{{#Wiki_filter:OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
{{#Wiki_filter:OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION  
                                              July 25, 2019
Mr. Ross Gould
Director, Power Generation
Sacramento Municipal Utility District
4401 Bradshaw Rd, Mail Stop EA405, Sacramento, CA 95827
P.O. Box 15830
July 25, 2019  
Sacramento, CA 95852-0830
SUBJECT:         RANCHO SECO INDEPENDENT SPENT FUEL STORAGE INSTALLATION,
                  PHYSICAL SECURITY REQUIREMENTS FOR INDEPENDENT SPENT FUEL
                  STORAGE INSTALLATIONS AND INSPECTION REPORT 072-00011/2019401
Mr. Ross Gould  
Dear Mr. Gould:
Director, Power Generation  
On June 20, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed a security
Sacramento Municipal Utility District  
inspection at your Rancho Seco Independent Spent Fuel Storage Installation. The NRC
4401 Bradshaw Rd, Mail Stop EA405, Sacramento, CA 95827  
inspector discussed the results of this inspection with Mr. Dan Tallman, Manager, Rancho Seco
P.O. Box 15830  
Assets, and other members of your staff. The inspector documented the results of this
Sacramento, CA 95852-0830  
inspection in the enclosed inspection report.
The NRC inspector documented one Severity Level IV violation. The NRC is treating this
SUBJECT: RANCHO SECO INDEPENDENT SPENT FUEL STORAGE INSTALLATION,  
violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.
PHYSICAL SECURITY REQUIREMENTS FOR INDEPENDENT SPENT FUEL  
If you contest the violation or significance of this NCV, you should provide a response within
STORAGE INSTALLATIONS AND INSPECTION REPORT 072-00011/2019401  
30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear
Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with
Dear Mr. Gould:  
copies to the Regional Administrator, Region IV; and the Director, Office of Enforcement,
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
On June 20, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed a security  
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of
inspection at your Rancho Seco Independent Spent Fuel Storage Installation. The NRC  
this letter will be available electronically for public inspection in the NRC Public Document Room
inspector discussed the results of this inspection with Mr. Dan Tallman, Manager, Rancho Seco  
or from the Publicly Available Records (PARS) component of NRC's Agencywide Document
Assets, and other members of your staff. The inspector documented the results of this  
Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at
inspection in the enclosed inspection report.
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Security-Related Information in accordance
The NRC inspector documented one Severity Level IV violation. The NRC is treating this  
with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security
violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.  
vulnerability. Therefore, the material in the enclosure will not be made available electronically
                  OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
If you contest the violation or significance of this NCV, you should provide a response within  
30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear  
Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with  
copies to the Regional Administrator, Region IV; and the Director, Office of Enforcement,
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of  
this letter will be available electronically for public inspection in the NRC Public Document Room  
or from the Publicly Available Records (PARS) component of NRC's Agencywide Document  
Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at  
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
However, the material enclosed herewith contains Security-Related Information in accordance  
with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security  
vulnerability. Therefore, the material in the enclosure will not be made available electronically  
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION  


                OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION  
R. Gould                                         2
for public inspection in the NRC Public Document Room or from the NRC's document system
R. Gould  
(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
2  
If Security-Related Information is necessary to provide an acceptable response, please mark
your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and
follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
for public inspection in the NRC Public Document Room or from the NRC's document system  
                                                Sincerely,
(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.  
                                                /RA/
If Security-Related Information is necessary to provide an acceptable response, please mark  
                                                Jeremy R. Groom, Chief
your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and  
                                                Plant Support Branch 1
follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with  
                                                Division of Safety
10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.  
Docket No. 72-00011
License No. SNM-2510
Sincerely,  
Nonpublic Enclosure:
NRC Inspection Report 072-00011/2019401
/RA/  
cc w/o encl: Electronic Distribution
                OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Jeremy R. Groom, Chief  
Plant Support Branch 1  
Division of Safety  
Docket No. 72-00011  
License No. SNM-2510  
Nonpublic Enclosure:  
NRC Inspection Report 072-00011/2019401
cc w/o encl: Electronic Distribution  




ML19206A578
  ML19206A578  
Entire Report:           ADAMS:           Non-Publicly Available       Non-Sensitive   Keyword:
Entire Report:  
  SUNSI Review By: DAH  Yes  No          Publicly Available           Sensitive _______MD 3.4 A.3
ADAMS:  
ADAMS ACCESSION NUMBER: ML19206A587
Non-Publicly Available  
Cover Letter Only:       ADAMS:           Non-Publicly Available       Non-Sensitive   Keyword:
Non-Sensitive  
  SUNSI Review By: DAH  Yes  No          Publicly Available           Sensitive       NRC-002
Keyword:
OFFICE           PSI:PSB1     C:PSB1         C:RIB           C:PSB1
  SUNSI Review By: DAH  Yes     No
  NAME             DHolman     JGroom         GWarnick         JGroom
  Publicly Available  
  SIGNATURE             /RA/         /RA/           /RA/             /RA/
Sensitive _______MD 3.4 A.3  
  DATE               7/17/2019   7/17/2019       7/25/2019       7/25/2019
ADAMS ACCESSION NUMBER: ML19206A587  
Cover Letter Only:  
ADAMS:  
Non-Publicly Available  
Non-Sensitive  
Keyword:
  SUNSI Review By: DAH  Yes     No
  Publicly Available  
Sensitive
NRC-002  
OFFICE  
PSI:PSB1  
C:PSB1  
C:RIB  
C:PSB1  
   
NAME  
DHolman  
JGroom  
GWarnick  
JGroom  
   
SIGNATURE  
/RA/  
/RA/  
/RA/  
/RA/  
   
DATE  
7/17/2019  
7/17/2019  
7/25/2019  
7/25/2019
}}
}}

Latest revision as of 00:48, 5 January 2025

Independent Spent Fuel Storage Installation, Physical Security Requirements for Independent Spent Fuel Storage Installations and Inspection Report 072-00011/2019401
ML19206A587
Person / Time
Site: 07200011
Issue date: 07/25/2019
From: Jeremy Groom
NRC Region 4
To: Gould R
Sacramento Municipal Utility District (SMUD)
Groom J
References
IR 2019401
Download: ML19206A587 (3)


See also: IR 07200011/2019401

Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

July 25, 2019

Mr. Ross Gould

Director, Power Generation

Sacramento Municipal Utility District

4401 Bradshaw Rd, Mail Stop EA405, Sacramento, CA 95827

P.O. Box 15830

Sacramento, CA 95852-0830

SUBJECT: RANCHO SECO INDEPENDENT SPENT FUEL STORAGE INSTALLATION,

PHYSICAL SECURITY REQUIREMENTS FOR INDEPENDENT SPENT FUEL

STORAGE INSTALLATIONS AND INSPECTION REPORT 072-00011/2019401

Dear Mr. Gould:

On June 20, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed a security

inspection at your Rancho Seco Independent Spent Fuel Storage Installation. The NRC

inspector discussed the results of this inspection with Mr. Dan Tallman, Manager, Rancho Seco

Assets, and other members of your staff. The inspector documented the results of this

inspection in the enclosed inspection report.

The NRC inspector documented one Severity Level IV violation. The NRC is treating this

violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or significance of this NCV, you should provide a response within

30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear

Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with

copies to the Regional Administrator, Region IV; and the Director, Office of Enforcement,

U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of

this letter will be available electronically for public inspection in the NRC Public Document Room

or from the Publicly Available Records (PARS) component of NRC's Agencywide Document

Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance

with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security

vulnerability. Therefore, the material in the enclosure will not be made available electronically

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

R. Gould

2

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

for public inspection in the NRC Public Document Room or from the NRC's document system

(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

If Security-Related Information is necessary to provide an acceptable response, please mark

your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and

follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with

10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Jeremy R. Groom, Chief

Plant Support Branch 1

Division of Safety

Docket No. 72-00011

License No. SNM-2510

Nonpublic Enclosure:

NRC Inspection Report 072-00011/2019401

cc w/o encl: Electronic Distribution

ML19206A578

Entire Report:

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

SUNSI Review By: DAH Yes No

Publicly Available

Sensitive _______MD 3.4 A.3

ADAMS ACCESSION NUMBER: ML19206A587

Cover Letter Only:

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

SUNSI Review By: DAH Yes No

Publicly Available

Sensitive

NRC-002

OFFICE

PSI:PSB1

C:PSB1

C:RIB

C:PSB1

NAME

DHolman

JGroom

GWarnick

JGroom

SIGNATURE

/RA/

/RA/

/RA/

/RA/

DATE

7/17/2019

7/17/2019

7/25/2019