{{#Wiki_filter:REGULATOR'r                         NFORMATION DISTRIBUTION 8         < EM (RIOS~
{{#Wiki_filter:REGULATOR'r NFORMATION DISTRIBUTION 8
ACCE'SSION NBR:830S270030 OUTDATE: 83/05/24 NOTARIZED:'ES                 DOCKET   &#xb9; FACIL:50-259 Browns Ferry iVuclear Power Stationr Unit 1< Tennessee                                     0503LO 50 260 Browns Ferry Nuclear Power Station< Unit 2E Tennessee BYNAME JUKZEL0 50 296 Browns Ferry Nuclear Power Stationg Unit 3E Tennessee                                     05000296 AUTH                 AUTHOR AFFILIATION MILLStL ~ M ~         Tennessee Valley Authority REC IP. NAME         RECIPIENT AFFILIATION DENTONgH ~ RE         Office of Nuclear Reactor Regulationi Director
< EM (RIOS~
ACCE'SSION NBR:830S270030 OUTDATE: 83/05/24
" NOTARIZED:'ES DOCKET &#xb9; FACIL:50-259 Browns Ferry iVuclear Power Stationr Unit 1< Tennessee 0503LO 50 260 Browns Ferry Nuclear Power Station<
Unit 2E Tennessee JUKZEL0 50 296 Browns Ferry Nuclear Power Stationg Unit 3E Tennessee 05000296 AUTH BYNAME AUTHOR AFFILIATION MILLStL ~ M ~
Tennessee Valley Authority REC IP. NAME RECIPIENT AFFILIATION DENTONgH ~ RE Office of Nuclear Reactor Regulationi Director


==SUBJECT:==
==SUBJECT:==
Forwards response to 830316 request to document compliance w/acceptance criteria 8 schedule for NUREG 0737'tem II' 3 13'eparate
Forwards response to 830316 request to document compliance w/acceptance criteria 8 schedule for NUREG 0737'tem II'
                  ~ ~                                        HPCI 8 RCIC   Initiation Levels."
~ 3 ~ 13'eparate HPCI 8
Criteria will be met                           ~
RCIC Initiation Levels."
DISTR ISUTION CODE:     AD<<OS               COPIES RECEIVED:LTR                 ENCL ~       SIZE:
Criteria will be met ~
TITLE:   OR   Submittal': TMI Action Plan Rgmt NUREG 0737 8 NUREG-0660 NOTES:NMSS/FCAF NMSS/FCAF 1cy icy'cyicy NMSS/FCAF/PM.                                                         05000259 05000260
DISTR ISUTION CODE:
                          ~
AD<<OS COPIES RECEIVED:LTR ENCL
1cy, icy NMSS/FCAF/PM.
~
NMSS/FCAF/PM'MSS/FCAF OS000296 RECIPIENT                       COPIES                      RECIPIENT            COPIES ID CODE/NAME                       LTTR ENCL                IO CODE/NAME          LTTR ENCL NRR ORB2 BC     01                           7      7 INTERNAL; ELO/HDS4                                               0      IE/OEPER OIR 33          1    1 IE/DEPER/EPB                                   3      3      IE/DEPER/IRB              1    1 NQR PALVLSONE Vl ~ .                           1            ,ERR/DHFS/DEPY29          1    1 NRR/DL DIR       14                           1      1      NRR/DL/ADL      16        1     1 NRR/DL/DRAB      18                            3      3      NRR/OS I/AORS 27               1 NRR/DSI/AEB                                    1      1      NRR/OS I/ASB                   1 NRH        RAB                                1      1      NRR/D ST OIR   30       1     1 04                            1     1     RGN2.                    1     1 EXTERNAL: ACRS               34                           10     10     INPOgJ ~ STARNES          1     1 LPDR            03                            1     1     NRC PDR         02       1     1 NSIC            05                            1     1     NTIS                      1     1 NOTES:
SIZE:
TOTAL NUMBER OF COPIES         REQUIRED: LTTR                         44   ENCL   43
TITLE:
OR Submittal':
TMI Action Plan Rgmt NUREG 0737 8
NUREG-0660 NOTES:NMSS/FCAF icy'cy NMSS/FCAF/PM.
NMSS/FCAF 1cy ~ icy NMSS/FCAF/PM'MSS/FCAF 1cy, icy NMSS/FCAF/PM.
05000259 05000260 OS000296 RECIPIENT ID CODE/NAME NRR ORB2 BC 01 INTERNAL; ELO/HDS4 IE/DEPER/EPB NQR PALVLSONE Vl ~.
NRR/DL DIR 14 NRR/DL/DRAB 18 NRR/DSI/AEB NRH RAB 04 COPIES LTTR ENCL 7
7 0
3 3
1 1
1 3
3 1
1 1
1 1
1 RECIPIENT IO CODE/NAME IE/OEPER OIR 33 IE/DEPER/IRB
,ERR/DHFS/DEPY29 NRR/DL/ADL 16 NRR/OS I/AORS 27 NRR/OS I/ASB NRR/D ST OIR 30 RGN2.
COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 EXTERNAL: ACRS LPDR NSIC NOTES:
34 03 05 10 10 1
1 1
1 INPOgJ
~ STARNES NRC PDR 02 NTIS 1
1 1
1 1
1 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 44 ENCL 43


TENNESSEE VALLEY AUTHORITY C'iATTANoosA . KV~JKSSK- 37~0l 400 Chestnut Street Tower   II May 24, 1983 Mr. Harold R. Denton,     Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555
TENNESSEE VALLEYAUTHORITY C'iATTANoosA
. KV~JKSSK-37~0l 400 Chestnut Street Tower II May 24, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555


==Dear Mr. Denton:==
==Dear Mr. Denton:==
 
In the Matter of the Tennessee Valley Authority Docket Nos.
In the Matter of the                                 Docket Nos. 50-259 Tennessee  Valley Authority                                    50-260 50-296 By letter from D. B. Vassallo to H. G. Parris dated March 16, 1983, we received the   NRC staff Safety Evaluations and plant specific acceptance criteria for NUREG-0737, Item II.K.3.13, RCIC Automatic Restart. The letter requested that we document compliance with the criteria and provide a schedule for implementation at the Browns Ferry Nuclear Plant.
50-259 50-260 50-296 By letter from D. B. Vassallo to H. G. Parris dated March 16,
: 1983, we received the NRC staff Safety Evaluations and plant specific acceptance criteria for NUREG-0737, Item II.K.3.13, RCIC Automatic Restart.
The letter requested that we document compliance with the criteria and provide a schedule for implementation at the Browns Ferry Nuclear Plant.
Enclosed is our response.
Enclosed is our response.
Very truly yours, TENNESSEE VALLEY AUTHORITY Q>
Very truly yours, TENNESSEE VALLEY AUTHORITY Q>
L. M. Mills, i anager Nuclear Licensing Subscribed, agd sworn to before me this~~~ day of +%7 r . 1983.
L. M. Mills, i anager Nuclear Licensing Subscribed, agd sworn to before me this~~~
7i(.u/N Notary  Publio 0,     )I- M~
day of +%7 r 1983.
My Commission   Expires Enclosure cc (Enclosure):
7i(.u/N 0, )I-M~
U.S. Nuclear Regulatory Commission Region II ATTN:   James P. O'Reilly, Regional Administrator 101 Marietta Street, Suite   2900 Atlanta, Georgia 30303 Mr. R. J. Clark Browns Ferry Prospect Manager                                   5 U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland     20814                                     I (
Notary Publio My Commission Expires Enclosure cc (Enclosure):
8305270030 830524 PDR ADOCK 05000259 P                 PDR
U.S. Nuclear Regulatory Commission Region II ATTN:
James P. O'Reilly, Regional Administrator 101 Marietta Street, Suite 2900 Atlanta, Georgia 30303 Mr. R. J. Clark Browns Ferry Prospect Manager U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue
: Bethesda, Maryland 20814 5
I
(
8305270030 830524 PDR ADOCK 05000259 P
PDR


ENCLOSURE COMPLIANCE WITH ACCEPTANCE CRITERIA AND SCHEDULE FOR NUREG>>0737, ITEM   II.K.3. 13 BROMNS FERRY NUCLEAR PLANT Me have reviewed our proposed design and have concluded that the criteria will be   met. However, the proposed design does not annunciate on high reactor   vessel level trip., This is acceptable since restart of the RCIC will be   automatic if water level decreases to the low water level initation setpoint. Tripping of the trip throttle valve is     still annunciated in the main control rooms and requires operator action to be reset.
ENCLOSURE COMPLIANCE WITH ACCEPTANCE CRITERIA AND SCHEDULE FOR NUREG>>0737, ITEM II.K.3.13 BROMNS FERRY NUCLEAR PLANT Me have reviewed our proposed design and have concluded that the criteria will be met.
By letter from L. M. Mills to H. R. Denton dated January 14, 1983, we submitted the latest revision (Revision 2) of the Browns Ferry integrated modification schedule. The schedule for performing modifications required by II.K.3. 13 was included.
However, the proposed design does not annunciate on high reactor vessel level trip.,
A functional test will be performed upon completion of this modification.}}
This is acceptable since restart of the RCIC will be automatic if water level decreases to the low water level initation setpoint.
Tripping of the trip throttle valve is still annunciated in the main control rooms and requires operator action to be reset.
By letter from L. M. Mills to H. R. Denton dated January 14,
: 1983, we submitted the latest revision (Revision 2) of the Browns Ferry integrated modification schedule.
The schedule for performing modifications required by II.K.3.13 was included.
A functional test will be performed upon completion of this modification.}}

Latest revision as of 03:53, 7 January 2025

Forwards Response to 830316 Request to Document Compliance W/Acceptance Criteria & Schedule for NUREG-0737,Item II.K.3.13, Separate HPCI & RCIC Initiation Levels. Criteria Will Be Met
ML18025B972
Person / Time
Site: Browns Ferry  
Issue date: 05/24/1983
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.3.13, TASK-TM NUDOCS 8305270030
Download: ML18025B972 (3)


Text

REGULATOR'r NFORMATION DISTRIBUTION 8

< EM (RIOS~

ACCE'SSION NBR:830S270030 OUTDATE: 83/05/24

" NOTARIZED:'ES DOCKET ¹ FACIL:50-259 Browns Ferry iVuclear Power Stationr Unit 1< Tennessee 0503LO 50 260 Browns Ferry Nuclear Power Station<

Unit 2E Tennessee JUKZEL0 50 296 Browns Ferry Nuclear Power Stationg Unit 3E Tennessee 05000296 AUTH BYNAME AUTHOR AFFILIATION MILLStL ~ M ~

Tennessee Valley Authority REC IP. NAME RECIPIENT AFFILIATION DENTONgH ~ RE Office of Nuclear Reactor Regulationi Director

SUBJECT:

Forwards response to 830316 request to document compliance w/acceptance criteria 8 schedule for NUREG 0737'tem II'

~ 3 ~ 13'eparate HPCI 8

RCIC Initiation Levels."

Criteria will be met ~

DISTR ISUTION CODE:

AD<<OS COPIES RECEIVED:LTR ENCL

~

SIZE:

TITLE:

OR Submittal':

TMI Action Plan Rgmt NUREG 0737 8

NUREG-0660 NOTES:NMSS/FCAF icy'cy NMSS/FCAF/PM.

NMSS/FCAF 1cy ~ icy NMSS/FCAF/PM'MSS/FCAF 1cy, icy NMSS/FCAF/PM.

05000259 05000260 OS000296 RECIPIENT ID CODE/NAME NRR ORB2 BC 01 INTERNAL; ELO/HDS4 IE/DEPER/EPB NQR PALVLSONE Vl ~.

NRR/DL DIR 14 NRR/DL/DRAB 18 NRR/DSI/AEB NRH RAB 04 COPIES LTTR ENCL 7

7 0

3 3

1 1

1 3

3 1

1 1

1 1

1 RECIPIENT IO CODE/NAME IE/OEPER OIR 33 IE/DEPER/IRB

,ERR/DHFS/DEPY29 NRR/DL/ADL 16 NRR/OS I/AORS 27 NRR/OS I/ASB NRR/D ST OIR 30 RGN2.

COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 EXTERNAL: ACRS LPDR NSIC NOTES:

34 03 05 10 10 1

1 1

1 INPOgJ

~ STARNES NRC PDR 02 NTIS 1

1 1

1 1

1 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 44 ENCL 43

TENNESSEE VALLEYAUTHORITY C'iATTANoosA

. KV~JKSSK-37~0l 400 Chestnut Street Tower II May 24, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Denton:

In the Matter of the Tennessee Valley Authority Docket Nos.

50-259 50-260 50-296 By letter from D. B. Vassallo to H. G. Parris dated March 16,

1983, we received the NRC staff Safety Evaluations and plant specific acceptance criteria for NUREG-0737, Item II.K.3.13, RCIC Automatic Restart.

The letter requested that we document compliance with the criteria and provide a schedule for implementation at the Browns Ferry Nuclear Plant.

Enclosed is our response.

Very truly yours, TENNESSEE VALLEY AUTHORITY Q>

L. M. Mills, i anager Nuclear Licensing Subscribed, agd sworn to before me this~~~

day of +%7 r 1983.

7i(.u/N 0, )I-M~

Notary Publio My Commission Expires Enclosure cc (Enclosure):

U.S. Nuclear Regulatory Commission Region II ATTN:

James P. O'Reilly, Regional Administrator 101 Marietta Street, Suite 2900 Atlanta, Georgia 30303 Mr. R. J. Clark Browns Ferry Prospect Manager U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue

Bethesda, Maryland 20814 5

I

(

8305270030 830524 PDR ADOCK 05000259 P

PDR

ENCLOSURE COMPLIANCE WITH ACCEPTANCE CRITERIA AND SCHEDULE FOR NUREG>>0737, ITEM II.K.3.13 BROMNS FERRY NUCLEAR PLANT Me have reviewed our proposed design and have concluded that the criteria will be met.

However, the proposed design does not annunciate on high reactor vessel level trip.,

This is acceptable since restart of the RCIC will be automatic if water level decreases to the low water level initation setpoint.

Tripping of the trip throttle valve is still annunciated in the main control rooms and requires operator action to be reset.

By letter from L. M. Mills to H. R. Denton dated January 14,

1983, we submitted the latest revision (Revision 2) of the Browns Ferry integrated modification schedule.

The schedule for performing modifications required by II.K.3.13 was included.

A functional test will be performed upon completion of this modification.