        6F      N6TLE.
A1
      ~)g    ZE    OTDAeA I                    dL5*_,_,
7LADJC EXAMINER:      A~i'24~.i7LEVEL:                                              .2z              DATE:    10- 9-36 REVIEWER:                                                      LEVEL:      _        _      _  DATE:    /0,/    2 ,
* OTHER:          &              -              Je"f,,sO        LEVEL:_    ________              DATE:    //-        -,
STATION:                                                      DATE:__ I_______
ANII:    _                                                    DATE:    2--0-L        It7
 
COMMONWEALTH EDISON COMPANY                                                                                                  Page 20 of 22 Procedure No. NDT-C-30                      Rev.      2                                                                    December, 199.
(                                  ULTRASONIC TESTING DATA SHEET                        NDT-DS-C2A STATION/UNIT:                  A          /-IL                    u/V '-  q  2--                              PAGEt.J              OF    /
PROCEDURE: NDT- r--3                    REV.        2. DATA SHEET NO.:"                  9/1                  DAfT:        161- 9c CALIBRATION SHEET NO.(S)
ST. BEAM:      _________                            ANGLE    BEAM:    axial  _            -- ____          circ.      C-0        75-COMPONENT INSPECTED SYSTEM:              ApV                          WELD #:          Z 65        N-2-A'3          WELD TYPE:      /V  2- SH
  '*"Y*S*ZE:        ~2*-/                    THICKNESS/SCHEDULE:                2 L    &#xa3;                MATERIAL:        CS COMPONENT TEMPERATURE:                                c  r-p  16 r SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:                        A//4-                  ANGLE BEAM AXIAL:                .            d.1O3J COUPLANT/
BATCH #:            )LTiZA 6-EL                          53**5                  ANGLE BEAM CIRC.:                            g EXAMINATION SCANS Performed                        Indications YES            NO      NO                YES
: 1) Base Metal Straight Beam                                                                  ,VIA K                                      1
: 2)  Angle Beam-Normal-Against                          Flow
: 3)  Angle Beam-Normal-With Flow                                                    2          A
: 4)  Angle Beam-Along Weld-CW                                                                  >e
: 5)  Angle Beam-Along Weld-CCW L    6)  Straight          Beam of Weld                                                  >_    V                _____
0 W    7) Thickness Across Weld & Base Metal                                                          ,V/A          ,W/A            'w/A' UP STRM          WELD            DN STR ADDITIONAL COMMENTS IP      oF.'*1E7,,Y O5,,SFgVEZ                    /.ELOu-      P1EC.4og)A'LE LEVELS
                                                                      .SHEAR EXAMINER:  _________________LEVEL:____________                                                                              q-TE fJ4 REVIEWER:        _        _        _        --              _        LEVEL:          L              DATE:      dCn,//.,        .
OTHER:                                                                    LEVEL:                          DATE:
STATION:c                        e                                        DATE:_______
IANII:                                                                      DATE:  __7__-It__7
 
COMMONWEALTH EDISON COMPANY                                                                                    Page 20 of 22 Prccedure No. NDT-C-30                    Rev. 2                                                              December, 1993 ULTRASONIC TESTING DATA SHEET              NDT-DS-C2A STATION/UNIT:                            LAS*ALLE                                                    PAGE:~j          OF    /
PROCEDURE:          NDT-C-3p          REV. _,    DATA SHEET NO.:            L-171/f__                DATE:    &t/9/!
CAL BRAT:ON SHEET NO.(S)
ST. BEAM:      ___          ____ANGLE            BEAM:  axial        C-7__-___7(_          circ._______
COMIPONENT        INSPECTED SYSTEM:              APV                      WELD 0:    LCS--      AJ.D -        WELD TYPE:          A4Z -SH
... ,P," 2 SZE:            o,,/
coMPoNE            TEMPERTR:
THICKNESS/SCHEDULE:      7.                      MATERIAL:      CS
                                                                                                            .S SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:              Al/A;'                ANGLE B3EAM AXIAL:
COUPLANT/                                                                ANGLE BEAM CIRC.:
BATCH #:            I.i-T&.ew    L                                        AA EXAMINATION SCANS Performed                      Indications YES        NO      NO                YES
: 1) Base Metal Straight Beam                                          . ...,'  ,i'.-
    / \    2)    Angle Beam-Normal-Against              Flow                      -
: 3)    Angle Beam-Normal-With            Flow                      .e        *!*..
: 4)    Angle Beam-Along Weld-CW                                          -
: 5)    Angle Beam-Along Weld-CCW                                        -
L    6)    Straight Beam of Weld
: 7)    Thickness Across Weld & Base Metal                _/_4444                                  l /#,
UP STEM        WELD        DN ST ADDITIONAL COMMENTS 4APX-_AfrrN41                  D      10 M 901 9          X          R5LL, t7') C75MEV                6B:5Qi)21j5O      9CL42W RE      490ARLE          L sticl-S.
iA2 ExAMr;E:        ~LEVEL:_______                                            DATE_______
L EVE    L _      _ _ _ _ DATE .: A */          2.
RE VIHER :
OjTHER:        .                                                LEVEL: .DATE:                            /."-Y-?P STAT'ON:                                                      DATE:____
ANII    _______________                                        DATE-      2~- )--g
 
GE NuclearEnergy Typical design for Main Steam ( N3) RPV Nozzle Assemblies.
REPORT NO.:
Due to the configuration of Nozzle N3C, weld number LCS-2-N3C examination coverage b-/_          PAGE:t__OF:  /                is as follows:
: 0.                  45&deg;                600    Exam Area
                                          ~-/0-/Z -14, 62.15%              62.15%            62.15% CW Circ scans GE REVIEWED BY          LEVI Li    DATE                          62.15%            62.15% CCW Circ scans 100.0%            100.0% Ax Down 0.0%              0.0% Ax Up 84.76%            88.73% Base Metal
          -    UTILITY REVIEW              DATE      62.15%              61.81%            62.60%
Total Composite Coverage = 62.19%
SMAD REVIEW                DATE HALF SCALE
 
CON.MC.7,N'EALTH EDISON COMPANY                                                                            *.Page 20 of 22 Prccedure No. NDT-C-30                Rev. 2                                                              "December,          1993 ULTRASONIC TESTING DATA SHEET                NDT-DS-C2A
(
STAT:!N,'UNIT:              LASALLE-i          UNIT t                                                PAGE:          /        OF  /
PROCC:UPZ:        NDT-C-3__      REV. 2    DATA SHEET NO.:            b-      0oi f4          DATE:      10-J12-1 cAL:FAT:ON SHEET NO.(S)
ST.      BE:A.:      (2  - 0?  4        ANGLE BEAM:      axial              )  *4-        circ.                    /
CO'UPOMNEN'      INSPECTED SYST-M:              RPV                  WELD i:      .-C-5"2-A17                WELD TYPE:          /VA - SP
    .....-          ':*      *-I    "      THICKNESS/SCHEDULE:          3.2"                  MATERIAL:          CS COM-C.:E.NT TEMPERATURE:            .LfE
* I J* 58 SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:          57. z                      ANGLE BEAM AXIAL:                A/1A COUPL~a;T/
BATCH t:                  -)oIOTFLH                                    ANGLE    BEAM    CIRC.:  _        _/_
EXAMINATION        SCANS Performed                    Indications YES          NO      NO                YES I)  Base  Metal  Straight      Beam                                      ____
          /  \    2)  Angle Beam-Normal-Against            Flow                      v        /,4
: 3)  Angle    Beam-Normal-With        Flow            ___//d                    I C-                  4) Angle Beam-Along Weld-CW
: 5) Angle Beam-Along Weld-CCW                                            IVI/4 F                if L        6) Straight Beam of Weld W        7) Thickness Across Weld Q Base Heza.T UP STRM        WELD            ON STR ADDITGONA.L COMMENTS S-AA,      A/A SErr/-,,6- MAl mSTA/NE.
                            .-                                        8O.%        ,s14    BAcx /*L-fT-o, DATE:      IO-/"-C REV:                                                                                        DATE:    /        -f/._ Y
                                                                      ~~LEVEL:____            ___
DATE:_________
STA_
CAT-
 
COMMONWEALTH EDISON COMPANY                                                                                          Page 20 of 22 Procedure No. NDT-C-30                    Rev. 2                                                                    December, 1993 ULTRASONIC      TESTING DATA SHEET          NDT-DS-C2A STATION/UNIT:                      L A*L-5                  uNr I,                                        PAGE[-      /    OF.  /
PROC*DURF:          NDT- C-30      REV.      . DATA SHEET NO.:          [        20/0-    L3        DATE:      !0-12-'?6 CALIBRATION SHEET NO.(S)
ST. BEAM:              /t2,I                ANGLE BEAM:    axial        C    -        Z'7          circ. __        -_____
COMPONENT INSPECTED SYSTEM:                  $PV                WELD 0:      -CSz-IAV7                      WELD TYPE:          /Z-        S/1
  .... TPE"S IZ:                  -/        THICKNESS/SCHEDULE:                3.622                MATERIAL:            CS COMPONENT TEMPERATURE:                    76 0 p SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:        _    1A N1,                    ANGLE BEAM AXIAL:                    6 05    0 BATCH #:    NT/FE                                      t*Q5*5              ANGLE BEAM CIRC.:                    6o0.____
EXAMINATION SCANS Performed                        Indications YES          NO        NO                  YES i)    Base Metal Straight            Beam                                        f/A/
1
          / \    2)    Angle Beam-Normal-Against              Flow                                  W"
: 3)    Angle    Beam-Normal-With        Flow              _4                /&#xb6;/        _
3/4.                4) Angle Beam-Along Weld-CW
: 5)    Angle Beam-Along          Weld-CCW                                            7""
F L      6)    Straight Beam of Weld                                              /      f/A 0
W      7)    Thickness Across Weld & Base Metal UP STRM          WELD        DN STR ADDITIONAL COMMENTS AiR)      5'0*  5/IF7A' S CA N          SF7-7-/1/16                MA/)7141IAIAIE4        /oZ - 3,0                /)o Ic      L[
(0) NO EXAMIWAATI Oe/                        DL)'FQ          NO R -a -
Al                        Co~
01V      16URALZOv XAM,1 rlE R:                                                    LEVEL:                ~            DATE:      10-12-76 REVhrWER:                                                          LEVEL:______                      DATE:_______
OR,: -          .    "'                                f            LEVEL:
* DATE:    /10-1-'-
S  A  1-  rO:
DATE:  _L_1_  ',__
A';
I3/4                                                            DATE :3!
 
COMMONWEALTH EDISON COMPANY                                                                                      Page 20 of 22 Procedure No.            fDT-C-30 Rev.          2                                                              December, 1993 ULTRASONIC TESTING DATA SHEET                NDT-DS-C2A
(
STATION/UNIT:                    I A        LLC          uA/,T-r o                                  PAGE::._;        OF  /
PROCEDURF:        NDT-    C-30      REV.      X_    DATA SHEET NO.:                    2oi o- C.        DA*:        /o-I2-gl CALIBRATION          SHEET NO.(S)
ST. BEAM:              0/A                ANGLE BEAM: axial              C-,V2Y            circ. _        -_    _  _
COMPONENT INSPECTED SYSTEM:            APy                      WELD #:        LCS-ZLA/7                WELD TYPE:      A'?- 5/4 P PE&#xa2;'SIIZE:        __    _--"        THICKNESS/SCHEDULE:                3. 62"            MATERIAL:          C-5 COMPONENT TEMPERATURE:                    74        s  a*Sc SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:                  /V                      ANGLE BEAM AXIAL:            45. 6A COUPLANT/
BATCH *:                5o/v*o7      .- ,  .-      s/e.56                    ANGLE BEAM CIRC.:            65".
EXAMINATION          SCANS Performed                  Indications YES        NO    NO                YES 1 ) Base Metal Straight Beam                                              V    '/A/
    / \      2)  Angle Beam-Normal-Against                Flow
: 3)  Angle Beam-Normal-With              Flow                        9      ,4//
: 4)  Angle Beam-Along Weld-CW                                  V/
: 5)  Angle Beam-Along Weld-CCW F
L      6)  Straight Beam of Weld                                                ,    ,&1/4 W      7)  Thickness Across Weld & Base Metal                                  .-                      #
UP STRM      WELD        DN STR ADDITIONAL COMMENTS
        -SC/AJ 6-,*,,              5E-77AI&V                /,IT-/A4AZ /RoO-L3                      /1/oLL D Alo EAxM1VAT7, 70,&/,                      PVu      7-0o  Al,Z aa    Z A-- 601.1F16-v,7-/0A EXAM.INER:            L'                                            LEVEL:                    DATE:      16 -/2-q6
  ? -.    -EER: ,                                                      LEVEL:  __                DATE:          ,
DATEE:
DATE:    JL/-d
 
GE Nuclear Energy Typical design for Top Head Nozzle LCS-2-N7 Exam coverage is limited due to the nozzle configuration REPORT NO.:
b  2LPAGE:.        OF: J      0.
62.75%
450 62.75%
600        Exam Area 62.75% CW Circ scans 62.75%            62.75% CCW Circ scans 100.0%              100.0% Ax Down LEVEL DATE                      0.0%                0.0% Ax Up GE REVIEWED BY 90.20%              94.30% Base Metal 62.75%              63.14%            63.96%
UTILITY REVIEW          AT Total composite coverage for Weld LCS-2-N7 = 63.28%
SMAD REVIEW          DATE
 
3.
COMMONWEALTH EDISON COMPANY                                                                                              Page 20 of 22 Prccedure No. NDT-C-30 Rev.                      2                                                                  .... December, 1993 ULTRASONIC TESTING DATA SKEET                            NDT-DS-C2A                      i?-
STATION/UNIT:            ZASALL-                        UNlTIT                                            PAGE: I        / OF PROCZE'IUPR:    NDT- C-3 0        REV.2              DATA SHEET NO.:            4            ;Z'        DATit        10 12 -q CAL:BRAT:ON SHEET NO.(S)
ST. BEAM:          (2 - 'D      '            ANGLE BEAM:            axial        L,,
                                                                                        /7    -          circ.
COMPONENT INSPECTED SYSTEM:            ,qpV                      WELD #:          L.S-'-/'        ,8          WELD TYPE:          /VZ-SH
        -:z    :      *SI "            THICKNESS/SCHEDULE:                    3. 6;"              MATERIAL:        C 5 COMPONENT TEMPERATURE:                  ?1, o            t 1I4'_*  ?
SCA!N  GAIN CONTROL SETTINGS STRAIGHT      BEAM:              5-7?    -dB                  ANGLE BEAM AXIAL:          ___        _    _  _
COUPLANT    /          11411nA-rn<x BATCH #:                  ovo                          )"*5    "ANGLE                      REAM CIRC.:            1/14 EXAMINATION SCANS Performed                    Indicationx YES        NO      NO                YES I)    Base Metal Straight Beam                                        7            .,
    / \    2)  Angle Beam-Normal-Against                      Flow                                w/
: 3)    Angle Beam-Normal-With                    Flow                                      /
C          4)    Angle Beam-Along Weld-CW-                                                7        /
: 5)    Angle Beam-Along Weld-CCW                                                        A11, L    6) Straight      Beam of Weld                                                  -
0 W    7)    Thickness Across Weld & Base Metal UP STRM      WELD          DN STR ADDITIONAL COMMENTS Ai    S          V&        MAItT-A/AEP                  86      clt/      8Ac& KFCLgCm-g ACAA' LEVEL:.                      DATE:    12.-,
RzV:-LEVEL:                                                            ilL-            DATE:      /6'/0  '    ,
                              - ~      ~                S"VAW~              LEVEL:_            ___      D3ATE:/Q          9y
______________________DATE:_                                      ____
 
COMMONWEALTH EDISON COMPANY                                                                                            Page 20 of 22 Procedure No. NDT-C-30                Rev. 2                                                                            December, 1993 ULTRASONIC TESTING DATA SHEET                    NDT-DS-C2A STATION/UNIT:                            QLNT-LA 5ALL*/                ir          2>-.                              PAGE t"        /      OF PROCrDURF:        NDT- C-3        REV.    .2-    DATA SHEET NO.:                                  13-)0,/3 DAT-:      io-iZ-gq CALIBRATION SHEET NO.(S)
ST. BEAM:          A./IA                ANGLE BEAM:            axial  _        --      __7        circ.                z-5 F7 COMPONENT INSPECTED SYSTEM:            RPV                    WELD #:        IC5 - Z-A/8                      WELD TYPE:          Ala-511 WV4'! 1
        ...ZE"SIZE :        2              THICKNESS/SCHEDULE:                  .                      MATERIAL:        C5 COMPONENT TEMPERATURE:                6 7* &deg;fr          !  5-8 78 SCAN GAIN        CONTROL SETTINGS STRAIGHT      BEAM:            f/AV                      ANGLE BEAM AXIAL:                        0,    0 JS COUPLANT/
BATCH #:            6OMOTE-do    ?      -'W                                  ANGLE BEAM CIRC.:                    (0      C)8d d EXAMINATION SCANS Performed                        Indications YES          NO        NO                YES
                  - ) Base Metal Straight              Beam                                    7      v1A
: 2)  Angle Beam-Normal-Against                Flow
: 3)  Angle Beam-Normal-With              Flow
(              4)  Angle Beam-Along Weld-CW
: 5)  Angle Beam-Along Weld-CCW                                  7                      7 F
L      6)  Straight Beam of Weld                                                  7        /./4 W      7)  Thickness      Across Weld & Base Metal                                                                A UP STRM        WELD          DN STR ADDITIONAL COMMENTS
                                                  /*g !            q5 o s 5CAA) &A)Jy SET/7-1/6                          /,41/A/    T7-AI4  E      /o4-o%                  /39        1e-L Q)/V      0  EXw&          -UWATI  01V      PCUC- TO            A1o?.R1-F 60 1C'1                        A-776A!
EXMNER:                c~LEVEL:                                          _______DATE:                              J~~
REVIEWER :                                                            LEVEL:          L              DATE:      /6.    /5-2Y AT; i Z :      6      *.,*i ]                          */            DAT:          -/7'-LEVEL:D DATE:
AUI        ~      ~        ~      >-.A                              DATE:            /r
 
COMMONWEALTH EDISON COMPANY                                                                                        Page 20 of 22 Procedure No. NDT-C-30          Rev. 2                                                                        December,          1993 ULTRASONIC TESTING DATA SHEET                  NDT-DS-C2A STATION/UNIT:          LA5A/.-' I'N7-L        VA'      4=*- ;2                                      PAGE.-&#xfd;_      /        OF  /
PROCEDURE: NDT- C-30          REV. 2_      DATA SHEET NO.:                  -2c            C2          DA4i:      0. 1-2-gZ CALIBRATION SHEET NO.(S)
ST. BEAM:        )//A            ANGLE      BEAM:  axial                          7--____  circ.      _        -_f_
COMPONENT INSPECTED SYSTEM:          RPv                WELD          LS2-1:          /VL3              WELD TYPE:            _  /V  _        _/-/
THICKNESS/SCHEDULE:                3. 2"                  MATERIAL:          C.5 COMPONENT TEMPERATURE:            76 '.        `&deg;      B ,
SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:              '/VA                    ANGLE BEAM AXIAL:                      65      6 ,R COUPLANT/
BATCH #:        501ONOF6,      It    11714                          ANGLE      BEAM CIRC.:                  65.6 1d6 EXAMINATION SCANS Performed                            Indications YES        NO          NO                    YES i) Base Metal Straight Beam                                                    NIA
: 2)  Angle Beam-Normal-Against            Flow            -                  I    /
: 3)  Angle  Beam-Normal-With        Flow                      6  v-'          AIA
: 4)  Angle  Beam-Along Weld-CW                            v7                    7
: 5)  Angle Beam-Along Weld-CCW                            V11 F
L      6)  Straight Beam of Weld                                                      1V1,4 0--
W      7)  Thickness Across Weld & Base Metai                                                                          _
UP STRM            WELD              DN STR ADDITIONAL COMMENTS
                                    /VAg; SCAN      &A*161    5F7-7,/n6-        /1fIiy7TAN-I        D          %10%-301%            ID      90LL-SAV O  EXAmINiATIOAN          Dv          7-    N2      "a,-    C..l,,,6-uZ,4.
EXAM INIER:      S4    r..L                                  LEVEL:            'IT-_          . DATE:        lO-/;Z-        9*
REV: E WE                                                    LEVEL:    _7_7                      DATE:        /*)''            -
OTHER:                                        fpO            LEVEL:            ?                DATE:      ro3/-9*,
STA:_ON-:6:-;                                                OATE: _____"-_i              __
AN I:,                                            &#xfd;v&#xfd;3DATE:            3 -174'
 
GE NuclearEnergy Typical design for Top Head Nozzle LCS-2-N8 Exam coverage is limited due to the nozzle configuration REPORT NO.:
____o        PAGE:  / OF:          0o 63.92%
45" 63.92%
60, 63.92%
Exam Area CW Circ scans 63.92%              63.92%    CCW Circ scans 100.0%            100.0%    Ax Down 0.0%                0.0%    Ax Up GE REVIEWED BY          LEVEL DATE 91.45%            94.86%    Base Metal 63.92%              63.86%              64.54%
UTILITY REVIEW          DATE Total composite coverage for Weld LCS-2-N8 = 64.10%
SMAD REVIEW            DATE 45 0 S
 
COMMONWEALTH EDISON COMPANY                                                                          Page-20 of 22 Rev. 2                                                          December, 19S Procedure No. NDT-C-30
(                            ULTRASONIC TESTING DATA sETNDT-Ds-C2A STATION/UNIT:                                                                            PG.5A PAGI              OiF    /
PROCEDURE:      NDT-    C_    REV.      .g    DATA SHEET NO.:    _      -__    ..__,_      DATE:          2o-f:2-1 CALIBRATION      SHEET NO.($)
ST. BEAM:      (d-    10              ANGLE BEAM: axial          ,i/4              circ.        /_.//4-/
COMPONENT      INSPECTED
  ,SXSTEM:          :PV                    WELD 1: L_.C  -. ?-NIOA            WELD TYPE:      AVZ-        /7-PIPE SIZE:        &#xfd;IC            THICKNESS/SCHEDULE-        e.  *"              MATERIAL:    C5 0    WA COMPONENT TEMPERATURE:            -7e          / 66 7.23 SCAN GAIN CONTROL SETTINGS STRAIGHT    BEAM:                              ANGLE    BEAM AXIAL:    _      _    _/A COUPLANT/                                                        ANGLE BEAM CIRC.:/A BATCH *:      u A~Jr7A &C6L f    953 ;!SAIA_
EXAMINATION SCANS Performed                  Indications YES        NO    NO                YES
: 1)  Base Metal    Straight        Beam                              ____
      / \    2)  Angle Beam-Normal-Against            Flow                        NIA
: 3)  Angle Beam-Normal-With Flow                                X      A1/A
: 4)  Angle Beam-Along Weld-CW                                    X    A
: 5)  Angle Beam-Along Weld-CCW                                ,        VI F-L    6)  Straight    Beam of Weld                          X    '
W    7) Thickness Across Weld Q Base Metal                          I          A/        I/VA          A//A UP STRM      WELD          ON STR ADDITIONAL COMMENTS
                          -SCAtJ J3        Ref(C-c-r-S    O    ,AIL.)%
A/O      ?EC-Co-<ABLE          /Aj-D1CA,-tCtJ$
0' L_      eN    ,-D,      AL EXAMINER: --                                              LEVEL:______                DATE:  /________
REVIEWER:_______________                                  LEVEL:    Z7ZZDATE:_______
OTHER:    CA--4            ---                          LEVEL:_________              DATE:/1C        -
STAT ION.<2::      .-                                    DATE: 1_________
ANI11:                                                    DATE:    ti-91 1:
 
COMMONWEALTH EDISON COMPANY                                                                                              Page 20 of 2 Procedure No. NDT-C-30 Rev.                2                                                                            December, 19
(                          ULTRASONIC TESTING DATA SHEET                        NDT-DS-C2A STATION/UNIT:      ZAS,4LL1E_                                                                              AE4O PROCEDURE:    NDT-e30          REv. t.      DATA SHEET NO.:                        -1      8          DATE:      __".__'___
CALIBRATION SHEET NO.(S)
ST. BEAM:          4) 64.            ANGLE BEA*: axial                                              cir. c-    C      /0 7 COMPONENT INSPECTED ST*#TEM:      /PV                    WELD 0-            2CS-N.-W/IOA                      WELD TYPE:      ,,_Z. _            _      _ _
PIPE SIZE:      4'0            THICKNESS/SCHEDULE:                6'g/"'                    MATERIAL:            CfS COMPONENT TEMPERATURE:            ZF          S/V /*5?..3 SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:        _      ______                        ANGLE BEAM AXIAL:                  (..      ( d4 COUPLANT/                                                                    A            B      C.                      Ole BATCH if:    ALTRAGEL          tt,        ~9S3-2S                            NLEM5RC:______
EXAMINATION    SCANS Performed                          Indications YES            NO    NO                      YES
: 1) Base Metal Straight Beam                                              II
: 2)  Angle Beam-Normal-Against                  Flow              .                  77
: 3) Angle Beam-Normal-With                Flow
(
: 4)  Angle Beam-Along Weld-CW L
5) 6)
Anile Beam-Along Weld-CCW Straight Beam of Weld                                                    j 7,/*  _
w    7)  Thickness Across Weld & Base Metai                        _
4- A UP STRM            WELD            DN STR ADDITIONAL COMMENTS
      .V'RX 5-          .0.                                                                                  RD,44tE-L~eVCIf.5.
0    A)VE-rAvj
          ~i                fLICt6  7Z)    100"46I-7 CV        5 2#t)  (/CeR4T/10m 415 0  6HE      EXA M EXAMINER:            I _        &#xfd;zLEVEL:-                                                            DATE: A0_-__2:!r              __q REVIEWER:                                                        LEVEL:            4Z1              DATE: ____2              ._
OTHER:        -                                  ,.e,'          LEVEL:.                            DATE: /C-'-
sTAT:O1,:                                                        D*DATE:  _,__-___
ADATE:                  q-01-11)
 
COMMONWEALTH EDISON COMPANY                                                                                    Page 20 of 22 Procedure No. NDT-C-30              Rev. 2                                                                  December, 1993 ULTRASONIC TESTING DATA SHEET                NDT-DS-C2A
(
STATION/UNIT:              LA 541-E                uA417- f                                      PAGE I        /V      OF  /
PROCEDURE:      NDT-    C-30    REV. 2.      DATA SHEET NO.:                                  _DATE:            /jo*2S*-176 CALIBRATION SHEET NO.(S)
ST. BEAM:                IA_          ANGLE  BEAM:  axial          C    -                circ.            -
COMPONENT INSPECTED SYSTEM:                  PV            WELD #:    kCS.1-fL-          i0          WELD TYPE:          /V      -    5H
  &#xfd;PIfE SIZE:          /O          THICKNESS/SCHEDULE:            6.99                MATERIAL:            C-COMPONENT TEMPERATURE:              788    v 16572-3 SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:              11,                    ANGLE BEAM AXIAL:
* e"    q Js COUPLANT/                                                              A BATCH #:            ()ITgLr4E - 1S
* 2                ANGLE BEAM CIRC.:            _  _  _.        _B EXAMINATION SCANS Performed                        Indications YES            NO    NO                    YES
: 1) Base Metal Straight          Beam                                      Al/A
    / I\  2)  Angle Beam-Normal-Against              Flow            7'
: 3)  Angle Beam-Normal-With            Flow                                  Al/
VIA
: 4)  Angle Beam-Along Weld-CW
: 5)  Angle Beam-Along Weld-CCW                            .,-
F L    6)  Straight      Beam of Weld                                              VIA// _
0 W    7)  Thickness Across Weld & Base Metal                                                        A'/A 411            WI/A UP STRM          WELD            DN STR ADDITIONAL COMMENTS A/RI        -    (6)"  sA.i~
4.-$      G,'-1F7-/                OSF2VEP 8z-oj                            eE*      o/,q r        L9- LEVELS.
SeA.4 G-A.)            5rn7-7wv6-s        IjA*NTA        JEIp          i/0 -- Zo/o J-p              oL.o.
I        ~,, ,~
LEVEL:                          DATE-      /"    ZS'-%
REV7EWER:                                                      LEVEL:                          DATE:      10__    .___,
OTHER:      ~                1                                LEVEL:                          DATE:    __-_0______
DATE:__________
IA-N:                                                          DATE:      /r(1
 
GE NuclearEnergy Typical design for CRD Nozzle LCS-2-N1 OA Exam coverage is limited due to the nozzle configuration REPORT NO.:
I)L~~    PAGEd- OF:
0o 70.21%
45.
70.21%
60&deg; 70.21%
Exam Area CW Circ scans 70.21%            70.21% CCW Circ scans 100.0%              100.0% Ax Down
                                        /02-27-,;P                      0.0%                0.0% Ax Up GE REVIEWED BY      LEVEL    DATE                          92.65%            95.96% Base Metal 70.21%              66.61%            67.27%
UTILITY REVIEW            DATE    Total composite coverage for Weld LCS-2-N10A = 68.04%
442Z_ //- 0  -7V SMAD REVIEW              DATE Half Scale i,
60O 45&deg; S
 
COMMONWEALTH EDISON COMPANY                                                                                            ,Page 20 of 22 Prccedure No. NDT-C-30                  Rev. 2                                                                  :JDecember, 1993 ULTRASONIC TESTING DATA SHEET                      NDT-DS-C2A
(
STATION/UNIT:                  L-A sAL          -          L    IVT-  *r  2    .                      PAGE:      j-        OF PROCEDURE:    NDT-C-3_              REV.-___        DATA SHEET NO.:            *-2C)          F-          DATi:          -
CAL:BRAT:ON SHEET NO.(S)
ST. SEAM-        C        D2        /.      ANGLE      BEAM:      axial          ,t//z'&#xfd;-          circ.      _______
CO:UPONENT INSPECTED SYSTEM:          /)PV                      WELD #:          L-CS- 2-VNIB              WELD TYPE:            A ai        5/9
                      . Cl                  THICKNESS/SCHEDULE:              3. 62"              MATERIAL:                C5 COXPONENT TEMPERATURE:                  "                  s-s 78 SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:                    5    2 dtE                ANGLE BEAM AXIAL:            _        A/_A COUPLANT/              le"jix BATCH                  o: IO/7--cN  tC          /      s                    ANGLE SEAM CIRC.:                  1V1,4 EXAMINATION SCANS Performed                      Indications YES      NO      NO                      YES
: 1) Base Metal Straight Beam                                                          I--,4'
      / \    2)  Angle Beam-Normal-Against                    Flow                              /V/A
: 3)  Angle Beam-Normal-With                    Flow                                  NIA C..          4)  Angle Beam-Along Weld-CWA F    5)  Angle Beam-Along Weld-CCW                                                      A/IA L    6)  Straight Beam of Weld W    7)  Thickness          Across Weld & Base Metal UP STR.M          WELD      IDN STRJ
                                                                                                                                          }A ADDITIONAL COMMENTS Scf4^ C-AA) 5E,,/,AV6                      /              lTVEb o"IA        80% FSH          4?Acie
          -'*E:/        _                    .        -LEVEL:                              .          DATE:      /O - I)-X a  :zWLEVEL:                                                      .i277              DATE:_            _____
y'~  n:    C 9~,7~4~                      J>~'9~'            LEVEL:-ZAT: 73                                      7 Coe.                                                                                    DAEATE:_____
____________________                      f44&__    DATE:    3?~
 
COMMONWEALTH EDISON COMPANY                                                                                    Page 20 of 22 Procedure No. NDT-C-30                  Rev. 2                                                              December, 199.
ULTRASONIC TESTING DATA SHEET                NDT-DS-C2A STATION/UNIT:                        LASALL                      A '/i/7-rlp-                      PAGEI;        /    OF    (
PROCDURE:          NDT- C-30          REV. -2        DATA SHEET NO.:              -                  DAT,        IQJ-12-L6 CALIBRATION SHEET NO.(S)
ST. BEAM:            A))14                  ANGLE BEAM:    axial                            circ.      (        o &#xfd; 7 COMPONENT INSPECTED SYSTEM:              RpV                      WELD #:    LCS-2-A118                  WELD TYPE:      /V    - SH
.I*"*'SIZE      :    */                THICKNESS/SCHEDULE:            3. 2"            MATERIAL:      C-COMPONENT TEMPERATURE:                  -kf        4P    58 78 SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:                  /1/A                  ANGLE    BEAM AXIAL:            6o.o0 J/
COUPLANT/                                                                  ANL      B BATCH #:            50-JOT*-CH              #                            ANGLE BEAM CIRC. :        __          .___
-EXAMINATION          SCANS Performed                    Indications YES        NO        NO              YES
: 1) Base Metal Straight Beam                                          V      V/I
    / \      2) Angle Beam-Normal-Against                Flow          V",
: 3) Angle Beam-Normal-With Flow                                  C            N$ A
: 4) Angle Beam-Along Weld-CW                              77
: 5) Angle Beam-Along Weld-CCW                                7 F
L        6) Straight Beam of Weld                                              -      ,wq 0                                                                                                  'I            ---
W        7) Thickness Across Weld & Base Metal UP STRM        WELD        DN STR ADDITIONAL COMMENTS AJ)R        ~    5  d/~
S-AcA        &AjV SFT7-T-J)A6              MIA/AITA/I&#xa3;)      I0%"- 36%                Ii) ROLL Al
            /nO    EXAM I IJATWA/                DuE Tt          I'40?-LE C0AJ/PC..fZATION EXAMINER:          L                a                            LEVEL:      J*              DATE:_,_-,_-__
REVIEWER:                                                        LEVEL:            -          DATE: /142 /,T-OTHER:                  g l-l...---                    J,"-  V    LEVEL:                        DATE: /9      -3/1 -,9 ANI::                    -        ',<7 *_.-- -- _      6,      DATE:    >-!        ,)
 
COMMONWEALTH EDISON COMPANY                                                                        Page 20 of 22 Procedure No. NDT-C-30              Rev. 2                                                          December, 1993 ULTRASONIC TESTING DATA SHEET            NDT-DS-C2A STATION/UNIT:            LA6ALLAE            U IVI      2                              PAGE      ]      OF PROCEDURE-      NDT-    3-0    REV. 2-  DATA SHEET NO.:        D-      :=1,3 C. DATi:      /2-2-.
CALIBRATION SHEET NO.(S)
ST. BEAM:          A64                ANGLE BEAM: axial        (        9'2      circ.      (2-6 COMPONENT INSPECTED SYSTEM:        RPy                    WELD #:      LC.S-2-AiIB            WELD TYPE:      ^/-      SH PIPE SIZE:            5        THICKNESS/SCHEDULE:          3.62"            MATERIAL:      CS COMPONENT TEMPERATURE:              71LF    ow I578 SCAN GAIN CONTROL SETTINGS STRAIGHT BEAM:            /V14                ANGLE BEAM AXIAL:                6o d8.
COUPLANT/          /    &-,,-c BATCH #:          56O 6b7"-H        *1-9sis                    ANGLE BEAM CIRC.:          b. &#xa3; dS EXAMINATION SCANS Performed                Indications YES      NO    NO              YES
: 1) Base Metal Straight Beam
  / \  2)  Angle Beam-Normal-Against Flow
: 3)  Angle Beam-Normal-With Flow                                      'vIA
: 4)  Angle Beam-Along Weld-CW                            V
: 5)  Angle Beam-Along Weld-CCW F
L    6)  Straight Beam of Weld                                        /
0 W    7)  Thickness Across Weld & Base Metal                                                A UP STRM      WELD        DN STR ADDITIONAL COMMENTS
    -ScAN &-AiN SEMN7A6- /IAIW1?_4/,VETD 1001o30%- 1pIoLL CD /N0 EXAAlINA~nav D)UE-T NOaiL- C.oNIf/6-U*'eA-rmA EXAMINER:                  ? /j.e                          LLEVEL:-                  DATE:      .        g 6-REVIEWER:                                                  LEVEL:    I              DATE: /0.    /-S-,'
OTHER:    .                'LEVEL:                                                  DATE:-    e&deg;-3'/
STATION:          "      6.        &#xfd;&#xfd;                    DATE:      E-7  .
ANII:        IIl                                        _  DATE:
 
                                                                                              =.-
0GE NuclearEnergy Typical design for Top Head Nozzle LCS-2-N1 8 Exam coverage is limited due to the nozzle configuration REPORT NO.:
i&z-  'c3    P  GE:ot OF:I          00 62.75%
450 62.75%
60&deg; 62.75%
Exam Area CW Circ scans 62.75%            62.75%      CCW Circ scans 100.0%            100.0%      Ax Down GE REVIEWED BY          LEVEL  DATE 0.0%                0.0%      Ax Up 90.20%            94.30%      Base Metal 62.75%              63.14%            63.96%
UTILITY REVIEW            DATE Total composite coverage for Weld LCS-2-N18 = 63.28%
SMAD REVIEW            DATE 0
60 S
 
EXAMINATION
 
==SUMMARY==
SHEET a            GE NUCLEAR ENERGY                                          LaSalle Unit 2 L2R08 LCS-2-N1B                        21.0039                          N-SH                            RPV                    B-D Component ID:                    Line ID:                    Configuration:                    System:              ASME Cat.:
Examination        Cert      Exam              Exams            Data      Cal                  Procedure            Calibration Personnel          Level    Completed          Performed        Sheet      Sheet                Revision                Block Paul Hayes              11      11/15/00              00L            D-070    D-070          UT-DRD-300V3 R.1            01-92-01 Credit              45 00 S        D-071    D-071          UT-DRD-300V3 R.A            01-92-01 60 S            D-072    D-072          UT-DRD-300V3 R.A            01-92-01 Section XI Examination Results:
Manual ultrasonic examination results were acceptable to the requirements of ASME Section Xl, 1989 Edition, No Addenda and Regulatory Guide 1.150.
Examinations were performed from the vessel wall with 00, 450 and 600 search units. The angle beam examinations were performed transverse and parallel to the weld.
No recordable indications were detected.
60.4% coverage of the examination volume was obtained.
Examination results were compared to data report          303,306,309    from      L2R02      outage with      X  No Change These examinations were performed under Work Order:                                                          N/A  Change This Summary and thefollowing data sheets have been reviewed and accepted by the folloivingpersonnel:          RWP:      2221
                                                                                                  .        .Dose:                80    mr.
GE Reviewed By:                Level:        Date:      Station Reviewed By:
 
==Title:==
Date:
Reviewed By:                    Level:        Date:      ANII ;*ewed By:
 
==Title:==
Date:        Page    1  of  7
 
La Salle Unit 2 NI Nozzle CROSS SECTIONAL AREA (per slice)                                            TOTAL CODE COVERAGE code cross              area                area            % of code area % of code area    degrees            degrees            percent            percent sectional            scanned            scanned                scanned      scanned        scanned            scanned            scanned            scanned area              automated            manually              automated      manually      automated          manually          automated          manually 00 wm                                60.1                  0.0                25.5                    0.0        42.4            0.0              360.0                0.0              42.4 450 T-scan                          60.1                  0,0                44.4                    0.0        73.9            0.0              360.0                0.0              73.9 60' T-scan                          60.1                  0.0                48.9                    0.0        81.4            0.0              360.0                0.0              81.4 45' P-scan CW                        60.1                  0.0                31.2                    0.0        51.9            0.0              360.0                0.0              51.9 600 P-scan CW                        60.1                  0.0                36.5                    0.0        60.7            0.0              360.0                0.0              60.7 45' P-scan CCW                      60.1                  0.0                31.2                    0.0        51.9            0.0              360,0                0.0              51.9 60' P-scan CCW                      60.1                  0.0                36.5                    0.0        60.7            0.0              360.0                0.0              60.7 0.0              60.4 Manual scans were not restricted.
No credit taken for initial 1/4" of material in Code coverage calculations due to near field effects..                                                    Total Composite Coverage =      60.4%
                                                                                                                              ,&#xfd; 2-R - 042 /                rr7
: r. Zi        -?6 '. ,
                                                                                                                                        .01 .1
 
Lasalle 2 Recirculation Outlet N1 Nozzle 0O L-wove wel d metal, 45* and 60* T-scan coverage 60"T R9-              p"-6z7
                                      -7          2&#xfd;    -eL
 
Lasalle 2 Recirculation Outlet N1  Nozzle 45" and 60&deg; P-scan coverage
  /
I 45TP L'Z7 ~ (P ~cu
 
EXAMINATION
 
==SUMMARY==
SHEET                                              Report No:
GE NUCLEAR ENERGY                                            LaSalle Unit 2 L2R08                                        2R8-002 LCS-2-N6A                          21.0061                          N-SH                          RPV                      B-D Component ID:                      Line ID:                      Configuration:                  System:                ASME Cat.:
Examination        Cert        Exam              Exams            Data      Cal              Procedure              Calibration Personnel        Level    Completed            Performed        Sheet      Sheet              Revision                  Block Paul Hayes              11        11/16/00              00 L          D-096      D-096        UT-DRD-300V3 R.1              01-92-01
          -                          Credit              450S            D-097      D-097        UT-DRD-300V3 R.1              01-92-01 60 0S          0-098      D-098        UT-DRD-300V3 R.1              01-92-01 Section XI Examination Results:
Manual ultrasonic examination results were acceptable to the requirements of ASME Section X1, 1989 Edition, No Addenda and Regulatory Guide 1.150.
Examinations were performed from the vessel wall with 0&deg;, 450 and 600 search units. The angle beam examinations were performed transverse and parallel to the weld.
No recordable indications were detected.
68.4% coverage of the examination volume was obtained.
Examination results were comparedto datareport                D457        from      L2R03    outage with      X  No Change These examinations were performed under Work Order:          990139382                                        N/A  Change This Summary and the following datasheets have been reviewed and accepted by thefollowing personnel:            RWP:        2221
____    ___  -                                                              p___    Dose:  -~240        mr.
GE Reviewed By:                Level:          Date:    Station Reviewed By:
 
==Title:==
Date:
Reviewed By:                    Level:          Date:    ANII,      iewed By:
 
==Title:==
Date:          Page    1 - of _7 I,
 
La Salie Unit 2 N6 Nozzle CROSS SECTONAL AREA (per slice)                                          TOTAL CODE COVERAGE code cross              area                area              % of code area % of code area  degrees        degrees            percent          percent sectional            scanned            scanned                scanned        scanned      scanned        scanned            scanned        scanned area              automated            manually              automated      manually    automated        manually          automated        manually 00 wm                                58.7                  0.0                30.1                    0.0          51.3          0.0          360.0                0.0            51.3 45' T-scan                          58.7                  0.0                47.5                    0.0          80.9          0.0            360.0                0.0            80.9 60' T-scan                          58J7                  0.0                50.5                    0.0          86.0          0.0          360.0                0.0            86.0 45' P-scan  CW                      58.7                  0.0                34:8                    0.0          59.3          0.0          360.0                0.0            59.3 600 P-scan  CW                      58.7                  0.0                41.6                    0.0          70.9          0.0          360.0                0.0            70.9 45' P-scan  CCW                    58.7                  0.0                34.8                    0.0          59.3          0.0            360.0                0,0            59.3 600 P-scan  CCW                    58.7                  0.0                41.6                    0.0          70.9          0.0            360.0                0.0            70.9 0.0            68.4 Manual scans were not restricted.
No credit taken for initial 1/4" of material in Code coverage calculations due to near field effects.
Total Composite Coverage =    68.4%
7 "IRYo0Z Pm_
                                                                                                                                    ;                      /ca7o2/-            'o
 
Lasalle 2 LPCI N6 Nozzle
: 0. L-wove weld metal, 45" and 60" T-scan coverage fI O"L 60*T 6c<Z
                                                    ~R8-c2~22~~
77? I'  /
 
Lasalle 2 LPCI N6 Nozzle 45" and 60" P-scan coverage I
2R2-aO'Z  /,*          7*7      7 i//li /'cc alf  " t - /f'G1C
 
EXAMINATION
 
==SUMMARY==
SHEET                                          Report No:
GE NUCLEAR ENERGY                                        LaSalle Unit 2 L2R08                                        2R8-003 LCS-2-N6C                        21.0063                          N-SH                            RPV                    B-D Component ID:                    Line ID:                    Configuration:                      System:              ASME Cat.:
Examination        Cert      Exam                Exams          Data        Cal                  Procedure            Calibration Personnel          Level    Completed          Performed        Sheet      Sheet                Revision                Block Jason Breza              11      11/17/00              0&deg;L          D-093      D-093          UT-DRD-300V3 R.1            01-92-01 0                    D-094          UT-DRD-300V3 R.1            01-92-01
'.:Tr*,'he-* ' ,        . 1        Credit              45 0S        D-094 60 S          D-095      D-095          UT-DRD-300V3 R.1            01-92-01 Section XI Examination Results:
Manual ultrasonic examination results were acceptable to the requirements of ASME Section Xl, 1989 Edition, No Addenda and Regulatory Guide 1.150.
Examinations were performed from the vessel wall with 00, 450 and 600 search units. The angle beam examinations were performed transverse and parallel to the weld.
No recordable indications were detected.
68.4% coverage of the examination volume was obtained.
Examination results were compared to data report          D454        from      L2R03      outage with      X  No Change These examinations were performed under Work Order:        990139382                                          N/A  Change This Summary and thefollowing data sheets have been reviewed and accepted by thefollowing personnel:            RWP:      2221
* A          *"f        -                    RWPDose: 300_ mr.
GE Reviewed By:                  Level:      Date:      Station Reviewed By:
 
==Title:==
Date:
Reviewed By:                    Level:      Date:      ANII RV wed By:
 
==Title:==
Date:        Page  1 of
 
La Salle Unit 2 N6 Nozzle CROSS SECTIONAL AREA (per slice)                                          TOTAL CODE COVERAGE code cross              area                area              % of code area % of code area  degrees        degrees            percent        percent sectional            scanned            scanned                scanned        scanned      scanned        scanned            scanned        scanned area              automated            manually              automated      manually      automated        manually          automated      manually 0, wm                                58.7                  0.0                30.1                    0.0          51.3          0.0          360.0                0.0          51.3 450 T-scan                          58.7                  0.0                47.5                    0.0          80.9          0.0          360.0                0.0          80.9 60' T-scan                          58.7                  0.0                50.5                    0.0          86.0          0.0          360.0                0.0          86.0 450 P-scan  CW                      58.7                  0.0                34.8                    0.0          59.3          0.0          360.0                0.0          59.3 60' P-scan  CW                      58.7                  0.0                41.6                    0.0          70.9          0.0          360.0                0.0          70.9 450 P-scan  CCW                    58.7                  0.0                34.8                    0.0          59.3          0.0          360.0                0.0          59.3 600 P-scan  CCW                    58.7                  0.0                41.6                    0.0          70.9          0.0          360.0                0.0          70.9 0.0          68.4 Manual scans were not restricted.
No credit taken for initial 1/4" of material in Code coverage calculations due to near field effects.                                                  Total Composite Coverage =  68.4%
e J- - 7 P,
A.~    (' ~    -
64A~                    ~,
11    /Zt). ,st&#xfd; 11-;13 -00 &#xfd;xvff)
 
Lasalle 2 LPCI N6 Nozzle 0* L-wave weld metal, 45" and 60" T-scan coverage I
O'L 60"T 1 /4 n5'
 
Lasalle 2 LPCI N6 Nozzle 45" and 60" P-scan coverage
/
I
                              -7 RE7
 
        ~GE              NUCLEAR ENERGY UT EXAMINATION
 
==SUMMARY==
SHEET                                    Summary No: 2R9-012 WO No: 430431 PROJECT              LaSalle Unit 2 WELD ID:            LCS-2-N4A SYSTEM:              RPV N4A N-SH INITIAL CALIBRATION ID:                          NOZ.IN, NOZ.70.IN FINAL CALIBRATION ID:                            NOZ.OUT, NOZ.70.OUT GERIS DATA:                                      n4a.70.1, n4a.tI.1, n4a.tl.2, n4a.pl.1, n4a.p2.1
- 2MANUALD tA:                                      N/A OPERATORS:                                      M. Hilborn Lv II; L. Benicki Lv II; CE Frakes Lv II; J.Guillote Lv II Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section XI, 1989 Edition no Addenda, also Section XI, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-D Reactor Pressure Vessel (RPV) Assembly Welds.
Automated transverse and parallel scans were performed in accordance with procedure GE-UT-705 V2, using 450 Shear wave, 600 RL, and 700 RL search units, 0' L-Wave supplemental scans were also performed.
Automated scanning was performed from the nozzle OD surface, 3600 around the nozzle, with no restrictions.
For initial calibrations refer to report G2K-CAL-1.
For final calibrations refer to report G2K-CAL-3.
The GERIS 2000 00 automated UT system 0&deg; reference is located at 90&deg; CW of nozzle TDC.
The GERIS 2000 OD system recorded no indications.
450 S / T-scan,                No recordable indications.
600 RL / T-scan,                No recordable indications.
450 S / P1-scan,                No recordable indications.
450 S / P2-scan,                No recordable indications.
700 RL / T-scan,              No recordable indications.
70&deg; RL / P-ccw                  No recordable indications.
70&deg; RL / P-cw                  No recordable indications.
Automated Composite Coverage = 78.1%
By          DATE      REVIEWED BY          DATE    UTILITY REVI                                        DATE UT Level                -_"&#xfd;v-03 I
T--
UT Level.=
                                                      ~I'
                                                          &#xfd; 4 (.03J
                                                              /  3                              1-LaSalle Unit-2, 2RO9                                                                                        Page I of_. I
 
Summary No.:  2R9-012 LaSalle Unit-2 Weld LCS-2-N4A Spring 2003 CODE CROSS-SECTIONAL AREA                  TOTAL CODE COVERAGE" Percent Weld Length =  360. Required Exam      Area Scanned    of Area      Weld Length      Percent Exam Volume =    59. Area Sq. In.          Auto        Auto            Auto          Auto 70* T-Scan        A        11.4                5.6        9.5%            360          4.7%
450 T-Scan        A        39.1              33.5      56.8%            360          28.4%
600 T-Scan        A          8.5                8.5      14.4%            360          7.2%
70&deg; P-Scan        A        11.4                4.9        8.3%            360          4.2%
450 P-Scan        A        39.1              31.2      52.9%            360          26.4%
IRS P-Scan        A          8.5                8.5      14.4%            360          7.2%
70' T-Scan 450 T-Scan 60&deg; T-Scan 700 P-Scan 450 P-Scan IRS P-Scan 70&deg; T-Scan    _
450 T-Scan 60' T-Scan 70' P-Scan 450 P-Scan IRS P-Scan
                                                                            % Total Composite Coverage =    78.1%
Comments: A - Examined 360*. Scanning limited due to nozzle configuration.
Note - Rounding methods may make calculated values appear in error.
LaSalle Unit-2, 2RO9                                                                                              Page  S" of IL
 
C..
                                                  .2' LaSalle Unit-2 Feedwater 700 Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 607T) = 8.5 Sq. In.
70' T-Scan achieved = 5.6 Sq. In.
45&deg; T-Scan achieved = 33.5 Sq. In.
60&deg; T-Scan achieved = 8.5 Sq. In.
70'T          45r              60"T I              I                I
 
LaSalle Unit-2 Feedwater 70' Exam Volume = 11.4 Sq. In.
45&deg; Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60"T) = 8.5 Sq. In.
70&deg; P-Scan achieved = 4.9 Sq. In.
45&deg; P-Scan achieved = 31.2 Sq. In.
IRS P-Scan achieved = 8.5 Sq. In.
Ct X I            70*P          45&deg;P / IRS 7
F---
                                                          ===d
 
LaSalle 2 GL,  ,L6-JG1.xls GOD-SL6E LaSalle 2                                NOZZLE EXAMINATION PLAN                                                            -                    1/21/2003 Feedwater GERIS-2000 NOZZLE-TO-VESSEL SCANNING LIMITS 5-NOZOD                  26.25 VSLIR                  126.69                                                                                            1 WALL                    6.44 WELD RAD                17.25 ODBR                    3.56 TYPE                    F    (F-FLANGE OR B-BARREL)
Delay                        INDEX  INDEX    STEP      RADIAL DISTANCE      AGATE  BE GATE      C GATE FIXTURE CPU CH    ANGLE      TYPE    usec          X        Y      DEG  INCHES  INCHES      START      STOP    STOP    START STOP  STOP    ANGLE ANGLE 1    0.00      W      3.66      0.00      0.00    0.80  0.317    0.150          0        18.97    88                  54        -
2    45.0'      T      13.26      3.00      0.00    0.8'  0.411    0.150          0        13.12  235      -                  7.3    -7730 3    60.0'      T      14.15      -3.00      0.00    0.80  0.490    0.150          0        18.97  185                        353,9&deg;    6.10 4/6    45.0'      P1      13.26      3.00      0.00    0.80  0.336    0.150          0        10.00  235                        298.00  62.00  (ccw) 5/7    45.0*      P1      13.26      -3.00      0.00    0.8&deg;  0.336    0.150          0        10.00  235                        62.0'  -62.00  (cw) 416    45.0*      P2      13.26      3.00      0.00    0.80  0.336    0.150          0      10.00    235      -    -      -  321.3'  38.70  (ccw) 5/7    45,0'      P2      13.26      -3.00      0.00    0.80  0.336    0.150          0      10.00    235      -    -      -    38.70  -38.70  (cw) 1    70.00      T      12,00      0.00      0.00    0.80  0.380    0.150          0      10.87    52      -    -      -    0.00    0.0&deg; 2    70.0'      P      12,00      3.00      0.00    0.80  0.313    0.150          0        6.25    52      -    -      -  287.20  72.8'  (ccw) 3    70.0'      P      12.00      -3.00      0.00    0.80  0.313    0.150          0        6.25    52      -    -      -    72.80  -72.8*  (cw) 1    49.0&deg;    Z1R      17.48      2.50      0.00    1.70  0.500    0.070        60        90    395      -    -      -  335,50  24.50  (ccw) 2    49.0'    ZIR      17,48      -2.50      0.00    1.70  0.500    0.070        60        90    395      -    -      -    24.50  -24.50  (cw)
: 1. 68.00    Z2A      17.28      2.50      0.00    1.70  0.500    0.070        50        90    281      -    -      -  348.40  11.60  (ccw) 2    68.00    Z2A      17.28      -2.50      0.00    1.70  0.500    0.070        50        90    281      -    -      -    11.60  -11.6*  (cw) 2    30.00    Z2B      17.28      2.50      0.00    1.50  0.354    0.070          -          -    237      -    -      -  300.00  600    (cw) 1    30.00    Z2B      17.28      -2.50      0.00    1.50  0.354    0.070          -                237      -    -      -    60.00  -60.00  (ccw) 2    20.00      Z3      17.28      2.50      0.00    1.50  0.354    0.070          -                188      -    -      -  270.00  90.0o  (cw) 1    20.00      Z3      17.28      -2.50      0.00    1.50  0.354    0.070          -                188    -    -      -    90.0o  -90.00  (ccw)
-- 1/29/2003
 
          ~GE            NUCLEAR ENERGY UT EXAMINATION
 
==SUMMARY==
SHEET                                    Summary No: 2R9-013 WO No: 430431 PROJECT            LaSalle Unit 2 WELD ID:            LCS-2-N4B SYSTEM:              RPV N4B N-SH INITIAL CALIBRATION ID:                          NOZ.IN, NOZ.70.1N FINAL CALIBRATION ID:                            NOZ.OUT, NOZ.70.OUT GERIS DATA:                                      n4b.tl.1, n4b.pl.1, n4b.p2.1, n4b.70.1, n4b.70.2
,.-.,MANUALbTA.>''                                  N/A OPERATORS:                                      M. Hilborn Lv II; L. Benicki Lv II; CE Frakes Lv II; J.Guillote Lv II Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section XI, 1989 Edition no Addenda, also Section XI, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-D Reactor Pressure Vessel (RPV) Assembly Welds.
Automated transverse and parallel scans were performed in accordance with procedure GE-UT-705 V2, using 450 Shear wave, 600 RL, and 70&deg; RL search units, 0&deg; L-Wave supplemental scans were also performed.
Automated scanning was performed from the nozzle OD surface, 360' around the nozzle, with no restrictions.
For initial calibrations refer to report G2K-CAL-1.
For final calibrations refer to report G2K-CAL-3, The GERIS 2000 OD automated UT system 0' reference is located at 900 CW of nozzle TDC.
The GERIS 2000 OD system recorded no indications.
450 S / T-scan,                No recordable indications.
600 RL / T-scan,              No recordable indications.
450 S / P1-scan,              No recordable indications.
450 S / P2-scan,              No recordable indications.
70&deg; RL / T-scan,              No recordable indications.
700 RL / P-ccw                No recordable indications.
70&deg; RL / P-cw                No recordable indications.
Automated Composite Coverage = 78.1%.
Qi                                                                                                                        I LaSalle Unit-2, 2RO9                                                                                        Page I of A
 
Sommary No.:    2R9-013 LaSalle Unit-2 Weld LCS-2-N4B Spring 2003 CODE CROSS-SECTIONAL AREA                  TOTAL CODE COVERAGE Percent Weld Length = 360. Required Exam      Area Scanned    of Area      Weld Length      Percent Exam Volume =  59. Area Sq. In.          Auto        Auto            Auto          Auto 70' T-Scan        A          11.4                5.6      9.5%              360          4.7%
450 T-Scan        A          39.2              33.5      56.8%            360          28.4%
60&deg; T-Scan        A          8.5                8.5      14.4%            360          7.2%
70&deg; P-Scan        A          11.4                4.9        8.3%            360          4.2%
450 P-Scan        A          39.2              31.2      52.9%            360          26.4%
IRS P-Scan        A          8.5                8.5      14.4%            360          7.2%
70' T-Scan 45' T-Scan 60&deg; T-Scan 700 P-Scan 450 P-Scan IRS P-Scan 70' T-Scan 450 T-Scan "
60&deg; T-Scan 70' P-Scan 450 P-Scan IRS P-Scan
                                                                            % Total Composite Coverage =    78.1%
Comments: A - Examined 360'. Scanning limited due to nozzle configuration.
Note - Rounding methods may make calculated values appear in error.
LaSalle Unit-2, 2RO9                                                                                              Page _      of I_
 
LaSalle Unit-2 Feedwater 700 Exam Volume = 11.4 Sq. In.
45&deg; Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60'T) = 8.5 Sq. In.
70&deg; T-Scan achieved = 5.6 Sq. In.
450 T-Scan achieved = 33.5 Sq. In.
600 T-Scan achieved = 8.5 Sq. In.
70"T            451T            60"T I              I
 
zo&#xfd; LaSalle Unit-2 Feedwater 700 Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 607T) = 8.5 Sq. In.
70' P-Scan achieved = 4.9 Sq. In.
45' P-Scan achieved = 31.2 Sq. In.
IRS P-Scan achieved = 8.5 Sq. In.
  /                    70"P          45P I IRS I              I 1//
I-----
B I      -~
I
 
9.,.
LaSalle 2 GL  .L6-JG1.xls GOD-SL6E LaSalle 2                                NOZZLE EXAMINATION PLAN                                                      ,.                        1/2112003 Feedwater GERIS.2000 NOZZLE-TO-VESSEL SCANNING LIMITS NOZOD                  26.25 VSLIR                126.69 WALL                      6.44 WELD RAD                17.25 ODBR                      3.56 TYPE                    F      (F-FLANGE OR B-BARREL)
Delay                          INDEX  INDEX    STEP      RADIAL DISTANCE    AGATE BE GATE    C GATE  FIXTURE CPU CH    ANGLE      TYPE    usec          X        Y      DEG  INCHES  INCHES      START      STOP  STOP  START STOP STOP      ANGLE ANGLE 1    0.00      W      3.66        0.00      0.00      0.80  0.317    0.150        0        18.97    88                54        -
2    45.00      T    13.26        3.00      0.00      0.80  0.411    0.150        0        13.12  235        -          -    7.33      -7.3 3    60.00      T    14.15        -3.00    0.00      0.80  0.490    0.150        0        18.97  185        -          -  353.90        6.10 4/6    45*0O      P1    13.26        3.00      0.00      0.80  0.336    0.150        0        10.00  235                        298.00      62.00  (ccw) 5/7    45.0'      P1    13.26        -3.00      0.00    0.80  0.336    0.150        0        10.00  235    -    -        -    62.00      -62.0' (cw) 4/6    45.0'      P2    13.26        3.00      0.00    0.80  0.336    0.150        0        10.00  235    -    -        -  321.30      38.70  (ccw) 5/7    45.0*      P2    13.26        -3.00    0.00      0.80  0.336    0.150        0        10.00  235    -    -        -    38.70      -38.70 (cw) 1    70.00      T    12.00        0.00      0.00      0.80  0.380    0.150        0        10.87    52    -    -        -    0.00        0.0&deg; 2    70.00      P    12.00        3.00      0.00      0.80  0.313    0.150        0        6.25    52    -    -        -  287.20      72.80  (ccw) 3    70.00      P    12.00        -3.00    0.00      0.80  0.313    0.150        0        6.25    52    -    -        -    72.80      -72.8* (cw) 1    49.0      ZIR    17.48        2.50      0.00      1.70  0.500    0.070      60          90    395                                I33550 24.50  (cw) 2    49.0'    Z1R    17.48        -2.50    0.00      1.70  0.500    0.070      60          90    395    -    -        -    24.50      -24.5&deg; (cw) 1    68.00    Z2A    17.28        2.50      0.00      1.70  0.500    0.070      50          90    281    -    -        -  348.4        11.60 (cow) 2    68.00    Z2A    17.28        -2.50    0.00      1.70  0.500    0.070      50          90    281    -    -        -    11.60      -11.6' (cw) 2    30.00    Z2B    17.28        2.50      0.00      1.50  0.354    0.070      5          90    237    -    -            11300.0    60.00  (cw) 1    30.00    Z2B    17.28        -2.50    0.00      1.50  0.354    0.070        -          -    237    -    -            60.00      -60.00 (cw) 2    20.00      Z3    17.28        2.50      0.00      1.50  0.354    0.070                    -    188      -                270.00      90.00  (cw) 1    20.00      Z3    17.28        -2.50    0.00      1.50  0.354    0.070                    -    188      -                  90.00      -90.0, (ccw) 1/29/2003
 
GE NUCLEAR ENERGY
(                    UT EXAMINATION
 
==SUMMARY==
SHEET                                    Summary No: 2R9-014 WO No: 430431 PROJECT              LaSalle Unit 2 WELD ID:            LCS-2-N4C SYSTEM:              RPV N4C N-SH INITIAL CALIBRATION ID:                          NOZ.IN, NOZ.70.IN FINAL CALIBRATION ID:                            NOZ.OUT, NOZ.70.OUT GERIS DATA:                                      n4c.ti.1, n4c.ti.3, n4c.pl.1, n4c.p2.1, n4c.p2.2, n4c.70.1
  "-MANUALDATU        A                            N/A OPERATORS:                                      M. Hilborn Lv II; L. Benicki Lv II; CE Frakes Lv II; J.Guillote Lv II Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section XI, 1989 Edition no Addenda, also Section X1, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-D Reactor Pressure Vessel (RPV) Assembly Welds Automated transverse and parallel scans were performed in accordance with procedure GE-UT-705 V2, using 450 Shear wave, 600 RL, and 700 RL search units, 00 L-Wave supplemental scans were also performed.
Automated scanning was performed from the nozzle OD surface, 360* around the nozzle, with no restrictions.
For initial calibrations refer to report G2K-CAL-1.
For final calibrations refer to report G2K-CAL-3.
The GERIS 2000 OD automated UT system 0&deg; reference is located at 90* CW of nozzle TDC.
The GERIS 2000 OD system recorded no indications, S.
450 S / T-scan,                No recordable indications.
600 RL/ T-scan,                No recordable indications.
450 S / P1-scan,              No recordable indications.
450 S / P2-scan,              No recordable indications.
70&deg; RL / T-scan,              No recordable indications.
70&deg; RL / P-ccw                No recordable indications.
7A0 RL I P-cw                  No recordable indications.
Automated Composite Coverage        =  78.1%.
  &#xfd;1 LaSalle Unit-2, 2RO9                                                                                        Page I of    q
 
Su.mmary No.: 2R9-014 LaSalle Unit-2 Weld LCS-2-N4C Spring 2003 CODE CROSS-SECTIONAL AREA                    TOTAL CODE COVERAGE' Percent Weld Length = 360. Required Exam      Area Scanned    of Area        Weld Length      Percent Exam Volume =  59.      Area Sq. In.          Auto          Auto            Auto            Auto 70* T-Scan      A          11.4                5.6        9.5%              360            4.7%
450 T-Scan      A          39.2              33.5        56.8%              360          28.4%
60' T-Scan      A            8.5                8.5        14.4%            360            7.2%
70' P-Scan      A          11.4                4.9        8.3%              360            4.2%
450 P-Scan      A          39.2              31.2        52.9%              360          26.4%
IRS P-Scan      A            8.5                8.5        14.4%            360            7.2%
70&deg; T-Scan 450 T-Scan 600 T-Scan 700 P-Scan 450 P-Scan IRS P-Scan 700 T-Scan 450 T-Scan 600 T-Scan 700 P-Scan 450 P-Scan IRS P-Scan 9/6 1otal Composite Coverage =    [U. I 7o Comments: A - Examined 360&deg;. Scanning limited due to nozzle configuration.
Note - Rounding methods may make calculated values appear in error.
LaSalle Unit-2, 2RO9                                                                                                    Page 3  of _q
 
LaSalle Unit-2 Feedwater 70&deg; Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60&deg;T) = 8.5 Sq. In.
70&deg; T-Scan achieved = 5.6 Sq. In.
45' T-Scan achieved = 33.5 Sq. In.
600 T-Scan achieved = 8.5 Sq. In.
I                  70'T          457            60T I              I              I
 
LaSalle Unit-2 Feedwater 70&deg; Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60 0T) = 8.5 Sq. In.
70' P-Scan achieved = 4.9 Sq. In.
450 P-Scan achieved = 31.2 Sq. In.
IRS P-Scan achieved = 8.5 Sq. In.
I 70"P          45"P I IRS I              I I
I
 
LaSalle 2 GC      L6-JG1 .xIs GOD-SL6E LaSalle 2                                NOZZLE EXAMINATION PLAN                                                                                1/21/2003 Feedwater GERIS-2000 NOZZLE-TO-VESSEL SCANNING LIMITS NOZOD                  26.25 VSLIR                  126.69 WALL                      6,44 WELD RAD                17.25 ODBR                      3.56 TYPE                    F      (F-FLANGE OR B-BARREL)
Delay                          INDEX  INDEX    STEP      RADIAL DISTANCE      AGATE BE GATE      C GATE FIXTURE CPU CH  ANGLE        TYPE    usec            X        Y      DEG  INCHES  INCHES      START        STOP    STOP  START STOP  STOP    ANGLE ANGLE 1    0.0&deg;      W      3.66        0.00    0.00      0.80  0.317    0.150        0          18.97    88                54        -
2  45.0'      T      13.26        3.00    0.00      0.80  0.411    0.150        0          13.12  235    -            -    7.3&deg;  -7.3*
3  60.00      T      14.15        -3.00    0.00      0.8&deg;  0.490    0.150        0          18.97  185            -      -  353.9*    6.10 4/6  45.00      P1    13.26        3.00    0.00      0.8&deg;  0.336    0.150        0          10.00  235    -298.0                    62.00  (cow) 5/7  45.0'      P1    13.26        -3.00    0.00      0.80  0.336    0.150        0          10.00  235    -                  62.0&deg;  -62.0'  (cw) 4/6  45.0'      P2      13.26        3.00    0.00      0.80  0.336    0.150        0          10.00  235            -      -  321.30  38.70  (cow) 5/7  45,00      P2    13.26        -3.00    0.00      0.80  0.336    0.150        0          10.00  235            -      -    38.70  -38.7'  (cw) 1  70.00      T      12.00        0.00    0.00      0.80  0.380    0.150        0          10.87    52            -    -      0.00    0.00 2  70,00      P      12.00        3.00    0.00      0.80  0.313    0.150        0          6.25    52            -      -  287.20  72.8&deg;  (ccw) 3  70,0*      P      12.00        -3.00    0.00      0.80  0.313    0.150        0          6.25    52            -      -    72.80  -72.8&deg;  (cw) 1  49.00      ZIR    17.48        2.50    0.00      1.7I  0.500    0.070      60            90    395                      335.5  24.50  (ccw) 2  49.0'      Z1R    17.48        -2.50    0.00      1.7'  0.500    0.070      60            90    395            -      -    24.50  &#xf7;24.5&deg;  (cw) 1  68.00      Z2A    17.28        2.50      0.00      1.70  0.500    0.070      50            90    281            -      -  348.4    11.60  (cow) 2  68.00      Z2A    17.28        -2.50    0.00      1.7'  0.500    0.070      50            90    281            -      -    11.6&deg;  11.6&deg;  (cw) 2  30,00      Z2B    17.28        2.50      0.00      1.50  0.354    0.070        -              -    237            -      -  300.00  60.00  (cw) 1  30.0'      Z2B    17.28        -2.50    0.00      1.50  0.354    0.070        -                  237                        60.00  -60.0,  (ccw) 2  20.00      Z3      17.28        2.50      0.00      1.50  0.354    0.070        -                  188                      270.0'  90.00  (cw) 1  20.0&deg;      Z3    17.28        -2.50    0.00      1,5&deg;  0354    0.070                            188                        90.00  -90.0&deg;  (ccw) 1/29/2003
 
GE NUCLEAR ENERGY
(      W            UT EXAMINATION
 
==SUMMARY==
SHEET                                    Summary No: 2R9-015 WO No: 430431 PROJECT              LaSalle Unit 2 WELD ID:            LCS-2-N4D SYSTEM:              RPV N4D N-SH INITIAL CALIBRATION ID:                          NOZIN, NOZ.70.IN FINAL CALIBRATION ID:                            NOZ.OUT, NOZ.70.OUT GERIS DATA:                                      n4d.tl.1, n4d.70.1, n4d.70.2, n4d.pl.1, n4d.pl.2, n4d.p2.1 MAKUAL DTA                                      N/A OPERATORS:                                      M. Hilborn Lv II; L. Benicki Lv II; CE Frakes Lv II; J.Guillote Lv II Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section X1, 1989 Edition no Addenda, also Section Xl, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-D Reactor Pressure Vessel (RPV) Assembly Welds Automated transverse and parallel scans were performed in accordance with procedure GE-UT-705 V2, using 45&deg; Shear wave, 60' RL, and 70' RL search units, 0&deg; L-Wave supplemental scans were also performed.
Automated scanning was performed from the nozzle OD surface, 3600 around the nozzle, with no restrictions.
For initial calibrations refer to report G2K-CAL-1.
For final calibrations refer to report G2K-CAL-3.
The GERIS 2000 OD automated UT system 0' reference is located at 90* CW of nozzle TDC.
(-  The GERIS 2000 OD system recorded ten (10) indications.
450 S / T-scan,                One (1) acceptable indication.
60&deg; RL / T-scan,              No recordable indications.
450 S / P1-scan,              Four (4) acceptable indications.
450 S / P2-scan,              Four (4) acceptable indications.
70* RL / T-scan,              One (1) acceptable indication.
70' RL / P-ccw                No recordable indications.
70&deg; RL / P-cw                  No recordable indications.
The indications recorded above have no determinable through wall dimension and are acceptable to the requirements of IWB-3000.
Automated Composite Coverage        =  78.1%
P, EPARED BY              DATE    REVIEWED BY            DATE    l1rITPIR  IE)V7 'DATE      ANII REVIEW            DATE UTLevel: 7i-.          .-          UTLevel:=7-          Iz*,v3              7 LaSalle Unit-2, 2R09                                                                                        Page I of 21
 
__1 Summary No.:    2R9-015 LaSalle Unit-2 Weld LCS-2-N4D Spring 2003 CODE CROSS-SECTIONAL AREA                  TOTAL CODE COVERAGE Percent Weld Length =  360. Required Exam      Area Scanned    of Area      Weld Length      Percent Exam Volume      59. Area Sq. In.          Auto        Auto            Auto          Auto 700 T-Scan          A        11.4                5.6        9.5%            360          4.7%
450 T-Scan          A        39.2              33.5      56.8%            360          28.4%
600 T-Scan          A        8.5                8.5      14.4%            360          7.2%
70' P-Scan          A        11.4                4.9      8.3%              360          4.2%
450 P-Scan          A        39.2              31.2      52.9%            360          26.4%
IRS P-Scan          A        8.5                8.5      14.4%            360          7.2%
700 T-Scan 450 T-Scan 600 T-Scan 700 P-Scan      _
450 P-Scan IRS P-Scan 700 T-Scan 450 T-Scan 60' T-Scan 700 P-Scan 450 P-Scan IRS P-Scan
                                                                            % Total Composite Coverage =    78.1%
Comments: A - Examined 3600. Scanning limited due to nozzle configuration.
Note - Rounding methods may make calculated values appear in error.
LaSalle Unit-2, 2RO9                                                                                              Page _  t    of_ ___
 
4 LaSalle Unit-2 Feedwater 700 Exam Volume = 11.4 Sq. In.
45&deg; Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60&deg;T) = 8.5 Sq. In.
70&deg; T-Scan achieved = 5.6 Sq. In.
450 T-Scan achieved = 33.5 Sq. In.
60&deg; T-Scan achieved = 8.5 Sq. In.
707            457
 
                                                          ~i.~
LaSalle Unit-2 Feedwater 70' Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS &60&deg;T) 8.5 Sq. In.
70&deg; P-Scan achieved = 4.9 Sq. In.
45' P-Scan achieved = 31.2 Sq. In.
IRS P-Scan achieved = 8.5 Sq. In.
/          I          70&deg;P          45&deg;P / IRS
( _________
I 7-I
 
LaSalle 2 GG- ,L6-JG1.xls GOD-SL6E LaSalle 2                                NOZZLE EXAMINATION PLAN                                                          -                    1121/2003 Feedwater GERIS-2000 NOZZLE-TO-VESSEL SCANNING LIMITS NOZOD                  26.25 VSLIR                  126.69 WALL                      6.44 WELD RAD                17.25 ODBR                      3.56 TYPE                    F      (F-FLANGE OR B-BARREL)
Delay                        INDEX  INDEX    STEP      RADIAL DISTANCE      AGATE  BE GATE    C GATE FIXTURE CPU CH    ANGLE      TYPE    usec          X        Y      DEG  INCHES  INCHES      START      STOP    STOP    START STOP STOP    ANGLE ANGLE 1    0.00      W        3.66      0.00      0.00      0.8*  0.317    0.150        0        18.97    88                54        -
2    45.0'      T      13.26      3.00      0.00      0.80  0.411    0.150        0        13.12    235    -      -    -      7.3    -7.3 3    60.0'      T      14.15      -3.00      0.00      0.80  0.490    0.150        0        18.97    185    -      -    -    353.90    6.10 416    45.0*      P1      13.26      3.00      0.00      0.80  0.336    0.150        0        10.00    235    -      -    -    298.00  62.00  (ccw) 5/7    45.0'      P1      13.26      -3.00      0.00      0.80  0.336    0.150        0        10.00    235    -      -    -    62,00  -62.0&deg; (cw) 4/6    45.00      P2      13.26      3.00      0.00      0.80  0.336    0.150      0l        10.00    235    -      -    -    321.30  38.70  (ccw) 5/7    45.00      P2      13.26      -3.00      0.00      0.80  0.336    0.150        0.        10.00    235                  -    38.70  -38.7* (cw) 1    70.00      T      12.00      0.00      0.00      0.8'  0,380    0.150        0        10.87. 52                  -      0.0)    0'0.
2    70,00      P      12.00      3.00      0.00      0.80  0.313    0.150        0  .      6.25    52                  -    287.20    72.86 (ccw) 3    70.0'      P      12.00      -3.00      0.00      0.80  0.313    0.150        0          6.25    52                        72.8'  -72.80 (cw) 1    49.00    Z1R      17.48      2.50      0.00    .1.70  0.500    0.070      60          90      395                -    335.50  24.50  (ccw) 2    49.00    ZIR      17.48      -2.50      0.00      1,7&deg;  0.500    0.070      60          90    395                        24.50  -24.5&deg; (cw) 1    68.00    Z2A      17.28      2.50    . 0.00      1.70  0.500    0.070      50          90    281                      348.40    11.60 (ccw) 2    68,00    Z2A      17.28      -2.50      0.00      1.70  0.500    0.070      50          90    281    -                  11.60  -11.6* (cw) 2    30V      Z2B      17.28      2.50      0.00      1.50  0.354    0.070        -            -    237    -                300.00  60.00  (cw) 1    30.00    Z2B      17.28      -2.50      0.00      1.50  0.354    0.070                          237    -                  60.00  -60.0&deg; (ccw) 2    20.00      Z3      17.28      2.50      0.00      1.50  0.354    0.070                            188                      270.00    90.00 (cw) 1    20,00      Z3      17.28      -2.50      0.00      1.5    0.354    0.070                            188                      90.00  -90.00 (ccw) 1/28/2003
 
GE NUCLEAR ENERGY
(                      UT EXAMINATION
 
==SUMMARY==
SHEET                                    Summary No: 2R9-016 WO No: 430431 PROJECT              LaSalle Unit 2 WELD ID:            LCS-2-N4E SYSTEM:              RPV N4E N-SH INITIAL CALIBRATION ID:                        NOZ.IN, FINAL CALIBRATION ID:                          NOZ.OUT GERIS DATA:                                    n4e.pl.2, n4e.p2.1, n4e.ti.1, n4e.70.1, n4e.70.2
      -ANUAL DATA:!                                  N/A OPERATORS:                                      M. Hilborn Lv II; L. Benicki Lv II; CE Frakes Lv II; J.Guillote Lv II Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section XI, 1989 Edition no Addenda, also Section XI, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-D Reactor Pressure Vessel (RPV) Assembly Welds Automated transverse and parallel scans were performed in accordance with procedure GE-UT-705 V2, using 450 Shear wave, 600 RL, and 70* RL search units, 0&deg; L-Wave supplemental scans were also performed.
Automated scanning was performed from the nozzle OD surface, 3600 around the nozzle, with no restrictions.
For initial calibrations refer to report G2K-CAL-1.
For final calibrations refer to report G2K-CAL-3, The GERIS 2000 OD automated UT system 0&deg; reference is located at 900 CW of nozzle TDC.
The GERIS 2000 OD system recorded three (3) indications.
(..
450  S/  T-scan,              No recordable indications.
600  RL  I T-scan,            No recordable indications.
450  S/  P1-scan,              One (1) acceptable indication.
450  S/  P2-scan,              No recordable indications.
700 RL / T-scan,              Two (2) acceptable indications.
70&deg; RL / P-ccw                No recordable indications.
700 RL / P-cw                  No recordable indications.
The indications recorded above have no determinable through wall dimension and are acceptable to the requirements of IWB-3000.
Automated Composite Coverage = 78.1%.
EPARED BY            DATE      REVIEWED BY          DATE    UTILITY R7IEW      / DATE  ANII REVIEW            DATE Leve=: r        nt- L-7-o3    UTLevel:-        \-rn. ()
                                                          \k        _  _
LaSalle Unit-2, 2RO9                                                                                      Pana I nf    ILL
 
summary No.:  2R9-016 LaSalle Unit-2 Weld LCS-2-N4E Summary No.:  2R9-016 Spring 2003 CODE CROSS-SECTIONAL AREA                    TOTAL CODE COVERAGE Percent Weld Length =  360. Required Exam    Area Scanned    of Area          Weld Length      Percent Exam Volume =    59. Area Sq. In.          Auto        Auto                Auto          Auto 700 T-Scan        A          11.4                5.6      9.5%                360          4.7%
450 T-Scan        A          39.2                33.5      56.8%                360          28.4%
60 T-Scan          A          8.5                8.5      14.4%                360          7.2%
700 P-Scan        A          11.4                4.9        8.3%                360          4.2%
450 P-Scan        A          39.2                31.2      52.9%                360          26.4%
IRS P-Scan        A          8.5                8.5      14.4%                360          7.2%
700 T-Scan 450 T-Scan 600 T-Scan 700 P-Scan 450 P-Scan      _
IRS P-Scan 700 T-Scan 450 T-Scan 600 T-Scan 70' P-Scan 450 P-Scan IRS P-Scan TI otal Composite Coverage =    78.1,/o Comments: A - Examined 3600. Scanning limited due to nozzle configuration.
,Note - Rounding methods may make calculated values appear in error.
LaSalle Unit-2, 2RO9                                                                                                  Page
* of
 
                                                  "-iF LaSalle Unit-2 Feedwater 700 Exam Volume = 11.4 Sq. In.
45&deg; Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS &60&deg;T) = 8.5 Sq. In.
70' T-Scan achieved = 5.6 Sq. In.
450 T-Scan achieved = 33.5 Sq. In.
600 T-Scan achieved = 8.5 Sq. In.
/
70"1"          45'T            60'r
 
LaSalle Unit-2 Feedwater 70&deg; Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60'T) = 8.5 Sq. In.
70&deg; P-Scan achieved = 4.9 Sq. In.
45&deg; P-Scan achieved = 31.2 Sq. In.
IRS P-Scan achieved = 8.5 Sq. In.
Ot
/                70'P          45P I IRS I          Iz I              I I  7' I
 
LaSalle 2 G(.- SL6-JG1.xIs GOD-SL6E LaSalle 2                                NOZZLE EXAMINATION PLAN                                                                              1/21/2003 Feedwater GERIS-2000 NOZZLE-TO-VESSEL SCANNING LIMITS NOZOD                  26.25 VSLIR                  126.69 WALL                      6.44 WELD RAD                17.25 ODBR                      3.56 TYPE                    F      (F-FLANGE OR B-BARREL)
Delay                        INDEX  INDEX    STEP      RADIAL DISTANCE    AGATE BE GATE    C GATE FIXTURE CPU CH    ANGLE      TYPE    usec            X        Y      DEG  INCHES  INCHES      START    STOP    STOP  START STOP STOP    ANGLE ANGLE 1    0.00      W      3.66        0.00      0.00    0.80    0.317    0.150        0      18.97    88    -          54        -
2    45.00      T      13.26        3.00      0.00    0.80    0.411    0.150          0      13.12    235        -      -    7.33    -773*
3    60.00      T      14.15      -3.00      0.00    0.60    0.490    0.150          0      18.97    185    -                35390    6.10 4/6    45.00      P1      13.26        3.00      0.00    0.80    0.336    0.150          0      10.00    235    -                298.00  62.00  (ccw) 5/7    45.00      P1      13.26      -3.00      0.00    0.80    0.336    0.150          0      10.00    235    -                62.00  -62.0* (cw) 416    45.00      P2      13.26        3.00      0.00    0.85    0.336  .0.150          0      10.00    235    -                321.30  38.70  (ccw) 5/7    45.00      P2      13.26      -3.00      0.00    0.80. 0.336    0.150          0,    10.00    235    -                38.7'  -38.7&deg;  (cw) 1    70.00      T      12.00        0.00      0.00    0.80    0.380    0.150          0      10.87    52    -                  0.00    0.00 2    70.0'      P      12.00        3.00      0.00    0.80    0.313    0.150        .0        6.25    52    -                287.20  72.80  (ccw) 3    70.00      P      12.00      -3.00      0.00    0.80    0.313    0.150          0        6.25    52    -                72.80  -72.8&deg; (cw) 1    49.0'    Z1R      17.48        2.50      0.00    1.70    0.500    0.070        60        90    395    -                335.50  24.50  (ccw) 2    49.00    ZIR      17.48      -2.50      0.00    1.7'    0.500    0.070        60          90    395    -                24.50  -24.5' (cw) 1    68.0'    Z2A      17.28        2.50      0.00    1.70    0.500    0.070        50        90    281    -                348.40    11.60 (ccw) 2    68.0'    Z2A      17.28      -2.50      0.00    1.7    0.500    0.070        50        90    261    -                11.60  -11.6* (cw) 2    30.0'    Z2B      17.28        2.50      0.00    1.50    0.354    0.070          -          -    237    -                300.0'  60.00  (cw) 1    30.00    Z2B      17.28      -2.50      0.00    1.50    0.354    0.070                          237    -                60.00  -60.00 (ccw) 2    20.00      Z3      17.28        2.50      0.00    1.5&deg;    0.354    0.070                          188    -                270.00  90.00  (cw) 1    20.00      Z3      17.28      -2.50      0.00    1.50    0.354    0.070          -              188    -                90.00  -90.0&deg; (ccw) 1/28/2003
 
*    *GE                  NUCLEAR ENERGY UT EXAMINATION
 
==SUMMARY==
SHEET                                      Summary No: 2R9-017 WO No: 430431 PROJECT              LaSalle Unit 2 WELD ID:            LCS-2-N4F SYSTEM:              RPV N4F N-SH INITIAL CALIBRATION ID:                          NOZ.IN, NOZ.70.IN FINAL CALIBRATION ID:                          NOZ.OUT, NOZ.70.OUT GERIS DATA:                                    n4f p2.1, n4f.tl.1, n4f.tI.2, n4f.pl.1, n4f.70.1, n4f.70.2 IVIANUAL DATA.                                  N/A OPERATORS:                                      M. Hilborn Lv II; L. Benicki Lv II; CE Frakes Lv II; J.Guillote Lv II Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section XI, 1989 Edition no Addenda, also Section XI, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-0 Reactor Pressure Vessel (RPV) Assembly Welds Automated transverse and parallel scans were performed in accordance with procedure GE-UT-705 V2, using 450 Shear wave, 600 RL, and 70&deg; RL search units, 0&deg; L-Wave supplemental scans were also performed.
Automated scanning was performed from the nozzle OD surface, 360* around the nozzle, with no restrictions.
For initial calibrations refer to report G2K-CAL-1.
For final calibrations refer to report G2K-CAL-3.
The GERIS 2000 OD automated UT system 0&deg; reference is located at 90* CW of nozzle TDC.
The GERIS 2000 OD system recorded no indications.
450 S / T-scan,                No recordable indications.
60* RL / T-scan,              No recordable indications.
456 S / PT-scan,              No recordable indications.
450 S / P12-scan,            No recordable indications, 70* RL / T-scan,              No recordable indications.
70* RL / P-ccw                No recordable indications.
700 RL / P-cw                No recordable indications.
Automated Composite Coverage = 78.1%.
  ,,REPARED BY                DATE REVIEWED BY                DATE      UtETVY  EiRVEVIEW W      DkTE                          DATE UTLevel:.L        nt-30,-.3 UT Level: -fa              -    3 LaSalle Unit-2, 2RO9                                                                                          Paqe I of q
 
Summary No.:  2R9-017 LaSalle Unit-2 Weld LCS-2-N4F Spring 2003 CODE CROSS-SECTIONAL AREA                  TOTAL CODE COVERAGE-Percent Weld Length =    360. Required Exam      Area Scanned    of Area      Weld Length      Percent Exam Volume =      59. Area Sq. In.          Auto        Auto            Auto          Auto 70 0 T-Scan        A          11.4              5.6        9.5%            360          4.7%
450 T-Scan          A          39.1              33.5        56.8%            360          28.4%
600 T-Scan          A          8.5                8.5        14.4%            360          7.2%
700 P-Scan          A          11.4              4.9        8.3%            360          4.2%
450 P-Scan          A          39.1              31.2        52.9%            360          26.4%
IRS P-Scan          A          8.5                8.5        14.4%            360          7.2%
70' T-Scan      _
450 T-Scan 60* T-Scan 70* P-Scan 450 P-Scan IRS P-Scan 70' T-Scan 450 T-Scan 600 T-Scan 70' P-Scan 450 P-Scan IRS P-Scan
                                                                                % Total Composite Coverage =    78.1%
Comments:    A - Examined 3600. Scanning limited due to nozzle configuration.
Note - Rounding methods may make calculated values appear in error.
LaSalle Unit-2, 2RO9                                                                                                  Page  3    of
 
LaSalle Unit-2 Feedwater 70&deg; Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60&deg;T) = 8.5 Sq. In.
70&deg; P-Scan achieved = 4.9 Sq. In.
450 P-Scan achieved = 31.2 Sq. In.
IRS P-Scan achieved = 8.5 Sq. In.
  /
I q_
70'P          45*P / IRS I  _ _
7
                                                            -I
 
LaSalle Unit-2 Feedwater 70&deg; Exam Volume = 11.4 Sq. In.
45' Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60'T) = 8.5 Sq. In.
70' T-Scan achieved = 5.6 Sq. In.
450 T-Scan achieved = 33.5 Sq. In.
60&deg; T-Scan achieved = 8.5 Sq. In.
!                  70'T          45'T            60'T I                    I              I                I
 
LaSalle 2 GO. L.6-JGI .xls GOD-SL6E LaSalle 2                                NOZZLE EXAMINATION PLAN                                                              -
* 1/21/2003 Feedwater GERIS-2000 NOZZLE.TO-VESSEL SCANNING LIMITS NOZOD                  26.25 VSLIR                  126.69 WALL                      6.44 WELD RAD                17.25 ODBR                      3.56 TYPE                    F      (F-FLANGE OR B-BARREL)
Delay                          INDEX  INDEX        STEP      RADIAL DISTANCE      AGATE BE GATE      C GATE FIXTURE CPU CH    ANGLE        TYPE    usec          X        Y      DEG    INCHES      INCHES      START        STOP  STOP  START STOP  STOP    ANGLE ANGLE 1    0.00      W      3.66        0.00      0.00    0.80    0.317      0.150        0          18.97    88    -            54      -
2    45.0'      T      13.26        3.00      0.00    0.80    0.411      0.150        0          13.12  235        -        -    7.33    -7.3 3    60.00      T      14.15        -3.00      0.00    0.80    0.490      0.150        0          18.97  185    -    -      -  353.9      6.10 4/6    45.00      P1      13.26        3.00      0.00    0.80    0.336      0.150        0          10.00  235                                  62.00 129.0&deg;    (ocw) 5/7    45.00      P1      13.26      -3.00      0.00    0.80    0.336      0.150        0          10.00  235    -    -      -    62.00    -62.00 (cw) 4/6    45.0*      P2      13.26        3.00      0.00    0.80    0.336      0.150        0          10.00  235    -    -      -  321.30    38.70 (ccw) 5/7    45.0'      P2      13.26      -3.00      0.00    0.80    0.336      0.150        0          10.00  235    -    -      -    38.70    -38.7a (cw) 1    70.00      T      12.00        0.00      0.00    0.80    0.380      0.150        0          10.87    52    -    -      -    0.00      0.00 2    70.0'      P      12.00        3.00      0.00    0.80    0.313      0.150        0          6.25    52    -    -      -  287.20    72.80 (ccw) 3    70.00      P      12.00      -3.00      0.00    0.80    0.313      0.150        0          6.25    52    -      -      -    72.80    -72.8* (cw) 1  49.0'      Z1R      17.48        2.50      0.00    1.70    0.500      0.070        60            90    395            -      -  335.50    24.50 (ccw) 2    49.0*    Z1R      17.48      -2.50      0.00    1.70    0.500      0.070        60            90    395          -      -    24.50    -24.5' (cw) 1  68.00      Z2A      17.28        2.50      0.00      1.7'    0.500      0.070        50            90    281    -    -      -  348.40    11.60 (ccw) 2    68.00      Z2A    17.28        -2.50      0.00      1.7*    0.500      0.070        50            90    281    -    -      -    11.60    -11.60 (cw) 2    30.00      Z2B      17.28        2.50      0.00      1.5'    0.354      0.070        -            -    237    -    -      -  300.00    60.00 (cw) 1  30.00      Z2B      17.28      -2.50      0.00      1.5&deg;    0.354      0.070        -                  237    -    -      -    60.00    -60.00 (ccw) 2    20.00      Z3      17.28        2.50      0.00      1.5&deg;      *0.354    0.070              -            188    -                270.00    90.00 (cw) 1  20.00      Z3      17.28      -2.50      0.00      1.5  1 0.354        0.070                            188                        90.00    -90.0* (ccw)
_-) 1/30/2003
* __                          EXAMINATION
 
==SUMMARY==
SHEET                                        2R9-e6o Report  NNo.:
GE NUCLEAR        ENERGY                                                                                        2R-6 Site and Unit:                LaSalle Unit 2                      Component ID:                      IRH-HX2B-08D Outage:                L2R09 System,              RHR                ASME Cat.:        C-C      ASME Item      C3.10      Aug Requirements:          N/A Exams Performed    Data Sheet        Cal Sheet            Procedure        Calibration Block F    Examination -Cet  Level.      Date Personnel MT            MT-004            N/A          MT-EXLN-102V0                N/A            Michael Kemp      II        1/22/2003 Examination Results:
During the magnetic particle examination of the above referenced weld, 1 indication was recorded. Indication was acceptable in accordance with ASME Section XI, Table IWC-3510-3.
74.4% of the code required surface area was examined.
This examination meets the requirements of ASME Section XI, 1989 Edition, no Addenda.
Examinationresults were compared to data report            D-307      from      1990      outage with    -  No Change These examinations were performed under Work Order:            430436                                    [Ji  Change This Summary and the following data sheets have been reviewed and accepted        y the following personnel:
Prepared By:                  Level:      Date:    Utility Reviewe  B
 
==Title:==
ate:
N/A                    N/A..N..... N/A Reviewed By:                  Level:      Date. AN1i Reviewed By:
 
==Title:==
Date:        Page    1  of
 
GE Nuclear Energy                                    MAGNETIC PARTICLE EXAMINATION REPORT Site:    LaSalle                            Unit: 2            Project:      L2R09                  Report Number:              2R9-060 Sheet No.:                  MT-004 Weld No.:      IRH-HX2B-08D                                          Configuration:      I Lug Drawing:        GEL-1111                                              System:              RHR Procedure No.:        MT-EXLN-102VO                          Version / Revision          Rev. 0        DRR:                  N/A Material:                          Surface Condition:                      Item:
Carbon Steel                      Smooth                                  Weld - Final Magnetizing Apparatus                                                                  Black Light Mfg:              ParkerResearch        Yoke Calibration: AC - 10 lb. Lift                                      Model            Serial Number Model:            B-300                                                                        Blacklight    N/A              N/A Serial No.        8140                  Yoke Spacing:            6'                          Light Meter    N/A              N/A Thermometer:            222229                      Surface Temperature:            65&deg; F Technique                                        Examination Medium                                      Blacklight Intensity Magnetization: AC                          Magnetic Particles:          Dry                                                    N/A Technique:          Continuous                  ParkerResearch                RP-6              11793                    Blacklight Intensity Manufacturer:          Particle Type:      Batch No indication Number:                                               
 
== Description:==
p            Results:
1        I                                  1/8" Linear on IRH-HX2BOD                                                            RI Comments:
See attached sketch #2 for indication details.
See attached sketch #1 for exam limitation.
Michael Kemp                      1.17j II            1/2212003        Utility Review                                Date Initial Examiner                  Level      Date GE Review                          Level      Date                ANII Review                                  Date            Page        _    of 6
 
(
                        -T t-hc        -v 9 C              tq-v ".~7  i/    /- 6,t 3-o(
T 'k q -t4 x Z6~ -        P T jCH -/JXZC-Oyi t)mJ      stote
      * < 7"tI S rv',c Tv,('f I    fpp,,
II
                                /13            7')  +- CZA2.S                    )
O)CA  A)o0T74A-        /Z3          3l.3,
                                  /,    z3 V1.3 CoVCRd-6                                      =- 7-1 /*
* jrr  '/&#x17d;3/o Pq          3 " tz, (,
 
(                                                    Report No: 2R9-060 Location of the IRH-HX2B-08D MT Indication
(
Indication is on the edge of the plate in the center of the marked area.
Page 4/1of 6
 
5L-eT 5R    /".
A'a  z AI- a 4 Wt (of *!Ze 14 - Hy z 6 --0 f I>
C 4 4 Af~~~~~
o  OfICi 9 Fron~-        Tke    --
                              -i-  VF CATh-k.to-edi    of- f~
f;~-~-
* 0  r6
 
(Report                                                    No: 2R9-060 IRH-HX2B-08D, 09D, and 010D
(      General view of the support showing the 8, 9, and 10 welds.
Location of the limitation on the 8 weld Page ( of
 
GE Energy Nuclear UT Examination Summary                                                  Report No. 2R10-007 Project:            LaSalle Unit-2, L2R10 Component ID:        LCS-2-AE System:              RPV Calibration ID:    -e,*.E.4,-    03 O&S. IfI? c'-,
GERIS Data:          UP and DN scan files Manual Data:        RPV-010, RPV-011 Examiners:          C. Gauthier Lv. II,S. Gauthier Lv. II Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code, Section Xl, 1989 Edition No Addenda, also Section Xl, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II,Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-A Reactor Vessel (RPV) Assembly Welds.
Automated transverse and parallel scans were performed in accordance with procedure GE-UT-704 V5 using 450 Shear wave, 60 RL&deg; and 700 RL search units, supplemental 0* L-wave scans were also performed.
Manual transverse and parallel scans were performed in accordance with procedure GE-UT-300 V8 using 60 RL&deg; search units.
Automated and manual scanning was performed from the vessel OD surface.
For calibration records refer to report G2K-CAL-1.
The GERIS 2000 OD automated UT system "0"references are located at Vessel 00 Azimuth and Vessel 0 Elevation.
The GERIS 2000 OD system and manual examinations recorded no indications.
Previous examination results were reviewed and no changes were noted.
Automated and Manual Composite Coverage = 58% Calculated as % of 1800 length.
29% Calculated as % of 3600 length.
repared y:                  Reviewed 19y:              U-ility Revieweo:y:          ANII Reviewed By:
Date:3/Z/'O5                  Date:  3..5            Date                        Date:
LaSalle Unit-2, L2R1O                                                                              Page 1 of 17-
 
C,)
Summary No.: 2R10-007 C
Weld LCS-2-AE 2.
LaSalle Unit-2, L2R10 CODE CROSS-SECTIONAL AREA                    LENGTH CALCULATIONS Percent Weld Length = 418.6 Required Exam Area Scanned                of Area      Weld Length      Percent Exam Volume = 75.6          Area Sq. In.        Auto              Auto          Auto            Auto 700 T-Scan        A          14.8              6.2            8.2%          370.5          3.6%
450 T-Scan        A          48.9            42.4            56.1%          370.5          24.8%
600 T-Scan        A          11.9              6.0            7.9%          370.5          3.5%
700 P-Scan        A          14.8              4.9            6.5%          370.5          2.9%
450 P-Scan        A          48.9            25.2            33.3%          370.5          14.8%
600 P-Scan        A          11.9              5.3            7.0%          370.5          3.1%
70_T-Scan 450 T-Scan 600 T-Scan 0
70' P-Scan 450 P-Scan 60* P-Scan Manual                                          0.0%
600 S4 T-Scan        B          11.9              5.0            6.6%            48            0.4%
60* S6 T-Scan        B          63.7            52.3            69.2%            48          4.0%
60 0 S4 P-Scan      B          11.9              5.3            7.0%            48          0.4%
600 S6 P-Scan        B          63.7              5.3            7.0%            48          0.4%
                                                                                    % Total Composite Coverage =      58%
Comments:    A - Automated coverage.
B - Manual scanning in an area limited to the automated device due to thermocouple pads at 00 Az.
Coverage calculated as percent of scheduled examination from 00 to 1800.
Note - Rounding methods may affect calculated values.
 
Summary No.: 2R10-007 C',
C                                                                Weld LCS-2-AE LaSalle Unit-2, L2R10 CODE CROSS-SECTIONAL AREA                    LENGTH CALCULATIONS Percent Weld Length= 837.2 Required Exam Area Scanned                of Area      Weld Length      Percent Exam Volume = 75.6        Area Sq. In.          Auto            Auto          Auto          Auto 70" T-Scan        A            14.8              6.2            8.2%          370.5          1.8%
450 T-Scan        A            48.9            42.4            56.1%          370.5          12.4%
60' T-Scan        A            11.9              6.0            7.9%          370.5          1.7%
70* P-Scan        A            14.8              4.9            6.5%          370.5          1.4%
45' P-Scan        A            48.9            25.2            33.3%          370.5          7.4%
600 P-Scan        A            11. 9            5.3            7.0%          370.5          1.6%
70_T-Scan 450 T-Scan 60' T-Scan 700 P-Scan 450 P-Scan 600 P-Scan Manual                                          0.0%
60' S4 T-Scan        B          11.9              5.0            6.6%            48          0.2%
60' S6 T-Scan        B          63.7            52.3            69.2%            48          2.0%
60&deg; S4 P-Scan        B          11.9              5.3            7.0%            48          0.2%
600 S6 P-Scan      B            63.7              5.3            7.0%            48          0.2%
                                                                                    % Total Composite Coverage =      29%
Comments:    A - Automated coverage.
0 B - Manual scanning in an area limited to the automated device due to thermocouple pads at 00 Az.
~I1 Coverage calculated as percent of full weld.
Note - Rounding methods may affect calculated values.
 
i_                                                            LaSalle Unit-2 CShell 2.
to Flange Weld PO 0,                                                          70' Exam Volume = 14.8 Sq. In.
450 Exam Volume = 48.9 Sq. In.
60" Exam Volume = 11.9 Sq. In.
70&deg; T-Scan achieved = 3.5 Sq. In.
I5SI1450                                                T-Scan achieved = 2.9 Sq. In.
600 T-Scan achieved = 0.0 Sq. In.
70&deg; P-Scan achieved = 4.9 Sq. In.
450 P-Scan achieved = 25.2 Sq. In.
600 P-Scan achieved = 5.3 Sq. In.
P/T-Scans
____  ___                          I 0 . " Looking DNScans-      .0 0
:=L -i~-_-
fz-      - - - - -
 
CD, LaSalle Unit-2 C                                Shell to Flange Weld 700 Exam Volume = 14.8 Sq. In.
450 Exam Volume = 48.9 Sq. In.
600 Exam Volume = 11.9 Sq. In.
700 T-Scan achieved = 6.2 Sq. In.
450 T-Scan achieved = 42.4 Sq. In.
600 T-Scan achieved = 11.9 Sq. In.
700 P-Scan achieved = 4.9 Sq. In.
450 P-Scan achieved = 25.2 Sq. In.
600 P-Scan achieved = 5.3 Sq. In.
P-Scans  70&deg;T                  45&deg;T        60'T I      I                      I          I
                          -1 0,
Scanner Motion Looking UP Scans 0.0"                                                    -20.75"
-h
    -Z i - - - -      --  -  --
 
_LaSalle                                        Unit-2 Shell to Flange Weld C) 0 C-n                            600 S4 Exam Volume = 11.9 Sq. In.
60&deg; S6 Exam Volume = 63.7 Sq. In.
600 S4 T-Scan achieved = 11.9 Sq. In. LKUP 600 S6 T-Scan achieved = 52.3 Sq. In. LKUP 600 S4 T-Scan achieved = 0.0 Sq. In. LKDN 60' S6 T-Scan achieved = 6.9 Sq. In. LKDN 600 S4 P-Scan achieved = 5.3 Sq. In. CW/CCW 600 S6 P-Scan achieved = 30.0 Sq. In. CW/CCW
            //
          /
60 P 60'P-Scans                                        60&deg;T
-D 0
 
Report No.:
EXAMINATION
 
==SUMMARY==
SHEET                                      2RIO-004 GE NUCLEAR ENERGY Site:          LaSalle Unit-2            Component ID:                      GEL-1061-DA Outage:              L2RIO0                                                          Bot. Hd. Meridional System              RPV              ASME Cat.:      B-A          ASME Item:          B1.22      Aug Requirements:      NIA Exams Performed: Data Sheet          Cal Sheet            Procedure        Calibration Block,    Examination    Cert Leveli    Date Personnel 600 Long.        RPV-003            N/A              GE-UT-300            IIW2-047        Scott Erickson      II      2/22/2005 600 Long.        RPV-004            N/A              GE-UT-300            01-92-06        Scott Erickson      II      2/23/2005 Examination Results:
Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code, Section XI, 1989 Edition No Addenda, also Section XI, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-A Reactor Vessel (RPV) Assembly Welds.
Manual transverse and parallel scans were performed in accordance with procedure GE-UT-300 V8, using 60' RL-wave search units.
Scanning was performed from the vessel OD surface. Scanning was limited due to the vessel skirt attachment weld and an inaccessible inner skirt region..
No indications were recorded.
Manual coverage = 66%.
Examination results were compared to data report 4023,18011,3247 from            PSI    outage with
* No Change These examinations were performed under Work Order:          5849600                                        Change This Summary and the following data sheets have been redv      ed and acceptedby the following personnel:
Prepared By:                    Level:      Date:      Utility Review-                            Date:
ANII Review:                                Date:          Page    1  of
 
I-
'U                                                                                                                            Inspection Report No.: 2R10-004 C',
iF Bottom Head Meridionals GEL-1061-DA r'3 LaSalle Unit-2, L2R10 I-M 0                                                  CODE CROSS-SECTIONAL AREA                            TOTAL CODE COVERAGE Percent Weld Length =    80.4  Required Exam          Area Scanned            of Area        Weld Length          Percent Exam Volume =    60.2    Area Sq. In.              Auto                Auto                Auto              Auto 60* S4 P-Scan LKDN        A            8.8                  8.8                7.3%                53              2.4%
600 S4 P-Scan LKUP        A            8.8                  8.8                7.3%                53              2.4%
600 S6 P-Scan        A          51.4                  51.4                85.4%                53              28.1%
600 S4 T-Scan LKCW        A            8.8                  8.8                7.3%6                53              2.4%
600 S4 T-Scan LKCCW        A            8.8                  8.8                7.3%                53              2.4%
60' S6 T-Scan        A            51.4                51.4                85.4%                53              28.1%
600  S4 P-Scan LKDN 600  S4 P-Scan LKUP 600 S6 P-Scan 600  S4 T-Scan LKCW 600  S4 T-Scan LKCCW_
600 S6 T-Scan 60' S4 P-Scan LKDN                                                                                                            "_
600 S4 P-Scan LKUP 60' S6 P-Scan 600 S4 T-Scan LKCW
'U              600 S4 T-Scan LKCCW (0
CD                    600 S6 T-Scan
                                                                                                % Total Composite Coverage =            66%
0  Comments:    A - Examined 53" of length. Scanning limited due to support skirt weld and inaccessible inner skirt region.
Note - Rounding methods may make calculated values appear in error.
 
LaSalle Unit-2 Bottom Head Meridional 600 S4 Exam Volume = 8.8 Sq. In.
60' S6 Exam Volume = 51.4 Sq. In.
600 S4 P-Scan LKDN achieved = 8.8 Sq. In.
600 S4 P-Scan LKUP achieved = 8.8 Sq. In.
60&deg; S6 P-Scan achieved = 51.4 Sq. In.
600 S4 T-Scan LKCW achieved = 8.8 Sq. In.
60&deg; S4 T-Scan LKCCW achieved = 8.8 Sq. In.
60' S6 T-Scan achieved = 51.4 Sq. In.
 
(
Lmax - 80.4" Lmin - 27.4" Weld Length - 80.4" Exam limited due to skirt weld.
LA SALLE L_
Rto pArc        I'- I
 
(t Site:          LaSalle Unit-2            Component ID:                      GEL-1061-DE Outage:                L2RIO                                                            Bot. Hd. Meridional System              RPV              ASME Cat.:      B-A        ASME Item:            BI.22      Aug Requirements:      NIA Exams Performed      Data Sheet        Cal Sheet          Procedure        Calibration Block    Examination    Cert Level0    Date Personnel 60&deg; Long.        RPV-001            N/A            GE-UT-300        i    IIW2-047        Wallace Reid        II      2/23/2005 60* Long.        RPV-002            N/A            GE-UT-300              01-92-06        Wallace Reid        II      2/23/2005 Examination Results:
Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code, Section XI, 1989 Edition No Addenda, also Section XI, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-A Reactor Vessel (RPV) Assembly Welds.
Manual transverse and parallel scans were performed in accordance with procedure GE-UT-300 V8, using 600 RL-wave search units.
(,,  Scanning was performed from the vessel OD surface. Scanning was limited due to the vessel skirt attachment weld and an inaccessible inner skirt region.
No indications were recorded.
Manual coverage = 66%.
Examination results were compared to data report 4023,18012,3247 from              PSI    outage with    ,. No Change These examinations were performed under Work Order:          5849600                                        Change This Summary and the following data sheets have been reviewed and accepted by the following personnel:
    "repared    By:                  Level:      Date      Utility R:                                  Date:
ANII Review:                                Date:          Page    1  of
 
Inspection Report No.: 2R10-005 Bottom Head Meridionals GEL-1061-DE LaSalle Unit-2, L2R10 CODE CROSS-SECTIONAL AREA                            TOTAL CODE COVERAGE Percent Weld Length =    80.4  Required Exam          Area Scanned            of Area        Weld Length          Percent Exam Volume =    60.2      Area Sq. In.            Auto                Auto                Auto            Auto 600 S4 P-Scan LKDN        A            8.8                  8.8                7.3%                  53              2.4%
600 S4 P-Scan LKUP        A            8.8                  8.8                7.3%                  53              2.4%
600 S6 P-Scan        A            51.4                51.4                85.4%                53              28.1%
600 S4 T-Scan LKCW        A            8.8                  8.8                7.3%                  53              2.4%
600 S4 T-Scan LKCCW        A            8.8                  8.8                7.3%                  53              2.4%
600 S6 T-Scan        A            51.4                51.4                85.4%                53              28.1%
600 S4 P-Scan LKDN 600 S4 P-Scan LKUP 600 S6 P-Scan 600 S4 T-Scan LKCW 600 S4 T-Scan LKCCW_
60&deg; S6 T-Scan 600 S4 P-Scan LKDN 600 S4 P-Scan LKUP 600 S6 P-Scan 600 S4 T-Scan LKCW 600 S4 T-Scan LKCCW 600 S6 T-Scan
                                                                                            % Total Composite Coverage =            66%
Comments:    A - Examined 53' of length. Scanning limited due to support skirt weld and inaccessible inner skirt region.
Note - Rounding methods may make calculated values appear in error.
 
LaSalle Unit-2 Bottom Head Meridional 600 S4 Exam Volume = 8.8 Sq. In.
60&deg; S6 Exam Volume = 51.4 Sq. In.
60&deg; S4 P-Scan LKDN achieved = 8.8 Sq. In.
600 S4 P-Scan LKUP achieved = 8.8 Sq. In.
60&deg; S6 P-Scan achieved = 51.4 Sq. In.
600 S4 T-Scan LKCW achieved = 8.8 Sq. In.
600 S4 T-Scan LKCCW achieved = 8.8 Sq. In.
600 S6 T-Scan achieved = 51.4 Sq. In.
 
(
Lmax - 80.4" Lmin - 27.4" Weld Length - 80.4" Exam limited due to skirt weld.
  /
LA SALLE -
R 1(0      -- I/
n A I~P
 
Report No.:
EXAMINATION
 
==SUMMARY==
SHEET                                        2R10-006 GE NUCLEAR ENERGY
(
Site:          LaSalle Unit-2            Component ID:                    GEL-1061-DF Outage:              L2R10                                                          Bot. Hd. Meridional System              RPV              ASME Cat.:        B-A        ASME Item:          B1.22      Aug Requirements:          NIA Exams Performed: Data Sheet          Cal Sheet          Procedure      Calibration Block    Examination    Cert Leve-        Date Personnel 60* Long.        RPV-005            N/A              GE-UT-300          IIW2-047        Scott Erickson        II        2123/2005 600 Long.        RPV-006            N/A              GE-UT-300          01-92-06        Scott Erickson        II        2/23/2005 Examination Results:
Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code, Section XI, 1989 Edition No Addenda, also Section XI, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-A Reactor Vessel (RPV) Assembly Welds.
Manual transverse and parallel scans were performed in accordance with procedure GE-UT-300 V8, using 60' RL-wave search units.
Scanning was performed from the vessel OD surface. Scanning was limited due to the vessel skirt attacltment weld and an inaccessible
(. inner skirt region.
No indications were recorded.
Manual coverage = 66%.
Examination results were compared to data report 4032,18011,3247 from          PSI    outage with    vi  No Change These examinations were performed under Work Order:          5849600                                    _. Change This Summary and the following data sheets have been reviwd and accepted by the following personnel:
Prepared By                    Level:      Date:      U      eie                                Date:
ANII Review:                              Date:          Page    1    of
 
U-                                                                                                                            Inspection Report No.: 2R10-006 Bottom Head Meridionals GEL-1061-DF LaSalle Unit-2, L2R10 CODE CROSS-SECTIONAL AREA                              TOTAL CODE COVERAGE Percent Weld Length = 80.4      Required Exam        Area Scanned            of Area        Weld Length          Percent Exam Volume = 60.2        Area Sq. In.              Auto                Auto                Auto            Auto 600 S4 P-Scan LKDN        A            8.8                  8.8                7.3%                  53              2.4%
600 S4 P-Scan LKUP        A            8.8                  8.8                7.3%                  53              2.4%
600 S6 P-Scan        A            51.4                51.4                85.4%                53              28.1%
600 S4 T-Scan LKCW        A            8.8                  8.8                7.3%                  53              2.4%
600 S4 T-Scan LKCCW A                    8.8                  8.8                7.3%                  53              2.4%
600 S6 T-Scan        A            51.4                51.4                85.4%                53              28.1%
-C                60004  P-Scan LKDN 600  S4 P-Scan LKUP 0                      600 S6 P-Scan 600 S4 T-Scan LKCW 600 S4 T-Scan LKCCW_
600 S6 T-Scan 600 S4 P-Scan LKDN 600 S4 P-Scan LKUP 600 S6 P-Scan 600 S4 T-Scan LKCW 600 S4 T-Scan LKCCW_
600 S6 T-Scan
                                                                                                  % Total Composite Coverage =            66%
Comments:    A - Examined 53" of length. Scanning limited due to support skirt weld and inaccessible inner skirt region.
Note - Rounding methods may make calculated values appear in error.
 
LaSalle Unit-2 Bottom Head Meridional 60&deg; S4 Exam Volume = 8.8 Sq. In.
600 S6 Exam Volume = 51.4 Sq. In.
60' S4 P-Scan LKDN achieved = 8.8 Sq. In.
60' S4 P-Scan LKUP achieved = 8.8 Sq. In.
600 S6 P-Scan achieved = 51.4 Sq. In.
60&deg; S4 T-Scan LKCW achieved = 8.8 Sq. In.
600 S4 T-Scan LKCCW achieved = 8.8 Sq. In.
60&deg; S6 T-Scan achieved = 51.4 Sq. In.
 
x        I- I-
: 5. 3 0) r-    x CD 0O CDO co 0U)    =
CD C CD.
 
_          GE Energy Nuclear UT ExaminationSummary                                                  Report No. 2R10-010 Project:            LaSalle Unit-2, L2R1O Component ID:        LCS-2-N2B System:              Recirculation Inlet Calibration ID:      01NOZIN GERIS Data:          TL, P1 and 70TP scan files Manual Data:        N/A Examiners:          C. Gauthier Lv. II, S. Gauthier Lv. II Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code, Section Xl, 1989 Edition No Addenda, also Section Xl, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-A Reactor Vessel (RPV) Assembly Welds.
Automated transverse and parallel scans were performed in accordance with procedure GE-UT-705 V4 using 450 Shear wave, 60 RL&deg; and 70&deg; RL search units, supplemental 00 L-wave scans were also performed.
Scanning of the inner 15%T volume for radial flaws was performed using 450 and 600 Shear wave search units as specified by the "Nozzle Inner Radius and Bore Requirements" sheet, which has been verified by modeling.
Automated scanning was performed from the vessel OD surface.
For calibration records refer to report G2K-CAL-1.
The GERIS 2000 OD automated UT system "0"references are located at Vessel 00 Azimuth and Vessel 0 Elevation.
The GERIS 2000 OD system recorded no indications.
Previous examination results were reviewed and no changes were noted.
Automated Composite Coverage        = 70%.
lreparea By:                  Reviewed 6y:                -Utility Reviewed By:    ANII Reviewed By:
DDate:Date:                              *-,6-.5            Date                -  Date:
LaSalle Unit-2, L2R1O                                                                            Page 1 of
 
Inspection Report No.: 2R10-010 Cl) rI-C O)                                                          Recirculation Inlet LCS-2-N2B 01                                                              LaSalle Unit-2, L2R10 CODE CROSS-SECTIONAL AREA                          TOTAL CODE COVERAGE Percent Weld Length = 360.      Required Exam        Area Scanned          of Area      Weld Length          Percent Exam Volume = 59.1          Area Sq. In.            Auto              Auto            Auto              Auto 700 T-Scan        A            11.4                  5.8              9.8%            360              4.9%
450 T-Scan          A          39.2                  33.5            56.7%            360              28.3%
600 T-Scan        A            8.5                    8.5            14.4%            360              7.2%
70&deg; P-Scan        A            11.4                  4.5              7.6%            360              3.8%
450 P-Scan        A            39.2                  22.5            38.1%            360              19.0%
Inner 15%T P-Scan      A            8.5                    8.5            14.4%            360              7.2%
70&deg; T-Scan 450 T-Scan 600 T-Scan 700 P-Scan 450 P-Scan Inner 15%T P-Scan 70* T-Scan 450 T-Scan 600 T-Scan 700 P-Scan                                                                                  _    ,_
450 P-Scan Inner 15%T P-Scan
                                                                                            % Total Composite Coverage =        70%
0
-0.
Comments:    A - Examined 3600 of length. Scanning limited due to nozzle configuration.
H                Inner 15%T P-Scan area by modeling.
Note - Rounding methods may make calculated values appear in error.
 
0)
CD, C
2.
LaSalle Unit-2 0n 0
Recirculation Inlet 700 Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60&deg;T) = 8.5 Sq. In.
700 T-Scan achieved = 5.8 Sq. In.
450 T-Scan achieved = 33.5 Sq. In.
600 T-Scan achieved = 8.5 Sq. In.
17.25"
    /
70'T          45=T              60'T I                I
-0 0)
            -----1>
0
 
LaSalle Unit-2 0                                    Recirculation Inlet 700 Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60&deg;T) = 8.5 Sq. In.
700 P-Scan achieved = 4.5 Sq. In.
450 P-Scan achieved = 22.5 Sq. In.
IRS P-Scan achieved = 8.5 Sq. In. (By model) 17.25"
  /                          70'P 45&deg;P,
( _______
-D CO CD 00 I
0
 
GE Energy Nuclear UT Examination Summary                                                Report No. 2R10-011 Project:            LaSalle Unit-2, L2R10 Component ID:        LCS-2-N2C System:              Recirculation Inlet Calibration ID:      01NOZIN GERIS Data:          TL, P1 and 70TP scan files Manual Data:        N/A Examiners:          C. Gauthier Lv. II, S. Gauthier Lv. II Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code, Section Xl, 1989 Edition No Addenda, also Section XI, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-D Reactor Vessel (RPV) Assembly Welds.
Automated transverse and parallel scans were performed in accordance with procedure GE-UT-705 V4 using 450 Shear wave, 60 RL&deg; and 700 RL search units, supplemental 0&deg; L-wave scans were also performed.
Scanning of the inner 15%T volume for radial flaws was performed using 450 and 60&deg; Shear wave search units as specified by the "Nozzle Inner Radius and Bore Requirements" sheet, which has been verified by modeling.
Automated scanning was performed from the vessel OD surface.
For calibration records refer to report G2K-CAL-1.
The GERIS 2000 OD automated UT system "0"references are located at Vessel 0' Azimuth and Vessel 0 Elevation.
The GERIS 2000 OD system recorded no indications.
Previous examination results were reviewed and no changes were noted.
Automated Composite Coverage = 70%.
LL                                                                                                                I LaSalle Unit-2, L2R1O                                                                          Page 1 of  (I
 
I'-
Inspection Report No.: 2R10-01 1 C
Recirculation Inlet LCS-2-N2C I-"
LaSalle Unit-2, L2R10 N,
CODE CROSS-SECTIONAL AREA                          TOTAL CODE COVERAGE Percent Weld Length = 360.        Required Exam      Area Scanned            of Area      Weld Length          Percent Exam Volume = 59.1            Area Sq. In.          Auto                  Auto          Auto              Auto 70' T-Scan          A            11.4                5.8                9.8%          308.4              4.2%
450 T-Scan          A            39.2                33.5                56.7%          308.4            24.3%
600 T-Scan          A              8.5                8.5                14.4%          308.4              6.2%
700 P-Scan          A            11.4                4.5                7.6%          308.4              3.3%
450 P-Scan          A            39.2                22.5                38.1%          308.4            16.3%
Inner 15%T P-Scan      A              8.5                8.5                14.4%          308.4              6.2%
700 T-Scan          B            11.4                5.8                9.8%            51.6              0.7%
450 T-Scan          B            39.2                33.5                56.7%            51.6            4.1%
600 T-Scan          B              8.5                4.8                8.1%            51.6              0.6%
70* P-Scan          B            11.4                4.5                7.6%            51.6              0.5%
450 P-Scan          B            39.2                22.5                38.1%            51.6            2.7%
Inner 15%T P-Scan      B              8.5                8.5                14.4%            51.6              1.0%
70' T-Scan 450 T-Scan 600 T-Scan 700 P-Scan 45' P-Scan (0Q Inner 15%T P-Scan CD                                                                                            % Total Composite Coverage =        70%
Comments:    A - Examined 308.40 of length. Scanning limited due to proximity of N9 nozzle, B - Examined 51.60 of length in area of N9 nozzle.
Inner 15%T P-Scan area by modeling.
Note - Rounding methods may make calculated values appear in error.
 
CD LaSalle Unit-2 CD'                        Recirculation Inlet 700 Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60'T) = 8.5 Sq. In.
70' T-Scan achieved = 5.8 Sq. In.
450 T-Scan achieved = 33.5 Sq. In.
600 T-Scan achieved = 8.5 Sq. In.
i, / 17.25" 70'T        45&deg;T              60'T I            I I
CD              - - ----
I 0
 
C)
C)          LaSalle Unit-2 Recirculation Inlet 700 Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60&deg;T) = 8.5 Sq. In.
700 T-Scan achieved = 5.8 Sq. In.
450 T-Scan achieved = 33.5 Sq. In.
600 T-Scan achieved = 6.6 Sq. In.
CD Limited area due to N9.
17.25" I          70&deg;T I
45'T I
60'T I
0D
 
CI)
CD LaSalle Unit-2 01                        Recirculation Inlet 700 Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60'T) = 8.5 Sq. In.
700 P-Scan achieved = 4.5 Sq. In.
450 P-Scan achieved = 22.5 Sq. In.
IRS P-Scan achieved = 8.5 Sq. In. (By model) 17.25"
    /            70&deg;P 45"P F-CD F-----
I 0ft4
 
Unlimited scan area.
24" Arm
                          -7 E    N2-D                              N 00 N9-A iL C*
 
_        GE Energy Nuclear UT ExaminationSummary                                                Report No. 2R10-014 Project:            LaSalle Unit-2, L2R1O Component ID:        LCS-2-N2F System:              Recirculation Inlet Calibration ID:      01NOZ.IN GERIS Data:          TL, P1 and 70TP scan files Manual Data:        N/A Examiners:          C. Gauthier Lv. II,S. Gauthier Lv. II Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code, Section XI, 1989 Edition No Addenda, also Section XI, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II,Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-A Reactor Vessel (RPV) Assembly Welds.
Automated transverse and parallel scans were performed in accordance with procedure GE-UT-705 V4 using 450 Shear wave, 60 RL&deg; and 70* RL search units, supplemental 00 L-wave scans were also performed.
Scanning of the inner 15%T volume for radial flaws was performed using 450 and 600 Shear wave search units as specified by the "Nozzle Inner Radius and Bore Requirements" sheet, which has been verified by modeling.
Automated scanning was performed from the vessel OD surface.
For calibration records refer to report G2K-CAL-1.
The GERIS 2000 OD automated UT system "0"references are located at Vessel 0' Azimuth and Vessel 0 Elevation.
The GERIS 2000 OD system recorded no indications.
Previous examination results were reviewed and no changes were noted.
Automated Composite Coverage = 70%.
Prepared By:                  Reviewed Ely:              Utility Reviewed By:      ANII Reviewed By:
Date:2    1  0 -5            Date:    ;L  -a6    S--    Date    7  -        -    Date:
LaSalle Unit-2, L2R1O                                                                          Page 1 of 1)
 
(n                                                                                                                Inspection Report No.: 2R10-014 9i CD C                                                        Recirculation Inlet LCS-2-N2F LaSalle Unit-2, L2R10 0                                              CODE CROSS-SECTIONAL AREA                          TOTAL CODE COVERAGE Percent Weld Length =  360. Required Exam        Area Scanned          of Area      Weld Length          Percent Exam Volume =    59.1      Area Sq. In.            Auto              Auto            Auto              Auto 700 T-Scan        A            11.4                  5.8              9.8%              360              4.9%
450 T-Scan        A            39.2                33.5              56.7%            360            28.3%
60' T-Scan        A            8.5                  8.5              14.4%            360              7.2%
700 P-Scan        A            11.4                  4.5              7.6%              360              3.8%
450 P-Scan        A            39.2                22.5              38.1%            360            19.0%
Inner 15%T P-Scan    A            8.5                  8.5              14.4%            360              7.2%
70' T-Scan 450 T-Scan 600 T-Scan 700 P-Scan 450 P-Scan Inner 15%T P-Scan 700 T-Scan 450 T-Scan 600 T-Scan 700 P-Scan 450 P-Scan CD Inner 15%T P-Scan
                                                                                          % Total Composite Coverage =        70%
0  Comments:    A - Examined 3600 of length. Scanning limited due to nozzle configuration.
Inner 15%T P-Scan area by modeling.
Note - Rounding methods may make calculated values appear in error.
 
CD LaSalle Unit-2 Recirculation Inlet 700 Exam Volume = 11.4 Sq In.
450  Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60 0T) = 8.5 Sq. In.
700 T-Scan achieved = 5.8 Sq. In.
450 T-Scan achieved = 33.5 Sq. In.
600 T-Scan achieved = 8.5 Sq. In.
17.25"    70&deg;T        45&deg;T              60 'T
-o
 
C))
0)
LaSalle Unit-2 Recirculation Inlet 700 Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60 0T) = 8.5 Sq. In.
70' P-Scan achieved = 4.5 Sq. In.
450 P-Scan achieved = 22.5 Sq. In.
IRS P-Scan achieved = 8.5 Sq. In. (By model)
CD 17.25"
    /                        70'P 45&deg;P I ________
                          *I        I
                                        -----H I
0
 
GE Energy Nuclear UT Examination Summary                                                Report No. 2R10-015 Project:            LaSalle Unit-2, L2R1O Component ID.:      LCS-2-N2G System:              Recirculation Inlet Calibration ID:      01NOZIN GERIS Data:          TL, P1 and 70TP scan files Manual Data:        N/A Examiners:          C. Gauthier Lv. II,S. Gauthier Lv. II Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code, Section Xl, 1989 Edition No Addenda, also Section XI, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-D Reactor Vessel (RPV) Assembly Welds.
Automated transverse and parallel scans were performed in accordance with procedure GE-UT-705 V4 using 450 Shear wave, 60 RL' and 700 RL search units, supplemental 00 L-wave scans were also performed.
Scanning of the inner 15%T volume for radial flaws was performed using 450 and 600 Shear wave search units as specified by the "Nozzle Inner Radius and Bore Requirements" sheet, which has been verified by modeling.
Automated scanning was performed from the vessel OD surface.
For calibration records refer to report G2K-CAL-1.
The GERIS 2000 OD automated UT system "0" references are located at Vessel 0' Azimuth and Vessel 0 Elevation.
The GERIS 2000 OD system recorded no indications.
Previous examination results were reviewed and no changes were noted.
Automated Composite Coverage = 70%.
LL LaSalle Unit-2, L2R1O                                                                          Page 1 of  I-
 
Inspection Report No.: 2R10-015 ch 9L CD Recirculation Inlet LCS-2-N2G LaSalle Unit-2, L2R10 CODE CROSS-SECTIONAL AREA                          TOTAL CODE COVERAGE Percent Weld Length = 360.      Required Exam        Area Scanned          of Area      Weld Length          Percent Exam Volume = 59.1          Area Sq. In.            Auto              Auto            Auto              Auto 70* T-Scan        A            11.4                  5.8              9.8%            360              4.9%
450 T-Scan        A            39.2                  33.5            56.7%            360            28.3%
600 T-Scan        A            8.5                  8.5              14.4%            360              7.2%
70' P-Scan        A            11.4                  4.5              7.6%            360              3.8%
450 P-Scan        A            39.2                22.5              38.1%            360            19.0%
Inner 15%T P-Scan      A            8.5                  8.5              14.4%            360              7.2%
700 T-Scan 450 T-Scan 600 T-Scan 70_P-Scan 450 P-Scan Inner 15%T P-Scan 70o T-Scan 450 T-Scan 60' T-Scan 700 P-Scan 45' P-Scan (D                Inner 15%T P-Scan
                                                                                            % Total Composite Coverage =        70%
0  Comments:    A - Examined 3600 of length. Scanning limited due to nozzle configuration.
Inner 15%T P-Scan area by modeling.
Note - Rounding methods may make calculated values appear in error.
 
0, C,,
CD C>
LaSalle Unit-2 C)
Recirculation Inlet 700 Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60 0T) = 8.5 Sq. In.
700 T-Scan achieved'= 5.8 Sq. In.
450 T-Scan achieved = 33.5 Sq. In.
600 T-Scan achieved = 8.5 Sq. In.
CD, 17.25"
    /                  707T I
457T I
607T
-J          ---- 1 0)
Co I
 
O,)
C/
LaSalle Unit-2 0
0 C:'
Recirculation Inlet 700 Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60 0T) = 8.5 Sq. In.
700 P-Scan achieved = 4.5 Sq. In.
450 P-Scan achieved = 22.5 Sq. In.
IRS P-Scan achieved = 8.5 Sq. In. (By model) 17.25"
    /                              70TP 45&deg;P I  _______
I    I I--                    ----- A 0
 
GE Energy Nuclear UT Examination Summary                                              Report No. 2R10-016 Project:            LaSalle Unit-2, L2R10 Component ID:        LCS-2-N2H System:              Recirculation Inlet Calibration ID:      O1NOZ.IN GERIS Data:          TL, P1 and 70TP scan files Manual Data:        N/A Examiners:          C. Gauthier Lv. II,S. Gauthier Lv. II Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code, Section XI, 1989 Edition No Addenda, also Section XI, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II,Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-D Reactor Vessel (RPV) Assembly Welds.
Automated transverse and parallel scans were performed in accordance with procedure GE-UT-705 V4 using 450 Shear wave, 60 RL&deg; and 700 RL search units, supplemental 00 L-wave scans were also performed.
Scanning of the inner 15%T volume for radial flaws was performed using 450 and 600 Shear wave search units as specified by the "Nozzle Inner Radius and Bore Requirements" sheet, which has been verified by modeling.
Automated scanning was performed from the vessel OD surface.
For calibration records refer to report G2K-CAL-1.
The GERIS 2000 OD automated UT system "0"references are located at Vessel 0&deg; Azimuth and Vessel 0 Elevation.
The GERIS 2000 OD system recorded no indications.
Previous examination results were reviewed and no changes were noted.
Automated Composite Coverage = 70%.
Prepared By:                  Rewed By:                  Ut  Re.viewed By:        ANII Reviewed By:
Date:                          Date:                      Date                      Date:
agelf  I La~ale Uit-, L210 LaSalle Unit-2, L2R1O                                                                          Page 1 of I I
 
Inspection Report No.: 2R10-016 Recirculation Inlet LCS-2-N2H LaSalle Unit-2, L2R10 CODE CROSS-SECTIONAL AREA                          TOTAL CODE COVERAGE Percent Weld Length = 360.        Required Exam      Area Scanned            of Area      Weld Length          Percent Exam Volume = 59.1            Area Sq. In.          Auto                  Auto          Auto              Auto 700 T-Scan          A            11.4                5.8                9.8%          308.4            4.2%
450 T-Scan          A            39.2                33.5                56.7%          308.4            24.3%
600 T-Scan          A              8.5                8.5                14.4%          308.4            6.2%
700 P-Scan          A            11.4                4.5                7.6%          308.4            3.3%
45' P-Scan          A            39.2                22.5                38.1%          308.4            16.3%
Inner 15%T P-Scan      A              8.5                8.5                14.4%          308.4            6.2%
-U Q)                    70' T-Scan          B            11.4                5.8                9.8%            51.6            0.7%
450 T-Scan          B            39.2                33.5                56.7%            51.6            4.1%
600 T-Scan          B              8.5                4.8                8.1%            51.6            0.6%
700 P-Scan          B            11.4                6.6                11.2%            51.6            0.8%
450 P-Scan          B&#xfd;            39.2                22.5                38.1%            51.6            2.7%
Inner 15%T P-Scan      B              8.5                8.5                14.4%            51.6            1.0%
70&deg; T-Scan 450 T-Scan 600 T-Scan 700 P-Scan 450 P-Scan Inner 15%T P-Scan
: 0)                                                                                            % Total Composite Coverage =        70%
Comments:    A - Examined 308.40 of length. Scanning limited due to proximity of N9 nozzle.
B - Examined 51.60 of length in area of N9 nozzle.
Inner 15%T P-Scan area by modeling.
Note - Rounding methods may make calculated values appear in error.
 
CD LaSalle Unit-2 0
Recirculation Inlet 70&deg; Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60*T) = 8.5 Sq. In.
70&deg; T-Scan achieved = 5.8 Sq. In.
450 T-Scan achieved = 33.5 Sq. In.
60' T-Scan achieved = 8.5 Sq. In.
0 17.25"
  /                  707T          45&deg;T              60'T I              I                I
            ~~~~17<
I
 
I-CD)
C:
=.3          LaSalle Unit-2 0
0 Recirculation Inlet 70' Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 607T) = 8.5 Sq. In.
70&deg; T-Scan achieved = 5.8 Sq. In.
450 T-Scan achieved = 33.5 Sq. In.
60' T-Scan achieved = 6.6 Sq. In.
Limited area due to N9.
17.25" I          70'T I
45*T    60*T I        I CD 00 0
 
I-"
Cn CD LaSalle Unit-2 Recirculation Inlet 700 Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60&deg;T) = 8.5 Sq. In.
700 P-Scan achieved = 4.5 Sq. In.
450 P-Scan achieved = 22.5 Sq. In.
IRS P-Scan achieved = 8.5 Sq. In. (By model)
CD
-o 0
-4'        17.25"
    /            70op 45oP I    I K----
-J F-----
"K 0)
 
Unlimited scan area.
24" Arm N2-J N9-B                T/C PADS C,,
I-I-
Ph 0
 
GE Energy Nuclear UT ExaminationSummary                                                Report No. 2R10-017 Project:            LaSalle Unit-2, L2R1O Component ID:        LCS-2-N2J System:              Recirculation Inlet Calibration ID:      01NOZ.IN GERIS Data:          TL, P1 and 70TP scan files Manual Data:        N/A Examiners:          C. Gauthier Lv. II,S. Gauthier Lv. II Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code, Section XI, 1989 Edition No Addenda, also Section XI, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part I, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-D Reactor Vessel (RPV) Assembly Welds.
Automated transverse and parallel scans were performed in accordance with procedure GE-UT-705 V4 using 450 Shear wave, 60 RL0 and 700 RL search units, supplemental 0&deg; L-wave scans were also performed.
Scanning of the inner 15%T volume for radial flaws was performed using 450 and 600 Shear wave search units as specified by the "Nozzle Inner Radius and Bore Requirements" sheet, which has been verified by modeling.
Automated scanning was performed from the vessel OD surface.
For calibration records refer to report G2K-CAL-1.
The GERIS 2000 OD automated uT system "0"references are located at Vessel 0&deg; Azimuth and Vessel 0 Elevation.
The GERIS 2000 OD system recorded no indications.
Previous examination results were reviewed and no changes were noted.
Automated Composite Coverage = 70%.
LaSalle Unit-2, L2R1O                                                                          Page I of  "
 
Inspection Report No.: 2R10-017 CO)
Ui)
(D Recirculation Inlet LCS-2-N2J LaSalle Unit-2, L2R10 CODE CROSS-SECTIONAL AREA                        TOTAL CODE COVERAGE Percent Weld Length = 360.        Required Exam      Area Scanned            of Area      Weld Length          Percent Exam Volume =    59.1        Area Sq. In.          Auto                Auto          Auto              Auto 700 T-Scan          A              11.4                5.8                9.8%          307.2              4.2%
450 T-Scan          A            39.2                33.5                56.7%          307.2            24.2%
60&deg; T-Scan          A              8.5                8.5                14.4%          307.2              6.1%
70_P-Scan          A              11.4                4.5                7.6%          307.2              3.2%
450 P-Scan          A            39.2                22.5                38.1%          307.2            16.2%
T                  Inner 15%T P-Scan      A              8.5                8.5                14.4%          307.2              6.1%
700 T-Scan          B              11.4                5.8                9.8%            52.8              0.7%
450 T-Scan          B      _    39.2                33.5                56.7%            52.8            4.2%
0                      60' T-Scan          B              8.5                7.5                12.7%            52.8              0.9%
70' P-Scan          B              11.4                4.5                7.6%            52.8              0.6%
450 P-Scan          B            39.2                22.5                38.1%            52.8            2.8%
Inner 15%T P-Scan      B              8.5                8.5                14.4%            52.8              1.1%
700 T-Scan 450 T-Scan 600 T-Scan 70' P-Scan 450 P-Scan Inner 15%T P-Scan
                                                                                              % Total Composite Coverage =        70%
Comments:    A - Examined 308.4' of length. Scanning limited due to proximity of N9 nozzle.
B - Examined 51.60 of length in area of N9 nozzle.
Inner 15%T P-Scan area by modeling.
Note - Rounding methods may make calculated values appear in error.
 
c-LaSalle Unit-2 Recirculation Inlet 70&deg; Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60 0T) = 8.5 Sq. In.
70&deg; T-Scan achieved = 5.8 Sq. In.
450 T-Scan achieved = 33.5 Sq. In.
600 T-Scan achieved = 8.5 Sq. In.
-13 0
17.25" 70OT        457T              60&deg;T I          I                  I
    /I
              --- H I
 
                                                                -1 0,
CD, 0,
LaSalle Unit-2 0
Recirculation Inlet 700 Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60 0T) = 8.5 Sq. In.
700 T-Scan achieved = 5.8 Sq. In.
450 T-Scan achieved = 33.5 Sq. In.
600 T-Scan achieved = 7.5 Sq. In.
Limited area due to N9.
17.25" I                  70'T          45&deg;T        60'T I            I            I K---
                - I 0)
 
C/)
CD LaSalle Unit-2 0
U1 Recirculation Inlet 70&deg; Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60&deg;T) = 8.5 Sq. In.
70&deg; P-Scan achieved = 4.5 Sq. In.
450 P-Scan achieved = 22.5 Sq. In.
IRS P-Scan achieved = 8.5 Sq. In. (By model) 17.25" I
F------
70iP45i cc I
0
 
Unlimited scan area.
24" Arm N2-H 0
N9-B      T/C PADS
                          )
V
 
GE Energy Nuclear
(              UT Examination Summary                                                Report No. 2R10-018 Project:            LaSalle Unit-2, L2R10 Component ID:        LCS-2-N2K System:              Recirculation Inlet Calibration ID:      01NOZIN GERIS Data:          TL, P1 and 70TP scan files Manual Data:        N/A Examiners:          C. Gauthier Lv. II, S. Gauthier Lv. II Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code, Section Xl, 1989 Edition No Addenda, also Section Xl, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-D Reactor Vessel (RPV) Assembly Welds.
Automated transverse and parallel scans were performed in accordance with procedure GE-UT-705 V4 using 450 Shear wave, 60 RL&deg; and 700 RL search units, supplemental 00 L-wave scans were also performed.
Scanning of the inner 15%T volume for radial flaws was performed using 45* and 60&deg; Shear wave search units as specified by the "Nozzle Inner Radius and Bore Requirements" sheet, which has been verified by modeling.
Automated scanning was performed from the vessel OD surface.
For calibration records refer to report G2K-CAL-1.
The GERIS 2000 OD automated UT system "0" references are located at Vessel 00 Azimuth and Vessel 0 Elevation.
The GERIS 2000 OD system recorded no indications.
Previous examination results were reviewed and no changes were noted.
Automated Composite Coverage = 70%.
I LaSalle Unit-2, L2R1 0                                                                        Page 1 of  10
 
Inspection Report No.: 2R10-018 Recirculation Inlet LCS-2-N2K LaSalle Unit-2, L2R10 CODE CROSS-SECTIONAL AREA                          TOTAL CODE COVERAGE Percent Weld Length = 360.      Required Exam        Area Scanned          of Area      Weld Length          Percent Exam Volume = 59.1          Area Sq. In.            Auto              Auto            Auto              Auto 70&deg; T-Scan        A            11.4                  5.8              9.8%            360              4.9%
450 T-Scan        A            39.2                  33.5            56.7%            360              28.3%
600 T-Scan        A            8.5                  8.5            14.4%            360              7.2%
700 P-Scan        A            11.4                  4.5              7.6%            360              3.8%
450 P-Scan_        A            39.2                  22.5            38.1%            360              19.0%
Inner 15%T P-Scan      A            8.5                  8.5            14.4%            360              7.2%
700 T-Scan 450 T-Scan 600 T-Scan 700 P-Scan 450 P-Scan Inner 15%T P-Scan 70_T-Scan 450 T-Scan 600 T-Scan 700 P-Scan 450 P-Scan Inner 15%T P-Scan
                                                                                            % Total Composite Coverage =        70%
Comments:    A - Examined 3600 of length. Scanning limited due to nozzle configuration.
ho              Inner 15%T P-Scan area by modeling.
Note - Rounding methods may make calculated values appear in error.
 
On a
C')
C 0.
N)
LaSalle Recirculation InletUnit-2 700 Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60 0 T) = 8.5 Sq. In.
707 T-Scan achieved = 5.8 Sq. In.
450 T-Scan achieved = 33.5 Sq. In.
600 T-Scan achieved = 8.5 Sq. In.
707T        45&deg;T              60'T I I CD 0
 
C),
Cz
:3 LaSalle Unit-2 C-fl                                    Recirculation Inlet 700 Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60&deg;T) = 8.5 Sq. In.
70&deg; P-Scan achieved = 4.5 Sq. In.
450 P-Scan achieved = 22.5 Sq. In.
IRS P-Scan achieved = 8.5 Sq. In. (By model) 17.25" I                        70'P 45 0 P I    I I
K----
                        -- 4 4
")
                        ---- 1 Jl  I    I 0
 
GE Energy Nuclear
(              UT Examination Summary                                                  Report No. 2R10-019 Project:            LaSalle'Unit-2, L2R10 Component ID:        LCS-2-N3A System:              Main Steam Calibration ID:      03NOZ.IN GERIS Data:          TL, P1 and 70TP scan files Manual Data:        N/A Examiners:          C. Gauthier Lv. II, S. Gauthier Lv. II Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code, Section XI, 1989 Edition No Addenda, also Section Xl, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-A Reactor Vessel (RPV) Assembly Welds.
Automated transverse and parallel scans were performed in accordance with procedure GE-UT-705 V4 using 450 Shear wave, 60 RL&deg; and 70" RL search units, supplemental 00 L-wave scans were also performed.
Scanning of the inner 15%T volume for radial flaws was performed using 450 and 600 Shear wave search units as specified by the "Nozzle Inner Radius and Bore Requirements" sheet, which has been verified by modeling.
Automated scanning was performed from the vessel OD surface.
For calibration records refer to report G2K-CAL-1.
The GERIS 2000 OD automated UT system "0" references are located at Vessel 0QAzimuth and Vessel 0 Elevation.
The GERIS 2000 OD system recorded no indications.
Previous examination results were reviewed and no changes were noted.
Automated Composite Coverage = 68%.
7-1/
  "P1epared By-                  Reviewed  y:                Utility Reviewed By:        ANII Reviewed By:
Date: Z/      ,{OS            Date:    AZ - z 4            Date      2--      QI-O -- Date:
LaSalle Unit-2, L2R1O                                                                              Page 1 of -I-
 
Inspection Report No.: 2R10-036 Ul)
Main Steam LCS-2-N3A LaSalle Unit-2, L2R10 CODE CROSS-SECTIONAL AREA                          TOTAL CODE COVERAGE Percent Weld Length =    360. Required Exam        Area Scanned          of Area      Weld Length          Percent Exam Volume =    77.2      Area Sq. In.            Auto              Auto            Auto              Auto 700 T-Scan        A            14.1                  6.3              8.2%            360              4.1%
450 T-Scan        A            52.1                  43.5            56.3%            360              28.2%
60' T-Scan        A            11.0                  11.0            14.2%            360              7.1%
700 P-Scan        A            14.1                  5.0              6.5%            360              3.2%
450 P-Scan        A            52.1        1        28.2            36.5%            360              18.3%
Inner 15%T P-Scan. A            11.0                  11.0            14.2%            360              7.1%
CD 70' T-Scan 450 T-Scan 0                    600 T-Scan 700 P-Scan 450 P-Scan Inner 15%T P-Scan 700 T-Scan 45' T-Scan 600 T-Scan 700 P-Scan 450 P-Scan Inner 15%T P-Scan
                                                                                            % Total Composite Coverage =        68%
Comments:    A - Examined 3600 of length. Scanning limited due to nozzle configuration.
-4, Inner 15%T P-Scan area by modeling.
Note- Rounding methods may make calculated values appear in error.
 
Cl LaSalle Unit-2 DMain                          Steam 70&deg; Exam Volume = 14.1 Sq. In.
450 Exam Volume = 52.1 Sq. In.
Inner 15%T Exam Volume (IRS & 60 0T) = 11.0 Sq. In.
70&deg; T-Scan achieved = 6.3 Sq. In.
450 T-Scan achieved = 43.5 Sq. In.
600 T-Scan achieved = 11.0 Sq. In.
[70OT                            45&deg;T              60'T T/
I  I                  I V      -1
 
C' Cn LaSalle Unit-2 Main Steam 700 Exam Volume = 14.1 Sq. In.
450 Exam Volume = 52.1 Sq. In.
Inner 15%T Exam Volume (IRS & 60 0T) = 11.0 Sq. In.
700 P-Scan achieved = 5.0 Sq. In.
450 P-Scan achieved = 28.2 Sq. In.
IRS P-Scan achieved = 11.0 Sq. In. (By model)
  /
H-----
I        ---- 4 CD CO
      ---I 0
 
GE Energy Nuclear UT Examination Summary                                  Report No. 2R10-020 Project:      LaSalle Unit-2, L2R1O Weld ID:      LCS-2-N3B System:        Main Steam Calibration ID:      03NOZ.IN GERIS Data:          TL, P1 and 70TP scan files.
Manual Data:          N/A Examiners:            C. Gauthier Lv. II, S. Gauthier Lv. II Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code, Section Xl, 1989 Edition No Addenda, also Section Xl, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-A Reactor Pressure Vessel (RPV) Assembly Welds.
Automated transverse and parallel scans were performed in accordance with procedure GE-UT-705 V4, using 450 Shear wave, 600 RL and 700 RL search units, supplemental 0' L-wave scans were also performed.
Scanning of the inner 15%T volume for radial flaws was performed using 600 Shear waves as specified by the "Nozzle Inner Radius and Bore Requirements" sheet which has been verified by modeling.
Automated scanning was performed from the vessel OD surface.
For calibration records refer to report G2K-CAL-1.
The GERIS 2000 OD automated UT system "0"references are located at Vessel 0" Azimuth and Vessel 0 Elevation.
The GERIS 2000 OD system recorded no indications.
Previous examination results were reviewed and no changes were noted.
Automated Composite Coverage = 68%.
LaSalle Unit-2, L2R1O                                                              Page    I  of 9
 
Inspection Report No.: 2R10-020 Cl)
R1 CD Main Steam LCS-2-N3B LaSalle Unit-2, L2R10 CODE CROSS-SECTIONAL AREA                          TOTAL CODE COVERAGE Percent Weld Length = 360.      Required Exam        Area Scanned          of Area      Weld Length          Percent Exam Volume = 77.2          Area Sq. In.            Auto              Auto            Auto              Auto 700 T-Scan        A            14.1                  6.3              8.2%            360              4.1%
450 T-Scan        A            52.1                43.5              56.3%            360              28.2%
60 0 T-Scan        A            11.0                  11.0            14.2%            360              7.1%
70" P-Scan        A            14.1                  5.0              6.5%            360              3.2%
450 P-Scan        A            52.1                28.2              36.5%            360              18.3%
Inner 15%T P-Scan      A            11.0                  11.0            14.2%            360              7.1%
(D 700 T-Scan 450 T-Scan 0                      600 T-Scan 700 P-Scan 450 P-Scan Inner 15%T P-Scan 70_T-Scan 450 T-Scan 600 T-Scan 700 P-Scan 450 P-Scan Inner I 5%T P-Scan h1
                                                                                              % Total Composite Coverage =        68%
Comments:    A - Examined 3600 of length. Scanning limited due to nozzle configuration.
Inner 15%T P-Scan area by modeling.
Note - Rounding methods may make calculated values appear in error.
 
I--
C LaSalle Unit-2 C) 0
(              Main Steam 70' Exam Volume = 14.1 Sq. In.
45&deg; Exam Volume = 52.1 Sq. In.
Inner 15%T Exam Volume (IRS & 60 0T) = 11.0 Sq. In.
70&deg; T-Scan achieved = 6.3 Sq. In.
450 T-Scan achieved = 43.5 Sq. In.
600 T-Scan achieved = 11.0 Sq. In.
      /
      /              70&deg;T            45&deg;T                607T I              I                  I t                    --
CD 0
h
 
I-C LaSalle Unit-2 0
0 01          Main Steam 70&deg; Exam Volume = 14.1 Sq. In.
450 Exam Volume = 52.1 Sq. In.
Inner 15%T Exam Volume (IRS & 607T) = 11.0 Sq. In.
700 P-Scan achieved = 5.0 Sq. In.
450 P-Scan achieved = 28.2 Sq. In.
IRS P-Scan achieved = 11.0 Sq. In. (By model)
CD 70'P 4 5 oP I    I Hi l/
"10      -l CD
 
EXAMINATION
 
==SUMMARY==
SHEET 0            GE NUCLEAR ENERGY                                          LaSalle Unit 2 L2R10 RPV-SS-2                            ATT                          RPV                    B-K                        Sec. XI Component ID:                    Configuration:                  System:            ASME Cat:                  Exam Credit.:
Examination        Ceit        Exam                Exams          Data        Cal              Procedure    Revision      Calibration Personnel        Level      Completed          Performed        Sheet        Sheet                                          Block W. Lt DeBusk              I1        2/26/05                PT          PT-06        N/A              GE-PT-10OVer.4                  N/A VT-I        05-198        N/A            ER-AA-335-014 R.1                N/A Examination Results:
During the liquid penetrant and visual examinations of the above referenced weld, no recordable indications were detected.
Due to adajacent structures only 52% of the required examination area was accessable for inspections. Due to this limiting condition a VT-1 examination was performed on 100% of the required examination area.
This examination meets the requirements of ASME Section Xl, 1989 Edition, no Addenda Examination results were compared to datareport            None        from          N/A      outage with      N/A  No Change These examinations were performedunder Work Order:          5849600                                                N/A  Change This Summary and the following data sheets have been reviewed and accepted bv the following personnel ,
_-                                                      fiu 't gr          /nnelDose:                20      mr.
Gevie        B                    Level:      Date:      Reviewed By:
 
==Title:==
Date:
Reviewed BY:                      Level:      Date:      ANI Reviewed By:
 
==Title:==
Date:            Page  1 of      3
 
GE Nuclear Energy                                    LIQUID PENETRANT EXAMINATION REPORT
(  Site: LaSalle                                Unit: 2            Project:      L2RIO              Report Number:                2R10-061 Data Sheet:                  PT-06 Component ID: RPV-SS 2                                                Configuration:    Attachment Drawing:        GEL-1119 / VPF 3073-080-2                            System:          RPV Procedure No.:          GE-PT-1O0 Ver4 Material:                        Surface Condition:                      Item:
SA-533                          As-found/Cleaned                        Weld Technique                                                                                    Cleaner            Penetrant          Developer Visible Solvent Removable (B-3)                                Manufacturer:              Ma-anaflux          Magnaflux          Magnaflux Thermometer:      241997                                      Brand / Type:                SKC-S                SKL-SP            SKD-S2 Temperature:      88*F                                        Batch No.:                    03LOK                01HO4K            03A03K 2
Black Light:      N/A                                  Light Meter  N/A                          Blacklight Intensity:        N/A    piW/cm Pre-Clean Method:                Siray / Wipe                                    Exam Start:                0240 /2/26/05 Penetrant Application            Brush                                            Drying Time:
Dwell Time:                10 Penetrant Removal:              Wipe with dry towel Wipe with damp towel                            Drying Time:                5 Developer Application:          Snray                                            Developing Time:            7 Comments I Indications I Limitations:
PT examination performed on accessabie areas of the                                          ./
attachment lug. See sketch for examination area.
52% of the required area was examined.
No recordable indications were detected.
                                                                                              '                                      1 iIi
[NA CC C(SSi h 6 SW. L. DeBusk                      11      2/26/05 Initials:  Examiner:                    Level:    Exam Date:          Reviewed By:                        Date:
3'                                        2g"                                      Pge            o U5 o
GF-evled                                  Level:        Date:            ANII Reviewed By:                    Date:        Form:Pipc Wdd Rmord #  146
 
ER-AA-335-014 QLL 3
4 ~ Revision I  I ATTACHMENT I VT-1 Visual Examination Record
* Component
 
== Description:==
R ]t" c AneA,j -                      Sheet No. 05- 1 c8 Date: 2/    6/O/SWO No. 58$9(600                          Procedure: ER-RR-33S-O0g              Rev. I Thickness:        AJ/ 1A                Visual Method:                Direct X                  Remote MaterlalToo: C          -S    S39        VisualAids: FL-s            Lo&.
Li          '    /76N        C Surface:        1D            OD X        M&TE:            NJ/A Items ln~eed(l'N):          R2 V,-'S ;        /h':ral  *,,l-Locateon: )rv*&#xa2;elC 804. ,              CID'o I.D.              IN        LEGHWDHAC                            RINPCO                      LVL Numbe    IND#      TYP    ENT            WDH                  UNACC      SIGNATURE/DATE Comments/Sketch:                                                                Defect Code:
4o recor**-a he ;**,'oc              h5        Wewre A'ote-7          Wear-W.
Jc~s,'~s~oe7'7~~j'fa(        ~o~ ~Corrosion-CR Damage-D Erosion-ER Cracds-C VT-1 INSPECTOR SIGNATURE/LEVEL/DATE 1                      U        f/*.*
Overall results: Acceptable            QVes      ONo                            W t- De6usk Additional Actions:              4,,,-
                                    ,. &#xfd;      -
(Action Request, Work Order, Condition Report, etc. initiated)
(                                        LX LEVEL III SIGNATURE              DATE                        ANII SIGNATURE            DATEj
 
Report No.:
EXAMINATION
 
==SUMMARY==
SHEET                                        2R11-oos GE ENERGY, NUCLEAR Site:                LaSolle                Component ID:                              GEL-1060-AG Outage:                  L2R11                                                              TOP HEAD FLANGE System:              RPV              ASME Cat.:        B-A          ASME Item            81.40          Aug Req          SECT XI Exams          Data Sheet        Cal Sheet            Procedure              Calibration Block 1  Examination      Cert Level      Date Performed '                                                                                            Personnel 60  RL            D-007            N/A          GE-UT-300 Ver/Rev    10      CAL-IIW2-026        Jack Reisewitz        II        3i2/2007 60' RL            D-008            N/A          GE-UT-300 Ver/Rev    10  i    01-92-04        Jack Reisewitz        II        312/2007 60&deg; RL            D-009            N/A          GE-UT-300 Ver/Rev    10      CAL-11W2-033      Mario Russomanno        II        3/3/2007 60' RL            D-010            N/A    1  GE-UT-300 Ver/Rev    10        01-92-04      Mario Russomanno        1I        3/3/2007 MT              MT-001            N/A          GE-MT-100 Ver/Rev 8              N/A            Wallace Reid          II        3/2/2007 Examination Results:
During the manual ultrasonic examination of the above referenced weld, no recordable indications were detected utilizing a 600 refracted longitudinal wave search unit.
A magnetic particle surface examination was also performed from 180&deg; to 3600 with no recordable indications.
No recordable indications were detected.
80.6% Code coverage was achieved.
This examination is acceptable per the requirements of ASME Section X11995 Edition, 1996 Addenda.
Examination results were compared to data report              D-188A      from        1996    outage with      V:  No Change These examinations were performed under Work Order:                00821549                                      .. Change This Summary and the following data sheets have been reviewed and accepted by the following personnel:                RWP:        N/A
                                                                              /. 2Do                    S                se:      9      mr.
Prepared By:                                  Date:    Utility Review:                                Dote:
ANII Review:                                    Date:          Page    1 of    8
 
GE Energy, Nuclear                                              MAGNETIC PARTICLE EXAMINATION REPORT Reor      NubrI2I-0 Site:    LaSalle                          Unit:    2          Project:            L2RXX                              Report Number:                      2R11-005 Sheet No.:                          MT-O01 Weld No.:      GEL-1060-AG                                              Configuration:                TOP HEAD FLANGE Drawing:      GEL-1060                                                System:                      RPV Procedure No.:          GE-MT-100                              Version / Revision                        8                DRR:                        N/A Material:                          Surface Condition:                          Item:
CarbonSteel                          GroundSmooth                              Weld - Final Magnetizing Apparatus                                                                                        Black Light Mfg:              ParkerResearch          Yoke Calibration:          2/14/08                                                                Model            Serial Number Model:            B-300                                                                                          Blacklight            N/A                N/A Serial No.:        5502                    Yoke Spacing:              6.0'                                        Light Meter            N/A              N/A Thermometer:            251804                          Surface Temperature:                              75 &deg; F Technique                                        Examination Medium                                                              Blocklight Intensity Magnetization: AC                          Magnetic Particles:                P-y                                                                        N/A Technique:        Continuous                        Magnaflux                      8A Red                      93AO45                            Blacklight intensity.
Manufacturer:              Particle Type:                Botch No Indication Numbe      ................... . ...........          ..........................................................                                      Results:
NIA                                                                N/A                                                                                      NRI Comments:
No recordable-indications.
Light Source: Yoke with ECT Light 12V/10W Exam Area: Examined 1800 to 360' Wallace Reid        JiA.J P,        It          3/2/200          Utility Review                                                      Dote iitial Examiner                    Level    Date GE Review                            Level    Dote                  ANti Review                                                        Date            Page        6    of  8
 
Wj                                                                          Reactor PressureVessel E
(D GE Energy - Nuclear                                        Coverage CalculationSheet LaSalle Unit-2, 2007 GEL-1 060-AG L2R11 CODE CROSS-SECTIONAL AREA                      TOTAL CODE COVERAGE Percent Weld Length =      180. Required Exam    Area Scanned        of Area        Weld Length  Percent Exam Volume =      35.8    Area Sq. In.        Manual          Manual            Manual    Manual 600 T-Scan (S4 UP)        A            5.2              0              0.0%              180      0.0%
60' T-Scan (S4 DN)        A            5.2            5.2            14.5%              180      3.6%
600 T-Scan (S6)          A*          30.6            29            81.0%              180      40.5%
C.'
600 P-Scan (S4 CW)          A            5.2            3.9            10.9%              180      2.7%
600 P-Scan (S4 CCW)          A            5.2            3.9            10.9%              180      2.7%
600 P-Scan (S6)          A            30.6            22.2            62.0%              180      31.0%
600 T-Scan (S4 UP) 60&deg; T-Scan (S4 DN) 600 T-Scan (S6) 600 P-Scan (S4 CW) 600 P-Scan (S4 CCW) 600 P-Scan (S6) 600 T-Scan (S4 UP) 60' T-Scan (S4 DN) 600 T-Scan (S6) 600 P-Scan (S4 CW)'
600 P-Scan (S4 CCW) 600 P-Scan (S6)
                                                                                            % Total Composite Coverage =  80.6%
Rev. 1 3/4107 Comments:
(D~
Scanning limited looking up due to the flange configuration. Examined from 1800 CW to 3600 Az. as scheduled.
04  A*- Single side access, 50% credit of the achieved Supplement 4 T-scan volume claimed.
Note - Rounding methods may affect calculated values. Weld length in degrees.
 
LaSalle Unit-2 Closure Head Flange 600 S4 Exam Volume  = 5.2 Sq. In.
600 S6 Exam Volume  = 30.6 Sq. In.
60' S4 P-Scan LKCW achieved = 3.9 Sq. In.
K                                              600 S4 P-Scan LKCCW achieved = 3.9 Sq. In.
N                                            600 S6 P-Scan achieved = 22.2 Sq. In.
N Ni                                            600 S4 T-Scan LKDN achieved = 5.2 Sq. In.
600 S4 T-Scan LKUP achieved = 0.0.Sq. In.
60' S6 T-Scan achieved = 29.0 Sq. In.
13-&#xfd;'
I Flange -. +-
Head Scan Iimited due to Flange configuration.
N~
Radial Plate T Norm. = 5.125" Clad T Nom. = 0.1875"
 
OGE                  (
Energy Nuclear                Examination SummarySheet
_______________________Report                                                          No.:    2R11-007 Site:        LaSalle Unit-2                Component ID:      LCS-2-N16A Outage:      L2R11                          Configuration:      Nozzle to Shell System:      RPV                            ASME Cot:          B-0          ASME Item:        B3.90 Aug. Requirements:      N/A Exams          Calibration                    Calibration                        Examination                NDE Performed:    Sheet(s):                      Block:            Procedure:      Personnel:                  Level:        Dote:
0&deg;L            NOZ                            01-92-01          GE-UT-704/705    C. Gauthier                II            3/3/07 4505          NOZ                            01-92-01          GE-UT-704/705    C. Gauthier                II            3/3/07 60*L          NOZ                            01-92-01          GE-UT-704/705    C. Gauthier                II            3/3/07 70'L          NOZ                            01-92-01          GE-UT-704/705    C. Gauthier                II            3/3/07 45 0S          IRS                            01-92-01          GE-UT-705        C. Gauthier                II            3/4/07 6005          IRS                            01-92-01          GE-UT-705        C. Gauthier                II            3/4/07 Comments:
Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section XI, 1989 Edition no Addenda, also Section XI, 1995 Edition with the 1996 Addenda as modified by the PD! program description and the Federal Register, Part II, Nuclear Regulatory Commission, 10 CFR Port 50 for Category B-D Reactor Pressure Vessel (RPV) Assembly Welds.
Automated transverse and parallel scans were performed in accordance with procedures GE-UT-704 V8 and GE-UT-705 V5, using 450 Shear wave, 60' RL, and 700 RL search units, supplemental 00 L-Wave scans were also performed. Nozzle Inner 15%T circ scans were performed in accordance with Model validated search unit angles.
Automated scanning was performed from the vessel OD surface. and was restricted due to the nozzle configuration.
The GERIS 2000 OD automated UT system 0 reference is located at 900 CW of nozzle TDC.
One acceptable indication was recorded.
Automated Composite Coverage = 70.5%
The examination results were compared with data report                D-436      from        L2R03  outage with    [  No Change These examinations were performed under Work Order:                  N/A                                            E  Change This summary and the following data sheets hove been reviewed and accepted by the following personnel:
Prepared By:                          Level Dote:                Utility Reviej By:                  Dote:
ANIl Reviewed 3v:                    Oote:
Page 1 of /C)
 
r-c)
Reactor Pressure Vessel C
(D GE Energy- Nuclear                                      Coverage CalculationSheet LaSalle Unit-2, 2007 LCS-2-N16A L2R11 CODE CROSS-SECTIONAL AREA                    TOTAL CODE COVERAGE Weld Length = 360.      Required Exam    Area Scanned        Percent Exam Volume = 59.1          Area Sq. In.        Auto.          of Area      Weld Length        Percent 60' T-Scan (S4 UC)        A*        8.5              8.5            14.4%            360            7.2%
450 T-Scan (S6 FV)      A*        39.2              33.5          56.7%              360            28.3%
70' T-Scan (S6 NS)      A*        11.4            5.8            9.8%              360            4.9%
IRS P-Scan (S4 UC)        A          8.5              8.5            14.4%            360            7.2%
450 P-Scan (S6 FV)      A        39.2            22.5            38.1%              360            19.0%
70' P-Scan (S6 NS)        A        11.4              4.5            7.6%              360            3.8%
600 T-Scan (S4 UC) 450 T-Scan (S6 FV) 700 T-Scan (S6 NS)
IRS P-Scan (S4 UC) 450 P-Scan (S6 FV) 700 P-Scan (S6 NS) 60' T-Scan (S4 UC) 450 T-Scan (S6 FV) 700 T-Scan (S6 NS)
IRS P-Scan (S4 UC) 450 P-Scan (S6 FV) 70' P-Scan (S6 NS)
(D
                                                                                        % Iotal Composite Coverage =      70.5%
Rev 0 9/23/M*
Comments:
0  Scanning limited due to nozzle configuration.
IRS P-Scan by modeling.
A*- Single side access, 100% credit of the achieved Supplement 4 T-scan volume claimed iaw. 10CFR50.55a.
Note - Rounding methods may affect calculated values. UC-Underclad, FV-Full volume, NS-Near Surface. Weld length in degrees.
 
CD LaSalle Unit-2 0
0                    LCS-2-N 16A (HPCS) 70' Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60 0 T) = 8.5 Sq. In.
70' T-Scan achieved = 5.8 Sq. In.
450 T-Scan achieved = 33.5 Sq. In.
600 T-Scan achieved = 8.5 Sq. In.
17.25"
    /
70'T          45&deg;T              60'T I            I                I CD 0
h1
 
C,.
CU LaSalle Unit-2 LCS-2-N 16A (HPCS) 700 Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 607T) = 8.5 Sq. In.
700 P-Scan achieved = 4.5 Sq. In.
450 P-Scan achieved = 22.5 Sq. In.
IRS P-Scan achieved = 8.5 Sq. In. (By model) 17.25" 70'P 45'P x  ----
K----
CD 0
 
GE Enerq Nuclear      W 'G Examination EnrgyNucearReport Summary Sheet                                  No.:  2RII-008 Site:        LaSalle Unit-2          Component ID:    LCS-2-N2A Outage:      L2R11                    Configuration:    Nozzle to Shell System:      RPV                      ASME Cat:        B-D          ASME Item:      83.90  Aug. Requirements:      N/A Exams          Calibration            Calibration                        Examination                NDE Performed:    Sheet(s):              Block:          Procedure:        Personnel:                Level:        Date:
00L            NOZ                    01-92-01        GE-UT-704/705    K. Montgomery              II            3/7/07 450S            NOZ                    01-92-01        GE-UT-704/705    K. Montgomery              II            3/7/07 60'L          NOZ                    01-92-01        GE-UT-704/705    K. Montgomery              II            3/7/07 70 0 L          NOZ                    01-92-01        GE-UT-704/705    K. Montgomery              II            3/7/07 450 S          IRS                    01-92-01        GE-UT-705        K. Montgomery              II            3/7/07 60'S          IRS                    01-92-01        GE-UT-705        K. Montgomery              II            3/7/07 Comments:
Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section XI, 1989 Edition no Addenda, also Section XI, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-D Reactor Pressure Vessel IRPV) Assembly Welds.
Automated transverse and parallel scans were performed in accordance with procedures GE-UT-704 V8 and GE-UT-705 V5, using 450 Shear wave, 60' RL, and 70' RL search units, supplemental 00 L-Wave scans were also performed. Nozzle Inner 15%T circ scans were performed in accordance with Model validated search unit angles.
Automated scanning was performed from the vessel OD surface. and was restricted due to the nozzle configuration.
The GERIS 2000 OD automated UT system 0 reference is located at 900 CW of nozzle TDC.
One acceptable indication was recorded.
Automated Composite Coverage = 70.5%
The examination results were compared with data report        D-459        from      L2R03    outage with    [D No Change These examinations were performed under Work Order:          N/A                                            [- Change This summary and the following data sheets have been reviewed and accepted by the following personnel:
17 Prepared By:                  Level  Date:                utility Reew By:                    Date:
ANII Reviewed By:                    Date:
Page 1 of /    0
 
Cn Reactor PressureVessel GE Energy- Nuclear                                              Coverage Calculation Sheet C
0                                                                      LaSalle Unit-2, 2007 LCS-2-N2A L2R11 CODE CROSS-SECTIONAL AREA                      TOTAL CODE COVERAGE Weld Length =      360.      Required Exam                          Percent Exam Volume =      59.1        Area Sq. In. Area Scanned          of Area        Weld Length      Percent 600 T-Scan (S4 UC)        A*              8.5                8.5          14.4%              360          7.2%
450 T-Scan (S6 FV)        A*            39.2                33.5          56.7%              360        28 3%
700 T-Scan (36 NS)        A*            11.4                5.8            9.8%              360          4.9%
IRS P-Scan (S4 UC)        A              8.5                8.5          14.4%              360          7.2%
450 P-Scan (S6 FV)        A            392                22.5          38.1%              360        19.0%
70 0 P-Scan (S6 NS)        A            11.4                4.5            7.6%              360          3.8%
600 T-Scan (S4 UC) 450 T-Scan (S6 FV) 700 T-Scan (S6 NS)    ___________                  ________      _______            ________      _______
IRS P-Scan (S4 UC) 450 P-Scan (S6 FV) 70' P-Scan (S6 NS) 60' T-Scan (S4 UC) 450 T-Scan (S6 FV) 700 T-Scan (S6 NS)
IRS P-Scan (S4 UC) 450 P-Scan (S6 FV) 70&deg; P-Scan (S6 NS)
                                                                                              % Total Composite Coverage =      70.5%
                                                                                                                                    %  oa Ceo.e0oea2Rev5 Comments:
(0 Scanning limited due to the nozzle configuration.
IRS P-Scan by modeling.
A* - Single side access, 100% credit of the achieved Supplement 4 T-scan volume claimed iaw. 10CFR50.55a..
Note - Rounding methods may affect calculated values. UC-Underclad, FV-Full volume, NS-Near Surface. Weld length in degrees.
 
I-C,,
C r\3                  LaSalle Unit-2 N) 0 0
-.4 LCS-2-N2A 70&deg; Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 607T) = 8.5 Sq. In.
70' T-Scan achieved = 5.8 Sq. In.
450 T-Scan achieved = 33.5 Sq. In.
600 T-Scan achieved = 8.5 Sq. In.
17.25"
    /
707T          45&deg;T              60'T I            I                I F-
              -----1 (0
CD
 
C/)
0                                  LaSalle Unit-2 0)
N)
LCS-2-N2A 700 Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60 0 T) = 8.5 Sq. In.
700 P-Scan achieved = 4.5 Sq. In.
450 P-Scan achieved = 22.5 Sq. In.
IRS P-Scan achieved = 8.5 Sq. In. (By model) 17.25"
    /                      70'P 45&deg;P K
k- -- - -        -----A CD
 
      -GE EnergyNuclear          Examination Summary Sheet Site:        LaSalle Unit-2          Component ID:    LCS-2-N2D Outage:      L2R11                  Configuration:    Nozzle to Shell System:      RPV                    ASME Cat:        B-D          ASME Item:        B3.90  Aug. Requirements:      N/A Exams          Calibration            Calibration                        Examination                NDE Performed:    Sheetls):              Block:          Procedure:        Personnel:                  Level:        Date:
0 0L            NOZ                    01-92-01        GE-UT-704/705    C. Gauthier                II            3/6/07 45&deg;S          NOZ                    01-92-01        GE-UT-704/705    C. Gauthier                II            3/6/07 60 0L          NOZ                    01-92-01        GE-UT-704/705    C. Gauthier                II            3/6/07 70 0L          NOZ                    01-92-01        GE-UT-704/705    C. Gauthier                II            3/6/07 4505          IRS                    01-92-01        GE-UT-705        C. Gauthier                tl            3/7/07 60&deg;S          IRS                    01-92-01        GE-UT-705        C. Gauthier                II            3/7/07 Comments:
Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section XI, 1989 Edition no Addenda, also Section X1, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II,Nuclear Regulatory Commission, 10 CFR Part 50 for Category 8-D Reactor Pressure Vessel (RPV) Assembly Welds.
Automated transverse and parallel scans were performed in accordance with procedures GE-UT-704 V8 and GE-UT-705 VS, using 450 Shear wave, 600 RL, and 700 RL search units, supplemental 0&deg; L-Wove scans were also performed. Nozzle Inner 15%T circ scans were performed in accordance with Model validated search unit angles.
Automated scanning was performed from the vessel OD surface. and was restricted due to the nozzle configuration and proximity of the N9A nozzle.
The GERIS 2000 OD automated UT system 0 reference is located at 900 CW of nozzle TDC, No relevant indications were recorded.
Automated Composite Coverage = 70.3%
The examination results were compared with data report      D-463        from        L2R03    outage with  [    No Change These examinations were performed Linder Work Order:        N/A                                            D  Change This summary and the following data sheets have been reviewed and accepted by the following personnel:
__ __  __    __  _  _  _        t      3'0        __    ___      ___      ___ __              ____
Prepaied ,y:                Levelt Date:                Utiity Review By:                    Date:
ANII Reviewed 1y:                    Date:
Page I of
 
Ul)
Reactor Pressure Vessel GE Energy - Nuclear                                        Coverage CalculationSheet C
LaSalle Unit-2, 2007 LCS-2-N2D L2R11 CODE CROSS-SECTIONAL AREA                    TOTAL CODE COVERAGE Weld Length =    360. Required Exam                        Percent Exam Volume =      69.1      Area Sq. In.      Area Scanned    of Area      Weld Length        Percent 600  T-Scan (S4 UC)      A*            8.5                8.5        14.4%            315              6.3%
450 T-Scan (S6 FV)      A*          39.2              33.5        56.7%            360            28.3%
70' T-Scan (S6 NS)      A*          11.4                5.8        9.8%            360              4.9%
IRS  P-Scan (S4 UC)      A            8.5                8.5        14.4%            360              7.2%
450  P-Scan (S6 FV)      A          39.2              22.5        38.1%            360            19.0%
70'  P-Scan (S6 NS)      A          11.4              4.5          7.6%            360              3.8%
600 T-Scan (S4 UC)        B            8.5              6.8          11.5%              45            0.7%
450 T-Scan (S6 FV) 700 T-Scan (S6 NS)
IRS P-Scan (S4 UC)                                                              '_
450 P-Scan (S6 FV) 70' P-Scan (S6 NS) 60' T-Scan (S4 UC) 450 T-Scan (S6 FV) 700 T-Scan (S6 NS)
IRS P-Scan (S4 UC) 450 P-Scan (S6 FV) 70&deg; P-Scan (S6 NS)
                                                                                        %Total Composite Coverage =        70.3%
                                                                                                                                  . &#xfd; gj--
Comments:
Scanning limited due to the nozzle configuration and proximity of the N9A nozzle.
IRS P-Scan by modeling.
A*- Single side access, 100% credit of the achieved Supplement 4 T-scan volume claimed iaw. 10CFR50.55a..
Note - Rounding methods may affect calculated values. UC-Underclad, FV-Full volume, NS-Near Surface. Weld length in degrees.
 
C/)
CD C:                              LaSalle Unit-2 LCS-2-N2D 700 Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60 0T) = 8.5 Sq. In.
700 P-Scan achieved = 4.5 Sq. In.
450 P-Scan achieved = 22.5 Sq. In.
IRS P-Scan achieved = 8.5 Sq. In. (By model) 17.25"
    /                  70TP 45&deg;P I    I K----
F-
                  --- 9
 
C, C
LaSalle Unit-2 0
0 LCS-2-N2D 700 Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60'T) = 8.5 Sq. In.
700 T-Scan achieved = 5.8 Sq. In.
450 T-Scan achieved = 33.5 Sq. In.
600 T-Scan achieved = 8.5 Sq. In.
17.25" I                                            60'T 70'T          45'T I
            /
I
 
r-0)
C 0.
LaSalle Unit-2 0*
LCS-2-N2D 700 Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 607T) = 8.5 Sq. In.
700 T-Scan achieved = 5.8 Sq. In.
450 T-Scan achieved = 33.5 Sq. In.
600 T-Scan achieved = 6.8 Sq. In.
Limited area due to N9.
17.25"
    /                        45&deg;T      60&deg;T 70'T I        I V-
 
a      GE EnergyNuclear            Examination Summary Sheet                                          Report No.:  2R11-010 Site:        LaSalle Unit-2          Component ID:    LCS-2-N2E Outage:      L2R11                    Configuration:  Nozzle to Shell System:      RPV                      ASME Cat:        B-D          ASME Item:        B3.90 Aug. Requirements:        N/A Exams          Calibration            Calibration                        Examination                NDE Performed:    Sheetls):              Block:          Procedure:        Personnel:                  Level:        Date:
0&deg;L            NOZ                    01-92-01        GE-UT-704/705      K. Montgomery              11            3/7/07 45&deg;S          NOZ                    01-92-01        GE-UT-704/705      K. Montgomery              11            3/7/07 60 0 L        NOZ                    01-92-01        GE-UT-704/705      K. Montgomery              11            3/7/07 70 0 L        NOZ                    01-92-01        GE-UT-704/705      K. Montgomery              11            3/7/07 450S          IRS                    01-92-01        GE-UT-705          K. Montgomery              11            3/7/07 60'S          IRS                    01-92-01        GE-UT-705          K. Montgomery              11            3/7/07 Comments:
Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section XI, 1989 Edition no Addenda, also Section XI, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-D Reactor Pressure Vessel IRPV) Assembly Welds.
Automated transverse and parallel scans were performed in accordance with procedures GE-UT-704 V8 and GE-UT-705 V5, using 450 Shear wave, 600 RL, and 700 RL search units, supplemental 00 L-Wave scans were also performed. Nozzle Inner 15%T circ scans were performed in accordance with Model validated search unit angles.
Automated scanning was performed from the vessel OD surface. and was restricted due to the nozzle configuration.
The GERIS 2000 OD automated UT system 0 reference is located at 900 CW of nozzle TDC.
No relevant indications were recorded.
Automated Composite Coverage = 70.5%
The examination results were compared with data report        D-463        from        L2R03  outage with    [    No Change These examinations were performed under Work Order:          N/A                                            [] Change This summary and the following data sheets have been reviewed and accepted by the following personnel:
Prepared By:                evel:  Dote:                Utility Review By:                  Cote:
ANII Reviewed By:                      qrp1te Page 1 of at3
 
I-.
Ul)
ReactorPressure Vessel (D
C GE Energy - Nuclear                                      Coverage Calculation Sheet C) 0 0-                                                                LaSalle Unit-2, 2007 LCS-2-N2E L2R1 1 CODE CROSS-SECTIONAL AREA                    TOTAL CODE COVERAGE Weld Length =      360. Required Exam                        Percent Exam Volume =      59.1    Area Sq. In. Area Scanned        of Area      Weld Length        Percent 60' T-Scan (S4 UC)      A*          8.5              8.5            14.4%            315            6.3%
450 T-Scan (S6 FV)      A*          39.2            33.5            56.7%            360            28.3%
709 T-Scan (S6 NS)      A*          11.4            5.8              9.8%            360            4.9%
IRS P-Scan (S4 UC)      A          8.5              8.5            14.4%            360            7.2%
450 P-Scan (S6 FV)      A          39.2            22.5            38.1%            360            19.0%
700 P-Scan (S6 NS)        A          11.4            4.5              7.6%            360            3.8%
60' T-Scan (S4 UC) 450 T-Scan (S6 FV) 70' T-Scan (S6 NS)
IRS P-Scan (S4 UC) 450 P-Scan (S6 FV) 700 P-Scan (S6 NS),
60' T-Scan (S4 UC) 45' T-Scan (S6 FV) 70' T-Scan (S6 NS)
IRS P-Scan (S4 UC) 45' P-Scan (S6 FV) 70' P-Scan (S6 NS)
                                                                                          % Total Composite Coverage =      69.6%
Re. 0 9/23/05 Comments:
Scanning limited due to the nozzle configuration.
IRS P-Scan by modeling.
A* - Single side access, 100% credit of the achieved Supplement 4 T-scan volume claimed iaw. 10CFR50.55a..
Note - Rounding methods may affect calculated values. UC-Underclad, FV-Full volume, NS-Near Surface. Weld length in degrees.
 
C:
2.
C~
LaSalle Unit-2 4                  LCS-2-N2E 70' Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60'T) = 8.5 Sq. In.
700 T-Scan achieved = 5.8 Sq. In.
450 T-Scan achieved = 33.5 Sq. In.
600 T-Scan achieved = 8.5 Sq. In.
17.25"
  //
70'T          45&deg;T              60'T I            I
            - --- A
 
C/)
CD LaSalle Unit-2 N)
C0 0
4.
LCS-2-N2E 700 Exam Volume = 11A4 Sq. In.
450 Exam Volume = 39,2 Sq. In.
Inner 15%T Exam Volume (IRS & 600T) = 8.5 Sq. In.
700 P-Scan achieved = 4.5 Sq. In.
450 P-Scan achieved = 22.5 Sq. In.
IRS P-Scan achieved = 8.5 Sq. In. (By model) 17.25"
      /
70'P 45*P I    I K----
1~
K----              ---- A L      (&#xa3;    I  I I
 
GE Energy Nuclear            Examination Summary Sheet                                        ReportNo.:  2R11-011 Site:        LaSalle Unit-2          Component ID:    LCS-2-N5A Outage:      L2R11                    Configuration:    Nozzle to Shell System:    RPV                      ASME Cat:        B-D          ASME Item:        B3.90 Aug. Requirements:      N/A Exams          Calibration            Calibration                        Examination                NDE Performed:      Sheet(s):              Block:          Procedure:        Personnel:                Level:        Date:
0&deg;L            NOZ                    01-92-01        GE-UT-704/705 K. Montgomery                  11            3/4/07 45&deg;S            NOZ                    01-92-01        GE-UT-704/705 K. Montgomery                  11            3/4/07 60'L            NOZ                    01-92-01        GE-UT-704/705 K. Montgomery                  11            3/4/07 700L            NOZ                    01-92-01        GE-UT-704/705 K. Montgomery                  11            3/4/07 450S            IRS                    01-92-01        GE-UT-705          K. Montgomery              11            3/4/07 60'S            IRS                    01-92-01        GE-UT-705          K. Montgomery              11            3/4/07 Comments:
Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section XI, 1989 Edition no Addenda, also Section XI, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-D Reactor Pressure Vessel (RPV) Assembly Welds.
Automated transverse and parallel scans were performed in accordance with procedures GE-UT-704 V8 and GE-UT-705 V5, using 450 Shear wave, 60&deg; RL, and 70' RL search units, supplemental 00 L-Wave scans were also performed. Nozzle Inner 15%T circ scans were performed in accordance with Model validated search unit angles.
Automated scanning was performed from the vessel OD surface. and was restricted due to the nozzle configuration.
The GERIS 2000 OD automated UT system 0 reference is located at 900 CW of nozzle TDC.
No relevant indications were recorded.
Automated Composite Coverage = 70.5%
The examination results were compared with data report        D-434        from        L2R03  outage with    [ No Change These examinations were performed under Work Order:          N/A                                            [l Change This summary and the following data sheets have been reviewed and accepted by the following personnel:
Pvepaced By:                Level: Date                Utility Review gy:                  Dote:
ANII Reviewed Ey:                    Date:
Page "I of
 
U/)
Reactor Pressure Vessel C
GE Energy - Nuclear                                      Coverage CalculationSheet
:3 C) 0 LaSalle Unit-2, 2007 LCS-2-N5A L2R11 CODE CROSS-SECTIONAL AREA                  TOTAL CODE COVERAGE Weld Length =    360. Required Exam  Area Scanned      Percent Exam Volume =      59.1      Area Sq. In.      Manual          of Area      Weld Length        Percent 600 T-Scan (S4 UC)      A*            8.5            8.5            14.4%            360              7.2%
450 T-Scan (S6 FV)      A*          39.2            33.5            56.7%            360            28.3%
700 T-Scan (S6 NS)      A*          11.4            5.8            9.8%            360              4.9%
IRS P-Scan (S4 UC)        A            8.5            8.5            14.4%            360              7.2%
450 P-Scan (S6 FV)        A          39.2            22.5            38.1%            360            19.0%
700 P-Scan (S6 NS)        A          11.4            4.5            7.6%            360              3.8%
600 T-Scan (S4 UC) 450 T-Scan (S6 FV) 700 T-Scan (S6 NS)
IRS P-Scan (S4 UC) 450 P-Scan (S6 FV) 70' P-Scan (S6 NS) 600 T-Scan (S4 UC) 450 T-Scan (S6 FV) 700 T-Scan (S6 NS)
IRS P-Scan (S4 UC) 450 P-Scan (S6 FV) 700 P-Scan (36 NS)
CD                                                                                      % Total Composite Coverage =      70.5%
Rev. 0 9/23105 Comments:
0 Scanning limited due to the nozzle configuration.
IRS P-Scan by modeling.
A*- Single side access, 100% credit of the achieved Supplement 4 T-scan volume claimed law. 10CFR50.55a..
Note - Rounding methods may affect calculated values. UC-Underclad, FV-Full volume, NS-Near Surface. Weld length in degrees.
 
r--
C,,)
C LaSalle Unit-2 N) 4                  LCS-2-N5A 70' Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60 0 T) = 8.5 Sq. In.
700 T-Scan achieved = 5.8 Sq. In.
450 T-Scan achieved = 33.5 Sq. In.
600 T-Scan achieved = 8.5 Sq. In.
17.25"
    /
70'T          45&deg;T              60'T I
              ---- 1 CD 0
 
LaSalle Unit-2 LCS-2-N5A 700 Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 60 0 T) = 8.5 Sq. In.
\I                700 P-Scan achieved = 4.5 Sq. In.
450 P-Scan achieved = 22.5 Sq. In.
IRS P-Scan achieved = 8.5 Sq. In. (By model) 17.25" 70&deg;P 45 P
 
(OGE          Enery Nuclear          Examination Summary Sheet                                        Report No.:    2R11-012 Site:        LaSalle Unit-2          Component ID:    LCS-2-N6B Outage:      L2R11                    Configuration:    Nozzle to Shell System:      RPV                      ASME Cat:        B-D          ASME Item:        B3.90 Aug. Requirements:        N/A Exams          Calibration            Calibration                        Examination                NDE Performed:    Sheetls):              Block:          Procedure:        Personnel:                Level:          Date:
0&deg;L            NOZ                    01-92-01        GE-UT-704/705    K. Montgomery              II              3/5/07 450S            NOZ                    01-92-01        GE-UT-704/705    K. Montgomery              II              3/5/07 60 0 L          NOZ                    01-92-01        GE-UT-704/705    K. Montgomery              II              3/5/07 70 0 L        NOZ                    01-92-01        GE-UT-704/705    K. Montgomery              II              3/5/07 450S          IRS                    01-92-01        GE-UT-705          C. Gauthier                II              3/5/07 60&deg;S          IRS                    01-92-01        GE-UT-705          C. Gauthier                II              3/5/07 Comments:
Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section Xl, 1989 Edition no Addenda, also Section XI, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal.
Register, Part II, Nuclear Regulatory Commission, 10 CFR Part 50 for Category B-D Reactor Pressure Vessel (RPV) Assembly Welds.
Automated transverse and parallel scans were performed in accordance with procedures GE-UT-704 V8 and GE-UT-705 V5, using 450 Shear wave, 600 RL, and 700 RL search units, supplemental 00 L-Wave scans were also performed. Nozzle Inner 15%T circ scans were performed in accordance with Model validated search unit angles.
Automated scanning was performed from the vessel OD surface. and was restricted due to the nozzle configuration.
The GERIS 2000 OD automated UT system 0 reference is located at 900 CW of nozzle TDC.
Note-The N6B is located at 3150 Az.
No relevant indications were recorded.
Automated Composite Coverage = 70.5%
The examination results were compared with data report        D-453        from      L2R03  outage with    [] No Change These examinations were performed under Work Order:          N/A                                            E]Change This summary and the following data sheets have been reviewed and accepted by the following personnel:
Piepared By:                  Level: Dote:                Utility Revcew By:                  Dote:
i',Nil Reviewed By:                  Dote:
Poge 1 of      <7
 
U-Reactor PressureVessel C:
GE Energy- Nuclear                                        Coverage CalculationSheet LaSalle Unit-2, 2007 LCS-2-N6B L2R11 CODE CROSS-SECTIONAL AREA                  TOTAL CODE COVERAGE Weld Length = 360.        Required Exam                      Percent Exam Volume = 59.1            Area Sq. In. Area Scanned      of Area      Weld Length          Percent 60' T-Scan (34 UC)      A*            8.5              8.5          14.4%            360              7.2%
450 T-Scan (S6 FV)      A*          39.2            33.5          56.7%            360            28.3%
70' T-Scan (S6 NS)      A*          11.4              5.8          9.8%            360            4.9%
IRS P-Scan (S4 UC)        A            8.5              8.5          14.4%            360              7.2%
450 P-Scan (S6 FV)      A          39.2            22.5          38.1%            360            19.0%
700 P-Scan (S6 NS)      A          11.4              4.5          7.6%            360              3.8%
600 T-Scan (S4 UC) 450 T-Scan (S6 FV) 700 T-Scan (S6 NS)
IRS P-Scan (S4 UC) 450 P-Scan (S6 FV) 700 P-Scan (S6 NS) 600 T-Scan (S4 UC) 450 T-Scan (S6 FV) 700 T-Scan (S6 NS)
IRS P-Scan (S4 UC) 450 P-Scan (S6 FV) 700 P-Scan (S6 NS)
(D                                                                                      %Total Composite Coverage =        70.5%
fl Comments:
0 Scanning limited due to the nozzle configuration.
IRS P-Scan by modeling.
A*- Single side access, 100% credit of the achieved Supplement 4 T-scan volume claimed iaw. 10CFR50.55a.
Note - Rounding methods may affect calculated values. UC-Underclad, FV-Full volume, NS-Near Surface. Weld length in degrees.
 
Cf)
CD D-.
LaSalle Unit-2 0                        LCS-2-N6B 700 Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 607T) = 8.5 Sq. In.
700 T-Scan achieved = 5.8 Sq. In.
450 T-Scan achieved = 33.5 Sq. In.
600 T-Scan achieved = 8.5 Sq. In.
17.25" I                        70&deg;T          457T              60'T I                  I F----
                - - -- A C
 
C/)
C LaSalle Unit-2 LCS-2-N6B 700 Exam Volume = 11.4 Sq. In.
450 Exam Volume = 39.2 Sq. In.
Inner 15%T Exam Volume (IRS & 607T) = 8.5 Sq. In.
700 P-Scan achieved = 4.5 Sq. In.
450 P-Scan achieved = 22.5 Sq. In.
IRS P-Scan achieved = 8.5 Sq. In. (By model) 17.25" I
70-p 45-P K----
CD 0
cft*
 
Site:              LaSalle                  Component ID:                              LCS-2-N9A Ouitoge:                L2R11                                                                      N-S%
System:              RPV              ASME Cot.:        B-D          ASME Item            83.90          Aug Req          SECT XI Exams            Data Sheet      Cal Sheet            Procedure            Calibration Block    Examination      Cert Level      Date Performed                                                                                            Personnel 60&deg; Shear          D-076              N/A          GE-UT-311 Ver/Rev 15          01-92-01        Phillip Hopkins        II    1 3/6/2007 600 RL    i      D-074              N/A          GE-UT-300 Ver/Rev 10          01-92-01          Wallace Reid          Ii        3/6/2007 600 RL            D-075              N/A    i    GE-UT-300 Ver/Rev 10      CAL-IIW2-017        Wallace Reid          II        3/6/2007 Examination Results:
Ultrasonic examination results were acceptableto the requirements of ASME B&PV Code Section X1,1989 Edition no. Addenda, and Section X1, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II. Nuclear Regulatory Commission, 10 CFR Part 50 of Category B-D Reactor Pressure Vessel (RPV) Assembly Welds.
Manual transverse and parallel scans were performed from the vessel OD surface in accordance with procedure GE-UT-300 V10, using 600 RL search units. Manual parallel scans of the inner 15%T volume were performed in accordance with procedure GE-UT-311 V15 using model validated shear wave search units.
Manual scanning was restricted due to the nozzle configuration.
The manual exams recorded no indications.
(  Manual UT composite coverage = 82.9%
Examination results were compared to data report              95-472    from    3/31/1995 outage with        V-1 No Change These examinations were performed under Work Order:.                                                                    Change This Summary and the following data sheets have been reviewed and accepted by the following personnel:
C&#xfd;            ' 6eCAO4&#xfd;'                                                                                                Dose:      164    mr.
Prepared By:                                    Date:    Utility Review:                              Date:
ANII Review.                                Date:            Page    I  of  7
 
rI-9i (D
C/
Reactor Pressure Vessel GE Energy - Nuclear                                    Coverage CalculationSheet 0
C                                                                  LaSalle Unit-2, 2007 LCS-2-N9A L2R11 CODE CROSS-SECTIONAL AREA                    TOTAL CODE COVERAGE Weld Length =    360. Required Exam                        Percent Exam Volume =      59.6    Area Sq. In. Area Scanned        of Area      Weld Length      Percent 600 T-Scan (S4)        A            8.5            8.5            14.3%            360        7.1%
600 T-Scan (S6)        A          51.1            38.1            63.9%              360        32.0%
IRS P-Scan (S4)        A*          8.5            8.5            14.3%            360        7.1%
60' P-Scan (S6)        A          51.1            43.7            73.3%              360        36.7%
600 T-Scan (S4) 600 T-Scan (S6)
IRS P-Scan (S4) 60' P-Scan (S6) 600 T-Scan (S4) 600 T-Scan (S6)
IRS P-Scan (S4) 60' P-Scan (S6) 600 T-Scan (S4) 60' T-Scan (S6)
IRS P-Scan (S4) 600 P-Scan (S6)
                                                                                          % Total Composite Coverage =  82.9%
0D 1, 1 J.-(**.*. Re,, 0 i91Vfl0v Rev 0 9/23/05 01  Comments:
A* - Single side access, 100% credit of the achieved Supplement 4 T-scan volume claimed iaw. 10CFR50.55a.
Note - Rounding methods may affect calculated values. Weld length in degrees.
 
_                LaSalle Unit-2
=LCS-2-N9A 0'o              60' S4 Exam Volume = 8.5 Sq. In.
4              600 S6 Exam Volume = 51.1 Sq. In.
600 S4 Inner 15%T IRS-Scan achie ved = 8.5 Sq. In.
600 S6 P-Scan achieved = 38.1 Sq. In.
600 S4 T-Scan achieved = 8.5 Sq. 1n.
600 S6 T-Scan achieved = 43.7 Sq. In.
          /0.0",            9.2" 15.6" 607T I
0T CD
 
Report No.:
EXAMINATION
 
==SUMMARY==
SHEET                                        2R11-014 GE ENERGY, NUCLEAR
(        Site:                LaSalle                  Component ID:                                LCS-2-N9B Outage:                    L2R11                                                                      N-SH System:                RPV            ASME Cat.:          B-D          ASME Item            B3. 90          Aug Req          SECT XI Exams              Data Sheet      Cal Sheet              Procedure            Calibration Black    Examination        Cert Level      Date Performed                                      I                                                        Personnel      i 60 "Ser                                                                        01-92-01          WlaeRidU                        372d "0 She              D-083            N/A            GE-UT-311 Ver/Rev 15    -G "31                  Wallace Reid        '30/2007 600 RL              D-077            N/A            GE-UT-300 Ver/Rev 10        CAL-11W2-017        Wallace Reid        iI      i 3/7/2007 60&deg; RL      i      D-078      I    N/A-    i      GE-UT-300 Ver/Rev i0          01-92-01      I  Wallace Reid            II      3/7/2007 Examination Results:
Ultrasonic examination results were acceptable to the requirements of ASME B&PV Code Section XI, 1989 Edition no. Addenda, and Section XI, 1995 Edition with the 1996 Addenda as modified by the PDI program description and the Federal Register, Part II.Nuclear Regulatory Commission, 10 CFR Part 50 of Category B-D Reactor Pressure Vessel (RPV) Assembly Welds.
Manual transverse and parallel scans were performed from the vessel OD surface in accordance with procedure GE-UT-300 VI1, using 60&deg; RL search units. Manual parallel scans of the inner 15%T volume were performed in accordance with procedure GE-UT-311 V15 using model validated shear wave search units. Reference nozzle inner radius and bore inspection requirement sheet included in report 2R11-025.
Manual scanning was restricted due to the nozzle configuration.
The manual exams recorded no indications.
Manual UT composite coverage = 82.9%
Examination results were compared to data report                95-474      from      3/31/1995 outage with      '      No Change These examinations were performed under Work Order:                                                                        Change This Summary and the following data sheets have been reviewed and accepted by the following personnel:
RW' 7    _.J/*'I      */                          6/,' "*                    /)y/[L.(~                ?..L .. ;.7        Dose:      145    mr.
Prepared By:                                    Date:    Utility Review.                              Date:
ANII Review                                  Date:            Page    1  of    6
 
C/)
Reactor PressureVessel GE Energy- Nuclear                                      Coverage CalculationSheet C:)
LaSalle Unit-2, 2007 LCS-2-N9B
              "                                                            L2R11 CODE CROSS-SECTIONAL AREA                    TOTAL CODE COVERAGE Weld Length =      360. Required Exam                        Percent Exam Volume =      59.6    Area Sq. In. Area Scanned        of Area      Weld Length    Percent 600 T-Scan (S4)        A          8.5              8.5            14.3%            360        7.1%
60&deg; T-Scan (S6)        A        51.1            38.1            63.9%              360      32.0%
IRS P-Scan (S4)        A*        8.5              8.5            14.3%            360        7.1%
60' P-Scan (S6)        A        51.1            43.7            73.3%              360      36.7%
600 T-Scan (S4) 600 T-Scan (S6).
IRS P-Scan (S4) 60' P-Scan (S6) 60' T-Scan (S4) 600 T-Scan (S6)
IRS P-Scan  (S4) 60' P-Scan (S6) 60' T-Scan (S4)      _
600 T-Scan (S6)
IRS P-Scan (S4) 600 P-Scan (S6)
                                                                                          % Total Composite Coverage =  82.9%
                                                                                                                        -j A-t,&*
* Rev. o 9/23105 (0  Comments:
A* - Single side access, 100% credit of the achieved Supplement 4 T-scan volume claimed iaw. 10CFR50.55a.
Note - Rounding methods may affect calculated values. Weld length in degrees.
 
i--LaSalle                                          Unit-2 CLCS-2-N9B C),)                              600 S4 Exam Volume = 8.5 Sq. In.
  -,4                            600 S6 Exam Volume = 51.1 Sq. In.
600 S4 Inner 15%T IRS-Scan achie\ ,ed = 8.5 Sq. In.
600 S6 P-Scan achieved = 38.1 Sq. In.
          *    *,60&deg;                S4 T-Scan achieved = 8.5 Sq. Ir 600 S6 T-Scan achieved = 43.7 Sq. In.
                      *0.0"9.2"1 15.6" 60&deg;P                    60'T I
CD 0>      r o,
C'\}}

Latest revision as of 14:14, 14 January 2025

Supplemental Information Concerning Relief Request CR-26 Associated with the Second 10-Year Inservice Inspection (ISI) Interval
ML083260525
Person / Time
Site: LaSalle  
Issue date: 11/18/2008
From: Simpson P
Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RS-08-152
Download: ML083260525 (437)