L-98-074, Responds to NRC Re Violations Noted in Insp Repts 50-334/97-11 & 50-412/97-11.Corrective Actions:Suppl Work Instruction That Was Not Properly Controlled Was Removed from Work Package: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 1: | Line 1: | ||
#REDIRECT [[L-98-074, Forwards Indicators Issued in Mar 1998 for St Lucie Plant, Units 1 & 2.Indicators Were Discussed at 980306 Plant Mgt Review Meeting]] | |||