ML17362A272: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 2: | Line 2: | ||
| number = ML17362A272 | | number = ML17362A272 | ||
| issue date = 12/15/2017 | | issue date = 12/15/2017 | ||
| title = Part 02 | | title = Part 02 SSAR (Rev. 1) - Part 2 - SSAR - Chapter 2 - Site Characteristics - Section 2.4.8 - Cooling Water Canals and Reservoirs | ||
| author name = Shea J | | author name = Shea J | ||
| author affiliation = Tennessee Valley Authority | | author affiliation = Tennessee Valley Authority | ||
| Line 11: | Line 11: | ||
| contact person = Fetter A | | contact person = Fetter A | ||
| case reference number = TVACLINCHRIVERESP, TVACLINCHRIVERESP.SUBMISSION.3, CRN.PART02, CRN.PART02.1, +reviewed | | case reference number = TVACLINCHRIVERESP, TVACLINCHRIVERESP.SUBMISSION.3, CRN.PART02, CRN.PART02.1, +reviewed | ||
| document type = Site Safety Analysis Report (SSAR) | | document type = Site Safety Analysis Report (SSAR) License-Application for Early Site Permit (ESP) | ||
| page count = 2 | | page count = 2 | ||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:Clinch River Nuclear Site Early Site Permit Application Part 2, Site Safety Analysis Report SUBSECTION 2.4.8 TABLE OF CONTENTS Section | {{#Wiki_filter:2.4.8-i Revision 1 Clinch River Nuclear Site Early Site Permit Application Part 2, Site Safety Analysis Report SUBSECTION 2.4.8 TABLE OF CONTENTS Section Title Page 2.4.8 Cooling Water Canals and Reservoirs........................................ 2.4.8-1 | ||
Clinch River Nuclear Site Early Site Permit Application Part 2, Site Safety Analysis Report 2.4.8 | 2.4.8-1 Revision 1 Clinch River Nuclear Site Early Site Permit Application Part 2, Site Safety Analysis Report 2.4.8 Cooling Water Canals and Reservoirs The small modular reactors under consideration at the Clinch River Nuclear (CRN) Site do not rely on the Clinch River arm of the Watts Bar Reservoir for a safety-related water supply, and the site does not include cooling water canals or reservoirs. The CRN Site uses the Clinch River arm of the Watts Bar Reservoir as the source of makeup water for nonsafety-related, normal plant cooling.}} | ||
Latest revision as of 07:53, 7 January 2025
| ML17362A272 | |
| Person / Time | |
|---|---|
| Site: | Clinch River |
| Issue date: | 12/15/2017 |
| From: | James Shea Tennessee Valley Authority |
| To: | Office of New Reactors |
| Fetter A | |
| References | |
| TVACLINCHRIVERESP, TVACLINCHRIVERESP.SUBMISSION.3, CRN.PART02, CRN.PART02.1, +reviewed | |
| Download: ML17362A272 (2) | |
Text
2.4.8-i Revision 1 Clinch River Nuclear Site Early Site Permit Application Part 2, Site Safety Analysis Report SUBSECTION 2.4.8 TABLE OF CONTENTS Section Title Page 2.4.8 Cooling Water Canals and Reservoirs........................................ 2.4.8-1
2.4.8-1 Revision 1 Clinch River Nuclear Site Early Site Permit Application Part 2, Site Safety Analysis Report 2.4.8 Cooling Water Canals and Reservoirs The small modular reactors under consideration at the Clinch River Nuclear (CRN) Site do not rely on the Clinch River arm of the Watts Bar Reservoir for a safety-related water supply, and the site does not include cooling water canals or reservoirs. The CRN Site uses the Clinch River arm of the Watts Bar Reservoir as the source of makeup water for nonsafety-related, normal plant cooling.