consumers Power POWERiNii MICHlliAN"S- PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 July 17, 1996 U. S. Nuclear Regulatory- Commission
consumers Power POW ERi Nii MICHlliAN"S-PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 July 17, 1996 U. S. Nuclear Regulatory-Commission  
    .Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR-20 -- PALISADES PLANT CORRECTED PAGES FOR HANDOUT USED AT THE PREDECISIONAL ENFORCEMENT CONFERENCE CONCERNING APPENDIXR COMPLIANCE HELD JUNE 21, 1996 AT REGION Ill On June 21, 1996, Consumers Power Company attended a Predecisio_nal Enforcement Conference at Region Ill concerning 10 CFR 50 Appendix R compliance for the .
.Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR-20 -- PALISADES PLANT CORRECTED PAGES FOR HANDOUT USED AT THE PREDECISIONAL ENFORCEMENT CONFERENCE CONCERNING APPENDIXR COMPLIANCE HELD JUNE 21, 1996 AT REGION Ill On June 21, 1996, Consumers Power Company attended a Predecisio_nal Enforcement Conference at Region Ill concerning 1 O CFR 50 Appendix R compliance for the.
Palisades Plant.
Palisades Plant.
As part of the Consumers Power Company presentation, a document containing technical information was provided to the NRC. After the conference was completed, errors werediscovered in the technical information. The purpose of this letter is to -
As part of the Consumers Power Company presentation, a document containing technical information was provided to the NRC. After the conference was completed, errors werediscovered in the technical information. The purpose of this letter is to -
dockf.; the corrected information. The pages in error have been revised and are an*
dockf.; the corrected information. The pages in error have been revised and are an*
attachment to this letter, with changes noted in the margins.                       *
attachment to this letter, with changes noted in the margins.  


==SUMMARY==
==SUMMARY==
OE COMMITMENTS
OE COMMITMENTS CC Administrator, Region Ill, USNRC
                                                                      -          ' (
_Project Manager, NRR, USNRC NRC Resident Inspector - Palisades Attachment  
CC       Administrator, Region Ill, USNRC
--9607230079 96071 7 PDR ADOCK 05000255 Q
_Project Manager, NRR, USNRC NRC Resident Inspector - Palisades Attachment
PDR
    - --9607230079 96071 7 PDR ADOCK 05000255 Q                               PDR A CMS' ENER<!i'Y COMPANY
(
A CMS' ENER<!i'Y COMPANY  


ATTACHMENT CONSUMERS POWER COMPANY PALISADES PLANT DOCKET 50-255 PREDECISIONAL ENFORCEMENT CONFERENCE
ATTACHMENT CONSUMERS POWER COMPANY PALISADES PLANT DOCKET 50-255 PREDECISIONAL ENFORCEMENT CONFERENCE  
        -10 CFR 50 APPENDIX R COMPLIANCE -
-10 CFR 50 APPENDIX R COMPLIANCE -
DATED JUNE 21, 1996, TECHNICAL INFORMATION - CORRECTED PAGES 2 Pages.
DATED JUNE 21, 1996, TECHNICAL INFORMATION - CORRECTED PAGES 2 Pages.  


0
0
* JUNE 21,-1996. < *,
* JUNE 21,-1996. < *,  
                                                                                                  "*t 10 CFR 50 APPENDIX R COMPLIANCE orscuSSION OF VIOLATIONS VIOLATION 1*EXAMPLE1: DIAGRAM OF IMPACTED FIRE AREAS r----:-----1       r       *    *,
"*t 10 CFR 50 APPENDIX R COMPLIANCE orscuSSION OF VIOLATIONS VIOLATION 1*EXAMPLE1: DIAGRAM OF IMPACTED FIRE AREAS r----:-----1 r I ---
I ---         !   I o.....a...-1-2 I
! I o.....a...-1-2 I  
                              '----,----' ----r--.J
'----,----' ----r--.J
:==::;;:;:;;;: - - - J._ - -  . -
:==::;;:;:;;;: - - - J._ -
                                                ,--.:_;_ Q_S~gr.., *.
,--.:_;_ Q_S~gr.., *.
              ............Ii~=~*'---- '----~   I    i..os~'
I i..os~'
Revised 7/10/96 10
............ Ii~=~*'----
'----~
10 Revised 7 /10/96  


.'*                                                                                                                                                                                                                                                                                                                                            JUNE 21, 1996
JUNE 21, 1996  
..~.* .1                                                                       i*.
~.**.1.
:.\:.**.il.\.l:.i.i.:l.l.* . * *.**.i.***.:*t.!\.*i.i.****.:i:.*:!.i.. iliiil.ie.i.**.****:.**.:.:.*         *.:~*. **.\s :.* *:.* * .*:* .** :. \m.* *.~*.!*.**.::.*.:l\ilil\fiijll\lll\iil-s1M&li::111iillii&*ill!E:i:i\\l:r::.:. :. :* :>> .&deg;'.: :~;: *: ; *:;1: ~; :
:.\\:.. **.. il.. \\  
                                                                                                              *.:11.*:*:**
.. l:.. i.i.:l.l.**..***. **.i.***.:*t.!\\.*i.i.****.:i:.*:!.i.. i
                                                                                                                  .**.*                          .***:****.**.*.**.*...*:.:.!.1.:.**.*
*. iliiil.. ie.i.**.****:.**.:.:.* *.:11.*:*:**
10 CFR 50 APPENDIX R COMPLIANCE DISCUSSION OF VIOLATIONS VIOLATION 1 - EXAMPLE 1: SIGNIFICANCE OF ISSUE
.* *.* *.:~*.*.**.\\s.:.*:*:.*:**.*:**.**.:.:.\\m.*
* ACTUAL SAFETY SIGNIFICANCE:
.* **:****.**.*.**.*... *:.:.!.1.:.**.*
* INVESTIGATION CONCLUDED THAT LOW VOLTAGE CUT-OFF SET POINT WAS CORRECTLY SET. BOARD INOPERABLE ONLY DURING SHORT LCO PERIOD -ACTUAL SAFETY SIGNIFICANCE IS MINIMAL
.* *.**.**.*:.*.. *.:.. *.~  
* EVEN IF SET POINT NOT CORRECTLY SET, ACTUAL SAFETY SIGNIFICANCE IS LOW BASED ON THE FOLLOWING:
.* *.!*.**.::.*.:l\\ilil\\fiijll\\lll\\iil-s1M&li::111iillii&*ill!E:i:i\\\\l:r::.:.. :.:.:*:*:>>:.&deg;'.::::~;::*::;;*:;1::~;;:::
                                                                                                        -                          OF THE 5 FIRE AREAS WHERE CREDIT IS GIVEN FOR THE ALTERNATE SHUTDOWN PANEL, ONLY 4 AREAS ARE IMPACTED DIRECTLY BY THIS POTENTIAL PROBLEM
10 CFR 50 APPENDIX R COMPLIANCE DISCUSSION OF VIOLATIONS VIOLATION 1 - EXAMPLE 1: SIGNIFICANCE OF ISSUE ACTUAL SAFETY SIGNIFICANCE:
                                                                                                        -                        PROBABILITY OF DAMAGING FIRE IS LOW:
INVESTIGATION CONCLUDED THAT LOW VOLTAGE CUT-OFF SET POINT WAS CORRECTLY SET. BOARD INOPERABLE ONLY DURING SHORT LCO PERIOD -ACTUAL SAFETY SIGNIFICANCE IS MINIMAL EVEN IF SET POINT NOT CORRECTLY SET, ACTUAL SAFETY SIGNIFICANCE IS LOW BASED ON THE FOLLOWING:
o LOW TO MODERATE FIRE LOAD o DETECTION AND AUTOMATIC SUPPRESSION o FIRE TOURS (SINCE LATE SUMMER 1994)
OF THE 5 FIRE AREAS WHERE CREDIT IS GIVEN FOR THE ALTERNATE SHUTDOWN PANEL, ONLY 4 AREAS ARE IMPACTED DIRECTLY BY THIS POTENTIAL PROBLEM PROBABILITY OF DAMAGING FIRE IS LOW:
* o . REQUIRES MULTIPLE AND SELECTIVE FAILURES
o LOW TO MODERATE FIRE LOAD o
                                                                                                        -                          EVEN IF ADAMAGING FIRE, SAFETY ANALYSIS, SIMULATOR RUNS, AND DISCUSSIONS WITH OPERATORS DEMONSTRATE THAT PLANT WOULD HAVE MAINTAINED LOCAL CONTROL OF AFW. WITH AFW, PLANT COULD ACHIEVE AND MAINTAIN SAFE SHUTDOWN:
DETECTION AND AUTOMATIC SUPPRESSION o
o                             FOR -8 HOURS WITHOUT OPERATOR ACTION (AFW STARTING VERIFIED) o                             FOR OVER 20 HOURS WITH MINIMAL ACTIONS o                             AC POWER RESTORATION 5 HOURS o                             WHILE IT IS CONCLUDED C-150 WAS OPERABLE, A DISCUSSION OF SAFE SHUTDOWN WITHOUT C-150 IS PROVIDED LATER Revised 7/10/96 15}}
FIRE TOURS (SINCE LATE SUMMER 1994)
* o. REQUIRES MULTIPLE AND SELECTIVE FAILURES EVEN IF A DAMAGING FIRE, SAFETY ANALYSIS, SIMULATOR RUNS, AND DISCUSSIONS WITH OPERATORS DEMONSTRATE THAT PLANT WOULD HAVE MAINTAINED LOCAL CONTROL OF AFW. WITH AFW, PLANT COULD ACHIEVE AND MAINTAIN SAFE SHUTDOWN:
o FOR -8 HOURS WITHOUT OPERATOR ACTION (AFW STARTING VERIFIED) o FOR OVER 20 HOURS WITH MINIMAL ACTIONS o
AC POWER RESTORATION -
3 - 5 HOURS o
WHILE IT IS CONCLUDED C-150 WAS OPERABLE, A DISCUSSION OF SAFE SHUTDOWN WITHOUT C-150 IS PROVIDED LATER Revised 7 /10/96 15}}

Latest revision as of 07:11, 6 January 2025

Forwards Corrected Pages for Handout Used at Predecisional Enforcement Conference Held on 960621 Re App R Compliance
ML18065A821
Person / Time
Site: Palisades 
Issue date: 07/17/1996
From: Smedley R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9607230079
Download: ML18065A821 (4)


Text

...

consumers Power POW ERi Nii MICHlliAN"S-PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 July 17, 1996 U. S. Nuclear Regulatory-Commission

.Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR-20 -- PALISADES PLANT CORRECTED PAGES FOR HANDOUT USED AT THE PREDECISIONAL ENFORCEMENT CONFERENCE CONCERNING APPENDIXR COMPLIANCE HELD JUNE 21, 1996 AT REGION Ill On June 21, 1996, Consumers Power Company attended a Predecisio_nal Enforcement Conference at Region Ill concerning 1 O CFR 50 Appendix R compliance for the.

Palisades Plant.

As part of the Consumers Power Company presentation, a document containing technical information was provided to the NRC. After the conference was completed, errors werediscovered in the technical information. The purpose of this letter is to -

dockf.; the corrected information. The pages in error have been revised and are an*

attachment to this letter, with changes noted in the margins.

SUMMARY

OE COMMITMENTS CC Administrator, Region Ill, USNRC

_Project Manager, NRR, USNRC NRC Resident Inspector - Palisades Attachment

--9607230079 96071 7 PDR ADOCK 05000255 Q

PDR

(

A CMS' ENER<!i'Y COMPANY

ATTACHMENT CONSUMERS POWER COMPANY PALISADES PLANT DOCKET 50-255 PREDECISIONAL ENFORCEMENT CONFERENCE

-10 CFR 50 APPENDIX R COMPLIANCE -

DATED JUNE 21, 1996, TECHNICAL INFORMATION - CORRECTED PAGES 2 Pages.

0

  • JUNE 21,-1996. < *,

"*t 10 CFR 50 APPENDIX R COMPLIANCE orscuSSION OF VIOLATIONS VIOLATION 1*EXAMPLE1: DIAGRAM OF IMPACTED FIRE AREAS r----:-----1 r I ---

! I o.....a...-1-2 I

'----,----' ----r--.J

==::;;:;:;;;: - - - J._ -

,--.:_;_ Q_S~gr.., *.

I i..os~'

............ Ii~=~*'----

'----~

10 Revised 7 /10/96

JUNE 21, 1996

~.**.1.

.\\:.. **.. il.. \\

.. l:.. i.i.:l.l.**..***. **.i.***.:*t.!\\.*i.i.****.:i:.*:!.i.. i

  • . iliiil.. ie.i.**.****:.**.:.:.* *.:11.*:*:**

.* *.* *.:~*.*.**.\\s.:.*:*:.*:**.*:**.**.:.:.\\m.*

.* **:****.**.*.**.*... *:.:.!.1.:.**.*

.* *.**.**.*:.*.. *.:.. *.~

.* *.!*.**.::.*.:l\\ilil\\fiijll\\lll\\iil-s1M&li::111iillii&*ill!E:i:i\\\\l:r::.:.. :.:.:*:*:>>:.°'.::::~;::*::;;*:;1::~;;:::

10 CFR 50 APPENDIX R COMPLIANCE DISCUSSION OF VIOLATIONS VIOLATION 1 - EXAMPLE 1: SIGNIFICANCE OF ISSUE ACTUAL SAFETY SIGNIFICANCE:

INVESTIGATION CONCLUDED THAT LOW VOLTAGE CUT-OFF SET POINT WAS CORRECTLY SET. BOARD INOPERABLE ONLY DURING SHORT LCO PERIOD -ACTUAL SAFETY SIGNIFICANCE IS MINIMAL EVEN IF SET POINT NOT CORRECTLY SET, ACTUAL SAFETY SIGNIFICANCE IS LOW BASED ON THE FOLLOWING:

OF THE 5 FIRE AREAS WHERE CREDIT IS GIVEN FOR THE ALTERNATE SHUTDOWN PANEL, ONLY 4 AREAS ARE IMPACTED DIRECTLY BY THIS POTENTIAL PROBLEM PROBABILITY OF DAMAGING FIRE IS LOW:

o LOW TO MODERATE FIRE LOAD o

DETECTION AND AUTOMATIC SUPPRESSION o

FIRE TOURS (SINCE LATE SUMMER 1994)

  • o. REQUIRES MULTIPLE AND SELECTIVE FAILURES EVEN IF A DAMAGING FIRE, SAFETY ANALYSIS, SIMULATOR RUNS, AND DISCUSSIONS WITH OPERATORS DEMONSTRATE THAT PLANT WOULD HAVE MAINTAINED LOCAL CONTROL OF AFW. WITH AFW, PLANT COULD ACHIEVE AND MAINTAIN SAFE SHUTDOWN:

o FOR -8 HOURS WITHOUT OPERATOR ACTION (AFW STARTING VERIFIED) o FOR OVER 20 HOURS WITH MINIMAL ACTIONS o

AC POWER RESTORATION -

3 - 5 HOURS o

WHILE IT IS CONCLUDED C-150 WAS OPERABLE, A DISCUSSION OF SAFE SHUTDOWN WITHOUT C-150 IS PROVIDED LATER Revised 7 /10/96 15