{{#Wiki_filter:Vogtle PEmails From:                             Hoellman, Jordan Sent:                             Tuesday, September 25, 2018 9:34 AM To:                               Vogtle PEmails
{{#Wiki_filter:1 Vogtle PEmails From:
Hoellman, Jordan Sent:
Tuesday, September 25, 2018 9:34 AM To:
Vogtle PEmails


==Subject:==
==Subject:==
Presentation Materials for 9/27/18 Public Meeting regarding Alternative Requirements to ASME Section III Pressure Testing Attachments:                     Alternative to ASME Section III Pressure Testing Requirements post N-5_Final.pdf Attached is the information regarding Alternative Requirements to ASME Section III Pressure Testing that will be presented during the 9/27/18 Technical Exchange Meeting during the normally scheduled public call.
Presentation Materials for 9/27/18 Public Meeting regarding Alternative Requirements to ASME Section III Pressure Testing Attachments:
The presentation does not contain SUNSI.
Alternative to ASME Section III Pressure Testing Requirements post N-5_Final.pdf Attached is the information regarding Alternative Requirements to ASME Section III Pressure Testing that will be presented during the 9/27/18 Technical Exchange Meeting during the normally scheduled public call.
1
The presentation does not contain SUNSI.  


Hearing Identifier:   Vogtle_COL_Docs_Public Email Number:         371 Mail Envelope Properties     (SN6PR0901MB23669EDB8569ACC6E40C0FE8D5160)
Hearing Identifier:
Vogtle_COL_Docs_Public Email Number:
371 Mail Envelope Properties (SN6PR0901MB23669EDB8569ACC6E40C0FE8D5160)  


==Subject:==
==Subject:==
Presentation Materials for 9/27/18 Public Meeting regarding Alternative Requirements to ASME Section III Pressure Testing Sent Date:             9/25/2018 9:33:41 AM Received Date:         9/25/2018 9:33:46 AM From:                 Hoellman, Jordan Created By:           Jordan.Hoellman2@nrc.gov Recipients:
Presentation Materials for 9/27/18 Public Meeting regarding Alternative Requirements to ASME Section III Pressure Testing Sent Date:
9/25/2018 9:33:41 AM Received Date:
9/25/2018 9:33:46 AM From:
Hoellman, Jordan Created By:
Jordan.Hoellman2@nrc.gov Recipients:  
"Vogtle PEmails" <Vogtle.PEmails@nrc.gov>
"Vogtle PEmails" <Vogtle.PEmails@nrc.gov>
Tracking Status: None Post Office:           SN6PR0901MB2366.namprd09.prod.outlook.com Files                           Size                     Date & Time MESSAGE                         280                     9/25/2018 9:33:46 AM Alternative to ASME Section III Pressure Testing Requirements post N-5_Final.pdf 668972 Options Priority:                       Standard Return Notification:             No Reply Requested:                 No Sensitivity:                     Normal Expiration Date:
Tracking Status: None Post Office:
Recipients Received:
SN6PR0901MB2366.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 280 9/25/2018 9:33:46 AM Alternative to ASME Section III Pressure Testing Requirements post N-5_Final.pdf 668972 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:  


LAR-XXX and Alt-XX Alternative to ASME Section III Pressure Testing Requirements Post N-5 Technical Exchange Meeting 9/27/18
LAR-XXX and Alt-XX Alternative to ASME Section III Pressure Testing Requirements Post N-5 Technical Exchange Meeting 9/27/18


2 Agenda
Agenda
* Background
* Background
* Problem Statement
* Problem Statement
Line 38: Line 52:
* Issue Resolution
* Issue Resolution
* Documentation
* Documentation
* Proposed LAR and Alternative Schedule
* Proposed LAR and Alternative Schedule 2


          $OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1
$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1
Background

Background
* Under 10 CFR 50.55a facilities licensed under Part 52 are subject to Section III of the ASME Code prior to the 52.103(g) finding. Following the 52.103 (g) finding, the licensee is subject to ASME Section XI.
* Under 10 CFR 50.55a facilities licensed under Part 52 are subject to Section III of the ASME Code prior to the 52.103(g) finding. Following the 52.103 (g) finding, the licensee is subject to ASME Section XI.
* ASME Section III requires a hydrostatic test following performance of a repair and/or replacement activity associated with a Class 1, 2, or 3 pressure boundary.
* ASME Section III requires a hydrostatic test following performance of a repair and/or replacement activity associated with a Class 1, 2, or 3 pressure boundary.
* The requirement to conduct multiple hydros at the elevated pressures required by ASME Section III following repair/replacement activities prior to the Section 52.103(g) finding creates a hardship associated with establishing test boundaries and elevated pressure.
* The requirement to conduct multiple hydros at the elevated pressures required by ASME Section III following repair/replacement activities prior to the Section 52.103(g) finding creates a hardship associated with establishing test boundaries and elevated pressure.
                                                                                  


            $OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1
$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1
Problem Statement 61&LVVHHNLQJWRXVHQRPLQDOV\VWHPRSHUDWLQJSUHVVXUHWRSHUIRUP$60(6HFWLRQ
Problem Statement 61&LVVHHNLQJWRXVHQRPLQDOV\\VWHPRSHUDWLQJSUHVVXUHWRSHUIRUP$60(6HFWLRQ
,,,K\GURVWDWLFSUHVVXUHWHVWLQJIRUUHSDLURUUHSODFHPHQWDFWLYLWLHVRI$60(6HFWLRQ
,,,K\\GURVWDWLFSUHVVXUHWHVWLQJIRUUHSDLURUUHSODFHPHQWDFWLYLWLHVRI$60(6HFWLRQ
,,,&ODVVDQGFRPSRQHQWVGXULQJWKHWLPHEHWZHHQ
,,,&ODVVDQGFRPSRQHQWVGXULQJWKHWLPHEHWZHHQ
* FRPSOHWLRQRIWKH$60(6HFWLRQ,,,1GDWDUHSRUWIRULQVWDOODWLRQRIWKH
* FRPSOHWLRQRIWKH$60(6HFWLRQ,,,1GDWDUHSRUWIRULQVWDOODWLRQRIWKH
FRPSRQHQW V LQWKHSODQWDQG
FRPSRQHQW V LQWKHSODQWDQG
* WKH J ILQGLQJ
* WKH J ILQGLQJ
,QOLHXRISHUIRUPLQJWKH6HFWLRQ,,,K\GURVWDWLFSUHVVXUHWHVWRIWKHUHSDLUHGRU
,QOLHXRISHUIRUPLQJWKH6HFWLRQ,,,K\\GURVWDWLFSUHVVXUHWHVWRIWKHUHSDLUHGRU
UHSODFHGFRPSRQHQWDOHDNFKHFNDWQRPLQDOV\VWHPRSHUDWLQJSUHVVXUHIRUWKH
UHSODFHGFRPSRQHQWDOHDNFKHFNDWQRPLQDOV\\VWHPRSHUDWLQJSUHVVXUHIRUWKH
FRPSRQHQWZLOOEHSHUIRUPHG7KLVLVFRQVLVWHQWZLWK6HFWLRQ;,UHTXLUHPHQWV
FRPSRQHQWZLOOEHSHUIRUPHG7KLVLVFRQVLVWHQWZLWK6HFWLRQ;,UHTXLUHPHQWV
Request is similar to TVA Watts Bar
Request is similar to TVA Watts Bar
                                                                                      



              $OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1
$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1
Regulatory Considerations

Regulatory Considerations
* Consideration was given to an Exemption to 10 CFR 50.55a and an alternative in accordance with 10 CFR 50.55a(z)
* Consideration was given to an Exemption to 10 CFR 50.55a and an alternative in accordance with 10 CFR 50.55a(z)
* Both paths would present a similar hardship argument
* Both paths would present a similar hardship argument
* Pursuing the alternative path in accordance with 10 CFR 50.55a(z)
* Pursuing the alternative path in accordance with 10 CFR 50.55a(z)
  - 10 CFR 50.55a(z) allows NRC staff to authorize the use of alternative requirements to ASME Section III requirements.
- 10 CFR 50.55a(z) allows NRC staff to authorize the use of alternative requirements to ASME Section III requirements.
  - Consideration was given to NRC recommendations presented in 2009 during interface with utilities [ADAM Accession # ML092310072, slide 8].
Consideration was given to NRC recommendations presented in 2009 during interface with utilities [ADAM Accession # ML092310072, slide 8].
* Application of ASME Section III up to the 52.103(g) finding presents a hardship due to the potential for multiples cycles of establishing test boundaries, establishing elevated pressures, and putting additional stress cycles on system beyond design pressure.
Application of ASME Section III up to the 52.103(g) finding presents a hardship due to the potential for multiples cycles of establishing test boundaries, establishing elevated pressures, and putting additional stress cycles on system beyond design pressure.
                                                                                        


            $OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1

Scope 7KHDOWHUQDWLYHZRXOGDSSO\WRSUHVVXUHWHVWLQJIRUDOO$60(6HFWLRQ,,,FRPSRQHQWV
Scope 7KHDOWHUQDWLYHZRXOGDSSO\\WRSUHVVXUHWHVWLQJIRUDOO$60(6HFWLRQ,,,FRPSRQHQWV
H[FHSWUHSDLURUUHSODFHPHQWRIODUJH$60(6HFWLRQ,,,&ODVVFRPSRQHQWVLQFOXGLQJ
H[FHSWUHSDLURUUHSODFHPHQWRIODUJH$60(6HFWLRQ,,,&ODVVFRPSRQHQWVLQFOXGLQJ
* 6WHDP*HQHUDWRUV
6WHDP*HQHUDWRUV 5&3V 3UHVVXUL]HU 5HDFWRU9HVVHO
* 5&3V
$FFXPXODWRUV
* 3UHVVXUL]HU
&RUH0DNH8S7DQNV
* 5HDFWRU9HVVHO
/RRSSLSLQJDVGHILQHGLQ8)6$57LHU7DEOH
* $FFXPXODWRUV
35+5+HDW([FKDQJHUV All other ASME Section III requirements (e.g. NDE, acceptable flaw sizes) will be maintained.
* &RUH0DNH8S7DQNV
$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1
* /RRSSLSLQJDVGHILQHGLQ8)6$57LHU7DEOH
* 35+5+HDW([FKDQJHUV All other ASME Section III requirements (e.g. NDE, acceptable flaw sizes) will be maintained.
                                                                                    


          $OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1

Example 1:
Example 1:
$IWHUFRPSOHWLRQRIWKH5&6V\VWHPFROGK\GURSUHVVXUHWHVWDQG1
$IWHUFRPSOHWLRQRIWKH5&6V\\VWHPFROGK\\GURSUHVVXUHWHVWDQG1
LQVWDOODWLRQGDWDUHSRUWDGUDLQYDOYHFRQQHFWHGWRWKH5&6LV
LQVWDOODWLRQGDWDUHSRUWDGUDLQYDOYHFRQQHFWHGWRWKH5&6LV
GDPDJHGDQGKDVWREHUHSODFHG7KLVYDOYHFDQQRWEHLVRODWHGIURP
GDPDJHGDQGKDVWREHUHSODFHG7KLVYDOYHFDQQRWEHLVRODWHGIURP
WKH5&6DQGSHUIRUPLQJDQRWKHUFROGK\GURSUHVVXUHWHVWRIWKHQHZ
WKH5&6DQGSHUIRUPLQJDQRWKHUFROGK\\GURSUHVVXUHWHVWRIWKHQHZ
ZHOGWRFRQQHFWWKLVYDOYHWRWKH5&6ZLOOH[SRVHWKH5&6V\VWHP
ZHOGWRFRQQHFWWKLVYDOYHWRWKH5&6ZLOOH[SRVHWKH5&6V\\VWHP
FRPSRQHQWVWRDQDGGLWLRQDOSUHVVXUHWHVWVWUHVVF\FOH$OHDNFKHFN
FRPSRQHQWVWRDQDGGLWLRQDOSUHVVXUHWHVWVWUHVVF\\FOH$OHDNFKHFN
RIWKHQHZFRQQHFWLQJZHOGDWQRPLQDOV\VWHPRSHUDWLQJSUHVVXUHZLOO
RIWKHQHZFRQQHFWLQJZHOGDWQRPLQDOV\\VWHPRSHUDWLQJSUHVVXUHZLOO
DGHTXDWHO\GHPRQVWUDWHWKHOHDNWLJKWQHVVDQGVWUXFWXUDOLQWHJULW\RI
DGHTXDWHO\\GHPRQVWUDWHWKHOHDNWLJKWQHVVDQGVWUXFWXUDOLQWHJULW\\RI
WKHQHZFRQQHFWLQJZHOGZLWKRXWH[SRVLQJWKH5&6V\VWHP
WKHQHZFRQQHFWLQJZHOGZLWKRXWH[SRVLQJWKH5&6V\\VWHP
FRPSRQHQWVWRDQ$60(6HFWLRQ,,,UHTXLUHGSUHVVXUHWHVWVWUHVV
FRPSRQHQWVWRDQ$60(6HFWLRQ,,,UHTXLUHGSUHVVXUHWHVWVWUHVV
F\FOH
F\\FOH
                                                                                  
$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1


          $OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1

Example 2:
Example 2:
$IWHUFRPSOHWLRQRIWKHSDVVLYHFRQWDLQPHQWFRROLQJ 3&& V\VWHP
$IWHUFRPSOHWLRQRIWKHSDVVLYHFRQWDLQPHQWFRROLQJ 3&& V\\VWHP
FROGK\GURSUHVVXUHWHVWDQG1LQVWDOODWLRQGDWDUHSRUWDYDOYHLV
FROGK\\GURSUHVVXUHWHVWDQG1LQVWDOODWLRQGDWDUHSRUWDYDOYHLV
UHTXLUHGWREHUHSODFHGGXHWRDPDVVLYHJRXJHLQWKHYDOYHERG\
UHTXLUHGWREHUHSODFHGGXHWRDPDVVLYHJRXJHLQWKHYDOYHERG\\
FUHDWHGGXULQJFRQVWUXFWLRQUHODWHGDFWLYLWLHV7KLVYDOYHLVFRQWDLQHG
FUHDWHGGXULQJFRQVWUXFWLRQUHODWHGDFWLYLWLHV7KLVYDOYHLVFRQWDLQHG
LQ7LHU7DEOH7KHK\GURVWDWLFWHVWZRXOGUHTXLUHGHYHORSLQJ
LQ7LHU7DEOH7KHK\\GURVWDWLFWHVWZRXOGUHTXLUHGHYHORSLQJ
K\GURVWDWLFWHVWSUHVVXUHRYHUWKHYDOYHWKH3&&:67DQGXSWR
K\\GURVWDWLFWHVWSUHVVXUHRYHUWKHYDOYHWKH3&&:67DQGXSWR
VHYHUDORWKHULVRODWLRQYDOYHV$OHDNFKHFNRIWKHQHZFRQQHFWLQJ
VHYHUDORWKHULVRODWLRQYDOYHV$OHDNFKHFNRIWKHQHZFRQQHFWLQJ
ZHOGDWQRPLQDOV\VWHPRSHUDWLQJSUHVVXUHZLOODGHTXDWHO\
ZHOGDWQRPLQDOV\\VWHPRSHUDWLQJSUHVVXUHZLOODGHTXDWHO\\
GHPRQVWUDWHWKHOHDNWLJKWQHVVDQGVWUXFWXUDOLQWHJULW\RIWKHQHZ
GHPRQVWUDWHWKHOHDNWLJKWQHVVDQGVWUXFWXUDOLQWHJULW\\RIWKHQHZ
FRQQHFWLQJZHOGV
FRQQHFWLQJZHOGV
                                                                                  
$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1


          $OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1

Issue Resolution (Licensing Path for Changes):
Issue Resolution (Licensing Path for Changes):
ASME Section III Code Alternative Proposal:
ASME Section III Code Alternative Proposal:  
- Request to perform pressure test at nominal system operating pressure for components repaired and/or replaced following the ASME Section III N-5 installation data report consistent with Section XI requirements.
- Request to perform pressure test at nominal system operating pressure for components repaired and/or replaced following the ASME Section III N-5 installation data report consistent with Section XI requirements.
License Amendment and Exemption:
License Amendment and Exemption:  
- Will expand on ASME Section III alternative request basis and address impact of alternative on ITAAC
- Will expand on ASME Section III alternative request basis and address impact of alternative on ITAAC
                                                                                  
$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1


          $OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1

Changes to Licensing Basis (Markups for Tier 1 Exemption Request):
Changes to Licensing Basis (Markups for Tier 1 Exemption Request):
RCS 7DEOH
RCS
                    ,QVSHFWLRQV7HVWV$QDO\VHVDQG$FFHSWDQFH&ULWHULD
$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1
                                                                                  
7DEOH
,QVSHFWLRQV7HVWV$QDO\\VHVDQG$FFHSWDQFH&ULWHULD


          $OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1

Changes to Licensing Basis (Markups for Tier 1 Exemption Request):
Changes to Licensing Basis (Markups for Tier 1 Exemption Request):
Non-RCS
Non-RCS
                                                                                  
$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1


              $OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1

Changes to Licensing Basis:
Changes to Licensing Basis:
Non-RCS (continued)
Non-RCS (continued)
* Change described would apply to all ASME ITAAC Design Commitment # 4.b for all non-RCS ITAAC.
Change described would apply to all ASME ITAAC Design Commitment # 4.b for all non-RCS ITAAC.
  - Tables 2.2.1-3, 2.2.2-3, 2.2.3-4, 2.2.4-4, 2.2.5-5, 2.3.2-4, 2.3.6-4, 2.3.7-4, 2.3.10-4, and 2.7.1-4
Tables 2.2.1-3, 2.2.2-3, 2.2.3-4, 2.2.4-4, 2.2.5-5, 2.3.2-4, 2.3.6-4, 2.3.7-4, 2.3.10-4, and 2.7.1-4
                                                                                                          
$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1


          $OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1

Documentation
Documentation
* Pressure testing required following the completion of the N-5 installation data report will be documented on a supplement to the N-5 installation data report
* Pressure testing required following the completion of the N-5 installation data report will be documented on a supplement to the N-5 installation data report
  - Requires ANI review
- Requires ANI review
* An ITAAC Post Closure Notification (PCN) will be issued for ASME pressure tests completed following the completion of the N-5 installation data report
* An ITAAC Post Closure Notification (PCN) will be issued for ASME pressure tests completed following the completion of the N-5 installation data report
                                                                                  
$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1


      $OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1

3URSRVHG/$5DQG$OWHUQDWLYH6FKHGXOH
3URSRVHG/$5DQG$OWHUQDWLYH6FKHGXOH
- Presubmittal Meeting - October 25, 2018
- Presubmittal Meeting - October 25, 2018
- Submittal - November 20, 2018
- Submittal - November 20, 2018
- Requested Approval Date - May 20, 2019
- Requested Approval Date - May 20, 2019
                                                                              }}
$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1}}

Latest revision as of 12:53, 5 January 2025

COL Docs - Presentation Materials for 9/27/18 Public Meeting Regarding Alternative Requirements to ASME Section III Pressure Testing
ML18268A128
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/25/2018
From:
NRC
To:
NRC/NRO/DLSE/LB4
References
Download: ML18268A128 (16)


Text

1 Vogtle PEmails From:

Hoellman, Jordan Sent:

Tuesday, September 25, 2018 9:34 AM To:

Vogtle PEmails

Subject:

Presentation Materials for 9/27/18 Public Meeting regarding Alternative Requirements to ASME Section III Pressure Testing Attachments:

Alternative to ASME Section III Pressure Testing Requirements post N-5_Final.pdf Attached is the information regarding Alternative Requirements to ASME Section III Pressure Testing that will be presented during the 9/27/18 Technical Exchange Meeting during the normally scheduled public call.

The presentation does not contain SUNSI.

Hearing Identifier:

Vogtle_COL_Docs_Public Email Number:

371 Mail Envelope Properties (SN6PR0901MB23669EDB8569ACC6E40C0FE8D5160)

Subject:

Presentation Materials for 9/27/18 Public Meeting regarding Alternative Requirements to ASME Section III Pressure Testing Sent Date:

9/25/2018 9:33:41 AM Received Date:

9/25/2018 9:33:46 AM From:

Hoellman, Jordan Created By:

Jordan.Hoellman2@nrc.gov Recipients:

"Vogtle PEmails" <Vogtle.PEmails@nrc.gov>

Tracking Status: None Post Office:

SN6PR0901MB2366.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 280 9/25/2018 9:33:46 AM Alternative to ASME Section III Pressure Testing Requirements post N-5_Final.pdf 668972 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

LAR-XXX and Alt-XX Alternative to ASME Section III Pressure Testing Requirements Post N-5 Technical Exchange Meeting 9/27/18

Agenda

  • Background
  • Problem Statement
  • Regulatory Considerations
  • Issue Resolution
  • Documentation
  • Proposed LAR and Alternative Schedule 2

$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1



Background

  • Under 10 CFR 50.55a facilities licensed under Part 52 are subject to Section III of the ASME Code prior to the 52.103(g) finding. Following the 52.103 (g) finding, the licensee is subject to ASME Section XI.
  • ASME Section III requires a hydrostatic test following performance of a repair and/or replacement activity associated with a Class 1, 2, or 3 pressure boundary.
  • The requirement to conduct multiple hydros at the elevated pressures required by ASME Section III following repair/replacement activities prior to the Section 52.103(g) finding creates a hardship associated with establishing test boundaries and elevated pressure.

$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1

Problem Statement 61&LVVHHNLQJWRXVHQRPLQDOV\\VWHPRSHUDWLQJSUHVVXUHWRSHUIRUP$60(6HFWLRQ

,,,K\\GURVWDWLFSUHVVXUHWHVWLQJIRUUHSDLURUUHSODFHPHQWDFWLYLWLHVRI$60(6HFWLRQ

,,,&ODVVDQGFRPSRQHQWVGXULQJWKHWLPHEHWZHHQ

  • FRPSOHWLRQRIWKH$60(6HFWLRQ,,,1GDWDUHSRUWIRULQVWDOODWLRQRIWKH

FRPSRQHQW V LQWKHSODQWDQG

  • WKH J ILQGLQJ

,QOLHXRISHUIRUPLQJWKH6HFWLRQ,,,K\\GURVWDWLFSUHVVXUHWHVWRIWKHUHSDLUHGRU

UHSODFHGFRPSRQHQWDOHDNFKHFNDWQRPLQDOV\\VWHPRSHUDWLQJSUHVVXUHIRUWKH

FRPSRQHQWZLOOEHSHUIRUPHG7KLVLVFRQVLVWHQWZLWK6HFWLRQ;,UHTXLUHPHQWV

Request is similar to TVA Watts Bar



$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1



Regulatory Considerations

  • Both paths would present a similar hardship argument

- 10 CFR 50.55a(z) allows NRC staff to authorize the use of alternative requirements to ASME Section III requirements.

Consideration was given to NRC recommendations presented in 2009 during interface with utilities [ADAM Accession # ML092310072, slide 8].

Application of ASME Section III up to the 52.103(g) finding presents a hardship due to the potential for multiples cycles of establishing test boundaries, establishing elevated pressures, and putting additional stress cycles on system beyond design pressure.



Scope 7KHDOWHUQDWLYHZRXOGDSSO\\WRSUHVVXUHWHVWLQJIRUDOO$60(6HFWLRQ,,,FRPSRQHQWV

H[FHSWUHSDLURUUHSODFHPHQWRIODUJH$60(6HFWLRQ,,,&ODVVFRPSRQHQWVLQFOXGLQJ

6WHDP*HQHUDWRUV 5&3V 3UHVVXUL]HU 5HDFWRU9HVVHO

$FFXPXODWRUV

&RUH0DNH8S7DQNV

/RRSSLSLQJDVGHILQHGLQ8)6$57LHU7DEOH

35+5+HDW([FKDQJHUV All other ASME Section III requirements (e.g. NDE, acceptable flaw sizes) will be maintained.

$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1



Example 1:

$IWHUFRPSOHWLRQRIWKH5&6V\\VWHPFROGK\\GURSUHVVXUHWHVWDQG1

LQVWDOODWLRQGDWDUHSRUWDGUDLQYDOYHFRQQHFWHGWRWKH5&6LV

GDPDJHGDQGKDVWREHUHSODFHG7KLVYDOYHFDQQRWEHLVRODWHGIURP

WKH5&6DQGSHUIRUPLQJDQRWKHUFROGK\\GURSUHVVXUHWHVWRIWKHQHZ

ZHOGWRFRQQHFWWKLVYDOYHWRWKH5&6ZLOOH[SRVHWKH5&6V\\VWHP

FRPSRQHQWVWRDQDGGLWLRQDOSUHVVXUHWHVWVWUHVVF\\FOH$OHDNFKHFN

RIWKHQHZFRQQHFWLQJZHOGDWQRPLQDOV\\VWHPRSHUDWLQJSUHVVXUHZLOO

DGHTXDWHO\\GHPRQVWUDWHWKHOHDNWLJKWQHVVDQGVWUXFWXUDOLQWHJULW\\RI

WKHQHZFRQQHFWLQJZHOGZLWKRXWH[SRVLQJWKH5&6V\\VWHP

FRPSRQHQWVWRDQ$60(6HFWLRQ,,,UHTXLUHGSUHVVXUHWHVWVWUHVV

F\\FOH

$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1



Example 2:

$IWHUFRPSOHWLRQRIWKHSDVVLYHFRQWDLQPHQWFRROLQJ 3&& V\\VWHP

FROGK\\GURSUHVVXUHWHVWDQG1LQVWDOODWLRQGDWDUHSRUWDYDOYHLV

UHTXLUHGWREHUHSODFHGGXHWRDPDVVLYHJRXJHLQWKHYDOYHERG\\

FUHDWHGGXULQJFRQVWUXFWLRQUHODWHGDFWLYLWLHV7KLVYDOYHLVFRQWDLQHG

LQ7LHU7DEOH7KHK\\GURVWDWLFWHVWZRXOGUHTXLUHGHYHORSLQJ

K\\GURVWDWLFWHVWSUHVVXUHRYHUWKHYDOYHWKH3&&:67DQGXSWR

VHYHUDORWKHULVRODWLRQYDOYHV$OHDNFKHFNRIWKHQHZFRQQHFWLQJ

ZHOGDWQRPLQDOV\\VWHPRSHUDWLQJSUHVVXUHZLOODGHTXDWHO\\

GHPRQVWUDWHWKHOHDNWLJKWQHVVDQGVWUXFWXUDOLQWHJULW\\RIWKHQHZ

FRQQHFWLQJZHOGV

$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1



Issue Resolution (Licensing Path for Changes):

ASME Section III Code Alternative Proposal:

- Request to perform pressure test at nominal system operating pressure for components repaired and/or replaced following the ASME Section III N-5 installation data report consistent with Section XI requirements.

License Amendment and Exemption:

- Will expand on ASME Section III alternative request basis and address impact of alternative on ITAAC

$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1



Changes to Licensing Basis (Markups for Tier 1 Exemption Request):

RCS

$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1

7DEOH

,QVSHFWLRQV7HVWV$QDO\\VHVDQG$FFHSWDQFH&ULWHULD



Changes to Licensing Basis (Markups for Tier 1 Exemption Request):

Non-RCS

$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1



Changes to Licensing Basis:

Non-RCS (continued)

Change described would apply to all ASME ITAAC Design Commitment # 4.b for all non-RCS ITAAC.

Tables 2.2.1-3, 2.2.2-3, 2.2.3-4, 2.2.4-4, 2.2.5-5, 2.3.2-4, 2.3.6-4, 2.3.7-4, 2.3.10-4, and 2.7.1-4

$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1



Documentation

  • Pressure testing required following the completion of the N-5 installation data report will be documented on a supplement to the N-5 installation data report

- Requires ANI review

  • An ITAAC Post Closure Notification (PCN) will be issued for ASME pressure tests completed following the completion of the N-5 installation data report

$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1



3URSRVHG/$5DQG$OWHUQDWLYH6FKHGXOH

- Presubmittal Meeting - October 25, 2018

- Submittal - November 20, 2018

- Requested Approval Date - May 20, 2019

$OWHUQDWLYHWR$60(6HFWLRQ,,,3UHVVXUH7HVWLQJ5HTXLUHPHQWV3RVW1