ML17265A265: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML17265A265
| number = ML17265A265
| issue date = 04/30/1998
| issue date = 04/30/1998
| title = Monthly Operating Rept for Apr 1998 for Re Ginna Nuclear Power Plant.W/980506 Ltr
| title = Monthly Operating Rept for Apr 1998 for Re Ginna Nuclear Power Plant
| author name = Walden J, Widay J
| author name = Walden J, Widay J
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY REGULAT RY INFORMATION DISTRIBUTIO             SYSTEM (RIDS)
{{#Wiki_filter:CATEGORY REGULAT RY INFORMATION DISTRIBUTIO SYSTEM (RIDS)
ACl"ESSION NBR:9805140326             DOC.DATE: 98/04/30 NOTARIZED: NO                     DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester                       G 05000244 AUTH. NAME             AUTHOR AFFILIATION WALDEN,J.V.           Rochester Gas S Electric Corp.
ACl"ESSION NBR:9805140326 DOC.DATE: 98/04/30 NOTARIZED: NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
WIDAY,J.A.             Rochester Gas & Electric Corp.
AUTH.NAME AUTHOR AFFILIATION WALDEN,J.V.
RECIP.NAME             RECIPIENT AFFILIATION VISSING, G. S.
Rochester Gas S Electric Corp.
C
WIDAY,J.A.
Rochester Gas
& Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000244 VISSING, G. S.


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for Apr 1998             for RE Ginna Nuclear Power Plant.W/980506       ltr.
Monthly operating rept for Apr 1998 for RE Ginna Nuclear Power Plant.W/980506 ltr.
DISTRIBUTION CODE: IE24D         COPIES RECEIVED:LTR           ENCL       SIZE:
DISTRIBUTION CODE:
TITLE: Monthly Operating Report (per Tech Specs)                                                     A,'5000244 E
IE24D COPIES RECEIVED:LTR ENCL SIZE:
NOTES:License Exp date         in accordance     with 10CFR2,2.109(9/19/72).
TITLE: Monthly Operating Report (per Tech Specs)
                                                                                                      .G RECIPIENT             COPIES              RECIPIENT            COPIES ID CODE/NAME            LTTR ENCL        ID CODE/NAME         LTTR ENCL PDl-1 PD                   1    1      VISSING,G.                1      1 INTERNAL: AEOD/SPD/RRAB                 1    1    -  ILE  CENTER    0        1      1 OC/DBA/PAD                 1    1      RGN1                      1      1 EXTERNAL: LITCO BRYCE,J H               1     1       NOAC                     1     1 NRC PDR                    1     1 D
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
C A,'5000244E
.G RECIPIENT ID CODE/NAME PDl-1 PD INTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LITCO BRYCE,J H NRC PDR 1
1 ILE CENTER 0
1 1
RGN1 1
1 1
1 NOAC COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1
1 VISSING,G.
COPIES LTTR ENCL 1
1 1
1 1
1 1
1 D
E N
E N
NOTE TO ALL   "RIDS" RECIPIENTS:
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR                 9   ENCL     9
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9
ENCL 9


l J
l J
II'
II'


AND ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EASTAVfNLIE,ROCHESTER, N. Y 14649-000I AREA CODE7I6 546-2700 May 6, 1998 US Nuclear Regulatory Commission Document Control Desk Attn:     Guy S. Vissing Project Directorate   1-1 Washington, DC 20555
AND ROCHESTER GAS ANDELECTRIC CORPORATION ~ 89 EASTAVfNLIE,ROCHESTER, N. Y 14649-000I AREA CODE7I6 546-2700 May 6, 1998 US Nuclear Regulatory Commission Document Control Desk Attn:
Guy S. Vissing Project Directorate 1-1 Washington, DC 20555


==Subject:==
==Subject:==
Line 41: Line 60:


==Dear Mr. Vissing:==
==Dear Mr. Vissing:==
Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of April, 1998.
Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of April, 1998.
                                                        ~
~
Very truly yours, u.d J s h A. Widay lant Manager xc:       U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14B2)
Very truly yours, u.d J
Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments 9805140326 'F80430 POR, AOQCK 05000244" R         .            PDR
s h A. Widay lant Manager xc:
=47)3g       g
U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14B2)
Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I
475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments 9805140326
'F80430
: POR, AOQCK 05000244 R
PDR
=47)3g g


o kl
o kl


OPERATING DATA REPORT 50-244 May 6, 1998 COMPLETED BY:
OPERATING DATAREPORT 50-244 May 6, 1998 COMPLETED BY:
John V. Walden TELEPHONE (716) 771-3588 OPERATING STATUS
John V. Walden TELEPHONE (716) 771-3588 OPERATING STATUS 480
: 1. Unit Name:           R.E. GINNA NUCLEAR POWER PLANT       Notes:
: 1. Unit Name:
: 2. Reporting Period:           A n'I, 'I998
R.E. GINNANUCLEAR POWER PLANT
: 3. Design Electric Rating (Net MWe):           470
: 2. Reporting Period:
: 4. Maximum Dependable Capacity (Net MWe):       480 This Month     Yr.-to-Date     Cumulative**
A n'I, 'I998 3.
: 5. Number of hours Reactor Was Critical           719.0          2879.0          200838.2
Design Electric Rating (Net MWe):
: 6. Hours Generator On-line                       719.0          2879.0          197817.7
470 4.
: 7. Unit Reserve Shutdown Hours                     0.0              0.0                8.5 *
Maximum Dependable Capacity (Net MWe):
: 8. Net Electrical Energy Generated (MWH)     357410.0       1429793.0         88971309.4
Notes:
** CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969
This Month Yr.-to-Date Cumulative**
: 5. Number of hours Reactor Was Critical
: 6. Hours Generator On-line
: 7. Unit Reserve Shutdown Hours
: 8. Net Electrical Energy Generated (MWH) 719.0 719.0 0.0 357410.0 2879.0 2879.0 0.0 1429793.0 200838.2 197817.7 8.5 88971309.4
**CUMULATIVETOTALCOMMENCING NOVEMBER 8, 1969


1
1
Line 66: Line 95:
11
11


4 l DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT COMPLETED BY: John V. Walden UNIT SHUTDOWN REPORTING PERIOD:             A ril 1998 (Month/Year)
l 4
NO.       DATE               TYPE         DURATION          REASON"'ETHOD OF                                ACTIONS F: FORCED             (HOURS)
DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT COMPLETED BY:
DOWN~2'AUSE/CORRECTIVE SHUTTING S: SCHEDULED                                                                    COMMENTS
John V. Walden UNIT SHUTDOWN REPORTING PERIOD:
A ril 1998 (Month/Year)
NO.
DATE TYPE F: FORCED S: SCHEDULED DURATION (HOURS)
REASON"'ETHOD OF SHUTTING DOWN~2'AUSE/CORRECTIVE ACTIONS COMMENTS


==SUMMARY==
==SUMMARY==
The unit operated at full power for the entire month of April.
The unit operated at full power for the entire month of April.
(1) Reason (2) Method A - Equipment Failure (Explain)                       1 - Manual B - Maintenance or Test                               2 - Manual Trip/Scram C - Refueling                                         3 - Automatic Trip/Scram D - Regulatory Restriction                             4 - Continuation E - Operator Training/License Examination             5 - Other (Explain)
(1) Reason (2) Method A - Equipment Failure (Explain)
F - Administrative G - Operational Error (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
H - Other (Explain) 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)


e   .0 t
e
        ~pl 9}}
.0 t
~pl 9}}

Latest revision as of 09:32, 8 January 2025

Monthly Operating Rept for Apr 1998 for Re Ginna Nuclear Power Plant
ML17265A265
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/30/1998
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9805140326
Download: ML17265A265 (8)


Text

CATEGORY REGULAT RY INFORMATION DISTRIBUTIO SYSTEM (RIDS)

ACl"ESSION NBR:9805140326 DOC.DATE: 98/04/30 NOTARIZED: NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

AUTH.NAME AUTHOR AFFILIATION WALDEN,J.V.

Rochester Gas S Electric Corp.

WIDAY,J.A.

Rochester Gas

& Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000244 VISSING, G. S.

SUBJECT:

Monthly operating rept for Apr 1998 for RE Ginna Nuclear Power Plant.W/980506 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

C A,'5000244E

.G RECIPIENT ID CODE/NAME PDl-1 PD INTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LITCO BRYCE,J H NRC PDR 1

1 ILE CENTER 0

1 1

RGN1 1

1 1

1 NOAC COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1

1 VISSING,G.

COPIES LTTR ENCL 1

1 1

1 1

1 1

1 D

E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9

ENCL 9

l J

II'

AND ROCHESTER GAS ANDELECTRIC CORPORATION ~ 89 EASTAVfNLIE,ROCHESTER, N. Y 14649-000I AREA CODE7I6 546-2700 May 6, 1998 US Nuclear Regulatory Commission Document Control Desk Attn:

Guy S. Vissing Project Directorate 1-1 Washington, DC 20555

Subject:

Monthly Report for April, 1998 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Vissing:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of April, 1998.

~

Very truly yours, u.d J

s h A. Widay lant Manager xc:

U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14B2)

Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I

475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments 9805140326

'F80430

POR, AOQCK 05000244 R

PDR

=47)3g g

o kl

OPERATING DATAREPORT 50-244 May 6, 1998 COMPLETED BY:

John V. Walden TELEPHONE (716) 771-3588 OPERATING STATUS 480

1. Unit Name:

R.E. GINNANUCLEAR POWER PLANT

2. Reporting Period:

A n'I, 'I998 3.

Design Electric Rating (Net MWe):

470 4.

Maximum Dependable Capacity (Net MWe):

Notes:

This Month Yr.-to-Date Cumulative**

5. Number of hours Reactor Was Critical
6. Hours Generator On-line
7. Unit Reserve Shutdown Hours
8. Net Electrical Energy Generated (MWH) 719.0 719.0 0.0 357410.0 2879.0 2879.0 0.0 1429793.0 200838.2 197817.7 8.5 88971309.4
    • CUMULATIVETOTALCOMMENCING NOVEMBER 8, 1969

1

~a S

11

l 4

DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT COMPLETED BY:

John V. Walden UNIT SHUTDOWN REPORTING PERIOD:

A ril 1998 (Month/Year)

NO.

DATE TYPE F: FORCED S: SCHEDULED DURATION (HOURS)

REASON"'ETHOD OF SHUTTING DOWN~2'AUSE/CORRECTIVE ACTIONS COMMENTS

SUMMARY

The unit operated at full power for the entire month of April.

(1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain) 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

e

.0 t

~pl 9