{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 January 11, 2012 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 January 11, 2012 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555  


==SUBJECT:==
==SUBJECT:==
BRAIDWOOD STATION, UNITS 1 AND 2 - NOTIFICATION F NRC INSPECTION AND REQUEST FOR INFORMATION
BRAIDWOOD STATION, UNITS 1 AND 2 - NOTIFICATION F NRC INSPECTION AND REQUEST FOR INFORMATION  


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==
On February 27, 2012, the U. S. Nuclear Regulatory Commission (NRC) will begin the Temporary Instruction (TI) Inspection, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks, (TI 2515-182) at your Braidwood Station Units 1 and 2. This on-site inspection is scheduled to be performed February 27 - 29, 2012.
On February 27, 2012, the U. S. Nuclear Regulatory Commission (NRC) will begin the Temporary Instruction (TI) Inspection, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks, (TI 2515-182) at your Braidwood Station Units 1 and 2. This on-site inspection is scheduled to be performed February 27 - 29, 2012.
In order to minimize the impact to your on-site resources, and to ensure a productive inspection for both sides, we have enclosed a list of documents pertinent to our inspection. The documents that are requested for this inspection include all relevant documents that will allow the inspector(s) to adequately complete Phase I of this inspection. It is important that all of these documents are up-to-date, and complete, in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.
In order to minimize the impact to your on-site resources, and to ensure a productive inspection for both sides, we have enclosed a list of documents pertinent to our inspection. The documents that are requested for this inspection include all relevant documents that will allow the inspector(s) to adequately complete Phase I of this inspection. It is important that all of these documents are up-to-date, and complete, in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. A. Murtaza, of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Mr. M. Holmberg at (630) 829-9748.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. A. Murtaza, of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Mr. M. Holmberg at (630) 829-9748.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.  


M. Pacilio                                             In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
M. Pacilio In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
Sincerely,  
                                              /RA/
/RA/
David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50 456; 50 457 License Nos. NPF-72; NPF-77
David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50 456; 50 457 License Nos. NPF-72; NPF-77  


==Enclosure:==
==Enclosure:==
TEMPORARY INSTRUCTION (TI 2515-182) INSPECTION DOCUMENT REQUEST cc w/encl:     Distribution via ListServ'
TEMPORARY INSTRUCTION (TI 2515-182) INSPECTION DOCUMENT REQUEST cc w/encl:
Distribution via ListServ'


TEMPORARY INSTRUCTION (TI 2515-182) INSPECTION DOCUMENT REQUEST Inspection Dates:             February 27 - 29, 2012 Inspection Procedures:       Temporary Instruction (TI 2515-182), Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks Inspector:                   Mel Holmberg (630) 829-9748, Mel.holmberg@nrc.gov A. Information Requested for the In-Office Preparation Week
TEMPORARY INSTRUCTION (TI 2515-182) INSPECTION DOCUMENT REQUEST 1
Enclosure Inspection Dates:
February 27 - 29, 2012 Inspection Procedures:
Temporary Instruction (TI 2515-182), Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks Inspector:
Mel Holmberg (630) 829-9748, Mel.holmberg@nrc.gov A.
Information Requested for the In-Office Preparation Week
: 1. The following documents listed below are requested (electronic copy CD ROM if possible) by February 13, 2012, to facilitate the preparation for the on-site inspection week.
: 1. The following documents listed below are requested (electronic copy CD ROM if possible) by February 13, 2012, to facilitate the preparation for the on-site inspection week.
: a. Organization list of site individuals responsible for the sites underground piping and tanks program; and
: a. Organization list of site individuals responsible for the sites underground piping and tanks program; and
Line 51: Line 56:
: d. Plan Implementation; and
: d. Plan Implementation; and
: e. Asset Management Plan.
: e. Asset Management Plan.
The inspector may select specific items from the information requested for the preparation week and request follow-up documents during the on-site inspection week.
The inspector may select specific items from the information requested for the preparation week and request follow-up documents during the on-site inspection week.  
1                                        Enclosure


TEMPORARY INSTRUCTION (TI 2515-182) INSPECTION DOCUMENT REQUEST B.       Information to be Provided On-Site to the Inspector at the Entrance Meeting
TEMPORARY INSTRUCTION (TI 2515-182) INSPECTION DOCUMENT REQUEST 2
Enclosure B.
Information to be Provided On-Site to the Inspector at the Entrance Meeting
: 1. Copy of EPRI document Recommendations for an Effective Program to Control the Degradation of Buried Pipe.
: 1. Copy of EPRI document Recommendations for an Effective Program to Control the Degradation of Buried Pipe.
: 2. Copy of Site Underground Piping and Tanks Program.
: 2. Copy of Site Underground Piping and Tanks Program.
Line 71: Line 77:
: d. Plan Implementation; and
: d. Plan Implementation; and
: e. Asset Management Plan.
: e. Asset Management Plan.
f.
: f.
The inspector may select specific items from the information requested for the preparation week and request follow-up documents during the on-site inspection week. If you have any questions regarding this information, please call the inspector as soon as possible.
The inspector may select specific items from the information requested for the preparation week and request follow-up documents during the on-site inspection week. If you have any questions regarding this information, please call the inspector as soon as possible.  
2                                      Enclosure


M. Pacilio                                                                             In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
M. Pacilio In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
Sincerely,  
                                                                          /RA/
/RA/
David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50 456; 50 457 License Nos. NPF-72; NPF-77
David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50 456; 50 457 License Nos. NPF-72; NPF-77  


==Enclosure:==
==Enclosure:==
TEMPORARY INSTRUCTION (TI 2515-182) INSPECTION DOCUMENT REQUEST cc w/encl:               Distribution via ListServ' DISTRIBUTION:
TEMPORARY INSTRUCTION (TI 2515-182) INSPECTION DOCUMENT REQUEST cc w/encl:
RidsNrrDorlLpl3-2 Resource Amy Snyder RidsNrrPMBraidwood Resource RidsNrrDirsIrib Resource Cynthia Pederson Jennifer Uhle Steven Orth Jared Heck Allan Barker DRPIII DRSIII Carole Ariano Linda Linn Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr 011112 Braidwood Notification of Inspection and Request for Information MSH.docx Publicly Available                         Non-Publicly Available                   Sensitive               Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE                 RIII                           RIII NAME                   MHolmberg:ls                   DEHills DATE                   01/04/12                       01/11/12 OFFICIAL RECORD COPY}}
Distribution via ListServ' DISTRIBUTION:
RidsNrrDorlLpl3-2 Resource Amy Snyder RidsNrrPMBraidwood Resource RidsNrrDirsIrib Resource Cynthia Pederson Jennifer Uhle Steven Orth Jared Heck Allan Barker DRPIII DRSIII Carole Ariano Linda Linn Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov DOCUMENT NAME: G:\\DRSIII\\DRS\\Work in Progress\\Ltr 011112 Braidwood Notification of Inspection and Request for Information MSH.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME MHolmberg:ls DEHills DATE 01/04/12 01/11/12 OFFICIAL RECORD COPY}}

Latest revision as of 21:09, 12 January 2025

Notification of NRC Inspection and Request for Information
ML12011A079
Person / Time
Site: Braidwood  
Issue date: 01/11/2012
From: Dave Hills
NRC/RGN-III/DRS/EB1
To: Pacilio M
Exelon Nuclear, Exelon Generation Co
Melvin Holmberg
References
Download: ML12011A079 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 January 11, 2012 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

BRAIDWOOD STATION, UNITS 1 AND 2 - NOTIFICATION F NRC INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Pacilio:

On February 27, 2012, the U. S. Nuclear Regulatory Commission (NRC) will begin the Temporary Instruction (TI) Inspection, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks, (TI 2515-182) at your Braidwood Station Units 1 and 2. This on-site inspection is scheduled to be performed February 27 - 29, 2012.

In order to minimize the impact to your on-site resources, and to ensure a productive inspection for both sides, we have enclosed a list of documents pertinent to our inspection. The documents that are requested for this inspection include all relevant documents that will allow the inspector(s) to adequately complete Phase I of this inspection. It is important that all of these documents are up-to-date, and complete, in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. A. Murtaza, of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Mr. M. Holmberg at (630) 829-9748.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

M. Pacilio In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50 456; 50 457 License Nos. NPF-72; NPF-77

Enclosure:

TEMPORARY INSTRUCTION (TI 2515-182) INSPECTION DOCUMENT REQUEST cc w/encl:

Distribution via ListServ'

TEMPORARY INSTRUCTION (TI 2515-182) INSPECTION DOCUMENT REQUEST 1

Enclosure Inspection Dates:

February 27 - 29, 2012 Inspection Procedures:

Temporary Instruction (TI 2515-182), Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks Inspector:

Mel Holmberg (630) 829-9748, Mel.holmberg@nrc.gov A.

Information Requested for the In-Office Preparation Week

1. The following documents listed below are requested (electronic copy CD ROM if possible) by February 13, 2012, to facilitate the preparation for the on-site inspection week.
a. Organization list of site individuals responsible for the sites underground piping and tanks program; and
b. Schedule for completion of the following NEI 09-14 Revision1 attributes:
2. Buried Piping
a. Procedures and Oversight;
b. Risk Ranking;
c. Inspection Plan;
d. Plan Implementation; and
e. Asset Management Plan.
3. Underground Piping and Tanks
a. Procedures and Oversight;
b. Prioritization;
c. Condition Assessment Plan;
d. Plan Implementation; and
e. Asset Management Plan.

The inspector may select specific items from the information requested for the preparation week and request follow-up documents during the on-site inspection week.

TEMPORARY INSTRUCTION (TI 2515-182) INSPECTION DOCUMENT REQUEST 2

Enclosure B.

Information to be Provided On-Site to the Inspector at the Entrance Meeting

1. Copy of EPRI document Recommendations for an Effective Program to Control the Degradation of Buried Pipe.
2. Copy of Site Underground Piping and Tanks Program.
3. Self or third party assessments of the Underground Piping and Tanks Program (if any have been performed).
4. For any of the NEI 09-14 Revision 1 attributes identified below which have been completed prior to the NRCs onsite inspection, provide written records that demonstrate that the program attribute is complete.
5. Buried Piping
a. Procedures and Oversight;
b. Risk Ranking;
c. Inspection Plan;
d. Plan Implementation; and
e. Asset Management Plan.
6. Underground Piping and Tanks
a. Procedures and Oversight;
b. Prioritization;
c. Condition Assessment Plan;
d. Plan Implementation; and
e. Asset Management Plan.
f.

The inspector may select specific items from the information requested for the preparation week and request follow-up documents during the on-site inspection week. If you have any questions regarding this information, please call the inspector as soon as possible.

M. Pacilio In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50 456; 50 457 License Nos. NPF-72; NPF-77

Enclosure:

TEMPORARY INSTRUCTION (TI 2515-182) INSPECTION DOCUMENT REQUEST cc w/encl:

Distribution via ListServ' DISTRIBUTION:

RidsNrrDorlLpl3-2 Resource Amy Snyder RidsNrrPMBraidwood Resource RidsNrrDirsIrib Resource Cynthia Pederson Jennifer Uhle Steven Orth Jared Heck Allan Barker DRPIII DRSIII Carole Ariano Linda Linn Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov DOCUMENT NAME: G:\\DRSIII\\DRS\\Work in Progress\\Ltr 011112 Braidwood Notification of Inspection and Request for Information MSH.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME MHolmberg:ls DEHills DATE 01/04/12 01/11/12 OFFICIAL RECORD COPY