ML12046A837: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:ES-301 | {{#Wiki_filter:ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) | ||
System / JPM Title Type Code* | |||
Function | Safety Function | ||
: a. 202001 A4.01 3.7 / JPM 448 Transfer RR pumps from Fast to Slow | : a. 202001 A4.01 3.7 / JPM 448 Transfer RR pumps from Fast to Slow speed M,S 1 | ||
: b. 217000 A4.04 3.6 / JPM 204 Manually Startup RCIC System | : b. 217000 A4.04 3.6 / JPM 204 Manually Startup RCIC System A,D,EN,L,S 2 | ||
: c. 239001 A4.01 4.2 / JPM 447 Perform RPS MSIV Channel Functional | : c. 239001 A4.01 4.2 / JPM 447 Perform RPS MSIV Channel Functional D,S 3 | ||
: d. 203000 A4.02 4.1 / JPM 440 SX Injection Through RHR B | : d. 203000 A4.02 4.1 / JPM 440 SX Injection Through RHR B A,N,L,S 4 | ||
: e. 223002 A4.01 3.6 / JPM 452 Verify a Group 3 Isolation | : e. 223002 A4.01 3.6 / JPM 452 Verify a Group 3 Isolation A,N,EN,L,S 5 | ||
: f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power | : f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power A,D,P,S 6 | ||
: g. 212000 A4.14 3.8 / JPM 449 Reset a Reactor SCRAM per CPS No. | : g. 212000 A4.14 3.8 / JPM 449 Reset a Reactor SCRAM per CPS No. | ||
: h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process | 4100.01 D,L,S 7 | ||
: i. 262002 2.1.30 4.4 / JPM 026 Manual Transfer of Distribution Panel Loads | : h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process Radiation Monitors A,D,S 9 | ||
: j. 295016 AA1.07 4.2 / JPM 454 RSP - Div 1 LPCI Operation | In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) | ||
: k. 286000 2.4.25 3.3 / JPM 455 Emergency Initiation of the Div 2 DG Room | : i. 262002 2.1.30 4.4 / JPM 026 Manual Transfer of Distribution Panel Loads (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER D,R 6 | ||
: j. 295016 AA1.07 4.2 / JPM 454 RSP - Div 1 LPCI Operation E,L,N,R,S 7 | |||
* Type Codes | : k. 286000 2.4.25 3.3 / JPM 455 Emergency Initiation of the Div 2 DG Room CO2 System A,E,N,R 8 | ||
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room. | |||
* Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A) | |||
(P)revious 2 exams (R)CA (S)imulator 4-6 / | |||
4-6 / 2-3 | |||
< 9 / | |||
< 8 / < 4 | |||
> 1 / | |||
> 1 / > 1 | |||
- / | |||
/ > 1 (control room system | |||
> 1 / | |||
> 1 / > 1 | |||
> 2 / | |||
> 2 / > 1 | |||
< 3 / | |||
< 3 / < 2 (randomly selected) | |||
> 1 / | |||
> 1 / > 1 ES-301, Page 23 of 27 | |||
ES-301 | ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) | ||
System / JPM Title Type Code* | |||
Function | Safety Function | ||
: a. 202001 A4.01 3.7 / JPM 448 Transfer RR pumps from Fast to Slow | : a. 202001 A4.01 3.7 / JPM 448 Transfer RR pumps from Fast to Slow speed M,S 1 | ||
: b. 217000 A4.04 3.6 / JPM 204 Manually Startup RCIC System | : b. 217000 A4.04 3.6 / JPM 204 Manually Startup RCIC System A,D,EN,L,S 2 | ||
: c. 239001 A4.01 4.0 / JPM 447 Perform RPS MSIV Channel Functional | : c. 239001 A4.01 4.0 / JPM 447 Perform RPS MSIV Channel Functional D,S 3 | ||
: d. 203000 A4.02 4.1 / JPM 440 SX Injection through RHR B | : d. 203000 A4.02 4.1 / JPM 440 SX Injection through RHR B A,N,L,S 4 | ||
: e. 223002 A4.01 3.5 / JPM 452 Verify a Group 3 Isolation | : e. 223002 A4.01 3.5 / JPM 452 Verify a Group 3 Isolation A,N,EN,L,S 5 | ||
: f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power | : f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power A,D,P,S 6 | ||
: h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process | : g. | ||
: i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads | : h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process Radiation Monitors A,D,S 9 | ||
: j. 295016 AA1.07 4.3 / JPM 454 RSP - Div 1 LPCI Operation | In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) | ||
: k. 286000 2.4.25 3.7 / JPM 455 Emergency Initiation of the Div 2 DG Room | : i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER D,R 6 | ||
: j. 295016 AA1.07 4.3 / JPM 454 RSP - Div 1 LPCI Operation E,L,N,R,S 7 | |||
* Type Codes | : k. 286000 2.4.25 3.7 / JPM 455 Emergency Initiation of the Div 2 DG Room CO2 System A,E,N,R 8 | ||
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room. | |||
* Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A) | |||
(P)revious 2 exams (R)CA (S)imulator 4-6 / | |||
4-6 / 2-3 | |||
< 9 / | |||
< 8 / < 4 | |||
> 1 / | |||
> 1 / > 1 | |||
- / | |||
/ > 1 (control room system | |||
> 1 / | |||
> 1 / > 1 | |||
> 2 / | |||
> 2 / > 1 | |||
< 3 / | |||
< 3 / < 2 (randomly selected) | |||
> 1 / | |||
> 1 / > 1 ES-301, Page 23 of 27 | |||
ES-301 | ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) | ||
System / JPM Title Type Code* | |||
Function a. | Safety Function | ||
b. | : a. | ||
c. | : b. | ||
: d. 203000 A4.02 4.1 / JPM 440 SX Injection through RHR B | : c. | ||
: e. 223002 A4.01 3.5 / JPM 452 Verify a Group 3 Isolation | : d. 203000 A4.02 4.1 / JPM 440 SX Injection through RHR B A,N,L,S 4 | ||
g. | : e. 223002 A4.01 3.5 / JPM 452 Verify a Group 3 Isolation A,N,EN,L,S 5 | ||
: h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process | : f. | ||
: i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads | : g. | ||
: j. 295016 AA1.07 4.3 / JPM 454 RSP - Div 1 LPCI Operation | : h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process Radiation Monitors A,D,S 9 | ||
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) | |||
* Type Codes | : i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER D,R 6 | ||
: j. 295016 AA1.07 4.3 / JPM 454 RSP - Div 1 LPCI Operation E,L,N,R,S 7 | |||
: k. | |||
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room. | |||
* Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A) | |||
(P)revious 2 exams (R)CA (S)imulator 4-6 / | |||
4-6 / 2-3 | |||
< 9 / | |||
< 8 / < 4 | |||
> 1 / | |||
> 1 / > 1 | |||
- / | |||
/ > 1 (control room system | |||
> 1 / | |||
> 1 / > 1 | |||
> 2 / | |||
> 2 / > 1 | |||
< 3 / | |||
< 3 / < 2 (randomly selected) | |||
> 1 / | |||
> 1 / > 1 ES-301, Page 23 of 27}} | |||
Latest revision as of 20:02, 12 January 2025
| ML12046A837 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 08/29/2011 |
| From: | Bielby M Operations Branch III |
| To: | Exelon Nuclear |
| Shared Package | |
| ML11354A098 | List: |
| References | |
| ES-301, ES-301-2 | |
| Download: ML12046A837 (3) | |
Text
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code*
Safety Function
- e. 223002 A4.01 3.6 / JPM 452 Verify a Group 3 Isolation A,N,EN,L,S 5
- f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power A,D,P,S 6
4100.01 D,L,S 7
- h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process Radiation Monitors A,D,S 9
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. 262002 2.1.30 4.4 / JPM 026 Manual Transfer of Distribution Panel Loads (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER D,R 6
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 /
4-6 / 2-3
< 9 /
< 8 / < 4
> 1 /
> 1 / > 1
- /
/ > 1 (control room system
> 1 /
> 1 / > 1
> 2 /
> 2 / > 1
< 3 /
< 3 / < 2 (randomly selected)
> 1 /
> 1 / > 1 ES-301, Page 23 of 27
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code*
Safety Function
- e. 223002 A4.01 3.5 / JPM 452 Verify a Group 3 Isolation A,N,EN,L,S 5
- f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power A,D,P,S 6
- g.
- h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process Radiation Monitors A,D,S 9
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER D,R 6
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 /
4-6 / 2-3
< 9 /
< 8 / < 4
> 1 /
> 1 / > 1
- /
/ > 1 (control room system
> 1 /
> 1 / > 1
> 2 /
> 2 / > 1
< 3 /
< 3 / < 2 (randomly selected)
> 1 /
> 1 / > 1 ES-301, Page 23 of 27
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code*
Safety Function
- a.
- b.
- c.
- e. 223002 A4.01 3.5 / JPM 452 Verify a Group 3 Isolation A,N,EN,L,S 5
- f.
- g.
- h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process Radiation Monitors A,D,S 9
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER D,R 6
- k.
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 /
4-6 / 2-3
< 9 /
< 8 / < 4
> 1 /
> 1 / > 1
- /
/ > 1 (control room system
> 1 /
> 1 / > 1
> 2 /
> 2 / > 1
< 3 /
< 3 / < 2 (randomly selected)
> 1 /
> 1 / > 1 ES-301, Page 23 of 27