ML17309A652: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 2: Line 2:
| number = ML17309A652
| number = ML17309A652
| issue date = 04/14/1999
| issue date = 04/14/1999
| title = Rev 14 to AP-RCS.1, Reactor Coolant Leak.
| title = Rev 14 to AP-RCS.1, Reactor Coolant Leak
| author name =  
| author name =  
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:EOP           TITLE:
{{#Wiki_filter:EOP AP-RCS.1
REV: 14 AP-RCS.1 ~                 REACTOR COOLANT LEAK PAGE 1 of 11
~
                                                                          'OCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER RESPONSIBL MANAGER EFFECTIVE DATE CATEGORY 1.0 REVIEWED BY:
TITLE:
ti "PQR'99Qcf.fg
REACTOR COOLANT LEAK REV:
        ~9oiaoos9z.z-  
14 PAGE 1 of 11
            .ADocK Gsooa
'OCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER RESPONSIBL MANAGER EFFECTIVE DATE CATEGORY 1.0 REVIEWED BY:
                        >oR
ti ~9oiaoos9z.z-  
                                        )
 
.ADocK Gsooa "PQR'99Qcf.fg
>oR
)


EOP         TITLE:
EOP AP-RCS. 1-TITLE:
REV  14 AP-RCS. 1-                   REACTOR COOLANT LEAK PAGE 2   of ll A. PURPOSE     This procedure provides the instructions necessary to mitigate the consequences of a reactor coolant leak.
REACTOR COOLANT LEAK REV 14 PAGE 2 of ll A.
1 B. ENTRY CONDITIONS/SYMPTOMS
PURPOSE This procedure provides the instructions necessary to mitigate the consequences of a reactor coolant leak.
: 1. ENTRY CONDITIONS     This procedure   is entered from:
1 B.
: a. S-12.2,   OPERATOR ACTION   IN THE EVENT OF INDICATION OF SIGNIFICANT INCREASE IN LEAKAGE, when a         significant increase in   RCS leakage   is indicated.
ENTRY CONDITIONS/SYMPTOMS 1.
: b. AP-CVCS.l,   CVCS LEAK, when   leak cannot   be isolated.
ENTRY CONDITIONS This procedure is entered from:
: 2. SYMPTOMS     The symptoms   of REACTOR COOLANT LEAK     are;
a.
: a. Annunciator F-14, CHARGING     PUMP SPEED,   lit, or
S-12.2, OPERATOR ACTION IN THE EVENT OF INDICATION OF SIGNIFICANT INCREASE IN LEAKAGE, when a significant increase in RCS leakage is indicated.
: b. Annunciator A-2, VCT LEVEL     14% 86,   lit, or
b.
: c. Annunciator  E 16'MS     PROCESS MON1TOR HIGH   ACTIVITY~
AP-CVCS.l, CVCS LEAK, when leak cannot be isolated.
lit,  or
2.
: d. Annunciator E-24, or RMS AREA MONITOR     HIGH ACTIVITY,   lit,
SYMPTOMS The symptoms of REACTOR COOLANT LEAK are; a.
: e. Annunciator F-4,   PRESSURIZER LEVEL DEVIATION       -5 NORMAL +5, lit, or
Annunciator F-14, CHARGING PUMP SPEED, lit, or b.
: f. Annunciator F-10,     PRESSURIZER LO PRESS     2205 PSI,   lit, or
Annunciator c.
: g. Annunciator   F-ll,   PRESSURIZER LO LEVEL 13%,     lit.
Annunciator lit, or A-2, VCT LEVEL 14% 86, lit, or E 16'MS PROCESS MON1TOR HIGH ACTIVITY~
d.
Annunciator E-24, RMS AREA MONITOR HIGH ACTIVITY, lit, or e.
Annunciator F-4, PRESSURIZER LEVEL DEVIATION -5 NORMAL +5, lit, or f.
Annunciator F-10, PRESSURIZER LO PRESS 2205 PSI, lit, or g.
Annunciator F-ll, PRESSURIZER LO LEVEL 13%, lit.


  ~
~
K t!
K t!


BOP:                TITLE:
BOP:
REV: 14 AP-RCS. 1.                           REACTOR COOLANT LEAK PAGE 3   of 11 STEP           ACTION/EXPECTED RESPONSE               RESPONSE   NOT OBTAINED
AP-RCS. 1.
* 1 I
TITLE:
* 4 * *
REACTOR COOLANT LEAK REV:
14 PAGE 3 of 11 STEP ACTION/EXPECTED RESPONSE
 
===RESPONSE===
NOT OBTAINED 1 I 4
* f 1
* f 1
* 4 1 1 I
4 1
* 1 I 4 i 0 4 1 0 1
1 I 1 I 4 i 0
* 4 ~ 1 4
4 1
* f 1 1 1 t t ~ ~
0 1
CAUTION IF,   AT ANY TIME DURING THIS PROCEDURE. A REACTOR TRIP OR SI OCCURS,           E-O, REACTOR     TRIP OR SAFETY. INJECTION, SHALL BE PERFORMED.
4
NOTE:       Conditions should be evaluated for site contingency reporting (Refer to EPIP-1.0, GINNA STATION EVENT EVALUATION AND CLASSIFICATION.
~
1   Check PRZR Level STABLE AT                 IF   PRZR level decreasing,   THEN PROGRAM      LEVEL                            start additional charging pumps       and increase speed as necessary to stabilize PRZR level.
1 4
IF PRZR level continues to decrease, THEN close loop B cold leg to   REGEN Hx isolation valve, AOV-427.
* f 1
IF available charging pumps are running at maximum speed with letdown isolated. AND PRZR level is decreasing, THEN trip the reactor and go to E-O, REACTOR TRIP or SAFETY INJECTION.
1 1 t t
~
~
CAUTION IF, AT ANY TIME DURING THIS PROCEDURE.
A REACTOR TRIP OR SI
: OCCURS, E-O, REACTOR TRIP OR SAFETY. INJECTION, SHALL BE PERFORMED.
NOTE:
Conditions should be evaluated for site contingency reporting (Refer to EPIP-1.0, GINNA STATION EVENT EVALUATION AND CLASSIFICATION.
1 Check PRZR Level STABLE AT PROGRAM LEVEL IF PRZR level decreasing, THEN start additional charging pumps and increase speed as necessary to stabilize PRZR level.
IF PRZR level continues to
: decrease, THEN close loop B cold leg to REGEN Hx isolation valve, AOV-427.
IF available charging pumps are running at maximum speed with letdown isolated.
AND PRZR level is decreasing, THEN trip the reactor and go to E-O, REACTOR TRIP or SAFETY INJECTION.
 
4
 
EOP:
AP-RCS.1 TITLE:
REACTOR COOLANT LEAK REV 14 PAGE 4 of 11 STEP ACTION/EXPECTED RESPONSE


4 EOP:            TITLE:
===RESPONSE===
REV  14 AP-RCS.1                            REACTOR COOLANT LEAK PAGE 4    of 11 STEP      ACTION/EXPECTED RESPONSE                  RESPONSE  NOT OBTAINED NOTE:   IF VCT   level decreases to   5%. charging pump suction     will swap to the RWST. This may   require a load reduction.
NOT OBTAINED NOTE:
IF VCT level decreases to 5%. charging pump suction will swap to the RWST.
This may require a load reduction.
2 Check VCT Makeup System:
2 Check VCT Makeup System:
: a. Verify   VCT level   - GREATER THAN       a. Ensure charging     pump suction 5%                                            aligned to   RWST.
: a. Verify VCT level GREATER THAN 5%
                                                          ~ LCV-112B - OPEN
a.
                                                          ~ LCV-112C - CLOSED
Ensure charging pump suction aligned to RWST.
: b. Verify the following:                     b. Adjust controls as necessary.
~ LCV-112B -
: 1) RMW   mode selector switch in AUTO
OPEN
: 2) RMW   control   armed - RED LIGHT LIT
~ LCV-112C -
: c. Check VCT   level:                       c. Check letdown, divert valve, LCV-112A, closed.
CLOSED
o  Level  GREATER THAN 20%
: b. Verify the following:
IF VCT makeup   flow NOT adequate,
1)
                        -OR-                            THEN perform   the following:
RMW mode selector switch in AUTO
o  Level  - STABLE OR INCREASING              1) Ensure BA   transfer pumps and RMW pumps   running.
: b. Adjust controls as necessary.
: 2) Adjust RMW flow control valve. HCV-ill. to increase RMW flow.
2)
: 3) Increase   boric acid flow   as necessary   to maintain required concentration.
RMW control armed RED LIGHT LIT c.
IF VCT level can NOT be maintained, THEN refer to ER-CVCS.1, REACTOR. MAKEUP CONTROL MALFUNCTION, necessary'.
Check VCT level:
if
o Level GREATER THAN 20%
-OR-o Level STABLE OR INCREASING c.
Check letdown, divert valve, LCV-112A, closed.
IF VCT makeup flow NOT adequate, THEN perform the following:
: 1) Ensure BA transfer pumps and RMW pumps running.
: 2) Adjust RMW flow control valve. HCV-ill. to increase RMW flow.
: 3) Increase boric acid flow as necessary to maintain required concentration.
IF VCT level can NOT be maintained, THEN refer to ER-CVCS.1, REACTOR. MAKEUP CONTROL MALFUNCTION, if necessary'.


Y I
Y I


EOP:                TITLE:
EOP:
REV: 14 AP-RCS.1                                 REACTOR COOLANT LEAK PAGE 5   of 11 STEP           ACTION/EXPECTED RESPONSE                     RESPONSE     NOT OBTAINED 3   Check     If RCS   Leakage     In CNMT:       ~ IF leakage is indicated in CNMT, THEN     perform the following:
AP-RCS.1 TITLE:
o  Check CNMT    radiation monitors NORMAL                                          a. Direct     RP to sample   CNMT for entry.
REACTOR COOLANT LEAK REV:
            ~  R-2
14 PAGE 5 of 11 STEP ACTION/EXPECTED RESPONSE
            ~  R-7                                          b. Continue with Step 4. WHEN CNMT
 
            ~  R-10A                                            cleared for entry. THEN dz'spatch
===RESPONSE===
            ~  R-11                                              personnel to investigate CNMT
NOT OBTAINED 3 Check If RCS Leakage In CNMT:
            ~  R-12                                              for RCS leakage.
o Check CNMT radiation monitors NORMAL
o  CNMT sump A pump run        freguency-NORMAL (Refer to RCS        Daily Leakage Log)
~ R-2
  ~  1 I 4   1 0 ~ 1 * ~ I 1 0 i l 0 ~ 4
~ R-7
* 1 I   ~ 4   1 1 I 4 I I ~ ~ 1 I 4 1 I *
~ R-10A
* CAUTION RADIATION PROTECTION TECHNICIAN SHOULD BE CONSULTED PRIOR TO ENTERING A HIGH AIRBORNE AREA.
~ R-11
4   Dispatch       AO To   AUX'LDG To Investigate For           CVCS Leak (locked area keys required) 5   Check For Leak To           CCW   System:           Go   to   AP-CCW.1, LEAKAGE INTO THE COMPONENT COOLING LOOP.
~ R-12 o
o   CCW   surge tank level APPROXIMATELY 50'/i AND STABLE o   CCW    radiation monitor,      R-17 NORMAL
CNMT sump A pump run freguency-NORMAL (Refer to RCS Daily Leakage Log)
~ IF leakage is indicated in CNMT, THEN perform the following:
: a. Direct RP to sample CNMT for entry.
: b. Continue with Step 4.
WHEN CNMT cleared for entry.
THEN dz'spatch personnel to investigate CNMT for RCS leakage.
~
1 I 4
1 0
~
1
~ I 1
0 i l 0
~
4 1 I
~
4 1
1 I 4 I I
~
~
1 I 4
1 I CAUTION RADIATION PROTECTION TECHNICIAN SHOULD BE CONSULTED PRIOR TO ENTERING A HIGH AIRBORNE AREA.
4 Dispatch AO To AUX'LDG To Investigate For CVCS Leak (locked area keys required) 5 Check For Leak To CCW System:
o CCW surge tank level APPROXIMATELY 50'/i AND STABLE Go to AP-CCW.1, LEAKAGE INTO THE COMPONENT COOLING LOOP.
o CCW radiation monitor, R-17 NORMAL
 
EOP AP-RCS. 1.
TITLE:
REACTOR COOLANT LEAK REV,:
14 PAGE 6 of 11 STEP ACTION/EXPECTED RESPONSE
 
===RESPONSE===
NOT OBTAINED 6 Check CVCS Conditions:
a.
Letdown indication:
o Letdown flow - APPROXIMATELY 40 GPM o
Low pressure LTDN pressure-APPROXIMATELY 250 PSIG a.
IF letdown isolated, THEN continue with Step 6b.
IF NOT
: isolated, THEN go to AP-CVCS.1.
CVCS LEAK. Step 6.
o Letdown pressure control
: valve, PCV-135, demand APPROXIMATELY 35'/i OPEN
: b. Charging indication:
o Seal injection flows GREATER THAN 6 GPM AND STABLE o
RCP Labyrinth seal D/Ps GREATER THAN 15 INCHES AND APPROXIMATELY EQUAL b.
Go to AP-CVCS.1, CVCS LEAK, Step 6.
o Charging pump discharge pressure GREATER THAN RCS PRESSURE c.
AUX BLDG radiation levels NORMAL
~ R-4
~ R-9
~ R-10B
~ R-13
~ R-14 c.
Go to AP-CVCS.l, CVCS LEAK, Step 6 and refer to CVCS piping diagrams for further guidance.


EOP                 TITLE:
EOP:
REV,:  14 .
AP-RCS. 1"
AP-RCS. 1.                         REACTOR COOLANT LEAK PAGE 6    of 11 STEP         ACTION/EXPECTED RESPONSE             RESPONSE  NOT OBTAINED 6  Check CVCS        Conditions:
.TITLE:
: a. Letdown    indication:                  a. IF letdown  isolated,  THEN continue with Step 6b. IF  NOT o    Letdown flow    - APPROXIMATELY        isolated,  THEN go  to AP-CVCS.1.
REACTOR COOLANT LEAK REV:
40  GPM                                CVCS LEAK. Step 6.
14 PAGE 7 of 11 STEP ACTION/EXPECTED RESPONSE
o    Low pressure LTDN pressure-APPROXIMATELY 250 PSIG o    Letdown pressure    control valve,    PCV-135, demand APPROXIMATELY 35'/i OPEN
: b. Charging      indication:              b. Go  to AP-CVCS.1,  CVCS LEAK, Step 6.
o    Seal  injection flows GREATER THAN 6 GPM AND STABLE o    RCP Labyrinth seal D/Ps GREATER THAN 15 INCHES AND APPROXIMATELY EQUAL o    Charging    pump discharge pressure    - GREATER THAN RCS PRESSURE
: c. AUX BLDG      radiation levels          c. Go  to AP-CVCS.l, CVCS LEAK, NORMAL                                      Step 6 and refer to CVCS piping diagrams for further guidance.
            ~  R-4
            ~  R-9
            ~  R-10B
            ~  R-13
            ~  R-14


EOP:              .TITLE:
===RESPONSE===
REV: 14 AP-RCS. 1"                          REACTOR COOLANT LEAK PAGE 7  of  11 STEP          ACTION/EXPECTED RESPONSE                  RESPONSE  NOT OBTAINED 7   Check PRT       Indications:                     Check tailpipe and valve leakoff temperatures for the PRZR safety
NOT OBTAINED 7 Check PRT Indications:
: a. Level -    BETWEEN 61'/. AND 84'/.          valves and PORVs for indication of leakage.
: a. Level BETWEEN 61'/. AND 84'/.
: b. Pressure - APPROXIMATELY 1.5 PSIG AND STABLE                         IF no   PORV or safety valve leakage is indic'ated,   THEN check other leak
: b. Pressure APPROXIMATELY 1.5 PSIG AND STABLE
: c. Temperature    - AT CNMT AMBIENT            paths from the RCS to the PRT.
: c. Temperature
TEMPERATURE AND STABLE
- AT CNMT AMBIENT TEMPERATURE AND STABLE Check tailpipe and valve leakoff temperatures for the PRZR safety valves and PORVs for indication of leakage.
                                                          ~ Letdown relief valve, RV-203
IF no PORV or safety valve leakage is indic'ated, THEN check other leak paths from the RCS to the PRT.
                                                          ~ Seal return relief valve, RV-314
~ Letdown relief valve, RV-203
      * * *  ~ I I I   * * * *
~ Seal return relief valve, RV-314
~ I I I
*
* I
* I I I I
~ I
~ I
~
* I I
~
* I
* I
* I I I I  * * ~ I ~ I ~
* I I
* I I ~
~ I I
* I *
~
* I I ~ I I  ~ ~
~
CAUTION STEAM GENERATOR TUBE LEAKAGE         IN ONE S/G SHALL NOT EXCEED   O.l GPM WHEN AVERAGED OVER 24 HOURS.
CAUTION STEAM GENERATOR TUBE LEAKAGE IN ONE S/G SHALL NOT EXCEED O.l GPM WHEN AVERAGED OVER 24 HOURS.
8   Check S/Gs For Leakage:                         IF S/G tube leak indicated, THEN refer to 0-6.10, PLANT OPERATION o  Air ejector radiation monitors                WITH A S/G TUBE LEAK INDICATION.
8 Check S/Gs For Leakage:
NORMAL
o Air ejector radiation monitors NORMAL IF S/G tube leak indicated, THEN refer to 0-6.10, PLANT OPERATION WITH A S/G TUBE LEAK INDICATION.
            ~   R-15
~ R-15
            ~   R-15A o   S/G blowdown   radiation monitor (R-19) -    NORMAL o   Steamline radiation monitors NORMAL
~ R-15A o
            ~   R-31
S/G blowdown radiation monitor (R-19)
            ~   R-32 o   S/G sample   activity   - NORMAL (Check   with RP Department     for normal)
NORMAL o
Steamline radiation monitors NORMAL
~ R-31
~ R-32 o
S/G sample activity -
NORMAL (Check with RP Department for normal)
 
EOP AP-RCS. 1".
TITLE:
REACTOR COOLANT LEAK REV:
14 PAGE 8 of 11, STEP ACTION/EXPECTED RESPONSE


EOP              TITLE:
===RESPONSE===
REV: 14 AP-RCS. 1".                      REACTOR COOLANT LEAK PAGE 8  of 11, STEP        ACTION/EXPECTED RESPONSE            RESPONSE  NOT OBTAINED 9 Check SI Accumulator         Levels     Calculate inleakage to SI STABLE                                    accumulators (Refer to S-16.11.
NOT OBTAINED 9 Check SI Accumulator Levels STABLE Calculate inleakage to SI accumulators (Refer to S-16.11.
MONITORING INLEAKAGE TO     SI ACCUMULATORS) 10 Check RCP       Seal Leakoff Flows:       Go  to AP-RCP.l. RCP SEAL MALFUNCTION.
MONITORING INLEAKAGE TO SI ACCUMULATORS) 10 Check RCP Seal Leakoff Flows:
o Leakoff flows     - WITHIN THE NORMAL OPERATING RANGE OF FIGURE RCP SEAL LEAKOFF o Leakoff flows     - STABLE ll Check (Refer RCDT to Leak Rate RCS NORHAL Daily Leakage Check to other sources of in leakage RCDT:
o Leakoff flows - WITHIN THE NORMAL OPERATING RANGE OF FIGURE RCP SEAL LEAKOFF Go to AP-RCP.l.
Log and    PPCS  point ID L1003)
RCP SEAL MALFUNCTION.
: a. IF Rx vessel flange   leakoff temperature has increased,   THEN close Rx VESS FLANGE SEAL LEAKOFF VLV. AOV-521.
o Leakoff flows - STABLE ll Check RCDT Leak Rate NORHAL (Refer to RCS Daily Leakage Log and PPCS point ID L1003)
Check other sources of in leakage to RCDT:
: a. IF Rx vessel flange leakoff temperature has increased, THEN close Rx VESS FLANGE SEAL LEAKOFF VLV. AOV-521.
: b. Verify excess letdown isolated.
: b. Verify excess letdown isolated.
IF NOT, THEN ensure RCDT divert valve. AOV-312, in the VCT position.
IF NOT, THEN ensure RCDT divert valve.
AOV-312, in the VCT position.
: c. IF source of leakage NOT determined'HEN suspect loop drains.
: c. IF source of leakage NOT determined'HEN suspect loop drains.


g ~
g
~
 
EOP:
EOP:
REV: 14 AP-RCS. 1"                         REACTOR COOLANT LEAK PAGE 9           of 11 STEP       ACTION/EXPECTED RESPONSE             RESPONSE   NOT OBTAINED 12 Check     Valve Leakoff                   IF any valve leakoff temperature is Temperatures  NORMAL (Refer            ,abnormally high, THEN initiate to Pressurizer Valve Leak-Off,            investigation of that leakage path.
AP-RCS. 1" REACTOR COOLANT LEAK REV:
Temperature Record Log) 13 Establish Stable Plant Conditions:
14 PAGE 9 of 11 STEP ACTION/EXPECTED RESPONSE
: a. PRZR level   - TRENDING TO PROGRAM   a. Control charging and letdown flows to restore   PRZR. level to'rogram.
 
: b. Check  PRZR  pressure control:        b. Verify proper operation of PRZR heaters and spray or take manual o  Pressure  - TRENDING TO              control of PRZR pressure 2235 PSIG                            controller 431K. IF pressure can NOT be   controlled, THEN o  PRZR  backup heaters  - OFF          refer to   AP-PRZR.1, ABNORMAL PRESSURIZER PRESSURE.
===RESPONSE===
14   Evaluate     RCS   Leakage:
NOT OBTAINED 12 Check Valve Leakoff Temperatures NORMAL (Refer to Pressurizer Valve Leak-Off, Temperature Record Log)
: a. Leakage   within limits (Refer to     a. IF leak   NOT isolable, but PRZR leakage surveillance sheet and            level and seal injection can be ITS  section 3.4.13)                      maintained, THEN shut the plant down (Refer to 0-2.1, NORMAL SHUTDOWN TO HOT SHUTDOWN or AP-TURB.5, RAPID LOAD REDUCTION).
IF any valve leakoff temperature is
: b. Leak  location identified            b. Return to Step 1.
,abnormally high, THEN initiate investigation of that leakage path.
13 Establish Stable Plant Conditions:
a.
PRZR level
- TRENDING TO PROGRAM b.
Check PRZR pressure control:
o Pressure
- TRENDING TO 2235 PSIG o
PRZR backup heaters OFF
: a. Control charging and letdown flows to restore PRZR. level to'rogram.
: b. Verify proper operation of PRZR heaters and spray or take manual control of PRZR pressure controller 431K.
IF pressure can NOT be controlled, THEN refer to AP-PRZR.1, ABNORMAL PRESSURIZER PRESSURE.
14 Evaluate RCS Leakage:
a.
Leakage within limits (Refer to leakage surveillance sheet and ITS section 3.4.13)
: b. Leak location identified
: a. IF leak NOT isolable, but PRZR level and seal injection can be maintained, THEN shut the plant down (Refer to 0-2.1, NORMAL SHUTDOWN TO HOT SHUTDOWN or AP-TURB.5, RAPID LOAD REDUCTION).
: b. Return to Step 1.


~ A
~
'EOP:
A
REV: 14
'AP-RCS.l"'EACTOR                      COOLANT LEAK PAGE 10 of 11 STEP    ACTION/EXPECTED RESPONSE          RESPONSE NOT OBTAINED NOTE:  Refer to 0-9.3, NRC INNEDIATE NOTIFICATION, for reporting requirements.
1S  Notify Higher Supervision
                                          -END-


~ ' EOP:         TITLE:
'EOP:'AP-RCS.l"'EACTOR COOLANT LEAK REV:
w
14 PAGE 10 of 11 STEP ACTION/EXPECTED RESPONSE
                                          /            REV: 14 AP-RCS.1"                   REACTOR COOLANT LEAK PAGE ll of 11 AP-RCS.1 APPENDIX LIST TITLE
 
: 1)   FIGURE RCP SEAL LEAKOFF (FIG-4.0)
===RESPONSE===
NOT OBTAINED NOTE:
Refer to 0-9.3, NRC INNEDIATE NOTIFICATION, for reporting requirements.
1S Notify Higher Supervision
-END-
 
~ '
EOP:
w AP-RCS.1" TITLE:
/
REACTOR COOLANT LEAK REV:
14 PAGE ll of 11 AP-RCS.1 APPENDIX LIST TITLE 1)
FIGURE RCP SEAL LEAKOFF (FIG-4.0)


V
V
  -=s P
-=s P


EOP         TITLE:
EOP ES-1.1 TITLE:
REV: 18 ES-1.1                       SI TERMINATION PAGE 1 of 24 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER RESPONSIBLE   NAGER 3 3I Jc-od-EFFECTIVE DATE CATEGORY 1.0 REVIEWED BY:
SI TERMINATION REV:
18 PAGE 1 of 24 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER RESPONSIBLE NAGER 3 3I Jc-od-EFFECTIVE DATE CATEGORY 1.0 REVIEWED BY:


EOP:
EOP:
REV: 18 ES-1.1                       SI TERMINATION PAGE 2 of 24 A. PURPOSE This procedure provides the necessary instructions to terminate safety injection and stabilize plant   conditions'.
ES-1.1 SI TERMINATION REV:
ENTRY CONDITIONS/SYMPTOMS 1 ~ ENTRY CONDITIONS This   procedure is entered from:
18 PAGE 2 of 24 A.
: a. E-O, REACTOR TRIP   OR SAFETY INJECTION, and E-l, LOSS OF REACTOR OR SECONDARY COOLANT, when specified termination criteria are sati'sfied.
PURPOSE This procedure provides the necessary instructions to terminate safety injection and stabilize plant conditions'.
: b. FR-H.1, RESPONSE TO LOSS OF SECONDARY HEAT SINK, after secondary heat sink has been reestablished and SI has been terminated.
ENTRY CONDITIONS/SYMPTOMS 1
~
ENTRY CONDITIONS This procedure is entered from:
a.
E-O, REACTOR TRIP OR SAFETY INJECTION, and E-l, LOSS OF REACTOR OR SECONDARY COOLANT, when specified termination criteria are sati'sfied.
b.
FR-H.1,
 
===RESPONSE===
TO LOSS OF SECONDARY HEAT SINK, after secondary heat sink has been reestablished and SI has been terminated.
 
~


EOP:
ES-1.1 TITLE:
SI TERMINATION REV 18 PAGE 3 of 24 STEP ACTION/EXPECTED RESPONSE
===RESPONSE===
NOT OBTAINED
~
1
~
~
4 t
* i i 0 l 4
4 1 I 4
~
0 I 1
1
~
~
* EOP:                TITLE:
0 I I 4
REV  18 ES-1.1                                      SI TERMINATION PAGE 3    of 24 STEP          ACTION/EXPECTED RESPONSE                    RESPONSE  NOT OBTAINED
0 4
      ~ 1  ~  ~ 4  t
0 1
* i i
4
* 0 l
~
* 4 4 1 I 4 ~ 0 I 1  1  ~ 0 I I
1 I 1
* 4 0 4 0 1 4 ~ 1 I 1 ~
~
CAUTION IF OFFSITE POWER IS LOST AFTER SI RESET. THEN SELECTED SW PUMPS AND ONE CCW PUMP WILL.AUTO START ON EMERGENCY D/G. MANUAL ACTION WILL BE REQUIRED TO RESTART SAFEGUARDS EQUIPMENT.
CAUTION IF OFFSITE POWER IS LOST AFTER SI RESET.
NOTE:     o   FOLDOUT page       should be open   AND monitored periodically.
THEN SELECTED SW PUMPS AND ONE CCW PUMP WILL.AUTO START ON EMERGENCY D/G.
o   Critical Safety Function         Status Trees should be monitored (Refer to Appendix I for       Red Path Summary).
MANUAL ACTION WILL BE REQUIRED TO RESTART SAFEGUARDS EQUIPMENT.
o   Adverse     CNMT   values should be used whenever CNMT pressure is greater than       4 psig or CNMT radiation is greater than 10+05 R/hr.
NOTE:
1 Reset SI 2 Reset CI:
o FOLDOUT page should be open AND monitored periodically.
: a. Depress CI reset pushbutton
o Critical Safety Function Status Trees should be monitored (Refer to Appendix I for Red Path Summary).
: b. Verify annunciator A-26,         CNMT         b. Perform the following:
o Adverse CNMT values should be used whenever CNMT pressure is greater than 4 psig or CNMT radiation is greater than 10+05 R/hr.
ISOLATION - EXTINGUISHED
1 Reset SI 2 Reset CI:
: 1) Reset SI.
a.
: 2) Depress CI reset pushbutton.
Depress CI reset pushbutton
3 Maintain         PRZR   Pressure Between 1800 PSIG And 2235 PSIG o   Reset     PRZR heaters o   Use   normal   PRZR   spray
: b. Verify annunciator A-26, CNMT ISOLATION - EXTINGUISHED
: b. Perform the following:
: 1) Reset SI.
: 2) Depress CI reset pushbutton.
3 Maintain PRZR Pressure Between 1800 PSIG And 2235 PSIG o
Reset PRZR heaters o
Use normal PRZR spray


EOP:
EOP:
REV: 18 ES-1.1                             SI TERMINATION PAGE 4 of 24 STEP       ACTION/EXPECTED RESPONSE           RESPONSE   NOT'BTAINED 4 Verify Adequate     SW Flow:
ES-1.1 SI TERMINATION REV:
: a. Check at least two SW pumps       a. Manually start SW pumps as power RUNNING                                supply permits '(257 kw each).
18 PAGE 4 of 24 STEP ACTION/EXPECTED RESPONSE
IF less than two SW pumps running. THEN perform the following:
 
: 1) Ensure SW isolation.
===RESPONSE===
: 2) Dispatch   AO to establish normal shutdown alignment (Refer to Attachment SD-1).
NOT'BTAINED 4 Verify Adequate SW Flow:
: 3) Go  to Step 7.
a.
: b. Dispatch AO to establish normal shutdown alignment (Refer to Attachment SD-1)
Check at least two SW pumps RUNNING
: a. Manually start SW pumps as power supply permits
'(257 kw each).
IF less than two SW pumps running.
THEN perform the following:
: 1) Ensure SW isolation.
: 2) Dispatch AO to establish normal shutdown alignment (Refer to Attachment SD-1).
: b. Dispatch AO to establish normal shutdown alignment (Refer to Attachment SD-1) 3)
Go to Step 7.


EOP:
EOP:
REV: 18 ES-1.1                               SI TERMINATION PAGE 5     of 24 STEP       ACTION/EXPECTED RESPONSE             RESPONSE NOT OBTAINED 5 Establish IA to       CNMT:
ES-1.1 SI TERMINATION REV:
: a. Verify non-safeguards   busses       a. Perform the following:
18 PAGE 5 of 24 STEP ACTION/EXPECTED RESPONSE
energized from  offsite  power
 
: 1) Close non-safeguards     bus   tie o  Bus 13 normal feed - CLOSED              breakers:
===RESPONSE===
                      -OR-                            ~ Bus 13 to Bus 14 tie
NOT OBTAINED 5 Establish IA to CNMT:
                                                        ~ Bus 15 to Bus 16 tie o  Bus 15 normal feed - CLOSED
: a. Verify non-safeguards busses energized from offsite power o
: 2) Verify adequate emergency       D/G capacity to run air compressors   (75 kw each).
Bus 13 normal feed CLOSED
IF NOT, THEN evaluate RECIRC fans should be if  CNMT stopped (Refer to Attachment   CNMT RECIRC FANS).
-OR-o Bus 15 normal feed CLOSED
: b. Verify SW isolation valves to turbine building -
OPEN
~ MOV-4613 and MOV-4670
~ MOV-4614 and MOV-4664
: c. Verify adequate air compressor(s)
RUNNING d.
Check IA supply:
o Pressure GREATER THAN 60 PSIG o
Pressure STABLE OR INCREASING e.
Reset both trains of XY relays for IA to CNMT AOV-5392
: f. Verify IA to CNMT AOV-5392 OPEN a.
Perform the following:
: 1) Close non-safeguards bus tie breakers:
~ Bus 13 to Bus 14 tie
~ Bus 15 to Bus 16 tie
: 2) Verify adequate emergency D/G capacity to run air compressors (75 kw each).
IF NOT, THEN evaluate if CNMT RECIRC fans should be stopped (Refer to Attachment CNMT RECIRC FANS).
3)'HEN bus 15 restored, THEN reset control room lighting.
3)'HEN bus 15 restored, THEN reset control room lighting.
: b. Verify SW isolation  valves to      b. Manually align valves.
: b. Manually align valves.
turbine building - OPEN
: c. Manually start air compressors as power supply permits (75 kw each).
          ~ MOV-4613 and MOV-4670
IF air compressors can NOT be started, THEN dispatch AO to locally reset compressors as necessary.
          ~ MOV-4614 and MOV-4664
: d. Perform the following:
: c. Verify adequate  air                c. Manually   start air   compressors compressor(s) -  RUNNING                as power supply permits (75 kw each). IF air compressors can NOT be started, THEN dispatch AO to locally reset compressors as necessary.
: 1) Continue attempts to restore IA (Refer to AP-IA.1.
: d. Check IA supply:                      d. Perform the   following:
LOSS OF INSTRUMENT AIR).
o  Pressure  - GREATER THAN              1) Continue attempts to restore 60 PSIG                                  IA (Refer to AP-IA.1. LOSS OF INSTRUMENT   AIR).
: 2) Continue with Step 6.
o  Pressure  - STABLE OR INCREASING                            2) Continue   with Step 6. WHEN IA restored. THEN do   Steps 5e and f.
WHEN IA restored.
: e. Reset both  trains of XY relays for IA to CNMT AOV-5392    "
THEN do Steps 5e and f.
: f. Verify IA to CNMT AOV-5392 - OPEN


e 0
e 0


EOP:
EOP:
REV: 18 ES-1.1                           SI TERMINATION PAGE 6   of 24 STEP       ACTION/EXPECTED RESPONSE           RESPONSE   NOT OBTAINED 6 Check Been If Charging Established:
ES-1.1 SI TERMINATION REV:
Flow Has
18 PAGE 6 of 24 STEP ACTION/EXPECTED RESPONSE
: a. Charging pumps ANY RUNNING       a. Perform the     following:
 
: 1) IF CCW   flow is lost to   any RCP thermal barrier OR any RCP gl seal outlet temperature offscale high, THEN dispatch AO with key to RWST gate to close seal injection needle valve(s) to affected     RCP:
===RESPONSE===
                                                      ~ RCP   A, V-300A
NOT OBTAINED 6 Check If Charging Flow Has Been Established:
                                                      ~ RCP   B, V-300B
: a. Charging pumps ANY RUNNING a.
: 2) Ensure HCV-142 open,     demand at 0/o.
Perform the following:
: b. Charging pump suction aligned to   b. Manually align valves as RWST:                                  necessary.
: 1) IF CCW flow is lost to any RCP thermal barrier OR any RCP gl seal outlet temperature offscale high, THEN dispatch AO with key to RWST gate to close seal injection needle valve(s) to affected RCP:
o  LCV-112B - OPEN                      IF LCV-112B can NOT be opened.
~
THEN dispatch AO to locally open o  LCV-112C - CLOSED                    manual charging pump suction from RWST (V-358 located in charging pump room).
RCP A, V-300A
~
RCP B, V-300B
: 2) Ensure HCV-142 open, demand at 0/o.
: b. Charging pump suction aligned to RWST:
o LCV-112B -
OPEN o
LCV-112C -
CLOSED
: b. Manually align valves as necessary.
IF LCV-112B can NOT be opened.
THEN dispatch AO to locally open manual charging pump suction from RWST (V-358 located in charging pump room).
IF LCV-112C can NOT be closed,"
IF LCV-112C can NOT be closed,"
THEN perform the following:
THEN perform the following:
: 1) Verify charging     pump A NOT running and place in     PULL STOP.
: 1) Verify charging pump A NOT running and place in PULL STOP.
: 2) Direct   AO to close V-268 to isolate charging     pumps B and C from   VCT (V-268 located   in charging pump room).
: 2) Direct AO to close V-268 to isolate charging pumps B and C from VCT (V-268 located in charging pump room).
: c. Start charging pumps as necessary and adjust charging flow to restore PRZR level
: c. Start charging pumps as necessary and adjust charging flow to restore PRZR level


EOP:
EOP:
REV: 18 ES-1.1                             SI TERMINATION PAGE 7 of 24 STEP       ACTION/EXPECTED RESPONSE           RESPONSE   NOT OBTAINED 7 Stop SI And RHR Pumps And Place In AUTO
ES-1.1 SI TERMINATION REV:
18 PAGE 7 of 24 STEP ACTION/EXPECTED RESPONSE
 
===RESPONSE===
NOT OBTAINED 7 Stop SI And RHR Pumps And Place In AUTO
* 8 Monitor SI Reinitiation Criteria:
* 8 Monitor SI Reinitiation Criteria:
: a. RCS subcooling based on core       a. Manually    start  SI pumps as exit T/Cs GREATER THAN 0 F         necessary   and go to E-l, LOSS OF USING FIGURE MIN SUBCOOLING            REACTOR OR SECONDARY COOLANT, Step l.
a.
: b. PRZR  level  - GREATER THAN 5%      b. Control charging flow to
RCS subcooling based on core exit T/Cs GREATER THAN 0 F
[30% adverse CNMT]                      maintain   PRZR level.
USING FIGURE MIN SUBCOOLING b.
IF PRZR level can NOT be maintained, THEN manually start SI pumps as necessary and go to E-1. LOSS OF REACTOR OR SECONDARY COOLANT,   Step 1.
PRZR level GREATER THAN 5%
[30% adverse CNMT]
: a. Manually start SI pumps as necessary and go to E-l, LOSS OF REACTOR OR SECONDARY COOLANT, Step l.
: b. Control charging flow to maintain PRZR level.
IF PRZR level can NOT be maintained, THEN manually start SI pumps as necessary and go to E-1.
LOSS OF REACTOR OR SECONDARY COOLANT, Step 1.


~c 4 ~ e
~ c 4
~
e


EOP:
EOP:
REV: 18 ES-1.1                               SI TERMINATION PAGE 8 of 24 STEP       ACTION/EXPECTED RESPONSE             RESPONSE  NOT OBTAINED
ES-1.1 SI TERMINATION REV:
* 9 Monitor Be  Stopped:
18 PAGE 8 of 24 STEP ACTION/EXPECTED RESPONSE
If  CNMT Spray    Should
: a. CNMT  spray  pumps  - RUNNING        a. Go to Step 10.
: b. Check  CNMT  pressure  - LESS THAN    b. Continue with Step 10; WHEN 4  PSIG                                    CNMT pressure less than 4 psig, THEN do Steps 9c through f.
: c. Reset  CNMT  spray
: d. Check  NaOH  tank outlet valves      d. Place  NaOH tank outlet valve CLOSED                                    controllers to  MANUAL and close valves.
          ~ AOV-836A
          ~ AOV-836B
: e. Stop  CNMT  spray pumps and place
        ~
in  AUTO
: f. Close  CNMT  spray  pump discharge valves
          ~  MOV-860A
          ~  MOV-860B
          ~  MOV-860C
          ~  MOV-860D


t EOP:
===RESPONSE===
REV    18 ES-l. 1                           SI TERMINATION PAGE 9   of 24 STEP       ACTION/EXPECTED RESPONSE           RESPONSE NOT OBTAINED 10 Verify MRPI Indicates         ALL     IF one or more control rods NOT CONTROL AND SHUTDOWN RODS ON            fully inserted,   THEN perform the BOTTOM                                  following:
NOT OBTAINED
: a. Place   RMW mode selector switch to BORATE.
* 9 Monitor If CNMT Spray Should Be Stopped:
: b. Adjust boric acid flow control valve. FCV-llOA, for desired flowrate.
a.
CNMT spray pumps RUNNING b.
Check CNMT pressure
- LESS THAN 4 PSIG
: c. Reset CNMT spray d.
Check NaOH tank outlet valves CLOSED
~ AOV-836A
~ AOV-836B a.
Go to Step 10.
: b. Continue with Step 10; WHEN CNMT pressure less than 4 psig, THEN do Steps 9c through f.
: d. Place NaOH tank outlet valve controllers to MANUAL and close valves.
e.
Stop CNMT spray pumps and place
~
in AUTO
: f. Close CNMT spray pump discharge valves
~ MOV-860A
~ MOV-860B
~ MOV-860C
~ MOV-860D
 
t
 
EOP:
ES-l. 1 SI TERMINATION REV 18 PAGE 9 of 24 STEP ACTION/EXPECTED RESPONSE
 
===RESPONSE===
NOT OBTAINED 10 Verify MRPI Indicates ALL CONTROL AND SHUTDOWN RODS ON BOTTOM IF one or more control rods NOT fully inserted, THEN perform the following:
a.
Place RMW mode selector switch to BORATE.
: b. Adjust boric acid flow control valve.
FCV-llOA, for desired flowrate.
: c. Set boric acid integrator to desired amount (650 gallons for each control rod not fully inserted).
: c. Set boric acid integrator to desired amount (650 gallons for each control rod not fully inserted).
: d. Place   RMW control to start and verify flow. IF flow can NOT be established. THEN refer to ER-CVCS.1. REACTOR MAKEUP CONTROL MALFUNCTION.
: d. Place RMW control to start and verify flow.
ll Establish Dump Condenser Steam Pressure Control:
IF flow can NOT be established.
: a. Verify condenser available:         a. Place S/G ARV controllers in AUTO at desired pressure   and go o  Any MSIV - OPEN                      to Step 12.
THEN refer to ER-CVCS.1.
o  Annunciator G-15. STEAM DUMP ARMED - LIT
REACTOR MAKEUP CONTROL MALFUNCTION.
: b. Adjust condenser steam dump controller HC-484 to desired pressure and verify in AUTO.
ll Establish Condenser Steam Dump Pressure Control:
: c. Place steam dump mode selector switch to MANUAL.
: a. Verify condenser available:
o Any MSIV -
OPEN o
Annunciator G-15.
STEAM DUMP ARMED - LIT a.
Place S/G ARV controllers in AUTO at desired pressure and go to Step 12.
: b. Adjust condenser steam dump controller HC-484 to desired pressure and verify in AUTO.
: c. Place steam dump mode selector switch to MANUAL.


d < 1 EOP:
d 1
REV: 18 ES-1.1                            SI TERMINATION PAGE 10    of 24 STEP      ACTION/EXPECTED RESPONSE          RESPONSE  NOT OBTAINED 12  Verify Adequate    SW  Flow To CCW  Hx:
: a. Verify at least two  SW pumps-      a. Manually  start  pumps as power RUNNING                                supply permits (257 kw each).
IF less than two SW pumps can be operated, THEN go to Step 18.
: b. Verify AUX BLDG SW  isolation      b. Manually align valves.
valves -  OPEN
          ~ MOV-4615 and MOV-4734
          ~ MOV-4616 and MOV-4735
: c. Verify CNMT RECIRC fan              c. Manually  start  an additional  SW annunciator C-2, HIGH                  pump as power  supply permits TEMPERATURE ALARM - EXTINGUISHED        (257 kw each).


EOP:
EOP:
REV: 18 ES-1.1                             SI TERMINATION PAGE 11     of 24 STEP       ACTION/EXPECTED RESPONSE           RESPONSE NOT OBTAINED 13 Check Operation If Normal   CVCS Can Be Established
ES-1.1 SI TERMINATION REV:
: a. Verify IA restored:                 a. Continue with Step 18.         WHEN   IA can be   restored. THEN do   Steps o  IA to  CNMT (AOV-5392) - OPEN        13 through 17.
18 PAGE 10 of 24 STEP ACTION/EXPECTED RESPONSE
o  IA pressure  - GREATER THAN 60 PSIG
 
: b. Verify instrument   bus D-           b. Energize   MCC B. IF MCC B NOT ENERGIZED                                available. THEN   perform the following:
===RESPONSE===
: 1) Verify MCC   A energized.
NOT OBTAINED 12 Verify Adequate SW Flow To CCW Hx:
: 2) Place   instrument bus     D on maintenance     supply.
: a. Verify at least two SW pumps-RUNNING
: c. CCW  pumps  - ANY RUNNING            c. Perform the following:
: b. Verify AUX BLDG SW isolation valves OPEN
: 1) IF any RCP &#xb9;1 seal outlet temperature offscale high, THEN isolate CCW to thermal barrier of affected       RCP(s).
: a. Manually start pumps as power supply permits (257 kw each).
                                                      ~ RCP A, MOV-749A and MOV-759A
IF less than two SW pumps can be
                                                      ~ RCP B, MOV-749B and MOV-759B
: operated, THEN go to Step 18.
: 2) Manually   start one   CCW pump.
: b. Manually align valves.
: d. Charging pump -  ANY RUNNING        d. Continue with Step 18.         WHEN   any charging   pump running,   THEN do Steps 14   through 17.
~ MOV-4615 and MOV-4734
~ MOV-4616 and MOV-4735
: c. Verify CNMT RECIRC fan annunciator C-2, HIGH TEMPERATURE ALARM - EXTINGUISHED
: c. Manually start an additional SW pump as power supply permits (257 kw each).
 
EOP:
ES-1.1 SI TERMINATION REV:
18 PAGE 11 of 24 STEP ACTION/EXPECTED RESPONSE
 
===RESPONSE===
NOT OBTAINED 13 Check If Normal CVCS Operation Can Be Established
: a. Verify IA restored:
o IA to CNMT (AOV-5392)
OPEN o
IA pressure
- GREATER THAN 60 PSIG a.
Continue with Step 18.
WHEN IA can be restored. THEN do Steps 13 through 17.
: b. Verify instrument bus D-ENERGIZED c.
CCW pumps ANY RUNNING
: b. Energize MCC B.
IF MCC B NOT available.
THEN perform the following:
: 1) Verify MCC A energized.
: 2) Place instrument bus D on maintenance supply.
: c. Perform the following:
: 1) IF any RCP &#xb9;1 seal outlet temperature offscale high, THEN isolate CCW to thermal barrier of affected RCP(s).
~
RCP A, MOV-749A and MOV-759A
~
RCP B, MOV-749B and MOV-759B
: d. Charging pump ANY RUNNING
: 2) Manually start one CCW pump.
: d. Continue with Step 18.
WHEN any charging pump running, THEN do Steps 14 through 17.


EOP:
EOP:
REV: 18 ES-1.1                                 SI TERMINATION PAGE 12   of 24 STEP       ACTION/EXPECTED RESPONSE               RESPONSE   NOT OBTAINED 14 Verify   PRZR Level GREATER               Continue with Step 16. WHEN PRZR THAN 13% [40% adverse CNMT]                 level increases to greater than 13%
ES-1.1 SI TERMINATION REV:
18 PAGE 12 of 24 STEP ACTION/EXPECTED RESPONSE
 
===RESPONSE===
NOT OBTAINED 14 Verify PRZR Level GREATER THAN 13%
[40% adverse CNMT]
Continue with Step 16.
WHEN PRZR level increases to greater than 13%
[40% adverse CNMT], THEN do Step 15.
[40% adverse CNMT], THEN do Step 15.
15 Establish Normal Letdown:                   IF  RCP seal return has been established, THEN establish excess
15 Establish Normal Letdown:
: a. Establish charging     line flow to     letdown as follows:
: a. Establish charging line flow to REGEN Hx -
REGEN Hx - GREATER THAN 20 GPM o  Place excess letdown    divert
GREATER THAN 20 GPM
: b. Place the following switches to             valve, AOV-312, to    NORMAL.
: b. Place the following switches to CLOSE:
CLOSE:
~ Letdown orifice valves (AOV-200A. AOV-200B, and AOV-202)
o  Ensure CCW from excess letdown
~ AOV-371, letdown isolation valve
          ~ Letdown   orifice valves                   open, (AOV-745).
~ AOV-427, loop B cold leg to REGEN Hx
(AOV-200A. AOV-200B, and AOV-202)                               o  Open excess letdown isolation
: c. Place letdown controllers in MANUAL at 40% open
          ~ AOV-371, letdown isolation                 valve AOV-310.
~ TCV-130
valve
~
          ~ AOV-427, loop   B cold leg to       o  Slowly open HCV-123 to maintain REGEN Hx                                   excess letdown temperature less than 195 F and pressure less
PCV-135
: c. Place letdown controllers in                 than 100 psig.
: d. Reset both trains of XY relays for AOV-371 and AOV-427 e.
MANUAL   at 40% open o  Adjust charging  pump speed  as
Open AOV-371 and AOV-427
          ~ TCV-130                                   necessary.
: f. Open letdown orifice valves as necessary
          ~ PCV-135 IF  RCP  seal return NOT established,
: g. Place TCV-130 in AUTO at 105'F
: d. Reset both   trains of   XY relays     THEN  consult Plant Staff to for AOV-371 and AOV-427                 determine  if  excess letdown should be placed in service.
: h. Place PCV-135 in AUTO at 250 psig
: e. Open AOV-371 and AOV-427
: i. Adjust charging pump speed and HCV-142 as necessary to control PRZR level IF RCP seal return has been established, THEN establish excess letdown as follows:
: f. Open letdown   orifice valves     as necessary
o Place excess letdown divert
: g. Place TCV-130   in AUTO at 105'F
: valve, AOV-312, to NORMAL.
: h. Place PCV-135   in AUTO at 250 psig
o Ensure CCW from excess letdown
: i. Adjust charging     pump speed   and HCV-142 as necessary     to control PRZR level
: open, (AOV-745).
o Open excess letdown isolation valve AOV-310.
o Slowly open HCV-123 to maintain excess letdown temperature less than 195 F and pressure less than 100 psig.
o Adjust charging pump speed as necessary.
IF RCP seal return NOT established, THEN consult Plant Staff to determine if excess letdown should be placed in service.
 
EOP:
ES-1.1 SI TERMINATION REV:
18 PAGE 13 of 24 STEP ACTION/EXPECTED RESPONSE
 
===RESPONSE===
NOT OBTAINED 16 Check VCT Makeup System:
: a. Adjust boric acid flow control valve in AUTO to 9.5 gpm
: b. Adjust RMW flow control valve in AUTO to 40 gpm
: c. Verify the following:
1)
RMW mode selector switch in AUTO
: c. Adjust controls as necessary.
2)
RMW control armed RED LIGHT LIT d.
Check VCT level:
o Level GREATER THAN 20/
-OR-o Level STABLE OR INCREASING
: d. Manually increase VCT makeup flow as follows:
: 1) Ensure BA transfer pumps and RMW pumps running.
IF NOT, THEN dispatch AO to locally reset MCC C and MCC D UV lockouts as necessary.
: 2) Place RMW flow control valve HCV-111 in MANUAL and increase RMW flow.
: 3) Increase boric acid flow as necessary.
 
I A.
~
, a


EOP:
EOP:
REV: 18 ES-1.1                               SI TERMINATION PAGE 13    of 24 STEP       ACTION/EXPECTED RESPONSE           RESPONSE  NOT OBTAINED 16 Check VCT Makeup System:
ES-1.1 SI TERMINATION REV:
: a. Adjust  boric acid flow control valve in  AUTO to 9.5 gpm
18 PAGE 14 of 24 STEP ACTION/EXPECTED RESPONSE
: b. Adjust  RMW  flow control valve in AUTO to  40 gpm
: c. Verify the following:                c. Adjust controls as necessary.
: 1) RMW  mode  selector switch in AUTO
: 2) RMW  control  armed - RED LIGHT LIT
: d. Check VCT  level:                    d. Manually increase  VCT makeup flow as  follows:
o  Level  - GREATER THAN  20/
: 1) Ensure BA  transfer  pumps and
                        -OR-                          RMW  pumps  running. IF NOT, THEN  dispatch AO to locally o  Level  - STABLE OR INCREASING            reset MCC C and MCC D    UV lockouts as necessary.
: 2) Place RMW flow control    valve HCV-111 in MANUAL and increase  RMW flow.
: 3) Increase  boric acid flow  as necessary.


I A. ~ , a EOP:
===RESPONSE===
REV: 18 ES-1.1                              SI TERMINATION PAGE 14    of 24 STEP      ACTION/EXPECTED RESPONSE            RESPONSE  NOT OBTAINED 17 Check     Charging   Pump   Suction Aligned   To VCT:
NOT OBTAINED 17 Check Charging Pump Suction Aligned To VCT:
: a. VCT level - GREATER THAN 20%       a. XF VCT   level can NOT be maintained greater than     5%, THEN perform the following'.
a.
: 1) Ensure   charging pump   suction aligned to RWST o   LCV-112B open, o   LCV-112C closed
VCT level GREATER THAN 20%
: 2) Continue   with Step   18. WHEN VCT level greater     than 40%.
a.
XF VCT level can NOT be maintained greater than 5%,
THEN perform the following'.
: 1) Ensure charging pump suction aligned to RWST o
LCV-112B open, o
LCV-112C closed
: b. Verify charging pumps aligned to VCT o
LCV-112C -
OPEN o
LCV-112B -
CLOSED
: 2) Continue with Step 18.
WHEN VCT level greater than 40%.
THEN do Step 17b.
THEN do Step 17b.
: b. Verify charging  pumps  aligned to  b. Manually align valves as VCT                                      necessary.
: b. Manually align valves as necessary.
o  LCV-112C - OPEN o  LCV-112B - CLOSED 18 Check RCS     Hot Leg                   Control steam dump and total feed Temperatures  STABLE                    flow as necessary to stabilize RCS temperature.
18 Check RCS Hot Leg Temperatures STABLE Control steam dump and total feed flow as necessary to stabilize RCS temperature.


EOP:
EOP:
REV  18 ES-1.1                                 SI TERMINATION PAGE 15   of 24 STEP       ACTION/EXPECTED RESPONSE                   RESPONSE   NOT OBTAINED NOTE:   o   WHEN using   a PRZR PORV. THEN   select   one with   an operable block valve.
ES-1.1 SI TERMINATION REV 18 PAGE 15 of 24 STEP ACTION/EXPECTED RESPONSE
o   If auxiliary   spray   is in use, spray flow may be increased by AOV-294 and normal PRZR spray valves.
 
closing normal charging valve 19 Control     PRZR Heaters And                     IF normal spray NOT available and Operate Normal Spray To                          letdown is in service, THEN perform Stabilize RCS Pressure                          the following:
===RESPONSE===
: a. Verify Regen Hx Chg outlet temp to PRZR Vapor temp hT less than 320'F. IF NOT, THEN control pressure using one     PRZR PORV and go to Step 20.
NOT OBTAINED NOTE:
: b. Control pressure using       auxiliary spray.
o WHEN using a
IF auxiliary spray     NOT available.
PRZR PORV.
THEN   use one PRZR   PORV.
THEN select one with an operable block valve.
NOTE:   TDAFW pump   flow control valves     fail open   on   loss of IA.
o If auxiliary spray is in use, spray flow may be increased by closing normal charging valve AOV-294 and normal PRZR spray valves.
*20 Monitor       Intact     S/G   Levels:
19 Control PRZR Heaters And Operate Normal Spray To Stabilize RCS Pressure IF normal spray NOT available and letdown is in service, THEN perform the following:
: a. Narrow range     level   - GREATER           a. Maintain    total feed flow greater THAN 5% [25%     adverse   CNMT]                 than 200     gpm until narrow range level greater than 5% [25%
: a. Verify Regen Hx Chg outlet temp to PRZR Vapor temp hT less than 320'F.
IF NOT, THEN control pressure using one PRZR PORV and go to Step 20.
: b. Control pressure using auxiliary spray.
IF auxiliary spray NOT available.
THEN use one PRZR PORV.
NOTE:
TDAFW pump flow control valves fail open on loss of IA.
*20 Monitor Intact S/G Levels:
a.
Narrow range level GREATER THAN 5%
[25% adverse CNMT]
: a. Maintain total feed flow greater than 200 gpm until narrow range level greater than 5%
[25%
adverse CNMT] in at least one S/G.
adverse CNMT] in at least one S/G.
: b. Control feed flow to maintain               b. IF narrow range level in any S/G narrow range level between 17%                  continues to increase, THEN stop
: b. Control feed flow to maintain narrow range level between 17%
[25% adverse CNMT] and 50%                      feed flow to that S/G.
[25% adverse CNMT] and 50%
: b. IF narrow range level in any S/G continues to increase, THEN stop feed flow to that S/G.


EOP:
EOP:
REV: 18 ES-1.1                               SI TERMINATION PAGE 16 of 24 STEP       ACTION/EXPECTED RESPONSE               RESPONSE NOT 'OBTAINED NOTE:   SW should be aligned to   CCW Hxs before restoring RCP seal cooling.
ES-1.1 SI TERMINATION REV:
21 Check RCP       Cooling:                     Establish normal cooling to RCPs (Refer to Attachment SEAL COOLING).
18 PAGE 16 of 24 STEP ACTION/EXPECTED RESPONSE
: a. Check  CCW to  RCPs:
 
o Annunciator A-7. RCP lA CCW RETURN HIGH TEMP OR LOW FLOW EXTINGUISHED o Annunciator A-15 'CP     1B CCW RETURN HIGH TEMP OR LOW FLOW EXTINGUISHED
===RESPONSE===
: b. Check   RCP seal injection:
NOT 'OBTAINED NOTE:
o Labyrinth seal D/Ps   - GREATER THAN 15 INCHES WATER
SW should be aligned to CCW Hxs before restoring RCP seal cooling.
                        -OR-o RCP   seal injection flow to each RCP - GREATER THAN 6 GPM
21 Check RCP Cooling:
a.
Check CCW to RCPs:
Establish normal cooling to RCPs (Refer to Attachment SEAL COOLING).
o Annunciator A-7.
RCP lA CCW RETURN HIGH TEMP OR LOW FLOW EXTINGUISHED o
Annunciator A-15 'CP 1B CCW RETURN HIGH TEMP OR LOW FLOW EXTINGUISHED b.
Check RCP seal injection:
o Labyrinth seal D/Ps GREATER THAN 15 INCHES WATER
-OR-o RCP seal injection flow to each RCP GREATER THAN 6 GPM
 
~
~
f r 5 4 j
r


~ . ~ f r 5 4 j r EOP:              TITLE:
EOP:
REV  18 ES-1.1                               SI TERMINATION PAGE 17   of 24 STEP       ACTION/EXPECTED RESPONSE             RESPONSE  NOT OBTAINED 22 Check      If  Seal Return Flow Should Be Established:
ES-1.1 TITLE:
I
SI TERMINATION REV 18 PAGE 17 of 24 STEP ACTION/EXPECTED RESPONSE
: a. Verify  RCP 0'1 seal outlet          a. Go to Step    23.
temperature    - LESS THAN 235'F
: b. Verify RCP seal outlet valves        b. Manually open valves as OPEN                                      necessary.
            ~ AOV-270A
            ~ AOV-270B
: c. Reset both    trains of XY relays for  RCP  seal return isolation valve  MOV-313
: d. Open  RCP  seal return isolation      d. Perform the following:
          ,valve  MOV-313
: 1) Place MOV-313    switch to OPEN.
: 2) Dispatch    AO with key to RWST gate to    locally open MOV-313.
: e. Verify  RCP 8'1 seal leakoff flow    e. Perform the    following:
LESS THAN    6.0 GPM
: 1) Trip the affected    RCP
: 2) Allow  4 minutes for pump coast down. THEN close the affected RCP seal discharge valve.
                                                        ~  RCP  A, AOV-270A
                                                        ~  RCP  B, AOV-270B IF both RCP seal discharge valves are shut, THEN go to Step 23.
: f. Verify RCP    tl seal  leakoff flow  f. Refer to AP-RCP.l. RCP SEAL GREATER THAN    0.8  GPM                MALFUNCTION.


        *1 ICI ' t   t
===RESPONSE===
NOT OBTAINED 22 Check If Seal Return Flow Should Be Established:
: a. Verify RCP 0'1 seal outlet temperature
- LESS THAN 235'F
: b. Verify RCP seal outlet valves OPEN
~ AOV-270A
~ AOV-270B I
a.
Go to Step 23.
: b. Manually open valves as necessary.
: c. Reset both trains of XY relays for RCP seal return isolation valve MOV-313 d.
Open RCP seal return isolation
,valve MOV-313
: e. Verify RCP 8'1 seal leakoff flow LESS THAN 6.0 GPM
: d. Perform the following:
: 1) Place MOV-313 switch to OPEN.
: 2) Dispatch AO with key to RWST gate to locally open MOV-313.
e.
Perform the following:
: 1) Trip the affected RCP
: 2) Allow 4 minutes for pump coast down.
THEN close the affected RCP seal discharge valve.
: f. Verify RCP tl seal leakoff flow GREATER THAN 0.8 GPM
~
RCP A, AOV-270A
~
RCP B, AOV-270B IF both RCP seal discharge valves are shut, THEN go to Step 23.
: f. Refer to AP-RCP.l.
RCP SEAL MALFUNCTION.
* 1 ICI t
t


EOP:
EOP:
REV: 18 ES-1.1                           SI TERMINATION PAGE 18     of 24 STEP     ACTION/EXPECTED RESPONSE         RESPONSE NOT OBTAINED 23 Verifv All AC   Busses               Perform the following:
ES-1.1 SI TERMINATION REV:
ENERGIZED BY OFFSITE POWER
18 PAGE 18 of 24 STEP ACTION/EXPECTED RESPONSE
: a. IF any AC emergency bus normal o Normal feed breakers  to all 480      feed breaker open, THEN ensure volt busses - CLOSED                  associated   D/G breaker closed.
 
o 480  volt bus voltage - GREATER    b. Perform the following as THAN 420 VOLTS                        necessary:
===RESPONSE===
o Emergency D/G output breakers          1) Close non-safeguards     .bus tie OPEN                                      breakers:
NOT OBTAINED 23 Verifv All AC Busses ENERGIZED BY OFFSITE POWER o
                                                    ~ Bus 13   to Bus 14 tie
Normal feed breakers to all 480 volt busses CLOSED o
                                                    ~ Bus 15   to Bus 16 tie
480 volt bus voltage GREATER THAN 420 VOLTS o
Emergency D/G output breakers OPEN Perform the following:
: a. IF any AC emergency bus normal feed breaker
: open, THEN ensure associated D/G breaker closed.
: b. Perform the following as necessary:
: 1) Close non-safeguards
.bus tie breakers:
~ Bus 13 to Bus 14 tie
~ Bus 15 to Bus 16 tie
: 2) Reset Bus 13 and Bus 15 lighting breakers.
: 2) Reset Bus 13 and Bus 15 lighting breakers.
: 3) Dispatch AO to locally reset and start two IA compressors.
: 3) Dispatch AO to locally reset and start two IA compressors.
: 4) Place the   following   pumps in PULL STOP:
: 4) Place the following pumps in PULL STOP:
                                                    ~ EH pumps
~
                                                    ~ Turning gear oil pump
EH pumps
                                                    ~ HP seal oil backup pump
~ Turning gear oil pump
: 5) Restore power     to MCCs.
~
                                                    ~ A from   Bus 13
HP seal oil backup pump
                                                    ~ B from   Bus 15
: 5) Restore power to MCCs.
                                                    ~ E from   Bus 15
~
                                                    ~ F from   Bus 15
A from Bus 13
: 6) Start HP seal oil backup pump.
~
: 7) Start CNMT RECIRC   fans as necessary.
B from Bus 15
: 8) Ensure D/G load     within limits.
~
E from Bus 15
~
F from Bus 15
: 6) Start HP seal oil backup pump.
: 7) Start CNMT RECIRC fans as necessary.
: 8) Ensure D/G load within limits.
: 9) Refer to Attachment SI/UV for other equipment lost with loss of offsite power.
: 9) Refer to Attachment SI/UV for other equipment lost with loss of offsite power.
: c. Try to restore offsite power to all AC busses (Refer to ER-ELEC.l. RESTORATION     OF OFFSITE POWER).
: c. Try to restore offsite power to all AC busses (Refer to ER-ELEC.l.
RESTORATION OF OFFSITE POWER).
 
e a ~
e s
~
~
t
 
EOP:
ES-1.1 SI TERMINATION REV:
18 PAGE 19 of 24 STEP ACTION/EXPECTED RESPONSE
 
===RESPONSE===
NOT OBTAINED NOTE:
Adverse CNMT conditions or loss of forced air cooling may result in failure of NIS detectors.
24 Check If Source Range Channels Should Be Energized:
a.
Source range channels DEENERGIZED a.
Go to Step 24e.
b.
Check intermediate range flux-EITHER CHANNEL LESS THAN 10 10 AMPS
: b. Perform the following:
: 1) IF neither intermediate range channel is decreasing, THEN initiate boration.
: 2) Continue with Step 25.
WHEN flux is LESS THAN 10 10 amps on any operable channels THEN do Steps 24c.
d and e.
c.
Check the following:
o Both intermediate range channels LESS THAN 10 10 AMPS
: c. Continue with step 25.
WHEN either condition met, THEN do Steps 24d and e.
-OR-o Greater than 20 minutes since reactor trip
: d. Verify source range detectors ENERGIZED
: d. Manually energize source range detectors by depressing P-6 permissive defeat pushbuttons (2
of 2).
: e. Transfei Rk-45 recorder to one source range and one intermediate range channel IF source ranges can NOT be restored.
THEN refer to ER-NIS.1, SR MALFUNCTIONS and go to Step 25.


e a ~ e s ~ ~ t
g V


EOP:
EOP:
REV: 18 ES-1.1                               SI TERMINATION PAGE 19  of 24 STEP       ACTION/EXPECTED RESPONSE             RESPONSE  NOT OBTAINED NOTE:  Adverse  CNMT  conditions or loss of forced air cooling    may result in failure of  NIS  detectors.
ES-1.1 SI TERMINATION REV:
24 Check    If  Source Range Channels Should Be Energized:
18 PAGE 20 of 24 STEP ACTION/EXPECTED RESPONSE
: a. Source range channels                  a. Go to Step 24e.
DEENERGIZED
: b. Check intermediate range    flux-      b. Perform the following:
EITHER CHANNEL LESS THAN 10 10 AMPS                                1)  IF neither intermediate range channel is decreasing, THEN initiate boration.
: 2) Continue  with Step 25. WHEN flux is  LESS THAN 10 10 amps on any operable channels  THEN do Steps 24c. d and e.
: c. Check the following:                  c. Continue with step 25. WHEN either condition met, THEN do o  Both intermediate range                Steps 24d and e.
channels - LESS THAN 10 10 AMPS
                      -OR-o  Greater than  20  minutes since reactor trip
: d. Verify source range detectors          d. Manually energize source range ENERGIZED                                  detectors by depressing P-6 permissive defeat pushbuttons (2 of 2).
IF source ranges can  NOT be restored. THEN refer to ER-NIS.1,  SR MALFUNCTIONS and go to Step 25.
: e. Transfei Rk-45 recorder to one source range and one intermediate range channel


g V EOP:
===RESPONSE===
REV: 18 ES-1.1                              SI TERMINATION PAGE 20  of 24 STEP      ACTION/EXPECTED RESPONSE            RESPONSE NOT OBTAINED 25 Check     If Emergency D/Gs Should Be Stopped:
NOT OBTAINED 25 Check If Emergency D/Gs Should Be Stopped:
: a. Verify AC emergency busses         a. Try to restore offsite power energized by  offsite power:            (Refer to ER-ELEC.l. RESTORATION OF OFFSITE POWER).
: a. Verify AC emergency busses energized by offsite power:
o Emergency D/G output breakers
o Emergency D/G output breakers OPEN
              - OPEN o  AC emergency   bus voltage GREATER THAN   420 VOLTS o AC emergency bus normal feed breakers   - CLOSED
: a. Try to restore offsite power (Refer to ER-ELEC.l.
RESTORATION OF OFFSITE POWER).
o AC emergency bus voltage GREATER THAN 420 VOLTS o
AC emergency bus normal feed breakers CLOSED
: b. Stop any unloaded emergency D/G and place in standby (Refer to Attachment D/G STOP)
: b. Stop any unloaded emergency D/G and place in standby (Refer to Attachment D/G STOP)


EOP:            TITLE:
EOP:
REV    18 ES-1.1                             SI TERMINATION PAGE 21     of   24 STEP       ACTION/EXPECTED RESPONSE               RESPONSE   NOT OBTAINED t t t t t   *
ES-1.1 TITLE:
SI TERMINATION REV 18 PAGE 21 of 24 STEP ACTION/EXPECTED RESPONSE
 
===RESPONSE===
NOT OBTAINED t t t t t
* t
* t
* t t t ~ 1 t ~  t t ~
* t t t
* t t t
* t t   *
~
* t t 1 ~ t t
1 t
* t ~ t
~ t t
* CAUTION IF RCP SEAL COOLING HAD PREVIOUSLY BEEN LOST, THEN THE AFFECTED RCP SHOULD NOT BE STARTED PRIOR TO A STATUS EVALUATION.
~
t t t ~ t
* t t t
* t t
* t t 1
~ t t
* t
~ t CAUTION IF RCP SEAL COOLING HAD PREVIOUSLY BEEN LOST, THEN THE AFFECTED RCP SHOULD NOT BE STARTED PRIOR TO A STATUS EVALUATION.
t t t
~ t
* t
* t
* I *
* I
* t t
* t t
* t
* t
* t 1 t t t t t ~   t t t t t t t   ~ ~ *
* t 1 t t t t t
* t t t 1 1 t 26 Check RCP       Status   AT LEAST           Perform the following:
~ t t t t t t t
ONE RUNNING
~
~
* t t t 1
1 t
26 Check RCP Status AT LEAST ONE RUNNING Perform the following:
: a. IF RVLIS level (no RCPs) less than 95%%d, THEN perform the following:
: a. IF RVLIS level (no RCPs) less than 95%%d, THEN perform the following:
o   Increase   PRZR level to greater than     65/. (82'/. adverse CNMT).
o Increase PRZR level to greater than 65/.
o   Dump steam   to establish     RCS subcooling based on core exit T/Cs to greater than 20'F using Figure MIN SUBCOOLING.
(82'/. adverse CNMT).
o   Energize   PRZR heaters as necessary   to saturate     PRZR water.
o Dump steam to establish RCS subcooling based on core exit T/Cs to greater than 20'F using Figure MIN SUBCOOLING.
: b. Establish conditions         for starting   an RCP:
o Energize PRZR heaters as necessary to saturate PRZR water.
o   Verify bus   11A   or 11B energized.
: b. Establish conditions for starting an RCP:
o   Refer to Attachment       RCP START.
o Verify bus 11A or 11B energized.
: c. Start one     RCP.
o Refer to Attachment RCP START.
IF an   RCP can NOT be   started,   THEN verify natural circulation (Refer to Attachment     NC).
: c. Start one RCP.
IF natural circulation NOT verified,     THEN increase dumping steam frorii intact S/Gs.
IF an RCP can NOT be started, THEN verify natural circulation (Refer to Attachment NC).
IF natural circulation NOT
: verified, THEN increase dumping steam frorii intact S/Gs.


EOP:
EOP:
REV: 18 ES-1.1                               SI TERMINATION PAGE 22   of 24 STEP       ACTION/EXPECTED RESPONSE             RESPONSE  NOT OBTAINED 27  Establish Normal Shutdown Alignment:
ES-1.1 SI TERMINATION REV:
: a. Check condenser    - AVAILABLE        a. Dispatch  AO to perform Attachment SD-2.
18 PAGE 22 of 24 STEP ACTION/EXPECTED RESPONSE
: b. Perform the  following:
o  Open  generator disconnects
              ~  1G13A71
              ~  9X13A73 o  Place voltage regulator to      OFF o  Open  turbine drain valves o  Rotate reheater steam supply controller cam to close valves o  Place reheater dump valve switches to  HAND o  Stop  all  but one condensate pump
: c. Verify adequate    Rx head  cooling:
: 1) Verify at least    one  control        1) Manually start one fan as rod shroud fan -  RUNNING                power supply permits (45 kw)
: 2) Verify  one Rx compartment,            2) Perform  the following:
cooling fan    - RUNNING o  Dispatch  AO to reset UV relays at  MCC C and MCC D.
o  Manually start one fan as power supply permits (23 kw)
: d. Verify Attachment    SD COMPLETE


EOP:             TITLE:
===RESPONSE===
REV: 18 ES-1.1                               SI TERMINATION PAGE 23   of 24 STEP       ACTION/EXPECTED RESPONSE             RESPONSE   NOT OBTAINED 28 Maintain Plant Conditions Stable:
NOT OBTAINED 27 Establish Normal Shutdown Alignment:
: a. RCS .pressure   - BETWEEN 1800 PSIG   a. Control PRZR heaters and spray AND 2235 PSIG                           as necessary.
a.
: b. PRZR level     BETWEEN 35% AND 40%   b. Control charging as necessary.
Check condenser
: c. Intact S/G narrow range levels       c. Control S/G feed flow as BETWEEN 17% AND 52%                       necessary.
- AVAILABLE
: d. RCS cold leg temperature   - STABLE d. Control dumping steam as necessary. IF cooldown continues,   THEN close both MSIVs.
: a. Dispatch AO to perform Attachment SD-2.
*29 Monitor SI         Reinitiation Criteria:
: b. Perform the following:
: a. RCS subcooling based on core         a. Manually    start  SI pumps as exit T/Cs GREATER THAN O'           necessary   and go to E-l, LOSS OF USING FIGURE MIN SUBCOOLING              REACTOR OR SECONDARY COOLANT, Step l.
o Open generator disconnects
: b. PRZR  level  - GREATER THAN 5%      b. Control charging flow to
~
[30%  adverse  CNMT]                    maintain   PRZR level.
1G13A71
IF PRZR level can NOT be maintained. THEN manually start SI pumps as necessary and go to E-l, LOSS OF REACTOR OR SECONDARY COOLANT. Step     1.
~
9X13A73 o
Place voltage regulator to OFF o
Open turbine drain valves o
Rotate reheater steam supply controller cam to close valves o
Place reheater dump valve switches to HAND o
Stop all but one condensate pump
: c. Verify adequate Rx head cooling:
: 1) Verify at least one control rod shroud fan RUNNING
: 1) Manually start one fan as power supply permits (45 kw)
: 2) Verify one Rx compartment, cooling fan RUNNING
: 2) Perform the following:
o Dispatch AO to reset UV relays at MCC C and MCC D.
o Manually start one fan as power supply permits (23 kw)
: d. Verify Attachment SD-1 COMPLETE
 
EOP:
ES-1.1 TITLE:
SI TERMINATION REV:
18 PAGE 23 of 24 STEP ACTION/EXPECTED RESPONSE
 
===RESPONSE===
NOT OBTAINED 28 Maintain Plant Conditions Stable:
a.
RCS.pressure BETWEEN 1800 PSIG AND 2235 PSIG b.
PRZR level BETWEEN 35%
AND 40%
: c. Intact S/G narrow range levels BETWEEN 17%
AND 52%
d.
RCS cold leg temperature STABLE
: a. Control PRZR heaters and spray as necessary.
: b. Control charging as necessary.
: c. Control S/G feed flow as necessary.
: d. Control dumping steam as necessary.
IF cooldown continues, THEN close both MSIVs.
*29 Monitor SI Reinitiation Criteria:
a.
RCS subcooling based on core exit T/Cs GREATER THAN O' USING FIGURE MIN SUBCOOLING b.
PRZR level GREATER THAN 5%
[30% adverse CNMT]
: a. Manually start SI pumps as necessary and go to E-l, LOSS OF REACTOR OR SECONDARY COOLANT, Step l.
: b. Control charging flow to maintain PRZR level.
IF PRZR level can NOT be maintained.
THEN manually start SI pumps as necessary and go to E-l, LOSS OF REACTOR OR SECONDARY COOLANT. Step 1.
 
k
\\A ~
Ol E
 
EOP:
ES-1.1 SI TERMINATION REV:
18 PAGE 24 of 24 STEP ACTION/EXPECTED RESPONSE


k \A ~ Ol E EOP:
===RESPONSE===
REV: 18 ES-1.1                          SI TERMINATION PAGE 24 of 24 STEP    ACTION/EXPECTED RESPONSE          RESPONSE NOT OBTAINED 30 Go To Procedure   0-2.1,   NORMAL SHUTDOWN TO HOT SHUTDOWN
NOT OBTAINED 30 Go To Procedure 0-2.1, NORMAL SHUTDOWN TO HOT SHUTDOWN
                                        -END-
-END-


EOP:
EOP:
REV  18 ES-1.1                     SI TERMINATION PAGE 1 of 1 ES-1.1 APPENDIX LIST TITLE
ES-1.1 SI TERMINATION REV 18 PAGE 1 of 1 ES-1.1 APPENDIX LIST TITLE 1)
: 1) RED PATH  
RED PATH  


==SUMMARY==
==SUMMARY==
: 2) FIGURE MIN SUBCOOLING         (FIG-1.0)
2)
: 3) ATTACHMENT CNMT RECIRC FANS             (Arr-ii.o)
FIGURE MIN SUBCOOLING (FIG-1.0) 3)
: 4) ATTACHMENT D/G STOP       (Arr-s.I)
ATTACHMENT CNMT RECIRC FANS (Arr-ii.o) 4)
: 5) ATTACHMENT NC   (ATr-13.0)
ATTACHMENT D/G STOP (Arr-s.I) 5)
: 6) ATTACHMENT SEAL COOLING         (ATT-15.2)
ATTACHMENT NC (ATr-13.0) 6)
: 7) ATTACHMENT RCP START       (ATT.15.0)
ATTACHMENT SEAL COOLING (ATT-15.2) 7)
: 8) ATTACHMENT SD-1   (ATT-17.0)
ATTACHMENT RCP START (ATT.15.0) 8)
: 9) ATTACHMENT SD-2   (Arr-17.1)
ATTACHMENT SD-1 (ATT-17.0) 9)
: 10) ATTACHMENT SI/UV     (ATT-8.CL)
ATTACHMENT SD-2 (Arr-17.1) 10)
: 11) FOLDOUT
ATTACHMENT SI/UV (ATT-8.CL) 11)
FOLDOUT


EOP:
EOP:
REV: 18 ES-1. 1                       SI TERMINATION PAGE 1 of 1 RED PATH  
ES-1. 1 SI TERMINATION REV:
18 PAGE 1 of 1
RED PATH  


==SUMMARY==
==SUMMARY==
: a. SUBCRITICALITY Nuclear power   greater than 5%
a.
: b. CORE COOLING   Core exit T/Cs greater than 1200'
SUBCRITICALITY Nuclear power greater than 5%
                                          -OR-Core exit T/Cs greater than 700' AND RVLIS level (no RCPs) less than 52% [55%
b.
adverse CNMT]
CORE COOLING Core exit T/Cs greater than 1200'
: c. HEAT SINK Narrow range   level in all S/Gs less than 5%
-OR-Core exit T/Cs greater than 700' AND RVLIS level (no RCPs) less than 52%
[25% adverse CNMT] AND total feedwater flow less than 200 gpm
[55%
: d. INTEGRITY Cold   leg temperatures decrease greater than 100'   in last 60 minutes AND RCS cold leg temperature less than 285'
adverse CNMT]
: e. CONTAINMENT   CNMT pressure greater than 60 psig
c.
HEAT SINK Narrow range level in all S/Gs less than 5%
[25% adverse CNMT] AND total feedwater flow less than 200 gpm d.
INTEGRITY Cold leg temperatures decrease greater than 100' in last 60 minutes AND RCS cold leg temperature less than 285' e.
CONTAINMENT CNMT pressure greater than 60 psig


EOP:
EOP:
REV: 18 ES-1.1                         SI TERMINATION PAGE 1 of 1 FOLDOUT PAGE
ES-1.1 SI TERMINATION REV:
: 1. SI REINITIATION CRITERIA IF EITHER condition listed below occurs, THEN manually start SI pumps as necessary and go to E-l, LOSS OF REACTOR OR SECONDARY COOLANT, Step 1:
18 PAGE 1 of 1
o RCS subcooling based on     core exit T/Cs LESS THAN 0 F USING FIGURE MIN SUBCOOLING OR o   PRZR level   CHARGING CAN NOT CONTROL LEVEL GREATER THAN 5%
FOLDOUT PAGE 1.
[30% adverse CNMT]
SI REINITIATION CRITERIA IF EITHER condition listed below occurs, THEN manually start SI pumps as necessary and go to E-l, LOSS OF REACTOR OR SECONDARY COOLANT, Step 1:
: 2. SECONDARY INTEGRITY   CRITERIA IF any S/G pressure is decreasing in an uncontrolled manner or is completely depressurized AND has not been isolated, THEN go to E-2,   FAULTED S/G ISOLATION,   Step 1.
o RCS subcooling based on core exit T/Cs LESS THAN 0 F USING FIGURE MIN SUBCOOLING OR o
: 3. AFW SUPPLY SWITCHOVER   CRITERION IF CST level decreases to less than 5 feet, THEN switch to alternate AFW water supply (Refer to ER-AFW.1, ALTERNATE WATER SUPPLY TO AFW PUMPS).
PRZR level CHARGING CAN NOT CONTROL LEVEL GREATER THAN 5%
: 4. E-3 TRANSITION CRITERIA IF any S/G level increases     in an uncontrolled manner or any S/G has abnormal   radiation, THEN manually start SI Pumps as necessary AND go   to E-3, STEAM GENERATOR TUBE RUPTURE, Step   l.
[30% adverse CNMT]
2.
SECONDARY INTEGRITY CRITERIA IF any S/G pressure is decreasing in an uncontrolled manner or is completely depressurized AND has not been isolated, THEN go to E-2, FAULTED S/G ISOLATION, Step 1.
3.
AFW SUPPLY SWITCHOVER CRITERION IF CST level decreases to less than 5 feet, THEN switch to alternate AFW water supply (Refer to ER-AFW.1, ALTERNATE WATER SUPPLY TO AFW PUMPS).
4.
E-3 TRANSITION CRITERIA IF any S/G level increases in an uncontrolled manner or any S/G has abnormal radiation, THEN manually start SI Pumps as necessary AND go to E-3, STEAM GENERATOR TUBE RUPTURE, Step l.


ppll A v',i    ~
ppllA i ~~4 v',
        ~~4
~ -,, ja'~;,
          -,, ja'~;,
4
4           ,1' W
,1' W
I IK}}
I IK}}

Latest revision as of 01:07, 8 January 2025

Rev 14 to AP-RCS.1, Reactor Coolant Leak
ML17309A652
Person / Time
Site: Ginna 
Issue date: 04/14/1999
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17309A651 List:
References
AP-RCS.1, NUDOCS 9904200392
Download: ML17309A652 (62)


Text

EOP AP-RCS.1

~

TITLE:

REACTOR COOLANT LEAK REV:

14 PAGE 1 of 11

'OCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER RESPONSIBL MANAGER EFFECTIVE DATE CATEGORY 1.0 REVIEWED BY:

ti ~9oiaoos9z.z-

.ADocK Gsooa "PQR'99Qcf.fg

>oR

)

EOP AP-RCS. 1-TITLE:

REACTOR COOLANT LEAK REV 14 PAGE 2 of ll A.

PURPOSE This procedure provides the instructions necessary to mitigate the consequences of a reactor coolant leak.

1 B.

ENTRY CONDITIONS/SYMPTOMS 1.

ENTRY CONDITIONS This procedure is entered from:

a.

S-12.2, OPERATOR ACTION IN THE EVENT OF INDICATION OF SIGNIFICANT INCREASE IN LEAKAGE, when a significant increase in RCS leakage is indicated.

b.

AP-CVCS.l, CVCS LEAK, when leak cannot be isolated.

2.

SYMPTOMS The symptoms of REACTOR COOLANT LEAK are; a.

Annunciator F-14, CHARGING PUMP SPEED, lit, or b.

Annunciator c.

Annunciator lit, or A-2, VCT LEVEL 14% 86, lit, or E 16'MS PROCESS MON1TOR HIGH ACTIVITY~

d.

Annunciator E-24, RMS AREA MONITOR HIGH ACTIVITY, lit, or e.

Annunciator F-4, PRESSURIZER LEVEL DEVIATION -5 NORMAL +5, lit, or f.

Annunciator F-10, PRESSURIZER LO PRESS 2205 PSI, lit, or g.

Annunciator F-ll, PRESSURIZER LO LEVEL 13%, lit.

~

K t!

BOP:

AP-RCS. 1.

TITLE:

REACTOR COOLANT LEAK REV:

14 PAGE 3 of 11 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 1 I 4

  • f 1

4 1

1 I 1 I 4 i 0

4 1

0 1

4

~

1 4

  • f 1

1 1 t t

~

~

CAUTION IF, AT ANY TIME DURING THIS PROCEDURE.

A REACTOR TRIP OR SI

OCCURS, E-O, REACTOR TRIP OR SAFETY. INJECTION, SHALL BE PERFORMED.

NOTE:

Conditions should be evaluated for site contingency reporting (Refer to EPIP-1.0, GINNA STATION EVENT EVALUATION AND CLASSIFICATION.

1 Check PRZR Level STABLE AT PROGRAM LEVEL IF PRZR level decreasing, THEN start additional charging pumps and increase speed as necessary to stabilize PRZR level.

IF PRZR level continues to

decrease, THEN close loop B cold leg to REGEN Hx isolation valve, AOV-427.

IF available charging pumps are running at maximum speed with letdown isolated.

AND PRZR level is decreasing, THEN trip the reactor and go to E-O, REACTOR TRIP or SAFETY INJECTION.

4

EOP:

AP-RCS.1 TITLE:

REACTOR COOLANT LEAK REV 14 PAGE 4 of 11 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED NOTE:

IF VCT level decreases to 5%. charging pump suction will swap to the RWST.

This may require a load reduction.

2 Check VCT Makeup System:

a. Verify VCT level GREATER THAN 5%

a.

Ensure charging pump suction aligned to RWST.

~ LCV-112B -

OPEN

~ LCV-112C -

CLOSED

b. Verify the following:

1)

RMW mode selector switch in AUTO

b. Adjust controls as necessary.

2)

RMW control armed RED LIGHT LIT c.

Check VCT level:

o Level GREATER THAN 20%

-OR-o Level STABLE OR INCREASING c.

Check letdown, divert valve, LCV-112A, closed.

IF VCT makeup flow NOT adequate, THEN perform the following:

1) Ensure BA transfer pumps and RMW pumps running.
2) Adjust RMW flow control valve. HCV-ill. to increase RMW flow.
3) Increase boric acid flow as necessary to maintain required concentration.

IF VCT level can NOT be maintained, THEN refer to ER-CVCS.1, REACTOR. MAKEUP CONTROL MALFUNCTION, if necessary'.

Y I

EOP:

AP-RCS.1 TITLE:

REACTOR COOLANT LEAK REV:

14 PAGE 5 of 11 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 3 Check If RCS Leakage In CNMT:

o Check CNMT radiation monitors NORMAL

~ R-2

~ R-7

~ R-10A

~ R-11

~ R-12 o

CNMT sump A pump run freguency-NORMAL (Refer to RCS Daily Leakage Log)

~ IF leakage is indicated in CNMT, THEN perform the following:

a. Direct RP to sample CNMT for entry.
b. Continue with Step 4.

WHEN CNMT cleared for entry.

THEN dz'spatch personnel to investigate CNMT for RCS leakage.

~

1 I 4

1 0

~

1

~ I 1

0 i l 0

~

4 1 I

~

4 1

1 I 4 I I

~

~

1 I 4

1 I CAUTION RADIATION PROTECTION TECHNICIAN SHOULD BE CONSULTED PRIOR TO ENTERING A HIGH AIRBORNE AREA.

4 Dispatch AO To AUX'LDG To Investigate For CVCS Leak (locked area keys required) 5 Check For Leak To CCW System:

o CCW surge tank level APPROXIMATELY 50'/i AND STABLE Go to AP-CCW.1, LEAKAGE INTO THE COMPONENT COOLING LOOP.

o CCW radiation monitor, R-17 NORMAL

EOP AP-RCS. 1.

TITLE:

REACTOR COOLANT LEAK REV,:

14 PAGE 6 of 11 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 6 Check CVCS Conditions:

a.

Letdown indication:

o Letdown flow - APPROXIMATELY 40 GPM o

Low pressure LTDN pressure-APPROXIMATELY 250 PSIG a.

IF letdown isolated, THEN continue with Step 6b.

IF NOT

isolated, THEN go to AP-CVCS.1.

CVCS LEAK. Step 6.

o Letdown pressure control

valve, PCV-135, demand APPROXIMATELY 35'/i OPEN
b. Charging indication:

o Seal injection flows GREATER THAN 6 GPM AND STABLE o

RCP Labyrinth seal D/Ps GREATER THAN 15 INCHES AND APPROXIMATELY EQUAL b.

Go to AP-CVCS.1, CVCS LEAK, Step 6.

o Charging pump discharge pressure GREATER THAN RCS PRESSURE c.

AUX BLDG radiation levels NORMAL

~ R-4

~ R-9

~ R-10B

~ R-13

~ R-14 c.

Go to AP-CVCS.l, CVCS LEAK, Step 6 and refer to CVCS piping diagrams for further guidance.

EOP:

AP-RCS. 1"

.TITLE:

REACTOR COOLANT LEAK REV:

14 PAGE 7 of 11 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 7 Check PRT Indications:

a. Level BETWEEN 61'/. AND 84'/.
b. Pressure APPROXIMATELY 1.5 PSIG AND STABLE
c. Temperature

- AT CNMT AMBIENT TEMPERATURE AND STABLE Check tailpipe and valve leakoff temperatures for the PRZR safety valves and PORVs for indication of leakage.

IF no PORV or safety valve leakage is indic'ated, THEN check other leak paths from the RCS to the PRT.

~ Letdown relief valve, RV-203

~ Seal return relief valve, RV-314

~ I I I

  • I
  • I I I I

~ I

~ I

~

  • I I

~

  • I
  • I I

~ I I

~

~

CAUTION STEAM GENERATOR TUBE LEAKAGE IN ONE S/G SHALL NOT EXCEED O.l GPM WHEN AVERAGED OVER 24 HOURS.

8 Check S/Gs For Leakage:

o Air ejector radiation monitors NORMAL IF S/G tube leak indicated, THEN refer to 0-6.10, PLANT OPERATION WITH A S/G TUBE LEAK INDICATION.

~ R-15

~ R-15A o

S/G blowdown radiation monitor (R-19)

NORMAL o

Steamline radiation monitors NORMAL

~ R-31

~ R-32 o

S/G sample activity -

NORMAL (Check with RP Department for normal)

EOP AP-RCS. 1".

TITLE:

REACTOR COOLANT LEAK REV:

14 PAGE 8 of 11, STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 9 Check SI Accumulator Levels STABLE Calculate inleakage to SI accumulators (Refer to S-16.11.

MONITORING INLEAKAGE TO SI ACCUMULATORS) 10 Check RCP Seal Leakoff Flows:

o Leakoff flows - WITHIN THE NORMAL OPERATING RANGE OF FIGURE RCP SEAL LEAKOFF Go to AP-RCP.l.

RCP SEAL MALFUNCTION.

o Leakoff flows - STABLE ll Check RCDT Leak Rate NORHAL (Refer to RCS Daily Leakage Log and PPCS point ID L1003)

Check other sources of in leakage to RCDT:

a. IF Rx vessel flange leakoff temperature has increased, THEN close Rx VESS FLANGE SEAL LEAKOFF VLV. AOV-521.
b. Verify excess letdown isolated.

IF NOT, THEN ensure RCDT divert valve.

AOV-312, in the VCT position.

c. IF source of leakage NOT determined'HEN suspect loop drains.

g

~

EOP:

AP-RCS. 1" REACTOR COOLANT LEAK REV:

14 PAGE 9 of 11 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 12 Check Valve Leakoff Temperatures NORMAL (Refer to Pressurizer Valve Leak-Off, Temperature Record Log)

IF any valve leakoff temperature is

,abnormally high, THEN initiate investigation of that leakage path.

13 Establish Stable Plant Conditions:

a.

PRZR level

- TRENDING TO PROGRAM b.

Check PRZR pressure control:

o Pressure

- TRENDING TO 2235 PSIG o

PRZR backup heaters OFF

a. Control charging and letdown flows to restore PRZR. level to'rogram.
b. Verify proper operation of PRZR heaters and spray or take manual control of PRZR pressure controller 431K.

IF pressure can NOT be controlled, THEN refer to AP-PRZR.1, ABNORMAL PRESSURIZER PRESSURE.

14 Evaluate RCS Leakage:

a.

Leakage within limits (Refer to leakage surveillance sheet and ITS section 3.4.13)

b. Leak location identified
a. IF leak NOT isolable, but PRZR level and seal injection can be maintained, THEN shut the plant down (Refer to 0-2.1, NORMAL SHUTDOWN TO HOT SHUTDOWN or AP-TURB.5, RAPID LOAD REDUCTION).
b. Return to Step 1.

~

A

'EOP:'AP-RCS.l"'EACTOR COOLANT LEAK REV:

14 PAGE 10 of 11 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED NOTE:

Refer to 0-9.3, NRC INNEDIATE NOTIFICATION, for reporting requirements.

1S Notify Higher Supervision

-END-

~ '

EOP:

w AP-RCS.1" TITLE:

/

REACTOR COOLANT LEAK REV:

14 PAGE ll of 11 AP-RCS.1 APPENDIX LIST TITLE 1)

FIGURE RCP SEAL LEAKOFF (FIG-4.0)

V

-=s P

EOP ES-1.1 TITLE:

SI TERMINATION REV:

18 PAGE 1 of 24 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER RESPONSIBLE NAGER 3 3I Jc-od-EFFECTIVE DATE CATEGORY 1.0 REVIEWED BY:

EOP:

ES-1.1 SI TERMINATION REV:

18 PAGE 2 of 24 A.

PURPOSE This procedure provides the necessary instructions to terminate safety injection and stabilize plant conditions'.

ENTRY CONDITIONS/SYMPTOMS 1

~

ENTRY CONDITIONS This procedure is entered from:

a.

E-O, REACTOR TRIP OR SAFETY INJECTION, and E-l, LOSS OF REACTOR OR SECONDARY COOLANT, when specified termination criteria are sati'sfied.

b.

FR-H.1,

RESPONSE

TO LOSS OF SECONDARY HEAT SINK, after secondary heat sink has been reestablished and SI has been terminated.

~

EOP:

ES-1.1 TITLE:

SI TERMINATION REV 18 PAGE 3 of 24 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED

~

1

~

~

4 t

  • i i 0 l 4

4 1 I 4

~

0 I 1

1

~

0 I I 4

0 4

0 1

4

~

1 I 1

~

CAUTION IF OFFSITE POWER IS LOST AFTER SI RESET.

THEN SELECTED SW PUMPS AND ONE CCW PUMP WILL.AUTO START ON EMERGENCY D/G.

MANUAL ACTION WILL BE REQUIRED TO RESTART SAFEGUARDS EQUIPMENT.

NOTE:

o FOLDOUT page should be open AND monitored periodically.

o Critical Safety Function Status Trees should be monitored (Refer to Appendix I for Red Path Summary).

o Adverse CNMT values should be used whenever CNMT pressure is greater than 4 psig or CNMT radiation is greater than 10+05 R/hr.

1 Reset SI 2 Reset CI:

a.

Depress CI reset pushbutton

b. Verify annunciator A-26, CNMT ISOLATION - EXTINGUISHED
b. Perform the following:
1) Reset SI.
2) Depress CI reset pushbutton.

3 Maintain PRZR Pressure Between 1800 PSIG And 2235 PSIG o

Reset PRZR heaters o

Use normal PRZR spray

EOP:

ES-1.1 SI TERMINATION REV:

18 PAGE 4 of 24 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT'BTAINED 4 Verify Adequate SW Flow:

a.

Check at least two SW pumps RUNNING

a. Manually start SW pumps as power supply permits

'(257 kw each).

IF less than two SW pumps running.

THEN perform the following:

1) Ensure SW isolation.
2) Dispatch AO to establish normal shutdown alignment (Refer to Attachment SD-1).
b. Dispatch AO to establish normal shutdown alignment (Refer to Attachment SD-1) 3)

Go to Step 7.

EOP:

ES-1.1 SI TERMINATION REV:

18 PAGE 5 of 24 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 5 Establish IA to CNMT:

a. Verify non-safeguards busses energized from offsite power o

Bus 13 normal feed CLOSED

-OR-o Bus 15 normal feed CLOSED

b. Verify SW isolation valves to turbine building -

OPEN

~ MOV-4613 and MOV-4670

~ MOV-4614 and MOV-4664

c. Verify adequate air compressor(s)

RUNNING d.

Check IA supply:

o Pressure GREATER THAN 60 PSIG o

Pressure STABLE OR INCREASING e.

Reset both trains of XY relays for IA to CNMT AOV-5392

f. Verify IA to CNMT AOV-5392 OPEN a.

Perform the following:

1) Close non-safeguards bus tie breakers:

~ Bus 13 to Bus 14 tie

~ Bus 15 to Bus 16 tie

2) Verify adequate emergency D/G capacity to run air compressors (75 kw each).

IF NOT, THEN evaluate if CNMT RECIRC fans should be stopped (Refer to Attachment CNMT RECIRC FANS).

3)'HEN bus 15 restored, THEN reset control room lighting.

b. Manually align valves.
c. Manually start air compressors as power supply permits (75 kw each).

IF air compressors can NOT be started, THEN dispatch AO to locally reset compressors as necessary.

d. Perform the following:
1) Continue attempts to restore IA (Refer to AP-IA.1.

LOSS OF INSTRUMENT AIR).

2) Continue with Step 6.

WHEN IA restored.

THEN do Steps 5e and f.

e 0

EOP:

ES-1.1 SI TERMINATION REV:

18 PAGE 6 of 24 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 6 Check If Charging Flow Has Been Established:

a. Charging pumps ANY RUNNING a.

Perform the following:

1) IF CCW flow is lost to any RCP thermal barrier OR any RCP gl seal outlet temperature offscale high, THEN dispatch AO with key to RWST gate to close seal injection needle valve(s) to affected RCP:

~

RCP A, V-300A

~

RCP B, V-300B

2) Ensure HCV-142 open, demand at 0/o.
b. Charging pump suction aligned to RWST:

o LCV-112B -

OPEN o

LCV-112C -

CLOSED

b. Manually align valves as necessary.

IF LCV-112B can NOT be opened.

THEN dispatch AO to locally open manual charging pump suction from RWST (V-358 located in charging pump room).

IF LCV-112C can NOT be closed,"

THEN perform the following:

1) Verify charging pump A NOT running and place in PULL STOP.
2) Direct AO to close V-268 to isolate charging pumps B and C from VCT (V-268 located in charging pump room).
c. Start charging pumps as necessary and adjust charging flow to restore PRZR level

EOP:

ES-1.1 SI TERMINATION REV:

18 PAGE 7 of 24 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 7 Stop SI And RHR Pumps And Place In AUTO

  • 8 Monitor SI Reinitiation Criteria:

a.

RCS subcooling based on core exit T/Cs GREATER THAN 0 F

USING FIGURE MIN SUBCOOLING b.

PRZR level GREATER THAN 5%

[30% adverse CNMT]

a. Manually start SI pumps as necessary and go to E-l, LOSS OF REACTOR OR SECONDARY COOLANT, Step l.
b. Control charging flow to maintain PRZR level.

IF PRZR level can NOT be maintained, THEN manually start SI pumps as necessary and go to E-1.

LOSS OF REACTOR OR SECONDARY COOLANT, Step 1.

~ c 4

~

e

EOP:

ES-1.1 SI TERMINATION REV:

18 PAGE 8 of 24 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED

  • 9 Monitor If CNMT Spray Should Be Stopped:

a.

CNMT spray pumps RUNNING b.

Check CNMT pressure

- LESS THAN 4 PSIG

c. Reset CNMT spray d.

Check NaOH tank outlet valves CLOSED

~ AOV-836A

~ AOV-836B a.

Go to Step 10.

b. Continue with Step 10; WHEN CNMT pressure less than 4 psig, THEN do Steps 9c through f.
d. Place NaOH tank outlet valve controllers to MANUAL and close valves.

e.

Stop CNMT spray pumps and place

~

in AUTO

f. Close CNMT spray pump discharge valves

~ MOV-860A

~ MOV-860B

~ MOV-860C

~ MOV-860D

t

EOP:

ES-l. 1 SI TERMINATION REV 18 PAGE 9 of 24 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 10 Verify MRPI Indicates ALL CONTROL AND SHUTDOWN RODS ON BOTTOM IF one or more control rods NOT fully inserted, THEN perform the following:

a.

Place RMW mode selector switch to BORATE.

b. Adjust boric acid flow control valve.

FCV-llOA, for desired flowrate.

c. Set boric acid integrator to desired amount (650 gallons for each control rod not fully inserted).
d. Place RMW control to start and verify flow.

IF flow can NOT be established.

THEN refer to ER-CVCS.1.

REACTOR MAKEUP CONTROL MALFUNCTION.

ll Establish Condenser Steam Dump Pressure Control:

a. Verify condenser available:

o Any MSIV -

OPEN o

Annunciator G-15.

STEAM DUMP ARMED - LIT a.

Place S/G ARV controllers in AUTO at desired pressure and go to Step 12.

b. Adjust condenser steam dump controller HC-484 to desired pressure and verify in AUTO.
c. Place steam dump mode selector switch to MANUAL.

d 1

EOP:

ES-1.1 SI TERMINATION REV:

18 PAGE 10 of 24 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 12 Verify Adequate SW Flow To CCW Hx:

a. Verify at least two SW pumps-RUNNING
b. Verify AUX BLDG SW isolation valves OPEN
a. Manually start pumps as power supply permits (257 kw each).

IF less than two SW pumps can be

operated, THEN go to Step 18.
b. Manually align valves.

~ MOV-4615 and MOV-4734

~ MOV-4616 and MOV-4735

c. Verify CNMT RECIRC fan annunciator C-2, HIGH TEMPERATURE ALARM - EXTINGUISHED
c. Manually start an additional SW pump as power supply permits (257 kw each).

EOP:

ES-1.1 SI TERMINATION REV:

18 PAGE 11 of 24 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 13 Check If Normal CVCS Operation Can Be Established

a. Verify IA restored:

o IA to CNMT (AOV-5392)

OPEN o

IA pressure

- GREATER THAN 60 PSIG a.

Continue with Step 18.

WHEN IA can be restored. THEN do Steps 13 through 17.

b. Verify instrument bus D-ENERGIZED c.

CCW pumps ANY RUNNING

b. Energize MCC B.

IF MCC B NOT available.

THEN perform the following:

1) Verify MCC A energized.
2) Place instrument bus D on maintenance supply.
c. Perform the following:
1) IF any RCP ¹1 seal outlet temperature offscale high, THEN isolate CCW to thermal barrier of affected RCP(s).

~

RCP A, MOV-749A and MOV-759A

~

RCP B, MOV-749B and MOV-759B

d. Charging pump ANY RUNNING
2) Manually start one CCW pump.
d. Continue with Step 18.

WHEN any charging pump running, THEN do Steps 14 through 17.

EOP:

ES-1.1 SI TERMINATION REV:

18 PAGE 12 of 24 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 14 Verify PRZR Level GREATER THAN 13%

[40% adverse CNMT]

Continue with Step 16.

WHEN PRZR level increases to greater than 13%

[40% adverse CNMT], THEN do Step 15.

15 Establish Normal Letdown:

a. Establish charging line flow to REGEN Hx -

GREATER THAN 20 GPM

b. Place the following switches to CLOSE:

~ Letdown orifice valves (AOV-200A. AOV-200B, and AOV-202)

~ AOV-371, letdown isolation valve

~ AOV-427, loop B cold leg to REGEN Hx

c. Place letdown controllers in MANUAL at 40% open

~ TCV-130

~

PCV-135

d. Reset both trains of XY relays for AOV-371 and AOV-427 e.

Open AOV-371 and AOV-427

f. Open letdown orifice valves as necessary
g. Place TCV-130 in AUTO at 105'F
h. Place PCV-135 in AUTO at 250 psig
i. Adjust charging pump speed and HCV-142 as necessary to control PRZR level IF RCP seal return has been established, THEN establish excess letdown as follows:

o Place excess letdown divert

valve, AOV-312, to NORMAL.

o Ensure CCW from excess letdown

open, (AOV-745).

o Open excess letdown isolation valve AOV-310.

o Slowly open HCV-123 to maintain excess letdown temperature less than 195 F and pressure less than 100 psig.

o Adjust charging pump speed as necessary.

IF RCP seal return NOT established, THEN consult Plant Staff to determine if excess letdown should be placed in service.

EOP:

ES-1.1 SI TERMINATION REV:

18 PAGE 13 of 24 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 16 Check VCT Makeup System:

a. Adjust boric acid flow control valve in AUTO to 9.5 gpm
b. Adjust RMW flow control valve in AUTO to 40 gpm
c. Verify the following:

1)

RMW mode selector switch in AUTO

c. Adjust controls as necessary.

2)

RMW control armed RED LIGHT LIT d.

Check VCT level:

o Level GREATER THAN 20/

-OR-o Level STABLE OR INCREASING

d. Manually increase VCT makeup flow as follows:
1) Ensure BA transfer pumps and RMW pumps running.

IF NOT, THEN dispatch AO to locally reset MCC C and MCC D UV lockouts as necessary.

2) Place RMW flow control valve HCV-111 in MANUAL and increase RMW flow.
3) Increase boric acid flow as necessary.

I A.

~

, a

EOP:

ES-1.1 SI TERMINATION REV:

18 PAGE 14 of 24 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 17 Check Charging Pump Suction Aligned To VCT:

a.

VCT level GREATER THAN 20%

a.

XF VCT level can NOT be maintained greater than 5%,

THEN perform the following'.

1) Ensure charging pump suction aligned to RWST o

LCV-112B open, o

LCV-112C closed

b. Verify charging pumps aligned to VCT o

LCV-112C -

OPEN o

LCV-112B -

CLOSED

2) Continue with Step 18.

WHEN VCT level greater than 40%.

THEN do Step 17b.

b. Manually align valves as necessary.

18 Check RCS Hot Leg Temperatures STABLE Control steam dump and total feed flow as necessary to stabilize RCS temperature.

EOP:

ES-1.1 SI TERMINATION REV 18 PAGE 15 of 24 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED NOTE:

o WHEN using a

PRZR PORV.

THEN select one with an operable block valve.

o If auxiliary spray is in use, spray flow may be increased by closing normal charging valve AOV-294 and normal PRZR spray valves.

19 Control PRZR Heaters And Operate Normal Spray To Stabilize RCS Pressure IF normal spray NOT available and letdown is in service, THEN perform the following:

a. Verify Regen Hx Chg outlet temp to PRZR Vapor temp hT less than 320'F.

IF NOT, THEN control pressure using one PRZR PORV and go to Step 20.

b. Control pressure using auxiliary spray.

IF auxiliary spray NOT available.

THEN use one PRZR PORV.

NOTE:

TDAFW pump flow control valves fail open on loss of IA.

  • 20 Monitor Intact S/G Levels:

a.

Narrow range level GREATER THAN 5%

[25% adverse CNMT]

a. Maintain total feed flow greater than 200 gpm until narrow range level greater than 5%

[25%

adverse CNMT] in at least one S/G.

b. Control feed flow to maintain narrow range level between 17%

[25% adverse CNMT] and 50%

b. IF narrow range level in any S/G continues to increase, THEN stop feed flow to that S/G.

EOP:

ES-1.1 SI TERMINATION REV:

18 PAGE 16 of 24 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT 'OBTAINED NOTE:

SW should be aligned to CCW Hxs before restoring RCP seal cooling.

21 Check RCP Cooling:

a.

Check CCW to RCPs:

Establish normal cooling to RCPs (Refer to Attachment SEAL COOLING).

o Annunciator A-7.

RCP lA CCW RETURN HIGH TEMP OR LOW FLOW EXTINGUISHED o

Annunciator A-15 'CP 1B CCW RETURN HIGH TEMP OR LOW FLOW EXTINGUISHED b.

Check RCP seal injection:

o Labyrinth seal D/Ps GREATER THAN 15 INCHES WATER

-OR-o RCP seal injection flow to each RCP GREATER THAN 6 GPM

~

~

f r 5 4 j

r

EOP:

ES-1.1 TITLE:

SI TERMINATION REV 18 PAGE 17 of 24 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 22 Check If Seal Return Flow Should Be Established:

a. Verify RCP 0'1 seal outlet temperature

- LESS THAN 235'F

b. Verify RCP seal outlet valves OPEN

~ AOV-270A

~ AOV-270B I

a.

Go to Step 23.

b. Manually open valves as necessary.
c. Reset both trains of XY relays for RCP seal return isolation valve MOV-313 d.

Open RCP seal return isolation

,valve MOV-313

e. Verify RCP 8'1 seal leakoff flow LESS THAN 6.0 GPM
d. Perform the following:
1) Place MOV-313 switch to OPEN.
2) Dispatch AO with key to RWST gate to locally open MOV-313.

e.

Perform the following:

1) Trip the affected RCP
2) Allow 4 minutes for pump coast down.

THEN close the affected RCP seal discharge valve.

f. Verify RCP tl seal leakoff flow GREATER THAN 0.8 GPM

~

RCP A, AOV-270A

~

RCP B, AOV-270B IF both RCP seal discharge valves are shut, THEN go to Step 23.

f. Refer to AP-RCP.l.

RCP SEAL MALFUNCTION.

  • 1 ICI t

t

EOP:

ES-1.1 SI TERMINATION REV:

18 PAGE 18 of 24 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 23 Verifv All AC Busses ENERGIZED BY OFFSITE POWER o

Normal feed breakers to all 480 volt busses CLOSED o

480 volt bus voltage GREATER THAN 420 VOLTS o

Emergency D/G output breakers OPEN Perform the following:

a. IF any AC emergency bus normal feed breaker
open, THEN ensure associated D/G breaker closed.
b. Perform the following as necessary:
1) Close non-safeguards

.bus tie breakers:

~ Bus 13 to Bus 14 tie

~ Bus 15 to Bus 16 tie

2) Reset Bus 13 and Bus 15 lighting breakers.
3) Dispatch AO to locally reset and start two IA compressors.
4) Place the following pumps in PULL STOP:

~

EH pumps

~ Turning gear oil pump

~

HP seal oil backup pump

5) Restore power to MCCs.

~

A from Bus 13

~

B from Bus 15

~

E from Bus 15

~

F from Bus 15

6) Start HP seal oil backup pump.
7) Start CNMT RECIRC fans as necessary.
8) Ensure D/G load within limits.
9) Refer to Attachment SI/UV for other equipment lost with loss of offsite power.
c. Try to restore offsite power to all AC busses (Refer to ER-ELEC.l.

RESTORATION OF OFFSITE POWER).

e a ~

e s

~

~

t

EOP:

ES-1.1 SI TERMINATION REV:

18 PAGE 19 of 24 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED NOTE:

Adverse CNMT conditions or loss of forced air cooling may result in failure of NIS detectors.

24 Check If Source Range Channels Should Be Energized:

a.

Source range channels DEENERGIZED a.

Go to Step 24e.

b.

Check intermediate range flux-EITHER CHANNEL LESS THAN 10 10 AMPS

b. Perform the following:
1) IF neither intermediate range channel is decreasing, THEN initiate boration.
2) Continue with Step 25.

WHEN flux is LESS THAN 10 10 amps on any operable channels THEN do Steps 24c.

d and e.

c.

Check the following:

o Both intermediate range channels LESS THAN 10 10 AMPS

c. Continue with step 25.

WHEN either condition met, THEN do Steps 24d and e.

-OR-o Greater than 20 minutes since reactor trip

d. Verify source range detectors ENERGIZED
d. Manually energize source range detectors by depressing P-6 permissive defeat pushbuttons (2

of 2).

e. Transfei Rk-45 recorder to one source range and one intermediate range channel IF source ranges can NOT be restored.

THEN refer to ER-NIS.1, SR MALFUNCTIONS and go to Step 25.

g V

EOP:

ES-1.1 SI TERMINATION REV:

18 PAGE 20 of 24 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 25 Check If Emergency D/Gs Should Be Stopped:

a. Verify AC emergency busses energized by offsite power:

o Emergency D/G output breakers OPEN

a. Try to restore offsite power (Refer to ER-ELEC.l.

RESTORATION OF OFFSITE POWER).

o AC emergency bus voltage GREATER THAN 420 VOLTS o

AC emergency bus normal feed breakers CLOSED

b. Stop any unloaded emergency D/G and place in standby (Refer to Attachment D/G STOP)

EOP:

ES-1.1 TITLE:

SI TERMINATION REV 18 PAGE 21 of 24 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED t t t t t

  • t
  • t t t

~

1 t

~ t t

~

  • t t t
  • t t
  • t t 1

~ t t

  • t

~ t CAUTION IF RCP SEAL COOLING HAD PREVIOUSLY BEEN LOST, THEN THE AFFECTED RCP SHOULD NOT BE STARTED PRIOR TO A STATUS EVALUATION.

t t t

~ t

  • t
  • I
  • t t
  • t
  • t 1 t t t t t

~ t t t t t t t

~

~

  • t t t 1

1 t

26 Check RCP Status AT LEAST ONE RUNNING Perform the following:

a. IF RVLIS level (no RCPs) less than 95%%d, THEN perform the following:

o Increase PRZR level to greater than 65/.

(82'/. adverse CNMT).

o Dump steam to establish RCS subcooling based on core exit T/Cs to greater than 20'F using Figure MIN SUBCOOLING.

o Energize PRZR heaters as necessary to saturate PRZR water.

b. Establish conditions for starting an RCP:

o Verify bus 11A or 11B energized.

o Refer to Attachment RCP START.

c. Start one RCP.

IF an RCP can NOT be started, THEN verify natural circulation (Refer to Attachment NC).

IF natural circulation NOT

verified, THEN increase dumping steam frorii intact S/Gs.

EOP:

ES-1.1 SI TERMINATION REV:

18 PAGE 22 of 24 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 27 Establish Normal Shutdown Alignment:

a.

Check condenser

- AVAILABLE

a. Dispatch AO to perform Attachment SD-2.
b. Perform the following:

o Open generator disconnects

~

1G13A71

~

9X13A73 o

Place voltage regulator to OFF o

Open turbine drain valves o

Rotate reheater steam supply controller cam to close valves o

Place reheater dump valve switches to HAND o

Stop all but one condensate pump

c. Verify adequate Rx head cooling:
1) Verify at least one control rod shroud fan RUNNING
1) Manually start one fan as power supply permits (45 kw)
2) Verify one Rx compartment, cooling fan RUNNING
2) Perform the following:

o Dispatch AO to reset UV relays at MCC C and MCC D.

o Manually start one fan as power supply permits (23 kw)

d. Verify Attachment SD-1 COMPLETE

EOP:

ES-1.1 TITLE:

SI TERMINATION REV:

18 PAGE 23 of 24 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 28 Maintain Plant Conditions Stable:

a.

RCS.pressure BETWEEN 1800 PSIG AND 2235 PSIG b.

PRZR level BETWEEN 35%

AND 40%

c. Intact S/G narrow range levels BETWEEN 17%

AND 52%

d.

RCS cold leg temperature STABLE

a. Control PRZR heaters and spray as necessary.
b. Control charging as necessary.
c. Control S/G feed flow as necessary.
d. Control dumping steam as necessary.

IF cooldown continues, THEN close both MSIVs.

  • 29 Monitor SI Reinitiation Criteria:

a.

RCS subcooling based on core exit T/Cs GREATER THAN O' USING FIGURE MIN SUBCOOLING b.

PRZR level GREATER THAN 5%

[30% adverse CNMT]

a. Manually start SI pumps as necessary and go to E-l, LOSS OF REACTOR OR SECONDARY COOLANT, Step l.
b. Control charging flow to maintain PRZR level.

IF PRZR level can NOT be maintained.

THEN manually start SI pumps as necessary and go to E-l, LOSS OF REACTOR OR SECONDARY COOLANT. Step 1.

k

\\A ~

Ol E

EOP:

ES-1.1 SI TERMINATION REV:

18 PAGE 24 of 24 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 30 Go To Procedure 0-2.1, NORMAL SHUTDOWN TO HOT SHUTDOWN

-END-

EOP:

ES-1.1 SI TERMINATION REV 18 PAGE 1 of 1 ES-1.1 APPENDIX LIST TITLE 1)

RED PATH

SUMMARY

2)

FIGURE MIN SUBCOOLING (FIG-1.0) 3)

ATTACHMENT CNMT RECIRC FANS (Arr-ii.o) 4)

ATTACHMENT D/G STOP (Arr-s.I) 5)

ATTACHMENT NC (ATr-13.0) 6)

ATTACHMENT SEAL COOLING (ATT-15.2) 7)

ATTACHMENT RCP START (ATT.15.0) 8)

ATTACHMENT SD-1 (ATT-17.0) 9)

ATTACHMENT SD-2 (Arr-17.1) 10)

ATTACHMENT SI/UV (ATT-8.CL) 11)

FOLDOUT

EOP:

ES-1. 1 SI TERMINATION REV:

18 PAGE 1 of 1

RED PATH

SUMMARY

a.

SUBCRITICALITY Nuclear power greater than 5%

b.

CORE COOLING Core exit T/Cs greater than 1200'

-OR-Core exit T/Cs greater than 700' AND RVLIS level (no RCPs) less than 52%

[55%

adverse CNMT]

c.

HEAT SINK Narrow range level in all S/Gs less than 5%

[25% adverse CNMT] AND total feedwater flow less than 200 gpm d.

INTEGRITY Cold leg temperatures decrease greater than 100' in last 60 minutes AND RCS cold leg temperature less than 285' e.

CONTAINMENT CNMT pressure greater than 60 psig

EOP:

ES-1.1 SI TERMINATION REV:

18 PAGE 1 of 1

FOLDOUT PAGE 1.

SI REINITIATION CRITERIA IF EITHER condition listed below occurs, THEN manually start SI pumps as necessary and go to E-l, LOSS OF REACTOR OR SECONDARY COOLANT, Step 1:

o RCS subcooling based on core exit T/Cs LESS THAN 0 F USING FIGURE MIN SUBCOOLING OR o

PRZR level CHARGING CAN NOT CONTROL LEVEL GREATER THAN 5%

[30% adverse CNMT]

2.

SECONDARY INTEGRITY CRITERIA IF any S/G pressure is decreasing in an uncontrolled manner or is completely depressurized AND has not been isolated, THEN go to E-2, FAULTED S/G ISOLATION, Step 1.

3.

AFW SUPPLY SWITCHOVER CRITERION IF CST level decreases to less than 5 feet, THEN switch to alternate AFW water supply (Refer to ER-AFW.1, ALTERNATE WATER SUPPLY TO AFW PUMPS).

4.

E-3 TRANSITION CRITERIA IF any S/G level increases in an uncontrolled manner or any S/G has abnormal radiation, THEN manually start SI Pumps as necessary AND go to E-3, STEAM GENERATOR TUBE RUPTURE, Step l.

ppllA i ~~4 v',

~ -,, ja'~;,

4

,1' W

I IK