{{#Wiki_filter:1 Exelon Generation ~
{{#Wiki_filter:1 Exelon Generation ~
RS-13-211                                                                   10 CFR 50.54(f)
RS-13-211 10 CFR 50.54(f)
August 28, 2013 u.s. Nuclear Regulatory Commission Attn: Document Control Desk 11555 Rockville Pike, Rockville. MD 20852 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265
August 28, 2013 u.s. Nuclear Regulatory Commission Attn: Document Control Desk 11555 Rockville Pike, Rockville. MD 20852 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265  


==Subject:==
==Subject:==
Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f)
Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f)
Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident  


==References:==
==References:==
Line 30: Line 30:
: 2. Exelon Generation Company, LLC letter to US NRC, Response to March 12,2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 2, Flooding Hazard Reevaluation Report, dated March 12, 2013 (RS-13-047)
: 2. Exelon Generation Company, LLC letter to US NRC, Response to March 12,2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 2, Flooding Hazard Reevaluation Report, dated March 12, 2013 (RS-13-047)
On March 12, 2012, the NRC issued Reference 1 to all power reactor licensees and holders of construction permits in active or deferred status. Enclosure 2 of Reference 1 requested that each licensee perform a reevaluation of external flooding sources and report the results in accordance with the NRC's prioritization plan. Exelon Generation Company, LLC (EGC) submitted the flood reevaluation for Quad Cities Nuclear Power Station, Units 1 and 2 in Reference 2. Reference 2 contains interim actions that EGC has taken or plans to take to address higher flooding hazards relative to the design basis until the integrated assessment is completed.
On March 12, 2012, the NRC issued Reference 1 to all power reactor licensees and holders of construction permits in active or deferred status. Enclosure 2 of Reference 1 requested that each licensee perform a reevaluation of external flooding sources and report the results in accordance with the NRC's prioritization plan. Exelon Generation Company, LLC (EGC) submitted the flood reevaluation for Quad Cities Nuclear Power Station, Units 1 and 2 in Reference 2. Reference 2 contains interim actions that EGC has taken or plans to take to address higher flooding hazards relative to the design basis until the integrated assessment is completed.
The enclosed table provides a list of the interim actions taken or planned to be taken as contained in Reference 2 along with additional information and the dates by which they have or will be implemented .
The enclosed table provides a list of the interim actions taken or planned to be taken as contained in Reference 2 along with additional information and the dates by which they have or will be implemented.
These interim actions have been converted into commitments as requested by the NRC and are identified in the enclosed table. Also as requested by the NRC, EGC will not modify these commitments or completion dates without notifying the NRC in advance.
These interim actions have been converted into commitments as requested by the NRC and are identified in the enclosed table. Also as requested by the NRC, EGC will not modify these commitments or completion dates without notifying the NRC in advance.
This letter contains new regulatory commitments as identified in the enclosed table.
This letter contains new regulatory commitments as identified in the enclosed table.
Should you have any questions concerning the content of this letter, please contact Ron Gaston at (630) 657-3359.
Should you have any questions concerning the content of this letter, please contact Ron Gaston at (630) 657-3359.  


U.S. Nuclear Regulatory Commission August 28, 2013 Page 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on the 28th day of August 2013.
U.S. Nuclear Regulatory Commission August 28, 2013 Page 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on the 28th day of August 2013.
Respectfully submitted,
Respectfully submitted,  
~ r~
~ r~
Glen T. Kaegi Director - Licensing & Regulatory Affairs Exelon Generation Company, LLC
Glen T. Kaegi Director - Licensing & Regulatory Affairs Exelon Generation Company, LLC  


==Enclosure:==
==Enclosure:==
: 1. Quad Cities Nuclear Power Station, Units 1 and 2 - Flood Hazard Reevaluation Report Interim Action Commitments cc:     Director, Office of Nuclear Reactor Regulation Regional Administrator - NRC Region III NRC Senior Resident Inspector - Quad Cities Nuclear Power Station NRC Project Manager, NRR - Quad Cities Nuclear Power Station Ms. Jessica A. Kratchman, NRR/JLD/PMB, NRC Mr. Eric E. Bowman, NRR/DPRlPGCB, NRC or Ms. Eileen M. McKenna, NRO/DSRAlBPTS, NRC Illinois Emergency Management Agency - Division of Nuclear Safety
: 1. Quad Cities Nuclear Power Station, Units 1 and 2 - Flood Hazard Reevaluation Report Interim Action Commitments cc:
Director, Office of Nuclear Reactor Regulation Regional Administrator - NRC Region III NRC Senior Resident Inspector - Quad Cities Nuclear Power Station NRC Project Manager, NRR - Quad Cities Nuclear Power Station Ms. Jessica A. Kratchman, NRR/JLD/PMB, NRC Mr. Eric E. Bowman, NRR/DPRlPGCB, NRC or Ms. Eileen M. McKenna, NRO/DSRAlBPTS, NRC Illinois Emergency Management Agency - Division of Nuclear Safety  


Enclosure 1: Quad Cities Nuclear Power Station, Units 1 and 2 - Flood Hazard Reevaluation Report Interim Action Commitments* ("Commitments" are bolded header columns)
Item Number : Quad Cities Nuclear Power Station, Units 1 and 2 - Flood Hazard Reevaluation Report Interim Action Commitments* ("Commitments" are bolded header columns)
Item                                                                                    Implementation        Commitment  Commitment Interim Actions Taken or Number                                                                                          Date                Type        Type Planned to Take as Report Included in the                           Additional Information           (Committed*         One-Time Programmatic*
Interim Actions Taken or Implementation Commitment Commitment Planned to Take as Date Type Type Included in the Report Additional Information (Committed*
Reference Reevaluation Report                                                               Date or             Action*
Reference One-Time Programmatic*
(Commitment*)                                                                 Outage)           (YeslNo)   (Yes/No)
Reevaluation Report Date or Action*
(Commitment*)
Outage)
(YeslNo)
(Yes/No)
The local intense precipitation interim evaluation will include:
The local intense precipitation interim evaluation will include:
: 1.         A visual inspection of plant   Report       Some of the plant grade         Completed             Yes       No grade level doors to         Cover         level doors do not have           March 18,2013 confirm proper operation       Letter,       seals, as seals are not and assess seal condition.
: 1.
Section       required by the current d.ii           design basis requirements. The results of this action are being evaluated under Interim Action Item Number 3.
A visual inspection of plant Report Some of the plant grade Completed Yes No grade level doors to Cover level doors do not have March 18,2013 confirm proper operation
: 2.         A visual inspection of plant Report         The overall drainage             Completed             Yes       No drainage system               Cover         system condition was             March 14,2013 components to confirm         Letter,       found acceptable.
: Letter, seals, as seals are not and assess seal condition.
Section required by the current d.ii design basis requirements. The results of this action are being evaluated under Interim Action Item Number 3.
: 2.
A visual inspection of plant Report The overall drainage Completed Yes No drainage system Cover system condition was March 14,2013 components to confirm
: Letter, found acceptable.
functionality.
functionality.
Section d.ii Page 1 of 5
Section d.ii Page 1 of 5  


Enclosure 1: Quad Cities Nuclear Power Station, Units 1 and 2 - Flood Hazard Reevaluation Report Interim Action Commitments* ("Commitments" are bolded header columns)
Item Number
Item                                                                                    Commitment      Commitment Interim Actions Taken or                                           Implementation Number                                                                            Date        Type            Type Planned to Take as Report Included in the                       Additional Information (Committed*     One-Time     Programmatic*
: 3. : Quad Cities Nuclear Power Station, Units 1 and 2 - Flood Hazard Reevaluation Report Interim Action Commitments* ("Commitments" are bolded header columns)
Reference Reevaluation Report                                                   Date or     Action*
Interim Actions Taken or Implementation Commitment Commitment Planned to Take as Date Type Type Included in the Report Additional Information (Committed*
(Commitment*)                                                     Outage)     (Yes/No)       (Yes/No)
Reference One-Time Programmatic*
: 3.      An evaluation of the           Report                             April 4, 2014 Yes           No effects of local intense       Cover precipitation event on the     Letter, plant, with respect to:
Reevaluation Report Date or Action*
Section d.ii
(Commitment*)
        -      Building structures and doors and amount of leakage the doors would allow;
Outage)
        -      How the leakage through the doors affect plant equipment;
(Yes/No)
        -      Recommended actions based on the results of the evaluations; and
(Yes/No)
        -      Prioritizing actions for high risk areas.
An evaluation of the Report April 4, 2014 Yes No effects of local intense Cover precipitation event on the
Page 2 of 5
: Letter, plant, with respect to:
Section Building structures d.ii and doors and amount of leakage the doors would allow; How the leakage through the doors affect plant equipment; Recommended actions based on the results of the evaluations; and Prioritizing actions for high risk areas.
Page 2 of 5  


Enclosure 1: Quad Cities Nuclear Power Station, Units 1 and 2 - Flood Hazard Reevaluation Report Interim Action Commitments* ("Commitments" are bolded header columns)
Item Number
Item    Interim Actions Taken or                                                 Implementation Commitment Commitment Number        Planned to Take as                                                         Date       Type       Type Report Included in the                     Additional Information         (Committed* One-Time Programmatic*
: 4.
Reference Reevaluation Report                                                         Date or     Action*
: 5.
(Commitment*)                                                           Outage)   (Yes/No)   (Yes/No)
: 6.
: 4.          Develop and implement         Report   Procedure QCOA 0010-           Completed     Yes       No appropriate operational         Cover     22 (Local Intense             March 14,2013 response procedures to         Letter,   Precipitation Procedure) mitigate the effects of the     Section   was developed.
- : Quad Cities Nuclear Power Station, Units 1 and 2 - Flood Hazard Reevaluation Report Interim Action Commitments* ("Commitments" are bolded header columns)
Interim Actions Taken or Implementation Commitment Commitment Planned to Take as Date Type Type Included in the Report Additional Information (Committed*
Reference One-Time Programmatic*
Reevaluation Report Date or Action*
(Commitment*)
Outage)
(Yes/No)
(Yes/No)
Develop and implement Report Procedure QCOA 0010-Completed Yes No appropriate operational Cover 22 (Local Intense March 14,2013 response procedures to
: Letter, Precipitation Procedure) mitigate the effects of the Section was developed.
LIP Event.
LIP Event.
d.ii
d.ii Perform additional local Report Calculations LlP-QDC-Completed Yes No intense precipitation Cover 002 and LlP-ODC-003 June 27,2013 calculations to further
: 5.        Perform additional local       Report   Calculations LlP-QDC-         Completed     Yes       No intense precipitation           Cover     002 and LlP-ODC-003           June 27,2013 calculations to further         Letter,   were developed in explore site drainage Section   accordance with Appendix affects.
: Letter, were developed in explore site drainage Section accordance with Appendix affects.
d.ii     B of NUREG/CR-7046, Case 1 and Case 2, respectively.
d.ii B of NUREG/CR-7046, Case 1 and Case 2, respectively.
: 6.        Obtaining a site survey so     Report   The results of this action     Completed     Yes       No that the results of the local   Cover     are being evaluated under     August 8,2013 intense precipitation           Letter,   Interim Action Item analysis can be directly Section   Number 3.
Obtaining a site survey so Report The results of this action Completed Yes No that the results of the local Cover are being evaluated under August 8,2013 intense precipitation
: Letter, Interim Action Item analysis can be directly Section Number 3.
correlated to the door sill d.ii elevations.
correlated to the door sill d.ii elevations.
Page 3 of 5
Page 3 of 5  


Enclosure 1: Quad Cities Nuclear Power Station, Units 1 and 2 - Flood Hazard Reevaluation Report Interim Action Commitments* ("Commitments" are bolded header columns)
Item Number
Item                                                                        Implementation Commitment    Commitment Interim Actions Taken or Number                                                                              Date          Type          Type Planned to Take as Report Included in the                       Additional Information (Committed*   One-Time     Programmatic*
: 7. : Quad Cities Nuclear Power Station, Units 1 and 2 - Flood Hazard Reevaluation Report Interim Action Commitments* ("Commitments" are bolded header columns)
Reference Reevaluation Report                                                 Date or       Action*
Interim Actions Taken or Implementation Commitment Commitment Planned to Take as Date Type Type Included in the Report Additional Information (Committed*
(Commitment*)                                                   Outage)       (Yes/No)       (Yes/No)
Reference One-Time Programmatic*
: 7.          Determine if interim flood   Report                               May 30, 2014   Yes           No barriers are warranted until Cover the 2-Year Integrated       Letter, Assessment Report is Section complete.
Reevaluation Report Date or Action*
(Commitment*)
Outage)
(Yes/No)
(Yes/No)
Determine if interim flood Report May 30, 2014 Yes No barriers are warranted until Cover the 2-Year Integrated
: Letter, Assessment Report is Section complete.
d.ii The river flood and combined-effects flood interim evaluation will include:
d.ii The river flood and combined-effects flood interim evaluation will include:
: 8.         Evaluate the effects of       Report                               November 15,   Yes           No wind-generated waves on       Cover                               2013 the plant.                     Letter, Section d.ii
: 8.
: 9.         Evaluate the effects of       Report                               November 15,   Yes           No hydrodynamic and debris       Cover                               2013 impact loading on the plant. Letter, Section d.ii Page 4 of 5
Evaluate the effects of Report November 15, Yes No wind-generated waves on Cover 2013 the plant.
: Letter, Section d.ii
: 9.
Evaluate the effects of Report November 15, Yes No hydrodynamic and debris Cover 2013 impact loading on the plant.
: Letter, Section d.ii Page 4 of 5  


Enclosure 1: Quad Cities Nuclear Power Station, Units 1 and 2 - Flood Hazard Reevaluation Report Interim Action Commitments* ("Commitments" are bolded header columns)
Item Number
Item  Interim Actions Taken or                                         Implementation Commitment     Commitment Number      Planned to Take as                                                 Date         Type             Type Report Included in the                   Additional Information   (Committed*     One-Time     Programmatic*
: 10. : Quad Cities Nuclear Power Station, Units 1 and 2 - Flood Hazard Reevaluation Report Interim Action Commitments* ("Commitments" are bolded header columns)
Reference Reevaluation Report                                               Date or       Action*
Interim Actions Taken or Implementation Commitment Commitment Planned to Take as Date Type Type Included in the Report Additional Information (Committed*
(Commitment*)                                                 Outage)       (Yes/No)         (Yes/No)
Reference One-Time Programmatic*
: 10. Revise Flooding             Report   Revisions to QCOA 0010-   July 18, 2014   Yes           No Procedures to incorporate   Cover     16 (Flood Emergency new issues (as appropriate) Letter,   Procedure) have been in accordance with updated Section   made to address river flood calculations.
Reevaluation Report Date or Action*
d.ii     evaluations completed to date. Additional revisions may be made as appropriate based on the results of completed Interim Actions.
(Commitment*)
                                                                  ~~-
Outage)
                                                                                                          -~
(Yes/No)
(Yes/No)
Revise Flooding Report Revisions to QCOA 0010-July 18, 2014 Yes No Procedures to incorporate Cover 16 (Flood Emergency new issues (as appropriate)
: Letter, Procedure) have been in accordance with updated Section made to address river flood calculations.
d.ii evaluations completed to date. Additional revisions may be made as appropriate based on the results of completed Interim Actions.  
~~-
-~
Page 5 of 5}}
Page 5 of 5}}

Latest revision as of 06:50, 11 January 2025

Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
ML13241A284
Person / Time
Site: Quad Cities  
(DPR-029, DPR-030)
Issue date: 08/28/2013
From: Kaegi G
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
RS-13-211
Download: ML13241A284 (7)


Text

1 Exelon Generation ~

RS-13-211 10 CFR 50.54(f)

August 28, 2013 u.s. Nuclear Regulatory Commission Attn: Document Control Desk 11555 Rockville Pike, Rockville. MD 20852 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265

Subject:

Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f)

Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident

References:

1. NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1,2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012
2. Exelon Generation Company, LLC letter to US NRC, Response to March 12,2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 2, Flooding Hazard Reevaluation Report, dated March 12, 2013 (RS-13-047)

On March 12, 2012, the NRC issued Reference 1 to all power reactor licensees and holders of construction permits in active or deferred status. Enclosure 2 of Reference 1 requested that each licensee perform a reevaluation of external flooding sources and report the results in accordance with the NRC's prioritization plan. Exelon Generation Company, LLC (EGC) submitted the flood reevaluation for Quad Cities Nuclear Power Station, Units 1 and 2 in Reference 2. Reference 2 contains interim actions that EGC has taken or plans to take to address higher flooding hazards relative to the design basis until the integrated assessment is completed.

The enclosed table provides a list of the interim actions taken or planned to be taken as contained in Reference 2 along with additional information and the dates by which they have or will be implemented.

These interim actions have been converted into commitments as requested by the NRC and are identified in the enclosed table. Also as requested by the NRC, EGC will not modify these commitments or completion dates without notifying the NRC in advance.

This letter contains new regulatory commitments as identified in the enclosed table.

Should you have any questions concerning the content of this letter, please contact Ron Gaston at (630) 657-3359.

U.S. Nuclear Regulatory Commission August 28, 2013 Page 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on the 28th day of August 2013.

Respectfully submitted,

~ r~

Glen T. Kaegi Director - Licensing & Regulatory Affairs Exelon Generation Company, LLC

Enclosure:

1. Quad Cities Nuclear Power Station, Units 1 and 2 - Flood Hazard Reevaluation Report Interim Action Commitments cc:

Director, Office of Nuclear Reactor Regulation Regional Administrator - NRC Region III NRC Senior Resident Inspector - Quad Cities Nuclear Power Station NRC Project Manager, NRR - Quad Cities Nuclear Power Station Ms. Jessica A. Kratchman, NRR/JLD/PMB, NRC Mr. Eric E. Bowman, NRR/DPRlPGCB, NRC or Ms. Eileen M. McKenna, NRO/DSRAlBPTS, NRC Illinois Emergency Management Agency - Division of Nuclear Safety

Item Number : Quad Cities Nuclear Power Station, Units 1 and 2 - Flood Hazard Reevaluation Report Interim Action Commitments* ("Commitments" are bolded header columns)

Interim Actions Taken or Implementation Commitment Commitment Planned to Take as Date Type Type Included in the Report Additional Information (Committed*

Reference One-Time Programmatic*

Reevaluation Report Date or Action*

(Commitment*)

Outage)

(YeslNo)

(Yes/No)

The local intense precipitation interim evaluation will include:

1.

A visual inspection of plant Report Some of the plant grade Completed Yes No grade level doors to Cover level doors do not have March 18,2013 confirm proper operation

Letter, seals, as seals are not and assess seal condition.

Section required by the current d.ii design basis requirements. The results of this action are being evaluated under Interim Action Item Number 3.

2.

A visual inspection of plant Report The overall drainage Completed Yes No drainage system Cover system condition was March 14,2013 components to confirm

Letter, found acceptable.

functionality.

Section d.ii Page 1 of 5

Item Number

3. : Quad Cities Nuclear Power Station, Units 1 and 2 - Flood Hazard Reevaluation Report Interim Action Commitments* ("Commitments" are bolded header columns)

Interim Actions Taken or Implementation Commitment Commitment Planned to Take as Date Type Type Included in the Report Additional Information (Committed*

Reference One-Time Programmatic*

Reevaluation Report Date or Action*

(Commitment*)

Outage)

(Yes/No)

(Yes/No)

An evaluation of the Report April 4, 2014 Yes No effects of local intense Cover precipitation event on the

Letter, plant, with respect to:

Section Building structures d.ii and doors and amount of leakage the doors would allow; How the leakage through the doors affect plant equipment; Recommended actions based on the results of the evaluations; and Prioritizing actions for high risk areas.

Page 2 of 5

Item Number

4.
5.
6.

- : Quad Cities Nuclear Power Station, Units 1 and 2 - Flood Hazard Reevaluation Report Interim Action Commitments* ("Commitments" are bolded header columns)

Interim Actions Taken or Implementation Commitment Commitment Planned to Take as Date Type Type Included in the Report Additional Information (Committed*

Reference One-Time Programmatic*

Reevaluation Report Date or Action*

(Commitment*)

Outage)

(Yes/No)

(Yes/No)

Develop and implement Report Procedure QCOA 0010-Completed Yes No appropriate operational Cover 22 (Local Intense March 14,2013 response procedures to

Letter, Precipitation Procedure) mitigate the effects of the Section was developed.

LIP Event.

d.ii Perform additional local Report Calculations LlP-QDC-Completed Yes No intense precipitation Cover 002 and LlP-ODC-003 June 27,2013 calculations to further

Letter, were developed in explore site drainage Section accordance with Appendix affects.

d.ii B of NUREG/CR-7046, Case 1 and Case 2, respectively.

Obtaining a site survey so Report The results of this action Completed Yes No that the results of the local Cover are being evaluated under August 8,2013 intense precipitation

Letter, Interim Action Item analysis can be directly Section Number 3.

correlated to the door sill d.ii elevations.

Page 3 of 5

Item Number

7. : Quad Cities Nuclear Power Station, Units 1 and 2 - Flood Hazard Reevaluation Report Interim Action Commitments* ("Commitments" are bolded header columns)

Interim Actions Taken or Implementation Commitment Commitment Planned to Take as Date Type Type Included in the Report Additional Information (Committed*

Reference One-Time Programmatic*

Reevaluation Report Date or Action*

(Commitment*)

Outage)

(Yes/No)

(Yes/No)

Determine if interim flood Report May 30, 2014 Yes No barriers are warranted until Cover the 2-Year Integrated

Letter, Assessment Report is Section complete.

d.ii The river flood and combined-effects flood interim evaluation will include:

8.

Evaluate the effects of Report November 15, Yes No wind-generated waves on Cover 2013 the plant.

Letter, Section d.ii
9.

Evaluate the effects of Report November 15, Yes No hydrodynamic and debris Cover 2013 impact loading on the plant.

Letter, Section d.ii Page 4 of 5

Item Number

10. : Quad Cities Nuclear Power Station, Units 1 and 2 - Flood Hazard Reevaluation Report Interim Action Commitments* ("Commitments" are bolded header columns)

Interim Actions Taken or Implementation Commitment Commitment Planned to Take as Date Type Type Included in the Report Additional Information (Committed*

Reference One-Time Programmatic*

Reevaluation Report Date or Action*

(Commitment*)

Outage)

(Yes/No)

(Yes/No)

Revise Flooding Report Revisions to QCOA 0010-July 18, 2014 Yes No Procedures to incorporate Cover 16 (Flood Emergency new issues (as appropriate)

Letter, Procedure) have been in accordance with updated Section made to address river flood calculations.

d.ii evaluations completed to date. Additional revisions may be made as appropriate based on the results of completed Interim Actions.

~~-

-~