=Text=
=Text=
{{#Wiki_filter:Client:              AMEC E&I, Inc.
{{#Wiki_filter:* p.,  
          ~
~
GeoTe t* g                       Project Name:
GeoTe t* g E l( P R E Client:
Project Name:
Project Location:
Project Location:
Clinch River Project Oak Ridge, TN E l( P R E                      GTX # :              301001 Start Date:        3/6/20 14 End Date :          3/14/ 2014 Test ed By :        en k C.l'\J: ~
GTX # :
Checked By:          mpd   W\P*
Start Date:
Boring ID:          MP- 101 Sample ID :          LS - 2 Depth, ft :        135.20-135.47 Sample Description : NA After test
End Date:
* p.,
Tested By:
Clinch River Data Report Rev. 4 CRP-1112.16                                RCN: CRP-1285.0 Page G.3-21 of 47                                                              Page 19 of 45
Checked By:
Boring ID:
Sample ID :
Depth, ft:
Sample Description :
Clinch River Data Report Rev. 4 CRP-1112.16 Page G.3-21 of 47 AMEC E&I, Inc.
Clinch River Project Oak Ridge, TN 301001 3/6/2014 3/14/2014 en k C.l'\\J: ~
mpd W\\P*
MP-101 LS-2 135.20-135.47 NA After test RCN: CRP-1285.0 Page 19 of 45  


Client:                 AMEC E&I, I nc.
Client:
Project Name:           Clinch River Project Project location :     Oak Ridge, TN E X P RES S                           GTX # :                 301001 Test Date :             3/14/201 4 Tested By:               ~s<=c/
AMEC E&I, Inc.
Checked Bv:               MP Boring ID:             MP-101 Sample ID:             1: t. 'S
Project Name:
* 2. r"'I'J. 3lL~/tf   Saw cut shear plane Deeth ft:               135.2- 135.6 ft.
Clinch River Project Project location :
Joint Roughness Profiles by ASTM 05607 Sliding Friction Initial Shear Surface
Oak Ridge, TN E X P R E S S GTX # :
  ~   _r. - - - - - - - - --                    - .\.._____       l -, '~
301001 Test Date:
Joint Roughness Coefficient: 0-2 Sliding Friction Failure Shear Surface           Normal Load:                 110 psi
3/14/2014 Tested By:  
                                                            "--- -               Tof
~s<=c/
                                            =
Checked Bv:
Joint Roughness Coefficient: 0- 2 Sliding Friction Failure Shear Surface           Normal Load :                 150 psi
MP Boring ID:
(
MP-101 Sample ID:
                                      ~- -
1: t. 'S
Joint Roughness Coefficient: 0-2 Sliding Friction Failure Shear surface         Norma l Load:                 200 psi
* 2. r"'I'J. 3lL~/tf Saw cut shear plane Deeth ft:
        ~     \ __ _)----     -
135.2-135.6 ft.
                                                      *-* ~~-     . ~
Joint Roughness Profiles by ASTM 05607 Sliding Friction Initial Shear Surface l
Joint Roughness Coefficient:   0-2 Note: Surface Roughness measured In the direction of shea r displacement.               Joint Roughness Coefficient based on ASTM 05607 Figure 4.
~
Clinch River Data Report Rev. 4 CRP-1112.16                                                                       RCN: CRP-1285.0 Page G.3-22 of 47                                                                                                       Page 20 of 45
_r  
\\.. _____ -, '~
Joint Roughness Coefficient:
0-2 Sliding Friction Failure Shear Surface Normal Load:
110 psi  
"--- - Tof  
=
Joint Roughness Coefficient: 0-2 Sliding Friction Failure Shear Surface Normal Load :
150 psi
(  
~-
Joint Roughness Coefficient: 0-2 Sliding Friction Failure Shear surface Normal Load:
200 psi  
~  
\\ __ _)---- -
*-*~~-.. ~
Joint Roughness Coefficient:
0-2 Note: Surface Roughness measured In the direction of shear displacement. Joint Roughness Coefficient based on ASTM 05607 Figure 4.
Clinch River Data Report Rev. 4 CRP-1112.16 Page G.3-22 of 47 RCN: CRP-1285.0 Page 20 of 45  


Client:                     AMEC E&I, Inc.
Client:
Project Name:               Clinch River Project Project Location:           Oak Ridge, TN XPitlSS                         GTX #:                       301001 Start Date:                 2/ 25/2014 End Date :                 3/7/2014 Tested By :                 jsc -5"5 (.....J Checked By :                 mpd MP Boring ID :                 MP-201 Sample JD :                 L5* 1l Depth, rt:                 28.4 0*28.65 Sample
AMEC E&I, Inc.
Project Name:
Clinch River Project Project Location:
Oak Ridge, TN XPitlSS GTX #:
301001 Start Date:
2/ 25/2014 End Date:
3/7/2014 Tested By:
jsc -5"5 (..... J Checked By:
mpd MP Boring ID:
MP-201 Sample JD:
L5*1l Depth, rt:
28.40*28.65 Sample


== Description:==
== Description:==
NA Sliding Friction Test of Rock by ASTM 05607-08                                                   (l)           1 Test Pronle I Setup Top to bottom:   steel plate I Rock Core Si!mple I steel pli!te Sample Prepilration :                Sample core cut to length using diamond tipped saw blade. Specimen coated with polyurethane spray. 'Hydro-Stone Super X' encapsulating compound was used to mount th e specimen Into the specimen holding ring.
NA Sliding Friction Test of Rock by ASTM 05607-08 (l)
Test Equipment:                      Load cells and LVDTs connected to data acquisition system for shear force, normal load and horizontal displacement readings.
Test Pronle I Setup Top to bottom:
Test Condition :                    Tested at as-received moisture and density.
Sample Prepilration:
Horizontal Displacement, In/min:    0.005 Parameter                          Point 1       Point 2         Point 3       Point 4       PointS Specimen Diameter Inches                                  2.40         2.40           2.40           ---            ---
Test Equipment:
Specimen Length Inches                                    3.07         3.07           3.07           ---            ---
Test Condition :
Specimen Area, ln 2                                      4.50         4.50           4.50           --*            ...
Horizontal Displacement, In/min:
Specimen Weight grams                                    584           584           584             ...            *--
Parameter Specimen Diameter Inches Specimen Length Inches Specimen Area, ln2 Specimen Weight grams Bulk Density of Specimen pcf Shear Plane Area In2 Normal Compressive Stress psi Peak Shear Stress psi Post-Peak Shear Stress _QSI Peak Friction Angle:
Bulk Density of Specimen pcf                              161           161           161             --*            ---
Peak Cohesion:
Shear Plane Area In 2                                    5.57         5.57           5.57           ---            ---
Post Peak Friction Angle:
Normal Compressive Stress psi                            100           150           200             --            ---
Post Peak Cohesion:
Peak Shear Stress psi                                      90           100           125             ...            *--
Equipment:
Post- Peak Shear Stress _QSI                              61           92           121             ...            ---
Balance:
Peak Friction Angle:                                19.3         degrees Peak Cohesion:                                      52.4         psi Post Peak Friction Angle:                          31.0         degrees Post Peak Cohesion:                                1.3           psi Equ ipment:                          Seria l #:     Date Next:
Caliper:
Balance:                              15606518 11/13/2014 Caliper:                            09047598 11/6/2014 10k Horizontal Load Cell:            473831A       1/7/2015 50k Horizonta l Load Cell:            236439       11/:!.3/2014 50k Verti cal Load Cell:              253300       11/13/2014 lOk Vertical Load Cell:              99440A         1/9/2015 Horl<eontal LVDT:                    103998         12/12/2014 Vertical LVDT :                      DSRLVDT- 1 12/12/2014 Vertical LVDI:                      DSRLVDf-2 12/12/2014 Vertical LVDT:                        DSRLVDT-3 12/12/2014 Vertica l LVDT:                      DSRLVDT-4 12/12/2014 Notes:
10k Horizontal Load Cell:
(1) Deviation approved by Bechtel: Test specimens coated with polyurethane spray Initial JRC:         8 -10 After Paint l JRC: 8-10 After Point 2 JRC: 6-8 Final JRC:           6*8 Actual strength pC!rCimeters may VC!ry and should be determined by an engineer for site-specific conditions.
50k Horizontal Load Cell:
Clinch River Data Report Rev. 4 CRP-1112.16                                                                     RCN: CRP-1285.0 Page G.3-23 of 47                                                                                                   Page 21 of 45
50k Vertical Load Cell:
lOk Vertical Load Cell:
Horl<eontal LVDT:
Vertical LVDT:
Vertical LVDI:
Vertical LVDT:
Vertical LVDT:
Notes:
steel plate I Rock Core Si!mple I steel pli!te Sample core cut to length using diamond tipped saw blade. Specimen coated with polyurethane spray. 'Hydro-Stone Super X' encapsulating compound was used to mount the specimen Into the specimen holding ring.
Load cells and LVDTs connected to data acquisition system for shear force, normal load and horizontal displacement readings.
Tested at as-received moisture and density.
0.005 Point 1 Point 2 Point 3 Point 4 PointS 2.40 2.40 2.40 3.07 3.07 3.07 4.50 4.50 4.50 584 584 584 161 161 161 5.57 5.57 5.57 100 150 200 90 100 125 61 92 121 19.3 degrees 52.4 psi 31.0 degrees 1.3 psi Serial #:
Date Next:
15606518 11/13/2014 09047598 11/6/2014 473831A 1/7/2015 236439 11/:!.3/2014 253300 11/13/2014 99440A 1/9/2015 103998 12/12/2014 DSRLVDT-1 12/12/2014 DSRLVDf-2 12/12/2014 DSRLVDT-3 12/12/2014 DSRLVDT-4 12/12/2014 (1) Deviation approved by Bechtel: Test specimens coated with polyurethane spray Initial JRC:
8-10 After Paint l JRC:
8-10 After Point 2 JRC:
6-8 Final JRC:
6*8 Actual strength pC!rCimeters may VC!ry and should be determined by an engineer for site-specific conditions.
1 Clinch River Data Report Rev. 4 CRP-1112.16 Page G.3-23 of 47 RCN: CRP-1285.0 Page 21 of 45  


Client:                                 AM EC E&I, Inc.
Client:
Project Name:                           Clinch River Project Proj ect Location :                     Oak Ridge, TN EXPRESS                                                 GTX #:                                   301001 Start Da e:                               2/ 25/2014 End Dat e:                               3/7/ 2014 Tested By :                             j sc -:fS<..-J Checked By :                             mpd Mf''
AMEC E&I, Inc.
Boring ID :                               MP-201 Sample ID :                               L5-ll Depth, ft:                               28.40-28.65 Sample Description :                     NA Sliding Friction Test of Rock by ASTM 05607-08 Shear $tress vs. $hear Displa,;ement                                                               Shear Stress vs. Normal Stress I -   -      100 psi     -          tso psi   -              200 psi I 4 00                                                                                              4 00~------.-------.-----~~-----.
Project Name:
I           i          i          i              !
Clinch River Project Project Location:
I             I              I
Oak Ridge, TN EXPRESS GTX #:
:            :              I I           I         I         I              I
301001 Start Da e:
:            :              I II          II        II        ~
2/ 25/2014 End Date:
J
3/7/ 2014 Tested By :
:I                                               :
j sc -:fS<..-J Checked By:
I
mpd Mf''
                                                                                                                                        ~
Boring ID:
MP-201 Sample ID:
L5-ll Depth, ft:
28.40-28.65 Sample Description :
NA Sliding Friction Test of Rock by ASTM 05607-08  
'iii
: c.
Shear $tress vs. $hear Displa,;ement I -
100 psi tso psi 200 psi I 400 I
i i
i I
I I
I I
I I
I
~
I I
I J
I 300 - -----~--~---t------~-- ---~-----1----- -
1 I
I I
I I
I I
I I
I I
I I
I I
300 -  -----~--~---t------~-----~-----1-----
1          I          I        I              I
                                                                                  -                      300  -------- -~ --- - ------ ~ --- - - --- - ~-- -- - - - - -
1            I              :
  'iii                  I          I          I        I              I                                                I            I              I
: c.                  I          I          I        I              I                                                I            I              I
    "'.                  I I
I I
I I
I I
I I
J I
J I
I I                        'Ui I
I I
I I
i I
I I'!
ti  200 I
I I
I I
I I
I I
I I
I I
I I
I I
I Q.
                                                                                                    .... 200 I
I I
I I
I I
I I
I
I  
              - ----~--     - ---t- - -- --~-----1r-----i--               ----
- ----~-- - ---t- - -- --~-----1r-----i-- ----
                                                                                                              ~::::: : :
I I
                                                                                                    .el"'
I I'! ti 200 I
                        '          I I         I               !
I I
I                     I         I             I I           I         I         I             I I           I         I         I             I                         Ul I         I         I          I               I                         1...
I I
I           I         I         I I
I I
1;;*;.*;;***-+t_*;;-.-;--;.;-,~~--~-::---~;=--~~~ ::_--'"1'                               100
I I
                                                                                                    .t::.
I I
V1 100 I
I I
I I
I I
I I
I I
I I
I 100 1
;;*;.*;;***-+t_ *;;-.-;--;.;-,~~--~-::
---~
; =--~~~........... :; ::_--'"1' I
I I
I I
I I
I I
I I
Q I
I I
,I 0.00 0.05 0.10 0.15 0.20 0.25 0.30 Shear Displacement, Inches Shear Stress vs. Normal Stress 4 00~------.-------.-----~~-----.
I I
I I
I
~
I I
I
-------- -~ --- - ------ ~ --- - - --- - ~-- -- - - - - -
1 I
300 I
I I
I I
I I
I I
I I
I I
I I
I i
I
'Ui Q.
I I
I I
I I
I I
                                                                                                                ~ I Post-P~ak I                         l Q                        I          I        I            ,I 0~~~===4~--L---~
I I
0.00    0.05          0.10      0.15        0.20      0.25          0.30                        0         100           200             300             400 Shear Displacement, Inches                                                                      Nortnal Stress, psi Normal Djsolacement ys. Shear Qjsplacement 0.100000
~:::::::::
:c     0,075000
~
                      .t::.
I Post-P~ak I l 0~~~===4~--L---~
                      .G o.osoooo
200
                      ~ 0.025000 E
.el Ul 1......,
el     0.000000
.t::.
                      ~
100 V1 0
c.
100 200 300 400 Nortnal Stress, psi Normal Djsolacement ys. Shear Qjsplacement 0.100000
5 -omsooo
:c 0,075000  
                      ~ *0.050000 0
.t::..G o.osoooo  
z -0.075000
~ 0.025000 E
                            *0.100000 0                 0.05                   0.1         0.15           0.2.           0.25             0.3 Shear Displacement, In che s Equipment ;                                               Serial #:               Date Next:
el 0.000000  
Balance:                                                 15606518               11/ 13/ 2014 Caliper:                                                 09047598               11/ 6/ 2014 10k Horizonta l Load Cell :                               473831A                 1/7/2015 SOk Horizontal Load Cell :                               236439                 11/ 13/2014 SOk Vertical Load Cell :                                 253300                 11/13/2014 10k Vertica l Load Cell :                                 99440A                 1/9/2015 Horizontal LVDT:                                         103998                 12/12/2014 Vertical LVDT:                                           DSRLVDT-1               12/12/ 2014 Vertical LVDT :                                           DSRLVDT*2               12/12/2014 Vertical LVDT :                                           DSRLVDT-3               12/12/2014 Vertical LVDT :                                           DSRLVDT-4               12/12/ 2014 Clinch River Data Report Rev. 4 CRP-1112.16                                                                                                               RCN: CRP-1285.0 Page G.3-24 of 47                                                                                                                                                 Page 22 of 45
~
: c. 5 -omsooo  
~ *0.050000 0 z -0.075000  
*0.100000 0
0.05 0.1 0.15 0.2.
0.25 0.3 Shear Displacement, Inches Equipment; Serial #:
Date Next:
Balance:
15606518 11/ 13/ 2014 Caliper:
09047598 11/ 6/ 2014 10k Horizontal Load Cell :
473831A 1/7/2015 SOk Horizontal Load Cell :
236439 11/ 13/2014 SOk Vertical Load Cell:
253300 11/13/2014 10k Vertical Load Cell:
99440A 1/9/2015 Horizontal LVDT:
103998 12/12/2014 Vertical LVDT:
DSRLVDT-1 12/12/ 2014 Vertical LVDT:
DSRLVDT*2 12/12/2014 Vertical LVDT:
DSRLVDT-3 12/12/2014 Vertical LVDT:
DSRLVDT-4 12/12/ 2014 Clinch River Data Report Rev. 4 CRP-1112.16 Page G.3-24 of 47 RCN: CRP-1285.0 Page 22 of 45  


Client:               AMEC E&I, Inc .
Client:
GeoTest*ng                        Project Name :
Project Name:
Project Location :
Project Location :
Clinch River Project Oak Ridge, TN EXPRESS                          GTX #:                301001 St art Date:          2/ 25/ 2014 End Date :            3/ 7/2014 Tested By :            j sc  -:f~cJ Checked By:            mpd -"t\
GeoTest*ng EXPRESS GTX #:
Boring I D:            MP-2 01 Sa mple ID :          LS-11 Dept h, ft:            28.40* 28.65 Sa mple Descri ption : NA Before test Clinch River Data Report Rev. 4 CRP-1112.16                                  RCN: CRP-1285.0 Page G.3-25 of 47                                                                Page 23 of 45
St art Date:
End Date :
Tested By:
Checked By:
Boring I D:
Sample ID :
Depth, ft:
Sample
 
== Description:==
Clinch River Data Report Rev. 4 CRP-1112.16 Page G.3-25 of 47 AMEC E&I, Inc.
Clinch River Project Oak Ridge, TN 301001 2/ 25/2014 3/ 7/2014 jsc
-:f~cJ mpd -"t\\
MP-201 LS-11 28.40* 28.65 NA Before test RCN: CRP-1285.0 Page 23 of 45  


Client:               AMEC E&t, Inc.
Client:
Project Name:         Clinch Ri ver Project Project Location:     Oak Ridge, TN E X P R E S S                     GTX # :               30100 1 Start Date:           2/ 25/ 201 4 J
Project Name:
End Date:             3/7/ 2014 Test ed By:           j sc  -">S Checked By :         mpd    MF1 Boring ID :           MP* 201 Sa mple ID :         LS*11 D~th, ft:             28.40-28. 65 Sa mple Description : NA Afte r test Clinch River Data Report Rev. 4 CRP-1112.16                                   RCN: CRP-1285.0 Page G.3-26 of 47                                                                 Page 24 of 45
Project Location:
E X P R E S S GTX # :
Start Date:
End Date:
Tested By:
Checked By:
Boring ID :
Sample ID :
D~th, ft:
Sample Description :
Clinch River Data Report Rev. 4 CRP-1112.16 Page G.3-26 of 47 AMEC E&t, Inc.
Clinch River Project Oak Ridge, TN 301001 2/ 25/ 2014 3/7/2014 jsc
-">S J mpd MF1 MP* 201 LS*11 28.40-28.65 NA After test RCN: CRP-1285.0 Page 24 of 45  


Client:             AMEC E&l, Inc.
Client:
Project Name:       Clinch River Proj ect Project Location : Oak Ridge, TN E )( P R t                             GTX #:             301001 Test Date:         3/7/2014
AMEC E&l, Inc.
                                                                    ~
Project Name:
Tested 6y:
Clinch River Project Project Location :
Checked By :
Oak Ridge, TN E )( P R t GTX #:
Boring ID:         MP-:HH- Z.C{ M~ l/t.f4(1" Sample 10:         LS-11 Deoth. Ft:         28.40-28.65 Joint Roughness Profiles by ASTM 05607 Sliding Friction I nitial Shear Surface
301001 Test Date:
                      \                   --~~-
3/7/2014 Tested 6y:  
                                                          **--    -- ~..__
~
ebtib~*. ~r                                           -~
Checked By:
Joint Roughness Coefficient:     8-10 Sliding Friction Failure Shear Surface           Normal Load:                       100 psi Tc!(J :     ~             e...----*-*---._____.--~---*-~-~. .-. . _ ......, . . . .---,L r1offo"" .~ ~ )                                   --------\
Boring ID:
Joint Roughness Coefficient:     8-10 Sliding Friction Failure Shear Surface           Normal Load:                       150 psi
MP-:HH-Z.C{ M~ l/t.f4(1" Sample 10:
                                  ~--------~~*~     * -~- " ~*--------~**~           * --~
LS-11 Deoth. Ft:
                                  \
28.40-28.65 Joint Roughness Profiles by ASTM 05607 Sliding Friction Initial Shear Surface  
I  ~*
\\
I\:;::"-
--~~-
Joint Roughness Coefficient:     6-8 Sliding Friction Failure Shear Surface           Normal Load :                     200 psi G.'i>t1oMir ~                           \
-- ~..__
Joint Roughness Coefficient :     6-8 Note: Surface Roughness measured In the direction of shear displacement. Joint Roughness Coefficient based on ASTM 05607 Figure 4.
ebtib~*. ~r  
Clinch River Data Report Rev. 4 CRP-1112.16                                                         RCN : CRP-1285.0 Page G.3-27 of 47                                                                                         Page 25 of 45
-~
Joint Roughness Coefficient:
8-10 Sliding Friction Failure Shear Surface Normal Load:
100 psi Tc!(J : ~
e...----*-* ---._____.--~ ---*-~-~  
........ -_......,....... ---,L r1offo"".~ ~ )  
--------\\
Joint Roughness Coefficient:
8-10 Sliding Friction Failure Shear Surface Normal Load:
150 psi I
~*
I\\:;::"-
~--------~~*~
* -~-
" ~*--------~
* *~
--~  
\\
Joint Roughness Coefficient:
6-8 Sliding Friction Failure Shear Surface Normal Load :
200 psi G.'i>t1oMir ~  
\\
Joint Roughness Coefficient:
6-8 Note: Surface Roughness measured In the direction of shear displacement. Joint Roughness Coefficient based on ASTM 05607 Figure 4.
Clinch River Data Report Rev. 4 CRP-1112.16 Page G.3-27 of 47 RCN : CRP-1285.0 Page 25 of 45  


Client:                   AMEC E&I, Inc.
Client:
Project Name :             Clinch Rl ve Project Project Location :         Oak Ridge, TN EJC     RESS                         GTX #:                     301001 Start Date:               2/25/2D1 4 End Date:                 2/ 28/2D14 Tested By:                 jsc :f'f'--
AMEC E&I, Inc.
Checked By :               mpd Y'I\.Q~
Project Name:
Boring ID:                 MP*2Dl Sample ID :                 LS-12 Depth, ft:                 53 .62* 53.85 Sample
Clinch Rlve Project Project Location :
Oak Ridge, TN EJC RESS GTX #:
301001 Start Date:
2/25/2D14 End Date:
2/ 28/2D14 Tested By:
jsc :f'f'--
Checked By:
mpd Y'I\\.Q~
Boring ID:
MP*2Dl Sample ID :
LS-12 Depth, ft:
53.62*53.85 Sample


== Description:==
== Description:==
NA Direct Shear Test of Rock by ASTM 05607-08                                                 (l)
NA Direct Shear Test of Rock by ASTM 05607-08 (l)
Test Profile I Setup Top to bottom :   steel plate I Rock Core Sample 1 steel plate Sample Preparation:                   Sample core cut to length using diamond tipped saw blade. Specimen coated with polyurethane spray. 'Hydro-Ston e Super X' encapsulating compound was used to mount the specimen Into the specimen holding ring.
Test Profile I Setup Top to bottom :
Test Equipment:                        Load cells and LVDTs connected to data acquisition system for shear force, norm<~l load and horizontal displacement readings.
steel plate I Rock Core Sample 1 steel plate Sample Preparation:
Test Condition :                      Tested at as- received moisture and density .
Test Equipment:
Horizontal Displacement, In/min:      D.OOS Parameter                          Point 1       Point 2        Point 3      Point 4          Point 5 Specimen Diameter Inches                                  2.4D           NA            NA            NA              NA Specimen Length, Inches                                  2.47           NA            NA            NA              NA Specimen Area, I n ~                                      4.51           NA            NA            NA              NA Specimen Weight, grams                                    473           NA            NA            NA              NA Bulk Denslt:t of Sf2eCimen 1 J:!Cf (2)                    162           NA            NA            NA              NA 2
Test Condition :
Shear Plane Area, in                                      5.45           NA            NA            NA              NA Normal Compsessive Stress osi                            115           NA            NA            NA              NA Peak Shear Stress psi                                    239           NA            NA            NA              NA Post-Peak Shear Stress psi                                126           NA            NA             NA               NA Peak Friction Angle:                                NA           degrees Peak Cohesion:                                      NA            psi Post Peak Friction Angle:                            NA            degrees Post Peak Cohesion:                                  NA            psi Equipment:                            Serial# :    Date Next :
Horizontal Displacement, In/min:
Balance:                              15606518 11/13/2D14 Caliper:                              D9D47598 11/6/2D14 1Dk Horizontal Load Cell :            473831A      1/7/2D15 SDk Horizontal Load Cell :            236439        11/13/2D14 SDk Vertical Load Cell:                2533DD       11/13/2D14 1Dk Vertical Load Cell:                99440A       1/9/2D15 Horizontal LVDT:                      1D3998       12/12/2014 Vertical LVDT:                        DSRLVDT* 1 12/12/2D14 Vertical LVOT:                        DSRLVDT-2 12/12/2D14 Vertical LVDT:                        DSRLVDT-3 12/12/2014 Vertical LVDT:                        DSRLVDT-4 12/12/ 2014 Notes :
Parameter Specimen Diameter Inches Specimen Length, Inches Specimen Area, I n ~
(1) Deviation approved by Bechtel: Test specimens coated with polyurethane spray (2) Specimen volume is determined with three digital caliper measurements of length and diameter. Due to the irregular shape of the specimen, the calculated volume and bulk density values may not represent actual values for the specimen.
Specimen Weight, grams Bulk Denslt:t of Sf2eCimen1 J:!Cf (2)
Shear Plane Area, in2 Normal Compsessive Stress osi Peak Shear Stress psi Post-Peak Shear Stress psi Peak Friction Angle:
Peak Cohesion:
Post Peak Friction Angle:
Post Peak Cohesion:
Equipment:
Balance:
Caliper:
1Dk Horizontal Load Cell :
SDk Horizontal Load Cell :
SDk Vertical Load Cell:
1Dk Vertical Load Cell:
Horizontal LVDT:
Vertical LVDT:
Vertical LVOT:
Vertical LVDT:
Vertical LVDT:
Notes:
Sample core cut to length using diamond tipped saw blade. Specimen coated with polyurethane spray. 'Hydro-Stone Super X' encapsulating compound was used to mount the specimen Into the specimen holding ring.
Load cells and LVDTs connected to data acquisition system for shear force, norm<~l load and horizontal displacement readings.
Tested at as-received moisture and density.
D.OOS Serial# :
15606518 D9D47598 473831A 236439 Point 1 2.4D 2.47 4.51 473 162 5.45 115 239 126 NA NA NA NA Date Next:
11/13/2D14 11/6/2D14 1/7/2D15 11/13/2D14 2533DD 11/13/2D14 99440A 1/9/2D15 1D3998 12/12/2014 DSRLVDT*1 12/12/2D14 DSRLVDT-2 12/12/2D14 DSRLVDT-3 12/12/2014 DSRLVDT-4 12/12/ 2014 Point 2 NA NA NA NA NA NA NA NA NA degrees psi degrees psi Point 3 Point 4 Point 5 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA (1) Deviation approved by Bechtel: Test specimens coated with polyurethane spray (2) Specimen volume is determined with three digital caliper measurements of length and diameter. Due to the irregular shape of the specimen, the calculated volume and bulk density values may not represent actual values for the specimen.
Vertical LVOT 3, located behind the specimen, did not record data during the test.
Vertical LVOT 3, located behind the specimen, did not record data during the test.
JRC Point 1:     14-16 Actual strength parameters may vary and should be determined by an engineer for site-specific conditions.
JRC Point 1:
Clinch River Data Report Rev. 4 CRP-1112.16                                                                   RCN : CRP-1285.0 Page G.3-28 of 47                                                                                                 Page 26 of 45
14-16 Actual strength parameters may vary and should be determined by an engineer for site-specific conditions.
Clinch River Data Report Rev. 4 CRP-1112.16 Page G.3-28 of 47 RCN : CRP-1285.0 Page 26 of 45  


Client:                                                       AM EC E&l, Jnc.
Client:
Project Name :                                                 Clinch River Project Project Location :                                             Oak Ridge, TN E X P R E S                                                                       GTX #:                                                         301001 Start Date:                                                   2/25/2014 End Date:                                                     2/28/2014 Tested By:                                                     jsc "')'s L-Checked Bv:                                                   mpd """'~
AMEC E&l, Jnc.
Boring ID :                                                   MP-201 Sample ID:                                                     L5-12 Dept h, ft:                                                   53.62-53.85 Sample Description :                                           NA Direct Shear Test of Rock by ASTM 05607-08 Shear Stress ys. Shear Djsp lacement
Project Name:
                                                        - - usps!
Clinch River Project Project Location:
Oak Ridge, TN E X P R E S GTX #:
301001 Start Date:
2/25/2014 End Date:
2/28/2014 Tested By:
jsc "')'s L-Checked Bv:
mpd """'~
Boring ID:
MP-201 Sample ID:
L5-12 Depth, ft:
53.62-53.85 Sample Description :
NA Direct Shear Test of Rock by ASTM 05607-08 Shear Stress ys. Shear Djsplacement I
I I
I I
-- usps!
I I
I I
400~------r-----~~----~~----~
400~------r-----~~----~~----~
II                                                                                                                                                                            I I
I I                                                                                                                                                                            I I                                                                                                                                                                            I I                                                                                                                                                                            I I              I                  I                      I                                                                                                                  I
___ ____..,.I ______ ... ___ t-----
I
                                                                                                                                                                                                                  ----+-I 300 "  -------~-------~-------t*------
1              I                  I t*------
I 300                    1                I                  I
                                                                                                                                                                                  !* I I                I                  I
    'iii                                  I              I                  I                      I
: a.                                                                                                                                                                            I                I                  I I
I              I                  I                      I
                                                                                                                                                    'Vi j
t;;~
: a.                                            P;ak 2.00                                                                                                                                              200      ~--------J ____ __ ____ : ______ _~-~---------
    ...        -------l-----JVP        1 I
: ------l-------l-------
I I
I I
I I
I I
I I
I I
I I
I I
300 " -------~-------~-------t*------ t*------
300
_______..,. ______... ___ t---------+- --------
'iii
: a.
1 I
1 I
I I
I I
I I
I I
I I
I I
I
                                                                                                                                                                    **-----J~J Post-Peak L..J .........
I              I                  I                      I                                                                            I                I                  I IIJ                                  I              I                  I                      I                                                                            I                I                  I
    .c:
I                I I              I                  I                      I Ul                                                                        I          ......-!1......._                    ...
lf :
100    -.........-...... -. .. ~ ---
I
                                                  - ~
I
                                                            ................. ~
I
                                                                                .................... ~-
I Ul    100 I                I                  I i                  i I                I                  I i
I                I                  I I                I                  I I                I                  I I              I                  I                      I                                                                            I                I                  I 0-1-- - - + -' - - - + -'- - - - + -' - - - - - i I              I                  I                      I I              I                  I                      I                                                                            I                I                  I 0 ~----~--~-----+-----r----;
0.00                0.05                0 .10            0.15                  0.20                          0 .25                              0            100                200              300        <100 Shear Displacement, Inch es                                                                                                                      Normal Stress, psi Normal Djsolacement ys. Shear Djsplacement 0.100 I
I                    I                          I 0.075 IIJ
                                  &#xa3;
                                                            --------------~-                      l --- --- ----- --~---------------~----
I f
I I
I I
I I
1 I
I I
I I
I I
I
~
t;;
2.00 -------l-----JVP: ------l-------l-------
'Vi a.
!* I P;ak I j
~--------J ____ ______ : _______ ~-~---------
200 IIJ 1
I I
I I
I I
I I
I I
I I
I I
I 1
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I
...... -!1....... _
.c:
Ul 100
-......... -...... -... ~ ---
-- 5 -~
................. ~.................... ~-............__...__
Ul 100
**-----J~J Post-Peak L.. J.........
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
lf : i i
i 0 ~----~--~-----+-----r----;
I I
I 0-1----+----+-----+------i 0.00 0.05 0.10 0.15 0.20 0.25 0
100 200 300
<100 Shear Displacement, Inches Normal Stress, psi 0.100 0.075 IIJ &#xa3; 0.050
.~
w c: 0.025 E
"' 0.000
"' a.
i5 -0.02.5
~ *0.050 0 z -0,075
*0.100 Equipment:
Balance:
Caliper:
10k Horizontal Load Cell:
SOk Horizontal Load Cell:
50k Vertical Load Cell :
10k Vertical Load Cell:
Horizontal LVDT:
Vertical LVDT:
Vertical LVDT:
Vertical LVDT:
Vertical LVDT:
0 Normal Djsolacement ys. Shear Djsplacement I
I I
I
--------------~- --- --- ----- --~---------------~---- -- --------9*~------------
l I
I I
I I
I I
f I
i li
------R---~~~ ~~ - --N~M-~~ W P~~~~---------------~-------------- *--------------
1 I
I I
I I
I i
I i
                                                                                                                                                                      -- --------9*~------------
I I
I I
li
                                  .~        0.050          ------R---~~~ ~~-                    1 --N~M-~~ W P~~~~---------------~--------------*--------------
I                    I                          I w
c:
I I
I I
i I
I i  
--------------t--------------1---------------~ --------------t--------------
l i
I I
I I
I i
-~----*-~~* ~ - -~*--~~~~-~~~~- -------*~---~ --------------~ --------------
1 I
I I
I I
I I
I I
I
~-------------- *-----------
-~---------------~---------~---~. --~-------~-~-
1 I
I I
I I
I I
- -~--i............ ________
I I
I I
t I
I I
--------------t--------------~---------------~---- ---- ------t--------------
1 I
i i
I I
I I
J I
I I
I I
I i
0.05 0.1 0.15 Shear Displacement, inches Serial #:
0.025          --------------t--------------1---------------~                                                        --------------t--------------
Date Next:
E                                                              l                                      i                    I                          I
15606518 11/13/2014 09047598 11/6/ 2014 473831A 1/ 7/ 2015 236439 11/13/2014 253300 11/13/2014 99440A 1/9/2015 103998 12/12/2014 DSRLVDT*l 12/12/2014 DSRLVDT-2 12/12/ 2014 DSRLVDT-3 12/12/2014 DSRLVDT -4 1211;u2014 0.2 0.25 Clinch River Data Report Rev. 4 CRP-1112.16 Page G.3-29 of 47 RCN: CRP-1285.0 Page 27 of 45  
                                  ..,"'    0.000 I                                      I
                                                                        -~----*-~~*~--~*--~~~~-~~~~--------*~---~--------------~--------------
I                          i
: a.                                                                                                      1                    I                            I i5 I                                      I                    I                          I I                                      I                    I                          I
                                            -0 .0 2.5        ~-------------- *-----------                                                -~---------------~---------~---~                  .II --~-------~-~-
1                                                            I I                                      I
                                  ~...
I                                      I
                                            *0.050
                                                            ----------- - -~--i.
I                                      I                    I                          I t                                      I                    I                          I 0
z        -0,075          --------------t--------------~---------------~--------------t--------------
1                                      I                    i                          i I                                      I                    I                          I J
                                            *0.100                                                                                        I                    I                          I 0                                  0.05                                       0.1                 0.15                       0.2                      0.25 Shear Displa cement, inches Equipment:                                                                        Seri al #:                                   Date Next:
Ba lance:                                                                          15606518                                     11/13/2014 Caliper:                                                                          09047598                                     11/6/ 2014 10k Horizontal Load Cell :                                                        473831A                                       1/ 7/ 2015 SOk Horizontal Load Cell :                                                          236439                                       11/13/2014 50k Vertica l Load Cell :                                                          253300                                       11/13/2014 10k Vertica l Load Cell:                                                          99440A                                       1/9/ 2015 Horizontal LVDT :                                                                  103998                                       12/12/2014 Vertical LVDT :                                                                    DSRLVDT* l                                   12/12/2014 Vertica l LVDT:                                                                    DSRLVDT-2                                   12/12/ 2014 Vertical LVDT:                                                                      DSRLVDT-3                                   12/12/2014 Vertica l LVDT :                                                                    DSRLVDT -4                                   1211;u2014 Clinch River Data Report Rev. 4 CRP-1112.16                                                                                                                                                                               RCN: CRP-1285.0 Page G.3-29 of 47                                                                                                                                                                                                             Page 27 of 45


Client:             AMEC E&I, Inc.
Client:
Project Name:       Clinch River Project Project Location:   Oak Ridge, TN E X P R E S S                     GTX #:             30100 1 Start Date :       2/25/2014 End Date :         2/ 28/201 4 Tested By:         j sc "5S <..
Project Name:
Checked By:         mpd M~A Boring ID :         MP-201 Sample ID :         L5* 12 Depth, ft:         53.62*53.85 Sample
Project Location:
E X P R E S S GTX #:
Start Date:
End Date:
Tested By:
Checked By:
Boring ID :
Sample ID :
Depth, ft:
Sample


== Description:==
== Description:==
NA Before test Clinch River Data Report Rev. 4 CRP-1112.16                               RCN: CRP-1285.0 Page G.3-30 of 47                                                             Page 28 of 45}}
Clinch River Data Report Rev. 4 CRP-1112.16 Page G.3-30 of 47 AMEC E&I, Inc.
Clinch River Project Oak Ridge, TN 301001 2/25/2014 2/ 28/2014 jsc "5S <..
mpd M~A MP-201 L5*12 53.62*53.85 NA Before test RCN: CRP-1285.0 Page 28 of 45}}

Latest revision as of 07:35, 7 January 2025

Part 08 Enclosures (Rev. 1) - Part 8 - Enclosures - Geotechnical Exploration and Testing Data Report Appendix G.3 Direct Shear Test Results Part 02 Pages G.3-21 Thru G.3-30
ML18003B036
Person / Time
Site: Clinch River
Issue date: 12/15/2017
From: James Shea
Tennessee Valley Authority
To:
Office of New Reactors
Fetter A
References
TVACLINCHRIVERESP, TVACLINCHRIVERESP.SUBMISSION.4, CRN.P.PART08, CRN.P.PART08.1
Download: ML18003B036 (10)


Text

  • p.,

~

GeoTe t* g E l( P R E Client:

Project Name:

Project Location:

GTX # :

Start Date:

End Date:

Tested By:

Checked By:

Boring ID:

Sample ID :

Depth, ft:

Sample Description :

Clinch River Data Report Rev. 4 CRP-1112.16 Page G.3-21 of 47 AMEC E&I, Inc.

Clinch River Project Oak Ridge, TN 301001 3/6/2014 3/14/2014 en k C.l'\\J: ~

mpd W\\P*

MP-101 LS-2 135.20-135.47 NA After test RCN: CRP-1285.0 Page 19 of 45

Client:

AMEC E&I, Inc.

Project Name:

Clinch River Project Project location :

Oak Ridge, TN E X P R E S S GTX # :

301001 Test Date:

3/14/2014 Tested By:

~s<=c/

Checked Bv:

MP Boring ID:

MP-101 Sample ID:

1: t. 'S

  • 2. r"'I'J. 3lL~/tf Saw cut shear plane Deeth ft:

135.2-135.6 ft.

Joint Roughness Profiles by ASTM 05607 Sliding Friction Initial Shear Surface l

~

_r

\\.. _____ -, '~

Joint Roughness Coefficient:

0-2 Sliding Friction Failure Shear Surface Normal Load:

110 psi

"--- - Tof

=

Joint Roughness Coefficient: 0-2 Sliding Friction Failure Shear Surface Normal Load :

150 psi

(

~-

Joint Roughness Coefficient: 0-2 Sliding Friction Failure Shear surface Normal Load:

200 psi

~

\\ __ _)---- -

  • -*~~-.. ~

Joint Roughness Coefficient:

0-2 Note: Surface Roughness measured In the direction of shear displacement. Joint Roughness Coefficient based on ASTM 05607 Figure 4.

Clinch River Data Report Rev. 4 CRP-1112.16 Page G.3-22 of 47 RCN: CRP-1285.0 Page 20 of 45

Client:

AMEC E&I, Inc.

Project Name:

Clinch River Project Project Location:

Oak Ridge, TN XPitlSS GTX #:

301001 Start Date:

2/ 25/2014 End Date:

3/7/2014 Tested By:

jsc -5"5 (..... J Checked By:

mpd MP Boring ID:

MP-201 Sample JD:

L5*1l Depth, rt:

28.40*28.65 Sample

Description:

NA Sliding Friction Test of Rock by ASTM 05607-08 (l)

Test Pronle I Setup Top to bottom:

Sample Prepilration:

Test Equipment:

Test Condition :

Horizontal Displacement, In/min:

Parameter Specimen Diameter Inches Specimen Length Inches Specimen Area, ln2 Specimen Weight grams Bulk Density of Specimen pcf Shear Plane Area In2 Normal Compressive Stress psi Peak Shear Stress psi Post-Peak Shear Stress _QSI Peak Friction Angle:

Peak Cohesion:

Post Peak Friction Angle:

Post Peak Cohesion:

Equipment:

Balance:

Caliper:

10k Horizontal Load Cell:

50k Horizontal Load Cell:

50k Vertical Load Cell:

lOk Vertical Load Cell:

Horl<eontal LVDT:

Vertical LVDT:

Vertical LVDI:

Vertical LVDT:

Vertical LVDT:

Notes:

steel plate I Rock Core Si!mple I steel pli!te Sample core cut to length using diamond tipped saw blade. Specimen coated with polyurethane spray. 'Hydro-Stone Super X' encapsulating compound was used to mount the specimen Into the specimen holding ring.

Load cells and LVDTs connected to data acquisition system for shear force, normal load and horizontal displacement readings.

Tested at as-received moisture and density.

0.005 Point 1 Point 2 Point 3 Point 4 PointS 2.40 2.40 2.40 3.07 3.07 3.07 4.50 4.50 4.50 584 584 584 161 161 161 5.57 5.57 5.57 100 150 200 90 100 125 61 92 121 19.3 degrees 52.4 psi 31.0 degrees 1.3 psi Serial #:

Date Next:

15606518 11/13/2014 09047598 11/6/2014 473831A 1/7/2015 236439 11/:!.3/2014 253300 11/13/2014 99440A 1/9/2015 103998 12/12/2014 DSRLVDT-1 12/12/2014 DSRLVDf-2 12/12/2014 DSRLVDT-3 12/12/2014 DSRLVDT-4 12/12/2014 (1) Deviation approved by Bechtel: Test specimens coated with polyurethane spray Initial JRC:

8-10 After Paint l JRC:

8-10 After Point 2 JRC:

6-8 Final JRC:

6*8 Actual strength pC!rCimeters may VC!ry and should be determined by an engineer for site-specific conditions.

1 Clinch River Data Report Rev. 4 CRP-1112.16 Page G.3-23 of 47 RCN: CRP-1285.0 Page 21 of 45

Client:

AMEC E&I, Inc.

Project Name:

Clinch River Project Project Location:

Oak Ridge, TN EXPRESS GTX #:

301001 Start Da e:

2/ 25/2014 End Date:

3/7/ 2014 Tested By :

j sc -:fS<..-J Checked By:

mpd Mf

Boring ID:

MP-201 Sample ID:

L5-ll Depth, ft:

28.40-28.65 Sample Description :

NA Sliding Friction Test of Rock by ASTM 05607-08

'iii

c.

Shear $tress vs. $hear Displa,;ement I -

100 psi tso psi 200 psi I 400 I

i i

i I

I I

I I

I I

I

~

I I

I J

I 300 - -----~--~---t------~-- ---~-----1----- -

1 I

I I

I I

I I

I I

I I

I I

I I

I I

J I

I I

I I

I I

I I

I I

I I

I I

I

- ----~-- - ---t- - -- --~-----1r-----i-- ----

I I

I I'! ti 200 I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I 100 1

.*;;***-+t_ *;;-.-;--;.;-,~~--~-

---~

=--~~~...........
; ::_--'"1' I

I I

I I

I I

I I

I I

Q I

I I

,I 0.00 0.05 0.10 0.15 0.20 0.25 0.30 Shear Displacement, Inches Shear Stress vs. Normal Stress 4 00~------.-------.-----~~-----.

I I

I I

I

~

I I

I


-~ --- - ------ ~ --- - - --- - ~-- -- - - - - -

1 I

300 I

I I

I I

I I

I I

I i

I

'Ui Q.

I I

I I

I I

~:::::::::

~

I Post-P~ak I l 0~~~===4~--L---~

200

.el Ul 1......,

.t::.

100 V1 0

100 200 300 400 Nortnal Stress, psi Normal Djsolacement ys. Shear Qjsplacement 0.100000

c 0,075000

.t::..G o.osoooo

~ 0.025000 E

el 0.000000

~

c. 5 -omsooo

~ *0.050000 0 z -0.075000

  • 0.100000 0

0.05 0.1 0.15 0.2.

0.25 0.3 Shear Displacement, Inches Equipment; Serial #:

Date Next:

Balance:

15606518 11/ 13/ 2014 Caliper:

09047598 11/ 6/ 2014 10k Horizontal Load Cell :

473831A 1/7/2015 SOk Horizontal Load Cell :

236439 11/ 13/2014 SOk Vertical Load Cell:

253300 11/13/2014 10k Vertical Load Cell:

99440A 1/9/2015 Horizontal LVDT:

103998 12/12/2014 Vertical LVDT:

DSRLVDT-1 12/12/ 2014 Vertical LVDT:

DSRLVDT*2 12/12/2014 Vertical LVDT:

DSRLVDT-3 12/12/2014 Vertical LVDT:

DSRLVDT-4 12/12/ 2014 Clinch River Data Report Rev. 4 CRP-1112.16 Page G.3-24 of 47 RCN: CRP-1285.0 Page 22 of 45

Client:

Project Name:

Project Location :

GeoTest*ng EXPRESS GTX #:

St art Date:

End Date :

Tested By:

Checked By:

Boring I D:

Sample ID :

Depth, ft:

Sample

Description:

Clinch River Data Report Rev. 4 CRP-1112.16 Page G.3-25 of 47 AMEC E&I, Inc.

Clinch River Project Oak Ridge, TN 301001 2/ 25/2014 3/ 7/2014 jsc

-:f~cJ mpd -"t\\

MP-201 LS-11 28.40* 28.65 NA Before test RCN: CRP-1285.0 Page 23 of 45

Client:

Project Name:

Project Location:

E X P R E S S GTX # :

Start Date:

End Date:

Tested By:

Checked By:

Boring ID :

Sample ID :

D~th, ft:

Sample Description :

Clinch River Data Report Rev. 4 CRP-1112.16 Page G.3-26 of 47 AMEC E&t, Inc.

Clinch River Project Oak Ridge, TN 301001 2/ 25/ 2014 3/7/2014 jsc

-">S J mpd MF1 MP* 201 LS*11 28.40-28.65 NA After test RCN: CRP-1285.0 Page 24 of 45

Client:

AMEC E&l, Inc.

Project Name:

Clinch River Project Project Location :

Oak Ridge, TN E )( P R t GTX #:

301001 Test Date:

3/7/2014 Tested 6y:

~

Checked By:

Boring ID:

MP-:HH-Z.C{ M~ l/t.f4(1" Sample 10:

LS-11 Deoth. Ft:

28.40-28.65 Joint Roughness Profiles by ASTM 05607 Sliding Friction Initial Shear Surface

\\

--~~-

-- ~..__

ebtib~*. ~r

-~

Joint Roughness Coefficient:

8-10 Sliding Friction Failure Shear Surface Normal Load:

100 psi Tc!(J : ~

e...----*-* ---._____.--~ ---*-~-~

........ -_......,....... ---,L r1offo"".~ ~ )


\\

Joint Roughness Coefficient:

8-10 Sliding Friction Failure Shear Surface Normal Load:

150 psi I

~*

I\\:;::"-

~--------~~*~

  • -~-

" ~*--------~

  • *~

--~

\\

Joint Roughness Coefficient:

6-8 Sliding Friction Failure Shear Surface Normal Load :

200 psi G.'i>t1oMir ~

\\

Joint Roughness Coefficient:

6-8 Note: Surface Roughness measured In the direction of shear displacement. Joint Roughness Coefficient based on ASTM 05607 Figure 4.

Clinch River Data Report Rev. 4 CRP-1112.16 Page G.3-27 of 47 RCN : CRP-1285.0 Page 25 of 45

Client:

AMEC E&I, Inc.

Project Name:

Clinch Rlve Project Project Location :

Oak Ridge, TN EJC RESS GTX #:

301001 Start Date:

2/25/2D14 End Date:

2/ 28/2D14 Tested By:

jsc :f'f'--

Checked By:

mpd Y'I\\.Q~

Boring ID:

MP*2Dl Sample ID :

LS-12 Depth, ft:

53.62*53.85 Sample

Description:

NA Direct Shear Test of Rock by ASTM 05607-08 (l)

Test Profile I Setup Top to bottom :

steel plate I Rock Core Sample 1 steel plate Sample Preparation:

Test Equipment:

Test Condition :

Horizontal Displacement, In/min:

Parameter Specimen Diameter Inches Specimen Length, Inches Specimen Area, I n ~

Specimen Weight, grams Bulk Denslt:t of Sf2eCimen1 J:!Cf (2)

Shear Plane Area, in2 Normal Compsessive Stress osi Peak Shear Stress psi Post-Peak Shear Stress psi Peak Friction Angle:

Peak Cohesion:

Post Peak Friction Angle:

Post Peak Cohesion:

Equipment:

Balance:

Caliper:

1Dk Horizontal Load Cell :

SDk Horizontal Load Cell :

SDk Vertical Load Cell:

1Dk Vertical Load Cell:

Horizontal LVDT:

Vertical LVDT:

Vertical LVOT:

Vertical LVDT:

Vertical LVDT:

Notes:

Sample core cut to length using diamond tipped saw blade. Specimen coated with polyurethane spray. 'Hydro-Stone Super X' encapsulating compound was used to mount the specimen Into the specimen holding ring.

Load cells and LVDTs connected to data acquisition system for shear force, norm<~l load and horizontal displacement readings.

Tested at as-received moisture and density.

D.OOS Serial# :

15606518 D9D47598 473831A 236439 Point 1 2.4D 2.47 4.51 473 162 5.45 115 239 126 NA NA NA NA Date Next:

11/13/2D14 11/6/2D14 1/7/2D15 11/13/2D14 2533DD 11/13/2D14 99440A 1/9/2D15 1D3998 12/12/2014 DSRLVDT*1 12/12/2D14 DSRLVDT-2 12/12/2D14 DSRLVDT-3 12/12/2014 DSRLVDT-4 12/12/ 2014 Point 2 NA NA NA NA NA NA NA NA NA degrees psi degrees psi Point 3 Point 4 Point 5 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA (1) Deviation approved by Bechtel: Test specimens coated with polyurethane spray (2) Specimen volume is determined with three digital caliper measurements of length and diameter. Due to the irregular shape of the specimen, the calculated volume and bulk density values may not represent actual values for the specimen.

Vertical LVOT 3, located behind the specimen, did not record data during the test.

JRC Point 1:

14-16 Actual strength parameters may vary and should be determined by an engineer for site-specific conditions.

Clinch River Data Report Rev. 4 CRP-1112.16 Page G.3-28 of 47 RCN : CRP-1285.0 Page 26 of 45

Client:

AMEC E&l, Jnc.

Project Name:

Clinch River Project Project Location:

Oak Ridge, TN E X P R E S GTX #:

301001 Start Date:

2/25/2014 End Date:

2/28/2014 Tested By:

jsc "')'s L-Checked Bv:

mpd """'~

Boring ID:

MP-201 Sample ID:

L5-12 Depth, ft:

53.62-53.85 Sample Description :

NA Direct Shear Test of Rock by ASTM 05607-08 Shear Stress ys. Shear Djsplacement I

I I

I I

-- usps!

I I

I I

400~------r-----~~----~~----~

I I

I I

I I

I I

I I

300 " -------~-------~-------t*------ t*------

300

_______..,. ______... ___ t---------+- --------

'iii

a.

1 I

I I

I I

I I

I I

I I

1 I

I I

I I

I I

I

~

t;;

2.00 -------l-----JVP: ------l-------l-------

'Vi a.

!* I P;ak I j

~--------J ____ ______ : _______ ~-~---------

200 IIJ 1

I I

I I

I I

I I

I I

I I

I I

I 1

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I

...... -!1....... _

.c:

Ul 100

-......... -...... -... ~ ---

-- 5 -~

................. ~.................... ~-............__...__

Ul 100

    • -----J~J Post-Peak L.. J.........

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

lf : i i

i 0 ~----~--~-----+-----r----;

I I

I 0-1----+----+-----+------i 0.00 0.05 0.10 0.15 0.20 0.25 0

100 200 300

<100 Shear Displacement, Inches Normal Stress, psi 0.100 0.075 IIJ £ 0.050

.~

w c: 0.025 E

"' 0.000

"' a.

i5 -0.02.5

~ *0.050 0 z -0,075

  • 0.100 Equipment:

Balance:

Caliper:

10k Horizontal Load Cell:

SOk Horizontal Load Cell:

50k Vertical Load Cell :

10k Vertical Load Cell:

Horizontal LVDT:

Vertical LVDT:

Vertical LVDT:

Vertical LVDT:

Vertical LVDT:

0 Normal Djsolacement ys. Shear Djsplacement I

I I

I


~- --- --- ----- --~---------------~---- -- --------9*~------------

l I

I I

I I

I I

f I

i li


R---~~~ ~~ - --N~M-~~ W P~~~~---------------~-------------- *--------------

1 I

I I

I i

I I

I I

I i


t--------------1---------------~ --------------t--------------

l i

I I

I I

I i

-~----*-~~* ~ - -~*--~~~~-~~~~- -------*~---~ --------------~ --------------

1 I

I I

I I

I I

I I

I

~-------------- *-----------

-~---------------~---------~---~. --~-------~-~-

1 I

I I

I I

I I

- -~--i............ ________

I I

I I

t I

I I


t--------------~---------------~---- ---- ------t--------------

1 I

i i

I I

I I

J I

I I

0.05 0.1 0.15 Shear Displacement, inches Serial #:

Date Next:

15606518 11/13/2014 09047598 11/6/ 2014 473831A 1/ 7/ 2015 236439 11/13/2014 253300 11/13/2014 99440A 1/9/2015 103998 12/12/2014 DSRLVDT*l 12/12/2014 DSRLVDT-2 12/12/ 2014 DSRLVDT-3 12/12/2014 DSRLVDT -4 1211;u2014 0.2 0.25 Clinch River Data Report Rev. 4 CRP-1112.16 Page G.3-29 of 47 RCN: CRP-1285.0 Page 27 of 45

Client:

Project Name:

Project Location:

E X P R E S S GTX #:

Start Date:

End Date:

Tested By:

Checked By:

Boring ID :

Sample ID :

Depth, ft:

Sample

Description:

Clinch River Data Report Rev. 4 CRP-1112.16 Page G.3-30 of 47 AMEC E&I, Inc.

Clinch River Project Oak Ridge, TN 301001 2/25/2014 2/ 28/2014 jsc "5S <..

mpd M~A MP-201 L5*12 53.62*53.85 NA Before test RCN: CRP-1285.0 Page 28 of 45